Loading...
HomeMy WebLinkAbout20081036 Ver 2_More Info Letter_20081114O?0F ,\N AF F pG Michael F. Easley, Governor William G. Ross Jr., Secretary \ r North Carolina Department of Environment and Natural Resources / ,M- p - Coleen H. Sullins, Director Cl) Division of Water Quality Chuck Wakild, P.E., Deputy Director Division of Water Quality November 14, 2008 DWQ Project # 08-1036 vs 2 Craven County CERTIFIED MAIL: RETURN RECEIPT REQUESTED #7008 1300 0001 0434 8515 Dr. Frank a Marmarose 302 Mahaffey Lane New Bern, NC 28560 Subject Property: Plantation Harbor Phase III, Sections A & B UT to Clubfoot Cr, Neuse Basin, 030410, 27-123, NSW, SA, HQW REQUEST FOR MORE INFORMATION Dear Mr. Mamarose: On October 1, 2008, the Division of Water Quality (DWQ) received your application dated July 15, 2008, to impact 0.094 acres of to construct the proposed residential subdivision roads. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetland, streams and/or buffers on the subject property. Therefore, unless we receive the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and 213 .0233(8) and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. Wetland Connectivity The project information indicates a request to fill 1355 square feet of wetlands designated a Section "A". Your request to fill Section "A" does not indicate any way for the remaining wetland on the east side of the cul-de-sac to connect with the wetland on the west side of the cul-de-sac. Please submit information indicating how you propose to establish connectivity between the two non-impacted portions of the wetland. Please respond in writing to the DWQ within four weeks of the date of this letter to with the requested information. If we do not hear from you within four weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. North Carolina Division of Water Quality Internet: h2o.enr.state.nc.us 943 Washington Square Mall Phone: 252-946-6481 One Washington, NC 27889 FAX 252-946-9215 NorthCarohna Plantation Harbor Pbase III Page 2 of 2 This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Kyle Barnes of the Washington Regional Office at 252-948-3917 or Ian McMillan of the DWQ Central Office at 919-733-1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sincerely, for Coleen H. Sullins cc: 4010versight/Express Permitting Unit USACE Washington Regulatory Field Office File Copy John Thomas, PE., PO Box 1309 New Bern, NC 28563 Filename: 08-1036 vs 2