November 18, 2008
NC Division of Water Quality
401 Wetlands Unit
1650 Mail Service Center
Raleigh, North Carolina 27699-1650
Attention: Ms. Cyndi Karoly
SUBJECT: Eagle Farms
Peppermill Drive Impact
PN# 06-104
DWQ Project # 04-0223 V3
Dear Ms. Karoly:
y&TLANDS ANCI STORM A!A? h BRANCH
Enclosed is an updated application and fee supporting maps for the wetland impact request on
Peppermill drive in Wilson County. I have addressed your comments as follows:
1. Building envelopes have been added to the lots to show the buildable areas.
2. A site plan of this phase has been added at 1 "=50' scale for your use. A larger overall plan
of Eagle Farm Development has been added as well for your use.
3. The proposed house and driveway placements have been revised to minimize impacts, the
tables have been updated on the application form. Driveway pipes have been added to allow
for wetland connectivity.
4. A small culver has been added to across peppermill drive to allow for wetland connections
5. This section of Eagle Farm drains to an existing pond that is no directly connected to a
riparian buffer. No level spreader is proposed. The development is under 24% there is no
need for treatment.
6. No level spreader form enclosed since no level spreader is proposed.
7. Contour lines not shown on the storm outlet since no BMP or level spreader is proposed.
8. A clear Wilson County Soil map is enclosed with this submittal.
Please notify me immediately if I need to provide any other information.
SPH/pbg
P:\EIUNNE\06104\0tBoo\Cyndi Karoly Letter 11-18-08.doc
Respectfully,
Sean P. Hein, PLS
GREEN ENGINEERING, PLLC
WATER, WASTEWATER SURVEYING, PLANNING, PROJECT MANAGEMENT
303 N. GOLDSBORO ST. PO BOX 609 WILSON N.C. 27893 TEL 252.237.5365 FAX 252.243.7489 WWW.GREENENGINEERING.COM
Office Use Only: Form Version March 08
USACE Action ID No. DWQ No.
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
1. Processing
1. Check all of the approval(s) requested for this project:
? Section 404 Permit ? Riparian or Watershed Buffer Rules
? Section 10 Permit ® Isolated Wetland Permit from DWQ
® 401 Water Quality Certification ? Express 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested:
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed
for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII,
and check here:
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Enviromnental Concern (see the top of page 2 for further details), check here: ?
H-1
II. Applicant Information
1. Owner/Applicant Information iv' "'
Name: Bunn-Eagles Farm, LLC (Fred Bunn) 36 .
Mailing Address: 2231 Nash Street NW, Suite D Y&TIAWSAND y'"^
Wilson, North Carolina 27896
Telephone Number: 252-291-1092 Fax Number: 252-291-7899
E-mail Address:
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: Sean P. Hein
Company Affiliation: Green Engineering, PLLC
Mailing Address: Post Office Box 609
Wilson, North Carolina 27893
Telephone Number: 252-237-5365 Fax Number: 252-243-7489
E-mail Address: s.hein(acz?,greenen ineerinZ.com
P:\BUNNE\06104\0ffice\1mpact210-18-08.docPage 5 of 13
Ill. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other snaps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Eagle Farm Subdivision
2. T.I.P. Project Number or State Project Number (NCDOT Only):
3. Property Identification Number (Tax PIN): 3713-57-9600
4. Location
County: Wilson Nearest Town: Wilson
Subdivision name (include phase/lot number): Eagle Farms. Section XII
Directions to site (include road numbers, landmarks, etc.): From Wilson, take Nash Street
North (NC Hwy 58) right on Peppermill Drive Site at end of existing paved drive
5. Site coordinates (Lat/Long or decimal degrees): N35'46'12.6" W77'56'12.28"
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Property size (acres): 6.80 ac
7. Name of nearest receiving body of water: UT to Toisnot Swamp
8. River Basin: Neuse
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://b2o.enr.state.nc.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Commercial and Residential land use directly adjacent to
wetland area. Land has been used for farming in past currently vacant
P:\BUNNE\06104\0ffice\1mpact2 10.18-08.docPage 6 of 13
10. Describe the overall project in detail, including the type of equipment to be used: Proposed
construction of street with curb and gutter. All public utilities' including water, sewer and
storm drainage for residential subdivision. Equipment to be used: Heavy grading and utility
installation equipment.
11. Explain the purpose of the proposed work: Development of residential subdivision - Eagle
Farm Section XII
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules. There have been previous impacts to site as follows: SO if stream
March, 2004 USACOE ID#200420666. Also adjacent shopping complex had a violation Case
No. WO-2006-0006 to this same wetland area. Drainage swale installed through wetlands This
request will install a permanent road fill and eliminate the drainaze swale.
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
No other Wetlands Impacts are reguested or antietpated for this project
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. Each impact must be
listed separately in the tables below (e.g., culvert installation should be listed separately from
nprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts,
permanent and temporary, must be listed, and must be labeled and clearly identifiable on an
accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial)
should be shown on a delineation map, whether or not impacts are proposed to these systems.
Wetland and stream evaluation and delineation forms should be included as appropriate.
Photographs may be included at the applicant's discretion. If this proposed impact is strictly for
wetland or stream mitigation, list and describe the impact in Section VIII below. If additional
space is needed for listing or description, please attach a separate sheet.
PABUNNE\06104\Office\Impact210-18-08.docPagc 7 of 13
1. Provide a written description of the proposed impacts: Impact to Isolated Wetlands or Road
Installation and Lot Development.
2. Individually list wetland impacts. Types of impacts include, but are not limited to
mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams,
separately list impacts due to both structure and floodinv-
Wetland Impact
Site Number
(indicate on map)
Type of Impact Type of Wetland
(e.g., forested, marsh,
herbaceous, bog, etc.) Located within
100-year
Floodplain
(yes/no) Distance to
Nearest
Stream
(linear feet) Area of
Impact
(acres)
I Fill Isolated - Forest No 900'+1- 0.56
Total Wetland Impact (acres)
3. List the total acreage (estimated) of all existing wetlands on the property: 1
4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary
impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam
construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib
walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed,
plans and profiles showing the linear footprint for both the original and relocated streams
must be included. To calculate ncrenue multinly lenoth X xvidtll then diyitie by Al r%i'Vn
Stream Impact
Number
(indicate on map)
Stream Name _
Type of Impact a r
Perennial or Intermittent? Average
Stream Width
Before Impact Impact
Length
(linear feet) Area of
Impact
(acres)
Total Stream Impact (by length and acreage)
P:\BUNNE\06104\Office\1mpact210-18-08.docPage 8 of 13
5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.). Open water impacts include, but are not limited to
fill. excavation. dredaina. flooding. drainage. bulkheads. etc.
Open Water Impact
Site Number
(indicate on map) Name Wate
applicable) le)
(if ap
Type of Impact Type of Waterbody
(lake, pond, estuary, sound, bay,
ocean, etc.) Area of
Impact
(acres)
Total Open Water Impact (acres)
6. List tl
ie cumulative impact to all waters of the U.Zs. resulting trom the project
Stream Impact (acres):
Wetland Impact (acres):
Open Water Impact (acres):
Total Impact to Waters of the U.S. (acres)
Total Stream Impact (linear feet):
7. Isolated Waters
Do any isolated waters exist on the property? ? Yes ? No
Describe all impacts to isolated waters, and include the type of water (wetland or stream) and
the size of the proposed impact (acres or linear feet). Please note that this section only
applies to waters that have specifically been determined to be isolated by the USAGE.
8. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Current land use in the vicinity of the pond:
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts. Road connection necessary to
PABUNNE\06104\0ffice\1mpact210-18-08.docPage 9 of 13
connect subdivision to surrounding parcels. Wetlands are at end o existing road and it is not
possible to re-locate connection to avoid the impact. Right-of-way has been recorded, sanitary
sewer alreadv exists in this area.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on January 15, 2002, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete.
An applicant may also choose to review the current guidelines for stream restoration in DWQ's
Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/ncwetlands/stnngide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
Request payment to NCEEP if mitigation is requested.
2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement
Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at
(919) 715-0476 to determine availability, and written approval from the NCEEP indicating
that they are will to accept payment for the mitigation must be attached to this form. For
additional information regarding the application process for the NCEEP, check the NCEEP
Pi\BUNNE\06104\Office\1mpact210-18-08.doePage 10 of 13
website at httl)://h2o.enr.state.nc.us/wrj)/index.htm. If use of the NCEEP is proposed, please
check the appropriate box on page three and provide the following information:
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):
Amount of Non-riparian wetland mitigation requested (acres): 0.56
Amount of Coastal wetland mitigation requested (acres):
IX. Environmental Documentation (required by DWQ)
1. Does the project involve an expenditure of public (federal/state/local) funds or the use of
public (federal/state) land? Yes ? No
2. If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SERA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No ?
3. If yes, has the document review been finalized by the State Clearinghouse? If so, please
attach a copy of the NEPA or SEPA final approval letter. Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC
2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please
identify )? Yes ? No
PABUNNE\06104\0ffice\Impact210-18-08.docPage 11 of 13
2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers.
If buffer mitigation is required calculate the required amount of mitigation by applying the
buffer multibliers.
Zone* Impact
(square feet) Multiplier Required
Mitigation
1 0 3 (2 for Catawba) 0
2 0 1.5 0
Total 0 0
* Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e.,
Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the
Riparian Buffer Restoration Fund). Please attach all appropriate information as identified
within 15A NCAC 2B .0242 or .0244, or .0260. No buffers to be impacted - no buffer
mitigation requested.
XI. Stormwater (required by DWQ)
Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater
controls proposed in order to protect surface waters and wetlands downstream from the property. If
percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed
impervious level. Existing impervious on undeveloyed_areas is low to zero percent. The development
proposes halfacre size lots and impervious will be under 30% Footprints unknown custom builders
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
Wastewater treated by City of Wilson through the ravity collection system
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ® No ?
Is this an after-the-fact permit application? Yes ? No
XIV. Cumulative Impacts (required by DWQ)
Will this project (based on past and reasonably anticipated future impacts) result in additional
development which could impact nearby downstream water quality? Yes ? No
PABUNND06104\Office\1mpact2 10-18-08.docPage 12 of 13
If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with
the most recent North Carolina Division of Water Quality policy posted on our website at
http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description:
This connects existing subdivision with main entrance. No other lots or commercial
development is planned in this area
XV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
PABUNNE\06104\0ffice\Impact210.18-08.docPage 13 of 13
.4m �rtt 2 R a
`
MaB V
Tit WaB WaB-
MaA Ra WaB
ppA Mag 1323
G oA
vu MaB
MaA Bb NoB 1 Aap
1332 (�j1aE3 �� . Co
Wa B
Co
Wa B T f
91 Dp MaB Stl
li A MaB
AaA
D
ppA Ra
�d M a A
Co ;..
D p AM3 a
o e �
A N B o�
MaRa NoA
MaA
Rd Ra a BbTt
q
MaB
♦ y '
\ppA
a MaB
oA Co Co NoA
MaA
MaB
MaB
o i
DpA NoA
• Co MaB NoA
toe
�0w
Ud ��� Rb GoA co Tt ,
NoA GoA 42 Ra MaB
d "58.a
. NoA NoB
Bb
GpA WILSON
GpA. NUB Tt
�0 Rb, , , N��B g
N u B Rb Ur
�"'-- �
�o N uB NUB
GpA GO
'
_ 132
r�' o -U n� �=• �ddK ` (Joins sheet 5) WIZ Snh/ e'0VN7Y JIL A41-)