Loading...
HomeMy WebLinkAbout20081271 Ver 2_Email_20081117U B-4Q19 in Beaufort County, Bridge No 103 on NC 32 over Runy og 1Z7 / Subject: RE B-4019 in Beaufort County, Bridge No 103 on NC 32 over Runyon Creek From: "Eatmon, Bryce E" <beatmon@ncdot gov> Date: Mon, 17 Nov 2008 09 26 32 -0500 To: Travis Wilson <travis wilson@ncwildlife org>, "Rivenbark, Chris" <cnvenbark@ncdot gov>, "Smyre, Elizabeth A" <bsmyre@ncdot gov> CC: "Robinson, Michael S" <mrobmson@ncdot gov>, "'Steve Sollod"' <Steve Sollod@ncmail net>, "Stephen Lane@ncmail net" <Stephen Lane@ncmail net>, "Bailey, David E" <debailey@ncdot gov>, "david wainwright@ncmail net" <david wainwright@ncmail net>, "'Wescott, William G SAW"' <William G Wescott@saw02 usace army mil>, "'Garcy Ward"' <Garcy Ward@ncmail net> Beth, This is email of the revised moratorium for the project and also the parties that were directly advised of it Feb 15 to June 15 Thanks, Ed -----Original Message----- From Travis Wilson [mailto travls wilsonCncwildlife org] Sent Monday, September 15, 2008 11 01 AM To Rivenbark, Chris Cc Eatmon, Bryce E, Robinson, Michael S, 'Steve Sollod', Stephen Lane«ncmail net, Bailey, David E, davld wainwri.ght@ncmail net, 'Wescott, William G SAW', 'Garcy Ward' Subject RE B-4019 in Beaufort County, Bridge No 103 on NC 32 over Runyon Creek This area is utilized by anadromous species, however recent data collection at this location did not indicate larval or juvenile species utilizing the project area as late as September of this year Therefore, taking into consideration our updated data, NCWRC will agree to reduce the original requested moratorium of Feb 15 to September 30 However, due to the presence of anadromous species, an in water work moratorium from Feb 15 to June 15 is still applicable Travis W Wilson Eastern Region Highway Project Resources Commission 1142 I-85 Service Rd Creedmoor, NC 27522 Phone 919-528-9886 ext 226 Fax 919-528-9839 Travis Wilson4ncwildlife ora Coordinator Habitat Conservation Program NC Wildlife -----Original Message----- From Rivenbark, Chris [mailto crivenbark@ncdot gov] Sent Friday, September 12, 2008 11 13 AM To Wilson, Travis Cc Eatmon, Bryce E, Robinson, Michael S, Bailey, David E Subject B-4019 in Beaufort County, Bridge No 103 on NC 32 over Runyon Creek B-4019 in Beaufort County Replacement of Bridge No 103 on NC 32 over Runyon Creek Travis, As you are aware, there is a history regarding the moratorium for this project NCWRC has requested an in-water work moratorium from February 15 to September 30 due to anadromous fish including striped bass, American shad, river herring, and hickory shad (letter dated letter dated 2/5/2004 and emails in 2006, 2007, 2008) The moratorium is longer than those typically proposed for inland waters considering that this is not a primary nusery area This leaves a small window to remove existing 1 of 2 11/17/2008 9 40 AM RE B-4Q19 in Beaufort County, Bridge No 103 on NC 32 over Runy piles, construct a temporary work bridge, and place 6 bents in the water It is estimated that the moratorium will delay completion of the bridge by 10-12 months and cost an additional $250,000 Additionally, the off-site detour for the project is appromately 2 2 miles NCDOT estimates the removal time of the existing timber piles is one week Estimated installation time of the driven piles is one week per bent This includes the preparation and set-up time which typically does not disturb the water and sediment Removal of the existing bents and installation of the temporary work bridge bents and bents for the new bridge during the moratorium would result in a significant savings in both time and money we are asking that you reconsider reducing the moratorium time period therefore allowing us to complete these activities in a timely and cost effective manner Thank you for your consideration and please feel free to contact me if you have any questions Chris Rivenbark Eastern Regional Manager Project Management Group PDEA Natural Environment Unit N C Department of Transportation (919)715-1460 _ x 2 of 2 11/17/2008 9 40 AM