Loading...
HomeMy WebLinkAbout20081555 Ver 1_Staff Comments_20081112 (441)of W ATFq 08- 15 55 ?? DG Michael F. Easley, Governor William G. Ross Jr., Secretary 7 North Carolina Department of Environment and Natural Resources U C Coleen H. Sullins Director Division of Water Quality Memorandum To: Ronnie Smith From: Joanne Steenhuis, Senior Environmental Specialist J T7 5 Through: Ed Beck, Regional Supervisor, DWQ, SWPS, Wilmington Regional Office (WiRO) Date: November 12, 2008 SUBJECT: Shelter Creek Quarry Mine Expansion This Office has reviewed the mine expansion application for an Individual Permit (IP) for additional wetland impacts. We have the following concerns: 1) The IP application dated 10/13/08 requests 46.92 acres of wetland impacts, the map labeled as Attachment 6 shows the total wetland impact area as approximately 33.46 acres. The map identified as enclosure # 42 has a chart that shows 47.45 acres of approximate wetland impact. Please state the correct amount of wetlands proposed for impact and correct all the maps and Written descriptions so they are consistent. Please identify which wetlands have been identified as isolated and include them in the calculated wetland impacts and narrative for the State. 2) Please show on an overall map, the wetlands to be impacted and in what phases and also identify the required 50 foot undisturbed buffer by the Land Quality Section from the property line and/or wetlands. 3) The maps indicate there will be a proposed "future" ditch on the northwestern side of the property (Phase IA). There are wetlands shown to abut this property line. Please indicate how this proposed ditch will not impact/drain additional wetlands offsite. 4) There are onsite and offsite wetland monitoring wells. Please show the previously collected data and provide a summary of these findings. 5) The proposed compensatory mitigation does not meet the requirements described in 15A NCAC 2H.0506(h) (1)-(7). Please give a detailed compensatory mitigation plan that will meet the State's requirements. If there is onsite restoration/creation proposed, please detail what will be required to accomplish this, the planting plan and the monitoring plan that will also be required. 6) In the narrative accompanying the IP application on page 14/27 states "that Phases IA and IIB, as permitted would be mined out in 12 to 14 years". Please clarify if this should be Phase IA and IIA. 7) A really good overall site plan identifying the wetlands (isolated vs jurisdictional), which wetlands will be impacted in each phase, monitoring well locations, buffer limits etc. would be beneficial to this reviewer. cc: 401 Wetland Unit - Ian McMillan W1RO Ne Caroli ona Ntura!!y North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet: www.ncwaterquality.org Fax (910) 350-2004 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper