Loading...
HomeMy WebLinkAbout20081688 Ver 1_CAMA Application_20081110RCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor James H. Gregson, Director William G. Ross Jr., Secretary November 7, 2008 0 8- 1 6 8 8 0 ???Q?? n MEMORANDUM: U NOV 1 0 2008 TO: Cyndi Karoly, Supervisor 401 Oversight & Express Permits Unit WETLANDS AND STORMWATER "C' Division of Water Quality-Surface Water Protection FROM: Doug Huggett, NC DENR-DCM Major Permits Coordinator 400 Commerce Ave., Morehead City, NC 28557 (Courier 11-12-09) SUBJECT: CAMA / Dredge & Fill Major Permit Application Review Applicant: Atlantic Ocean Waterfront/Coast to Coast Real Estate & Development, Inc. Project Location: 4693 Peoples Way, off Bricklanding Rd., Adj. AIWW, near the Town of Shallotte, Brunswick County Proposed Project: construction of 15 campsites with water and sewer, a community boat ramp, boat launching assist pier, and a pier with a gazebo/crabbing dock Please indicate below your agency's position or viewpoint on the proposed project and return this form by December 3, 2008. If you have any questions regarding the proposed project, contact Debbie Wilson at (910) 796-7270, when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 127 Cardinal Drive Ext., Wilmington, North Carolina 28405-3845 Phone: 910-796-72151 FAX: 910-395-39641 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer - 50% Recycled 110% Post Consumer Paper DIVISION OF COASTAL MANAGEMENT FIELD IN`V ESTIG ATION REPORT 1. APPLICANT'S NAME: Atlantic Ocean Waterfront Resort / Coast To Coast Real Estate And Development, Inc. 2. LOCATION OF PROJECT SITE: The property is located at 4693 Peoples Way, off Bricklanding Road, adjacent to the Atlantic Intracoastal Waterwav, near the Town of Shallotte, in Brunswick County. Photo Index - 2006:2-6199, G-H(16) 2000: 2-23, Q-R(9-10) 1995-.2-24,Q-R06) State Plane Coordinates -X: 2183941 Y:57050 GPS File: N041713 A Lat:33°54'18.72069"N Long: 78°23'38.03180"W 3. INVESTIGATION TYPE: CAiNLk/DREDGE & FILL 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 4/17/08, 5/22/08, 9/30/08 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received - Complete on 10/10/08 Office - Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan -Brunswick County Classification From LUP - Transitional (B) AEC(s) Involved: EW, ES, PT, CW (C) Water Dependent: Yes (D) Intended Use: Private/Community (E) Wastewater Treatment: Existing -None Planned - Municipal (F) Type of Structures: Existing - Several mobile campers Planned - Campsites with water and sewer, community boat ramp, boat launching assist pier and a pier with a gazebo/crabbing dock. (G) Estimated Annual Rate of Erosion: N/A Source- N/A 7. HABITAT DESCRIPTION: [AREA] T)RF.T)C'.FTI FTT T FT) OTT-TFR 8. (A) Vegetated Wetlands - Coastal 384 sq. ft. 292 sq. ft. (shaded) (B) Non-Vegetated Wetlands - open water 1,180 sq. ft. 1,284 sq. ft. (incorporated) (C) Other - Highground 103,731 sq. ft. (disturbed) (D) Total Area Disturbed: 2.38 acres (E) Primary Nursery Area: No (F) Water Classification: SA Open: Yes PROJECT SUMMARY: Applicant is proposing to construct 15 campsites with water and sewer, a community boat ramp, boat launching assist pier, and a pier with a gazebo/crabbing dock. Atlantic Ocean Waterfront Resort Page 2 9. PROJECT DESCRIPTION: The project site is located at 4693 Peoples Way, adjacent to the Atlantic Intracoastal Waterway (AIWW), near the town of Shallotte, in Brunswick County. To find the property from Shallotte, travel south on NC Highway 179 approximately 4 miles to Bricklanding Road SW. Turn left onto Bricklanding Road SW and travel approximately 1.3 miles to Peoples Way and turn left. Peoples Way cuts through the northern section of the subject property and Devane Road SW cuts through a portion of the property to the south. The subject property is approximately 2.38 acres with approximately 118' of shoreline frontage on the AlWW. The elevation of the property varies from approximately 0-16' above normal high water (NHW). The upper portion of the subject site has several existing mobile camping units and is vegetated with lawn grasses, shrubs and Oak trees. The southwest portion of the property located between Devane Road SW and the AIWW is currently vacant with vegetation consisting of lawn grasses, shrubs, and a few palm trees on the high ground. There are coastal wetland plant species located on the site adjacent to the AIWW, which consist of Salt Meadow Grass (Spartina patens), Glasswort (Salicornia spp.), Sea Lavender (Limonium, spp.) and Smooth Cordgrass (Spartina alterniflora). The Brunswick County Land Use Plan classifies the upland areas of this project as transitional. The waters of the project site are classified as SA by the NC Division of Water Quality. These waters are NOT designated as Primary Nursery Area (PNA) by the NC Division of Marine Fisheries and they are OPEN to the harvest of shellfish. PROPOSED PROJECT: The applicant is proposing to construct a campground consisting of 15 campsites with water and sewer, a community boat ramp, boat launching assist pier, and a pier with a gazebo/crabbing dock. As proposed, all 15 campsites will be located landward of the 75' Estuarine Shoreline AEC (see Sheet 6 of 18). The application states that the entire tract (2.38 acres) will be graded or disturbed and result in a total of approximately 20,626 sq. ft. of impervious surface coverage for the entire tract of which, approximately 1,500 sq. ft. will be located within the AEC. Currently there are 6 mobile campers in place on the northern side of Devane Road SW. The applicant is proposing to install a concrete community boat ramp measuring approximately 20' in width by 80' in length by 12" thick (see Sheets 8-10 of 18). As proposed there would be an asphalt driveway and approach to the proposed ramp, which would measure approximately 20' in width and connect to Bricklanding Road and Devane Road. The proposed location of the boat ramp is in an area that historically has been used as an unimproved boat ramp with the users placing old carpet remnants over the marsh and into the water for a ramp surface. As proposed, the boat ramp would result in the fill of approximately 384 sq. ft. of coastal wetlands consisting primarily of Salt Meadow Cordgrass (Spartina alterniflora), Sea Lavender (Limonium, spp.) and Glasswort (Salicornia, spp.). The ramp would terminate approximately 35' landward of normal low water (NLW). No excavation is proposed for the installation of the ramp. The applicant states that a quick dry compound will be added to the concrete and poured at low tide. The applicant also states that the ramp is to be used during mid to high tide due to the lack of water at low tide. Atlantic Ocean Waterfront Resort Page 3 The applicant is also proposing a boat launching assist pier to be located on the eastern side of the proposed boat ramp (see Sheets 9 & 10 of 18). As proposed the pier would measure approximately 4.5' in width by 80' in length with a handrail on the eastern side of the pier and would be elevated a minimum of above coastal wetlands. The applicant is also proposing to construct a second crabbing dock and gazebo which would be located on the western side of the proposed boat ramp (see Sheets 9 & 11 of 18). As proposed, the pier would measure approximately 6' in width by 138.5' in length and elevated a minimum of 3' above coastal wetlands. At the terminal end of the proposed pier would be a fixed, covered "L-head" measuring approximately 15' in width by 20' in length. There are no slips associated with this structure. The water depth at the end of the proposed pier is approximately -3' @ NLW. The applicant received a Low Density Development Stormwater Permit # SW8 060111 on February 2, 2006 and received a Modification on July 30, 2008 for the campground. Each campsite is limited to a maximum of 397 sq. ft. of built upon area. The overall built upon area shall not exceed 25% of the overall tract. The applicant received a Sedimentation and Erosion Control Plan No. Bruns-2006-211, which was issued on February 14, 2006. The applicant states that a wastewater treatment plan is concurrently being pursued and will be forwarded upon receipt. 10. ANTICIPATED IMPACTS The proposed boat ramp would fill approximately 1180 sq. ft. of Shallow Bottom and approximately 384 sq. ft. of coastal wetlands. The proposed approach would disturb approximately 1500 sq. ft. of highground (above NHW) located within the AEC. The boat launch assist pier would incorporate approximately 270 sq. ft. of Estuarine Waters and Pubic Trust Area and the shading of approximately 112 sq. ft. of coastal wetlands. The crabbing dock and gazebo would incorporate approximately 1014 sq. ft. of Estuarine Waters and Pubic Trust Area and the shading of approximately 180 sq. ft. of Coastal Wetlands. The proposed crabbing dock and gazebo would extend approximately 93 feet into the waterbody, which measures approximately 530 feet across. This distance would conform with the 1/4 width rule and the adjacent pier head alignment and would not encroach into the U.S. Army Corps of Engineers 80-foot setback from the AIWW (see Sheet 7 of 18). The proposed structures would not encroach into the 15' riparian corridor setback. The entire project would result in approximately 103,731 sq. ft. (2.38 acres) of high ground disturbance. Minor increases in turbidity can be expected during construction. Submitted by: Debra D. Wilson Date: November 7, 2008 Office: Wilmington Recommendations for State Permit - Atlantic Ocean Waterfront Resort Square footage of dock calculated as follows: 4.5' x 80' Pier not counted 6' x 138.5' Pier not counted 15' x 20' L-Head 300 sq. ft. Total 300 sq. ft. Shoreline Length 118' x 4 sq. ft.= 472 sq. ft. Allowable I have no objections to the proposed project. Any permit issued should include the following conditions: 1. This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structures, whether floating or stationary, may become a permanent part of the structure without permit modification. No non-water dependent uses of structures may be conducted on, in, or over public trust waters without permit modification. 2. No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 3. The authorized structure and associated activity must not cause an unacceptable interference with navigation and shall not exceed the established pier line and 1/4 width of the waterbody. 4 The permittee must install and maintain, at his expense, any signal lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, on authorized facilities. 5. In order to protect water quality, runoff from the construction must not visibly increase the amount of suspended sediments in adjacent waters. 6. This permit does not authorize the interference with any existing or proposed Federal project, and, the permittee will not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 7. The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the project without having the permit transferred to a third-party. 8. Any portion of the permitted access pier and docking facilities built over coastal wetlands must not exceed six feet in width and must be elevated a minimum of three feet over the wetland substrate as measured from the bottom of the decking. 9. No vegetated coastal wetlands/marsh grass will be excavated or filled except for the areas shown as impacted on the plans. 10. Appropriate sedimentation and erosion control devices, measures or structures must be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, sand fence, etc.). NOTE: The building code or flood damage prevention ordinance may impose additional more restrictive requirements than the Division's standards for development in areas of environmental concern (.aAECs). NOTE: It is strongly recommended that the permittee exercise all available precautions in the day-to-day operation of the facility to prevent facility waste from entering the adjacent waters. Such discharge, either directly or indirectly, to adjacent waters could contravene state water quality standards, thereby violating state law. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non-water dependent activities are not authorized within 30 feet of the normal high water level. Project Narrative CAMA Major Permit Construction of Boat Ramp, Piers, Gazebo and Campground Atlantic Ocean Waterfront Resort, Brunswick County Coast to Coast Real Estate and Development Inc., requests a CAMA Major permit for construction of a (1)20' x 80' community boat ramp (2) paved or crushed stone covered turn-around, (3) 4.5' x 80' boat launching assist pier, (4) 6' wide by 138.5' long wood plank pier with 15'x20'gazebo/crabbing dock at the end (5) 15 graded campsites and (6) installation of water to individual campsites. The planned construction area is located off Bricklanding Road in Brunswick County, adjacent to the Atlantic Intracoastal Waterway, and totals approximately 2.38-acres in size. The property is located within the planning jurisdiction of Brunswick County, and the CAMA Land Use Plan is transitional. Waters of The AIWW at this location have been classified SA by the NC Environmental Management Commission and are presently open to shellfishing. A Stormwater Permit (No. SW8 060111 MOD) has been granted as of 30 July 2008 and an erosion and sedimentation control plan (Project ID; Bruns-2006-211) was approved on 14 February 2006. A wastewater treatment plan will be pursued concurrently with the submittal of this application and will be forwarded as soon as it is approved by Brunswick County. Historically the area of the proposed ramp has been used as an unimproved boat launch ramp with users placing carpets and other items on the sand for traction. Over the course of time and the removal of much of these carpets by the applicant, coastal wetlands have volunteered in the area proposed for the boat ramp. Coastal wetland impacts resulting from the placement of the boat ramp are estimated to be approximately 384 square feet and are considered not to represent a significant impact. The two wooden plank piers would be elevated a minimum of three feet above the marsh substrate. The ramp and gazebo will be for the private use of the campground tenants and limited to boats less than 20 feet, canoes and kayaks. The ramp will be for use only during mid to high tide due to the distance of the end of ramp to normal low water. Proposed work within the coastal shoreline AEC is limited to the ramp, limited grading, and portions of the paved turnaround area and wooden access to crabbing pier. No wetlands currently exist on the upland portions of the property. V SJCP 1 1 20'8 c iv? `N k L 1III &i G'1 t 7?: , 7 cur DCM MP-1 , NOV '1 0 2008 ' APPLICATION for WVLMo ANo TE A R e '?" Major Development Permit (last revised 12127/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) Coast To Coast Real Estate And Development Atlantic Ocean Waterfront Resort Applicant 1: First Name MI Last Name James and Karen Broman Applicant 2: First Name Last Name Michael MI Brazil David Hansen If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box City State 1722 Heron Point Rd. SW Ocean Isle Beach NC ZIP Country Phone No. FAX No. 28469 us 910 - 579 - 7240 ext. 910 - 579 - 7241 Street Address (if different from above) City State ZIP Email 2. Agent/Contractor Information Business Name Land Management Group Inc. Agent/ Contractor 1: First Name MI Last Name Mark Westendorff Agent/ Contractor 2: First Name MI Last Name Laura Stasavich Mailing Address PO Box City State PO Box 2522 Wilmington NC ZIP Phone No. 1 Phone No. 2 28402 910 - 452 - 000 1 ext. - ext. FAX No. Contractor # 910 452 0060 Street Address (if different from above) City e r ZIP 3805 Wrightsville Ave Suite 15 Wilmington NC 2840 3 - Email mwestendorff@lmgroup.net and Itasavich@lmgroup.net rte ' ~ m SEP 1 1 08 <Form continues on back> .?r '1 NC Form DCM MP-1 (Page 3 of 5) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Brunswick 4693 Peoples Way Shallote Subdivision Name City State Zip NA Shallotte NC 28469- Phone No. Lot No. (s) (if many, attach additional page with list) - - ext. See attached, , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project AIWW c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ?Manmade ?Unknown AIWW e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ?Yes ®No work falls within. Ocean Isle Beach 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) -118' 103,731.39 sf or 2.38 acres c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NA, NWL (normal water level) (If many lot sizes, please attach additional page with a list) 0-16' ®NHW or ?NWL e. Vegetation on tract shrubs, lawn grass on upland portion and S. patens, salicornia, sea lavender, S. alterniflora on shoreline adjacent to AIWW. f_ Man-made features and uses now on tract Existing dirt road, dirticarpet for existing launch ramp, two mobile camper units. g. Identify and describe the existing land uses adiacent to the proposed project site. private residence and state road h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? CO-NC (Attach zoning compliance certificate, if applicable) ®Yes ?No ?NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ?Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ?Yes ®No ?NA If yes, by whom? 1. Is the proposed project located in a National Registered Historic District or does it involve a ?Yes ®No ?NA National Register listed or eligible property? <Fonn continues on next page> RFC.., fi C r Bx: -- DCM Form DCM MP-1 (Page 4 of 5) APPLICATION for ' Major Development Permit m. (i) Are there wetlands on the site? NYes ?No (ii) Are there coastal wetlands on the site? ®Yes ?No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ®Yes ?No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. None currently onsite adjacent to water. Sewer service on parcels north of Devane Rd. SW. o. Describe existing drinking water supply source. None currently onsite adjacent to water. Community.water service on parcels north of Devane Rd. SW. p. Describe existing storm water management or treatment systems. None currently exist onsite. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ?Commercial ?Public/Government NPrivate/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. Create a campground with amenities area to include improvements to existing boat ramp, construct crabbing dock and access/boat launch assist pier. No permanent slips are poroposed, and will be detered with signage and hand rails. Development of upland area to create 15 space campground. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Grading equipment to be used for site preperation, road installation, and parking installation. Piling rig and concrete truck to be utilized for pier piling and ramp installation. Standard and good construction practices will be used d. List all development activities you propose. (1)Improvements to an existing dirt/carpet boat landing by constructing a concrete, 20' x 80' community boat ramp (2) paved or crushed stone covered turn-around, (3) 4.5' x 80' boat launching assist pier, (4) 6' wide by 138.5' long wood plank pier with 15'x20'gazebo/crabbing dock at the end (5) 15 graded campsites and (6) installation of water and sewer to individual campsites. e. Are the proposed activities maintenance of an existing project, new work, or both? Both f. What is the approximate total disturbed land area resulting from the proposed project? 2.00 ?Sq.Ft or NAcres g. Will the proposed project encroach on any public easement, public accessway or other area ?Yes NNo ?NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. Limited surface runoff i. Will wastewater or stormwater be discharged into a wetland? ?Yes NNo ?NA If yes, will this discharged water be of the same salinity as the receiving water? ?Yes ?No NNA j. Is there any mitigation proposed? ?Yes NNo ?NA If yes, attach a mitigation proposal. 9..-t; V E_ <Form continues on back> SEA 1 11 2008 Farm DCM MP-1 (Page 5 of 5) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) - (1) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name NC DOT c/o Dan Cumbo Phone No. 910 251 2655 Address 300 Division Rd. Wilmington, NC 28401 Name Shannon Ward Phone No. Address 4653 Peoples Way SW Shallotte, NC 28470 Name Ronald Holden Phone No. Address 3852 Holden Rd. SW, Shallotte, NC 28470 g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. NCDENR: SW8 060111 2/2/2006 and Modification 30 July 2008 NCDENR: PROJ. ID BRUNS-2006-211, 2/14/06 h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certi that e inf rmation provided in this application is truthful to the best o my k owledge. Date 4144t, d'002? Print Name '- WJa= Signature VI't1*4 aw Please indicate application attachments pertaining to your proposed project. ®DCM MP-2 Excavation and Fill Information ?DCM MP-5 Bridges and Culverts ®DCM MP-3 Upland Development ®DCM MP-4 Structures Information A! SEi 1 1200 0': Jt.iiVNNGTOJ;, NC Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline (NLW or stabilization) NWL) Length NA NA NA 80' NA NA NA Width NA NA NA 20' NA NA NA Avg. Existing NA NA NA "+2.5 NLW at NA NA NA Depth ramp toe Final Project NA NA NA 0 NLW at NA NA NA Depth ramp toe 1. EXCAVATION ®This section not applicable a. Amount of material to be excavated Trom below NHW or NWL in b. Type of material to be excavated. cubic yards. c. (i) Does the area to be excavated include coastal wetlands/marsh d. High-ground excavation in cubic yards. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ?CW ?SAV ?SB ?WL []None (ii) Describe the purpose of the excavation in these areas: 2. DISPOSAL O?FE AVATED M ATERIAL ®This section not Loation of disp. b. Dimensions of disposal area. c. (i) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance? []Yes []No ?NA []Yes ?No ?NA (ii) If no, attach a letter granting permission from the owner. (ii) If yes, where? e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ?CW ?SAV ?SB ?WL []None (ii) Describe the purpose of disposal in these areas: f. (i) Does the disposal include any area in the water? []Yes ?No ?NA (ii) If yes, how much water area is affected? P C, Sr 1 2008 3. SHORELINE STABILIZATION ®This section not applicable (If development is a wood groin, use MP-4 - Structures) a. Type of shoreline stabilization: b. Length: []Bulkhead ?Riprap []Breakwater/Sill []Other: Width: c. Average distance waterward of NHW or NWL: d. Maximum distance waterward of NHW or NWL: e. Type of stabilization material: g. Number of square feet of fill to be placed below water level. Bulkhead backfill Riprap Breakwater/Sill Other i. Source of fill material. 4. OTHER FILL ACTIVITIES ?This section not applicable (Excluding Shoreline Stabilization) f. (i) Has there been shoreline erosion during preceding 12 months? []Yes ?No ?NA (ii) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material. a. (i) Will fill material be brought to the site? NYes LJNo If yes, (ii) Amount of material to be placed in the water approximately 1600 cubit feet or 59.26 cubic yards (iii) Dimensions of fill area -20'X 80'X1' (iv) Purpose of fill for grading and istallation of concrete ramp area LJNA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. NCW ?SAV ?SB ?WL []None (ii) Describe the purpose of the fill in these areas: Unavoidable fill of approximately 384 sf of coastal wetlands for improvement to existing boat ramp. 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? Per state-approved sedimention and erosion control plan Pile driver, dozer, dumptruck, and other standard commercial and marine construction equipment. c. (i) Will navigational aids be required as a result of the project? d. (i) Will wetlands be crossed in transporting equipment to project []Yes ENo ?NA site? []Yes ZNo ?NA (ii) If yes, explain what type and how they will be implemented. (ii) If yes, explain steps that will be taken to avoid or minimize NA environmental impacts. NA Date Coast to Coast Real Estate Applicant Nam Project Name Applicant Signature 1 ul-ftwtfv$ Form DCM MP-3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT a. Type and number of buildings, facilities, units or structures proposed. No buildings proposed, 15 individual campsites with parking, one wastewater pumpout area. c. Density (give the number of residential units and the units per acre). No permanent residential units proposed. 15 campsites proposed. e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land-disturbing activity begins. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? EYes ?No ?NA (ii) If yes, list the date submitted: Approved: Bruns-2006-211 b. Number of lots or parcels. 15 individual campsite proposed. d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. Approximately -103,731.39 sf or 2.38 acres f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for impervious surfaces. Asphalt, concrete, and crushed stone. g. Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and/or built-upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 2,450 sf for boat ramp and 1,247 sf for access drive/turnaround or approximately 3.6% i. Give the percentage of the entire tract to be covered by impervious and/or built-upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. -31% (--20,626 SQ FT) j. Describe proposed method of sewage disposal. Onsite septic 1. Describe location and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, industrial/ commercial effluent, "wash down" and residential discharges). Limited surface runoff. h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. (i) Has a site development plan been submitted to the Division of Water Quality for review? ®Yes ?No ?NA (ii) If yes, list the date submitted: -Approved: SW8 060111_Modified July 30, 2008 k. Have the facilities described in Item (i) received state or local approval? EYes ?No ?NA If yes, attach appropriate documentation. m. Does the proposed project include an innovative stormwater design? ?Yes ENo ?NA If yes, attach appropriate documentation E C r) SEP 1 1 2008 DCM WILMINGTON, NC m. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) Public system o. When was the lot(s) platted and recorded? 5/17/2006 n. (i) Will water be impounded? ?Yes ®No ?NA (ii) if yes, how many acres? NA p. if proposed development is a subdivision, will additional utilities be installed for this upland development? ?Yes ?No ®NA 9 Date Project Name Applica t Nam Applicant Signature V °) SEP 1 12008 Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ?Commercial ?Public/Government E Private/Comm unity ?This section not applicable b. (i) Will the facility be open to the general public? ?Yes ONo c. (i) Dock(s) and/or pier(s) (ii) Number 2 (iii) Length 80, 138.5 (iv) Width 4.5, 6 (v) Floating ?Yes ONo e. (i) Are Platforms included? ®Yes ?No If yes: (ii) Number 1 (iii) Length 20' (iv) Width 15' (v) Floating ?Yes ®No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed 0 (ii) Number of slips existing 0 i. Check the proposed type of siting: ? Land cut and access channel ?Open water; dredging for basin and/or channel ®Open water; no dredging required ?Other; please describe: k. Typical boat length: <20' m. (i) Will the facility have tie pilings? ?Yes ®No (ii) If yes number of tie pilings? d. (i) Are Finger If yes: (ii) Number (iii) Length (iv) Width (v) Floating Piers included? ?Yes ENo NA NA NA ?Yes ?No f. (i) Are Boatlifts included? ?Yes ONo If yes: (ii) Number NA (iii) Length NA (iv) Width NA In. Check all the types of services to be provided. ? Full service, including travel lift and/or rail, repair or maintenance service ? Dockage, fuel, and marine supplies ? Dockage ("wet slips") only, number of slips: ? Dry storage; number of boats: ® Boat ramp(s); number of boat ramps: 1 ? Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Small runabouts less than 20', canoes and kayaks 1. (i) Will the facility be open to the general public? ?Yes ®No IF E SEP 11 2008 DitM WiLM1i4G1' N _ NC 2. DOCKING FACILITY/MARINA OPERATIONS EThis section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ? Office Toilets ? Toilets for patrons; Number: ; Location: ? Showers ? Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. C. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. i. Give the location of fuel-handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live-aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? M. Is the marina/docking facility proposed within a primary or secondary nursery area? CE ?Yes ?No CO)M WiiLMIN .. NC n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ?Yes ?No o. Is the marina/docking 1acillty proposed within or adjacent to coastai Wetlancs/marsn tINV), SUDmergeu aquauc vegetduun tJrw), ancu uUuUui (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ?CW ?SAV ?SB ?WL ?None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ?Yes ?No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 13. BOATHOUSE (including covered lifts) ®This section not applicable a. (i) Is the boathouse structure(s): ?Commercial ?Public/Government ?Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): ?Commercial ?Public/Government ?Private/Community c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present e. Arc of the swing 7. GENERAL b. Number d. Description of buoy (color, inscription, size, anchor, etc.) SE? 1 2008 OCM 1y ' a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities. -30 to the west and 26' to the east Approximately 306' to the east and 366' to the west Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 530' d. Water depth at waterward end of structure at NLW or NWL --3.0 NLW at end of crabbing dock,0 NLW at end of ramp and launch assist pier. e. (i) Will navigational aids be required as a result. of the project? ?Yes ENo ?NA (ii) If yes, explain what type and how they will be implemented. 8. OTHER ®This section not applicable a. Give complete description: Date a? ?r i a r 01-17 t pu 7 L Project Name Coast to Coast Real Estate and Development _.&colic?t.Namee _ ?? /I _ Applicant Signature V , SEP 1 1210388 DCM WILMI NGIIr ?C . P :.. - k n?ti v .a . 1?/! Vi K t ,. ? vj 71 .. ? SITE .., ? s, e ? i t a*n ?t o *Boundaries are approximate and are - not meant to be absolute. Map Source: North Carolina Atlas & Gazetteer. Pg 86.2003 SITE Atlantic Ocean Waterfront Resort LMG Coast to Coast Real Estate & Dev. Brunswick County, NC LANU NIA\P.GENIENT GROUP 01-06-142 , nvi,o„n,rnh,l concuif:,nrc October 2007 OC T? -NI W I I r3As;,,. SCALE 1" = 1 Mile Sheet 1 of 18 Vicinity Map *Boundaries are approximate and are not meant to be absolute. Map Source: Shallotte Quadrangle 7.5 minute (topographic) 1990. Atlantic Ocean Waterfront Resort Coast to Coast Real Estate & Dev Brunswick County, NC 01-06-142 LMG LAND MAXAGl1iEtd1' GROUP r:c. Fnt?irnnmorttal C:onswronts September 2008 R C ?? eta QIIAtk WIN 400' Sheet 2 of 18 USGS Topgraphic Map S 1 ? 1 j.? t i K ry A y s'M r k r 4 2K.' t. w _, aWr Y' rr i 2x c C µ V W. NhE % 3 r G 4/: a 4. ?^ P4 r -.t "Boundaries are approximate and are not meant to be absolute. Map Source: NRCS Soil Survey. Atlantic Ocean Waterfront Resort Coast to Coast Real Estate & Dev Brunswick County, NC 01-06-142 AkAMGLN;ENT GROUP i.::. Fnvrrnn rnen tal ColmWronrs September 2008 rW FYCAiLFr-,i1f- =r4 00' f 5hetl`tvF 18 Soils Map DCN! MY ii+'vi1'yC?Ivi a NC n - V 4x F 4, Y - ? Y_ :'.. SSE 1 --{: _'s _ R f D .' ' mow - .i 1 4i14r? . • 1 ? I Y n -i-? -I - r, 9 c ^S- ? ?y gg T (F r 1 *Boundaries are approximate and are not meant to be absolute. _ o Map Source: 2004 NAPP aerial photography A FLA IV Atlantic Ocean Waterfront Resort Coast to Coast Real Estate & Dev. ' LMG Sheet 4 of 18 Brunswick County, NC 01 0 LNTGR0UP- ?e to f, F, i,otgg ia rnvno„mer , rN l mmujl r I - 6-142 4 , , S , on L , u . y, ,4C , September 2008 J7 Z O 0 1 N 0 to 0 =1. r * i? I (l V ? mot. } •_1 1 'r t _ I i rt ? i ?I z '- } Si r i 2 ? r b S O w 0 `+1 Q 0 o° 1 IL x 1 7-F77 ?5 4 V j ? looks! rat ?. 1( VMS T O m r5r? ,V v1 11 m ft? m g z a ? m m a ? m a m o D ? a ? L` ? } m Z _ ? a :- 2 -_ t ? r f It _Y ? 4 ? {•yf??Y,,?. pi,,? rf P,?,y h "? f t. «t ? 'EC -y rt-?Ft '." , r I N YY? C Y T w h F - . I yr b ; A: (A ypfr I t R? t?d x C As; t - .- F w 7 4 - - } 1 ^i Y F. L' _ 1t 4y ? 1 h _ _ _ I t 2 _ o - 0 v a l a CD \ 1 a 'CFA `'. lltia .? t i 5 _ Land Management Group, Inc. Environmental Consultants P.O. Box 2522 Wilmington, NC 28402 910-452-0001 LMG # 01-06-142 CAMA Major Permit Application, ATLANTIC OCEAN WATERFRONT RESOR SITE PHOTOS Applicant: COAST TO COAST REALTY Location: AIWW, Brunswick Co. Date: 4/21/2008 Sheet 16 of 18, x _ -Y 7 7 Land Management Group, Inc. CAMA Major Permit Application, Environmental Consultants ATLANTIC OCEAN WATERFRONT RESORT P.O. Box 2522 SITE PHOTOS Wilmington, NC 28402 applicant: COAST TO COAST REALTY 910-452-0001 Location: AIWW, Brunswick Co. LMG # 01-06-142 Date: 4/21/2008 Sheet 17 0 18 lµ J .C f Land Management Group, Inc. CAMA Major Permit Application, Environmental Consultants ATLANTIC OCEAN WATERFRONT RESORT P.O. Box 2522 SITE PHOTOS Wilmington, NC 28402 Applicant: COAST TO COAST REALTY 910-452-0001 Location: AIWW, Brunswick Co. LMG # 01-06-142 Date: 4/21/2008 Sheet 18 of 18 80-bZ-17 :31V0 Zvi-9AW 491D AiNnoo ?IOIMSNm:ie IeA 31d0S 180S381N083831dM NV300 JI1NV11V lau dnm6wl@ojui :11VW3 ZOVBZ 0N' 0900'Zsv(`a) xvd ZZgZ X Z9Z X0G9 Od Od O 00 ; tooo-Z0(06) (O t0) 3131 d w ?- 11! co Ll MWl :,kg NMV210 Nd1d ?lIS SlNV1lf1SNOO WiNDNNOUAN3 0VN1d1N C3N`d'1 w 0 i= T O 1N3110 ' ONI inotjo 1Nay4a f NVW0?J8 V300 DI1NVl1V :103f0W c? c:? .:? ® e n m ?v_1 cJ xo3 98-b5--bSL (0 L6) 0089--V9L (OL6) L L-b L-6S{V8Z 'O'N 30}}01IDLIS L L L L X08 '0'd a}oloossV ?g 6uo1 'w Aggo8 :A8 0301AO8d k3Adns $ON 8aesuv s Sri a 9002 0 t AON gumg@g? '3NI `SU33NIJN3 ONuinSNOO I IVISNni aNd [3)1sn)i LS1UU0N :A8 0301AO?id JNI833NIJN3 ZI- S'Ot- 011- 90-1?O-t''WVO L 1V 3411 MO-I '131NI 311011VHS lV 3Jf1VJ 3411 83d SV MIN 013AI1V138 38V SHldAG d31VM 11V • '43SOd08d S311SdWV3 1V1015 L • 3411 HJIH Ol QIW 30 S3W11 Ol a311Wi1 38 111M 3Sfl dWVB • 9 LL- SI 3N1132JOHS 30 HiON31 8V3NI1 • . SV38V a3ZPdOHinVNf) NI 39VA300 1N3n38d 0103Sf1 38 111M 3JVNJIS (INV S11V810WH • .1a08831VM e NVHl 3n110181.S38 380W ?10V813S 108 33VSf1 • HSBVW 30 3043 3MOHS 8V3 GNV 1089 30 30NV1SIa AGO8831VM 1V10131VNIiS3 Ol a3Sf1 S1V183V • NOI1V1393n A8 33V1S 9W1 ,k8 90OZ IRMV 2 NO SdJ 83ddVW 311801N S31VH1 H11M 031VOO1 3N11 MHN (INV SaNV113M 1V1SVO0 • S(INV Pdt? ? 1VlSVOO 3n08V X 30 W 031VAB13 38 111M 'dWVB IV OX3 'S38f113f181S 11V • dWVB a3SOd08d 30 V38V 3H1 NI 31V301 (3S ti88) HSBVW 1V1SVO3 30 V38V TWINS • : S310 N 103MJd SIHl 803 N0110f12J1SNO0 80 NOIS30 IVNl3 2103 03Z111in 38 Ol 030N31N1 ION SI ONIMd80 SIHl 'J.-lNO M31A321 LIV483d MV0 203 03Sf1 38 Ol SI 0NV 1N31N1 103('021d 30 NO1IViN3S38d38 01iVVGH0S d S`d 0301AO8d SI ONIMVJO SIHl 00Z OU 05 ???,a?'u/l at Il- tl- t l- v°oc t'L- tlooa 0'B- C_ O-C- MlN L _ ?'rt'90 o•t- Sf 3x1 3w Qz ONkWWO ON-00 OMOA 00 - o d/MOOY 0730 9WH lyw am -71wa 11f V-1 -1YO71 OLWZ ON •311OT HS •MS M. Nam. cm N3=H O lywN MWOa311z 99? SONllld .?1 ONIl$I%3 IPIL't tl3ddfly w 3YBWV'fe001vn O?vi ?B 031v001 tlsnrN f0 3003 ONa xaln 1 AVMMIVM 03uVlS I u1 y'.'•}u?o11?' )0•? •L Vg- S'L- 0.9- 0 S r- - Rm yf- O'C- 0. _l - Mt-w LOLWY3HL 000-k-M orwo 10 -Mvdl)gm 0730 [YH-16 Wet lY1d OVIZ, 1-1 m ma Os 1nY70 nwn 11 [lot "Q 1t10d A lM KW" AVM • t ONYO Io[o0V3 z L a 1e0? Ie0 O Ie3ele .hp1 d MOe-Hf L'[YO/Ylzo -Ava/'IOa Mao [Yll-t6 N/el 1Vld OVe1''1-l11031 rAm as 'IC1vm 3-uwm N [IOI MW LdDd 'M 1M NOLLYa A" i f ONVO MOY3YIZ OMC-M-03 tow/[[[z wyly Wa (am C4L/ -w ONgN Qm IV 1OV3a 3Hl OVSZ't -931 ZIOLz ON 5Nommm MOtl SN01YQ0 V ZM[ OTI 53DY"Hd y [ ajW ' iIIlN3063Y a- 3MDz KOQYOmY[0 - OOY 4730 1-1 OYS["31 uwz ON 71M311NM 0V A3T A NOW ?W Y3HZU NY30 Nd3S3ol• YOOHZY/L lYNN30c'3Y 0009-M-00 3NOZ 1LI/l'1d OYfN' -'031 LLaei OS 1lOV]B 7llkL11 NY 0 31 Z0 "g LOGM9M w Q 2 dVW UINI0IA ^T1 ? .,1F Y .t T J. , 1 t Tt ? Y •- ryti Y'yr r 1 ?' W ? V4a1?'? [h t''' ` QI '^ Mt L*??' ??+ ? ] t, K 1A Ywt, ? 4 fk t I 3. +a i; . aj ?T U) s O m l n m III ? I 1 ; I Co Z O I 7 f tF 3 F 7 *'V9' i Ef' ?rc Y X 1 1 ,F?' ; 4 r' ,R k+Pe'? s r 44 11 T ?i _ j t ? ,4 i rw, r 1 i y? it r 47 ?' I ?) T $( I? t f .f 04 q? 1 0 ) dPa ¦ P ` f L S -'r I ? y .' j 1 t F R ?,1 Ti s t r r v? ` Y a i OUNTY PffW J?Cp PROJECT: ATLA A LAND MANAGEMENT GROUP INC CLIENT: J. BROMAN SOB # 1 6-142 ENVIRONMENTAL CONSULTANTS WATERBODY WIDTH DRAWN BY: TMW Q-1) I VI 9.9.2008. PO BOX 2522 TELE: (910) 452-0001 WILMINGTON, N.C. 28402 FAX'. (910)4520060 ATLANTIC OCEAN WATERFRONT RESORT SCALE: 1" = 100' EMAIL: info@Im9--P.ne1 DAM WILMINGTON. NC -- - II Al N `NO.L. ) ?'q^ p?AA,,,, lVVll1;(J¢ Fy}JQ 31tfOS ?OS32i 1N02i?b?l`dM N`d3J0 JIlNt/lltl jau'dna6wl@Gjul:llVw3 ZOVSZ'O' N'NO10NIWIIM 0900'lSi 1010) XVd Woo-zgy(ot6 ,3ig1 ZZSZXOaod e p ? z -- co i M III:; 800Z'6'6 NOISI/?32j MWl l8 NMb2?4 1N?aN?d?d ?I?l`dM S1Nb1lf1SNOO 1V1N3WN02lInN3 W 3N`d-1 ? ' ?` I Poa ' t w _ W C ' ?' o ? r ati?-so-? ?e r :1N3n? d N ONI dflOWD 1NaW?l?b ?l V : 03rObd J.1NnOO?OIMSNmo V3000I1NVII l cD 1 1 i Q oy'?,?,s O ?! s/ s?titiy ?J Jib ?'1'b 0 ??ti ??ti0 Odd 0' y 0 GJ000o 19 d 44,0, bti ?s sz 0 wcc Qw U IL CL O Q g Y J W U Q ? m m Q QI_ nV) O? W r J J ~ U p 2 - < w ? 0 / Q ? O Z Z U? co Q O J 0 N z m v o ,Q- 3: U) H a a Q Q J F- ~ ? Y w J ? Z Q W O U W O ° W Ln o L I co I d- N 1z O m r j 00 Lo O i I o O O r-I- rr) V- a I xi C0 Oo ? rl? r- O 1 1 i `Z5 x 0 0 . I 12 I 15' R_ 1_PJ PAR gETB 75'X X RIp?R NO L O I 20)( RAMP O I? IM c P PO w U O X =w ' J m Q 2i O a ? Z C7 (DCDo ? J N W >T d o _ X n w > LLJ ? Zco I ? 00 I 0 ? I O d- ? I O CO co I I 00 L Lo I v m W O co 00 1 O c+ c-r c+ c? H g c? 0 D _ D m m G7z m ?0 x = p F CO m m G) Z cn O i n Cn G) O E Qu ? F= cn m m x r- O n v m o N dWdl, X"oz G1 vn 80 r1 m m D O O -n x n o m ( ?z U) > > r- > m z t b (3 l i o. 00 Z ?° 00 > O Z z 0 D / - - 2 O F i ? r J O G? -I r-' Cn m cf)o ?m n x WX nD m= ;;-, D ? m DO -o n M D M ?m 0 O UT Co 0 d7 0 C??FA?S O,Q 0; C T /lp oc°FO i °+ ? A,p oF0 °, or cT s 14,j sc- ? °??C??"?yo9sC ' O ?O O ?,q B . ?Sic??yc (1' PROJECT: ATL6AGkTi%0C L, ROUP INC CLIENT: J. BROMAN JOB cn LAND MANAQEMENT O DIMENSIONS DRAWN BY: TMWv -r I Q o rn i ENVIRONMENTAL CONSULTANTS rl T a 0001 452 1 P - PO BOX 2522 TELE: (910) 0060 ATLANTIC OCEAN WATERFRONT RESORT 1" = 30' -; O ? WILMINGTON. N.G28402 FAX: (910)452. SCALE: EMAIL: Info@lmgmup.net - K COUNTY 01-06-142 9.9.2008 NC - 31di11nW '31VOS l?lOS32? 1N0?A?]31dM Nd300 0IlNtl?ld iau dnw6wlooqul :IIVW3 1016)XVj ZOVBZ'ON'NOlONIWIIM 0900ZS6 1000-Z(0) 3131 ZZ9ZX080d O O ? i CO II;? 800Z'6' n^?l 4 °n MWl .l8 NMb2J4 S,id a dwdH HONnd? S1NviinSNOO1V1N3WNMJIAN3 a w w _ u -a O LL -i <- Zb6-90-10 #80f NVWON9-f :1N3110 JNi dnodo -LNawan`oNVV4 C3NV " 9' 11' Vl1V :103f0:jd S. n N F AiNn0 + _ .a %J 0 0 0 0 NI T W (n Q ?I Z Q O d _ + 90 m O N 0 0 N H IY W Cl) O o N a + - ao U z _ O Z z O LO Q J x F- m U) W O 0 0+ 70 5 O m Q w 00 = J J X ° z z +50 w Q in w Z J Q ?t d a (n < 0+ 60 y U + 41) J ~ Z m Q 0 U W + U Z ?- = U) CL Q Q? O 0 I LL w w > = _? t r CO v J LL -{- u LL + U U) O U- w w Cl) w 3 < 0 I- N ? v / < - Q U X +00 ? / ?,/ ) T ...1.? w ?O cn U Q O Z 0± 40 m + U Q - ? T-FH m ? J Q O ? ------- + (n b< O U)m U + 0 9 U) °c° Ox + 0 LL W O 1 Z C) 2 U) + -? Z Q W J O H d w + w + (D 0 w 1 W Z J = + ^ Z 1+30 ----- 8 + 1 +10 10+ 00 co + Q i T -______ 1 1 1 1 1 N / / Q W O ? ca mZLD OQQ T U) T c~!) Z) .J.. W Q Z O O N UD) N J O F- :2Z-4. M > Li < OF--1OU O O NWOL, ) J d W LO aZ3OUJw (0 Q ) ° ¢ F- 5 fVd U) W Q ? UwF= cn W-'??F } Y Z J U 2 «i N Q ° °UF-F- H O Off-"LiJ O O ?W LLJ wQO w u.iW W_F 5; Oa?mO O 1¢-m?wo m? > ?W¢o u J aoa?? o w Q???F- _ 001-W o?zz?F-?o? Ocnz_v? ?zOm QI] w0?`pW F- J 11 Q ZQ U) o0_ O?OF- (!) (n L J -j Q U,aOr= Oa zC?mOaWQO4Q wIz>Q- ?O m = Q Y = p ZQUZO ? w J U Q L J Q U (n }z? c nuj - O = F OOO ZMZ z ofoM ?°°F-WWF wsa=C7,0?ZQ pwOF-p Q CO Q > JLLLLJ>UO ?mW_°wcn?w wc a.00-JW ~ t_na°ZU W Q -? Z -?cnUwzQ o wU v0¢-'J n F-Ez0 D Z WcnNfY O _ Q C) O (n?oo? <=)L ??.m...?d'Dfn -Jo_00_QQ QF-< <>UO d'JOQZF-OF-?mJLLU ..L N N O F- n/ LL O • • Z • • • • w it G?FA?`r o s sFO?FO,p? ? ? oT?o?tiT?tic iS O,L il, C Tj0 ST,Q?c`,?,'9?'t' A GO009A0? o? ?O? ?, F,Q?of, OFO A?FO oti?T yF? ovFco? ?- gtioq?o T ti?,s?sT ?ctitic O N N O O U' O z m r m O O z D m fn W :o O D z z m D 0 A m m O rrcn D-IDOp-IZra°mDm _Z ?r mr 1- 0 Ozo?WODmmy c) I, m;d oo+ m?m_?)uDc m r O m m D zWm? ?n+mrzU) DprvG)=m X::E c ?D m v o c?nr-U) 0y?om C?cvn D?Czmo vDm momo`''w mZ (n,-i m N c) 0 o rn O T-Ta z r z m G F7 m 0 G) m + O D 0 ? 0 + _ ''^^ > V/ ? z + G 0 0 X 0 z W 00 D v m m p - GT7+1 ;u m x 0 O z + 0 m m + z G) z m + 2 0 ;a < + m z D D + r cn n 0 D v02 m r m z z 0 0 N r 2 S 0 0 II ?i (n C 0 ? m D -I co Dm z O O 0 _ G) D z z r U7 O p O .p N O O 6) PROJECT: ATLANTIC OCLF OUP INC CLIENT: J. BROMAN O # 1- 6- i LAND MANAQEMENT GR NTS PIER DETAILS DRAWN BY: TMW ., O m ENVIRONMENTAL CONSULTA m f n I' ..? Z D e BOX 2522 - TELE: (910) 452-0001 28402 FAX: (910)452-0080 N C TON T RESORT ATLANTIC OCEAN WATERFRON , SCALE: MULTIPLE 0 V WI . . , WILMING net mu l i f ,; P. mg n o@ EMAIL: nr°nn Uni harilnr,r_Tnni nrl . N 1lN1? 3id?s yWjjqION 102jJdWb'oJNIaNd_N012?8 lau dnoiftMoR :11VVU 0 (b" 0000-no (Ole) :xvd Z069Z'0'N NOIJNIWIIM Z (V co ZZSZ X0 ) 3131 0Od LIJ '- L11 ( aN Ole 1000-m 8 L . 0 :31F/C] GNVI 9P :,k 8 NMV2J0 NOLL03S 1sOdo ?IAUVd S1Nd1?fISNO0 IV1N3WN02ilAN3 2: U) NaWal VN` V4 C3N`d-1 jnaWV Zbl 0 ' NVWM02i8 'f :1N81?? _ ONI ROB NaIMSNmds NIdNVI)40 i8 :1O3f02 cj c9 'iArONd SIHl 2103 NOI10(1NISNOO 210 NOIS30 -lbNl3 2103 03Z1111f1 38 Ol 030N31NI i0N Sl ONIMV8(1 SIHl '.13NO MTA38 11W83d ` VWD 803 03Sf) 38 Ol 0I1bONV N13H3 3'd ISV 0301A08d SOONM 8(1 SIH1 'ONI `SZI33NION3 ONinnSNOD 11VISNni 0NV `B)isn `Sl-M0N :A9 aEIGIAO jd 9NWA3,NION3 SIN 3ab?JOens a3lOddWOO (XZW) INO1S 09V ldkL ,t8 ? v - NOU03S 1N3N3AVd'ildHdS`d i000N 'NO1103S 1N3W]Add ?dn10`d 3NIW?13110 01 ?IIINION3 -1`dOINH03l039 28 2JINMO/m 31VNIGdOO3 7VHS dOlO`d UNOO SNOI11aN00 (MIJ NOdn ONIGN3d_3(1 ),ddA kVIN N01103S iN3W3ndd :31ON 3NO1S 38d IOQON „9 - '1N3W3Add 1-IdHdS`d `d 5'6 AS lOaON „Z 'S'1' N NOU03S-SSOHO 133HiS W01dJk1 %Z tt0 t` t tt 0- ttO t L u o t L a 01 3MJ0 Nld?J N NIW „0-, L u 0 t tt0 t? (XdW) Z \-I L 2JIIaNIO H lOGON tZ NO i?VHdS`d Z-1 lOaON „Z c z Z N ? m m -'I C7 Z R NN?€ D ? w Z gg ? ? Y r s R r D Z m z 1?. 98 ?v D Z N m >D x ?m C 0 n Z x a m z Iz T3 s ct ?S R? MIN. SFF L O Z OAAO NP _ IMF o T g? k ?oN o 0 In 1 o? It's S Q z $D ?- o Z m4? o 0- All {?, gny N p90 r • p fi ?$ d SS€ z 0S z II I \ N JAN ? ?m OYw gS d AN m Zt r 0 s 0 n m m x P F .0 O ? 9 m O I N m m z y D Z y O O O m 4m O mo F 2'6- o ? o ? C > z ° 4z' A o ° '1 O ? n r O F 0 D m rn C) S A ± Z Z P ?? m C) mm ^ n m Z ?o. 9 r O D m ct x zO Z 0 N O Z N Z z 0 o D O L mD ZD m D m oz m ? Cn Z W -i O g z Ll D m x C m Z $$ 0 A U N p, J m N 9 Z -1 ?i V -I ? V1 -i Vt m ? ? o m v o z° c T f °- 6" m ?r cc A m q z ; o z F; v m p z z m r x A x m "-1 r n m pz A v o N o m ?i i N ° a m c m v vmi m` 0 m v 5 rm.. N o o z c a m > 'a 0 a o o S '4' A z°° IFn m m pi x i N a v F i N °° x o o F n o z m '^ Z ° v ?^ z o z m z$ ?c v r= r g§ 'J o°° a z i z S,Fi'^ S'z ocziTz p '^ rm' mzr.?CNZr '^'z ° vi !n z T. A O D° Z ~ O o Al ^' n -D.1 o N 2 '? O° ?m°I ° C I7 Z -1 r' ° m_ ° T ° Z O r Z NSS (Z7 a O n? f?+l Z? O = p A (((<??? -0 Z U Ae Z -i V ;Cy^ ?C? A f l/1 m FFf.1 ^ O F?m > R• O 2 £O m c T m O 2° 1a m = z y i m Z p 0 p U1 , I p °$ F> m Z f°•t m o m> m A< Z C m o!=n O° m?m o v' m e '" m o I" ; a z m m vci m> m s m o N m D x g c m Z D S m C T F V 6 N 2 T O C r A 0 2 m r°n 2 D m 'T ° O C r S O -1 O 8 O A yyZ r m m m m- ?: T x< L 2 N C ° L A 0A 'J C ti -l m m O A C O .? 1?/1 n o g 0 A j $ F£ z g m 6 m D F n m A O m 0 0 0 V C N £ 2 m 9 m O; ° O A A O m yY? j . m ° z mz c ? ?Tn i ?6rl zaO v vas °a o v ry p ri z m x o m v fin N°° A I 2 A T m i c 0 z i 2 m v v N 0 m° Vi t^ {A o 2 S'iG ; 6^ A A r n o ° N °c o 5 m° a c z p i g° o xo m m i i m, x£ m o m m u C r A .0 x r mo r m o m m > m ?^ o M-M m m r f x v y £ F_ my y in m ?c o f F oa m y m m? Z z g m m m Z A C A y O N O V N V T m oT Z m D a m 'i z m 1n vms ° zy in m i m v 2 2 c£ z0 0 v v =1 m o m YO f N m A m umi o rz" A m n o rT-i A O rt;1 rn x c'I °° oy O ° ?n °S o In ^v' o to c'i z N N n to ;° o. g i i o Z m m D u? _ ?y/ x m ro f?1 (y?? m c'' Ya S s m v m o F i ?ii cpi v' A v_i F ?" -' vl -a O c z ft ° -1 ° (A Z -1 U1 ° ° .'[m1 f Z 31 Cl g r ho O m D m .? € 9 °L A ?Z-, Fr m P m N n rJc z mo ° £ Z5 C+ ° N J m= o o i a> v m m=$ v F N VI m gym„ m ?' > A Z C o A A D D m Z `G a 2 A o T c ?n > A '^ A A o c 2'? m n v m A z z m> o b m c ° i m m Z O O A F O N y m N ° £ -1 y° 0 0 0 >z s m m o o f o c v a^ N K o S ?v 2 m F ° ?i c z w m c i A m° °z m z z n A 2 m m o a N ° ?zn c z i t r $ i m gym' N O m° f 0 f m F Z n O S ? C O T Om = D N N m V Z f m m GZJ ° !.1 N n O G> ITA O S£ m o o p O (.?m? y Oy A°y z O 2 m N D V. 1 O C O F y p r U 0 0 D m O p p> Z 'OO x D S Z m V U Z F m O V ??++ C N Z m Pt =° O D - C Z ° Z Ar S Z S F ?n A Z 'A i o A z ° ?n z ?> g 6 m m z ° ° '" i i Ag OZ Z y -, -c o x m m z m g< o° A a z mo c o f ?z o° z a p g _ N o zn =_ Z x r S2 y mo ° m° m ° o° n C°l ; D? o A z p °,? °~ 1?.1 O ° L m C= uzi N V) N N m mil m A K v m i o S> O O m A i;_° m r N c v v p m N v ti v 5 o m= 0 S m£° -' m o o r? m y ?, D c ° g ? '•' v 9 A '^ m m sy g p o £ G = S m ° z 0 2< 0 0< z Ar A m a p pp g x ° pz m z.c m z ° F Z x 0 ?C z O ° ° K r l• m '^ S v O °> o m p A D D v o m Z 2 N m N m z x m D T O N m A p ,?, = C m Z F p °O n N °mV = ? O O m R-1 04/03/08 BC P k Z COMMENTS -mni -TF DESCRIPTION NORRIS, KUSKE gt TUNSTALL `? ,p ti? REF ? CONSULTING ENGINEERS, INC. CD st f ?PHONE (910) 343-9653 ' ?+f N L o Off;. 9t0 343-9604 .s ,r mz Z co 902 WILMI MA FCNGTON,KET NC, STREET 26401 aff..0nkt-9.com X2008 NORRIS, KUSKE k TUNSTALL NTES & DE'hAILS 7ER: N .f Ir(PGROUND rOINT ROAD s.,,x'. ALANTIC OCEAN OCEAN ISLE BEACH, NC 28469 4669 PEOPLES WAY y BRUNSWICK COUNTY ZJrAI;? 6 ? v A O D E/ $ ? S s Z m nm z N D m? 0 =s m D_ r DCM WILMINGTON, NC ON `Noj1 )NIIAIJIpA IN-)(7 VNIlO O IRON `A1Nf100 )i01MSNnui3 03. AVM S31d03d 699b 694FZDN'H:)VHHB'iSINa3DO d31VMNV300011NV'lV '&Savo-dXNIO No)l'aleZZL YqI,f mnotjDdWV0A 1 A S-II`d13a V S310N :a3NMo 11V15Nfll 'P 3NSNN SIiR10N 8002 S1401SIA31J g N0I1083S30 31VO if S1NIMY103 Z IF d 39 I80/£0/ a =? z ? d aQlp w> L7 J? w dR A2 pu.¢U Q o sIO o~ 00 ? W J , N 1-ti Q, OQrOW ¢ F Q 1-0: ''?yorx-a >w 71- uJx a o w1,???wWxa Z Wq;O 2w >NU Fay ZJU=WWG3 p °u=vwi>o.>40 S J Q I-- W A a° d v Q Z„ w F N u a w W W F- w A C3 q Z y W .-. Q r? 10 ? a o a Xa 0. N LO O Z N I N l>_ X1 N v iu a .0-.I U N Cl q Q LD w N z J U L, ¢? pqz H w ~ J o A m A Z f- 3=Z ZZCL I "a GGb O Vl= Z O C3 r p 3Q Z z =L, W Z W F -1 7 Z W ~ (n o: a W w w Cie P:4 UZ WUU? Q W F ww0 f 1: 0. aW 0 J QQW Iwo Wlr UUKx ZN UJ pWps eo$ O x N Qy N p W 1 1- oa?C 4JK [??W NaM \ aux d H d< Sy ¢ LLJ A Z F- Z f x z z w N N wor6ualqu®aoy/o ? ?'P ? Si Z 4096-£6£ (OW XVd wlgz SON 'NOlONIYfIIM , co m O2 w oc £596-£4£ (016) 3NOHd 133x15 13N1lVW Z06 a o o S J ! l w 'DNI `MIHEINIONH E)NI,,'IfISNOD co -IrlVzsNnz ? jIIsnx `sr"ON I.a.l J [L'xrm A I LI U C3 N Z W d g ? Y w w 1..1.. ? F Y ~ N H J wn wj C3 A t _ I.LI °d o Ir 4 Z H Zx W ^ r 1- 1- S a. H NK NN ? o> raw A r W > W O W ? J w U O A a ? 2 pU Na ? W 3 M ? ? rn a J QW 4 I U 4. ED N \ J ?I I J_ Q W A^b 11 Q 'a J? N ?I¢ 3NIl 3QV?J? ? ?B-rI 1 0 N? 1 J Z o_ r u Lij Z b ¢ M C m ? w A? b i n ~~?i ? N Sq>K 3 NrF+2 d >jA OO >4.x? aJ2 ? b K H U XrK [j SW? H w _ vWO ova w o o ?rcou a rc > J > x a s ai~ W o o '? WNZ Ua vuV Wa RUB p Z W {{?? >KFa- OSZ .0-?4 a owc7a . o?? ?Z J A z Z 0900-ZS4(OL6) :XVj 1audna6wl?o olul :?IVW3 Z069Z O'N'NOlONIWIIM 1000-ZS4 (Ol6) :313 1 ZZSZ x09 Od SINviinSNOD IVIN3WNONIAN3 '°' 1 ONI c nc>w o .LNaIN?tDb'N` V4 aNb'1 H d f- W V W4 z, /? w LL U ¢H Q o. j p z>¢aa xRO>w d w awa m > W ,JJ S WF > r 4 44ff 6 Q? ?OR o: FW >o o 4W g 6.w p H ?3wK W ?N ii ??R>1a1--K JF Z S ? JF N p WS dRN> < N'~ ? Qa J U Rh w U WY U 1.1 N1.. ¢¢ I:.=I?U>O OW ZZ 7>Q I I?¢ - ' % ^ n " p o 0 3 $ ° r _ o t 0 3 9 _ D? ?r-7'o O £ N C A A O? n v n o v > = - K 3 z A 000 x1 aeon ?' N N q?g ? ?? u o ?? ?\ o A 0000 4J Y ; 3 > ^ ° a-?? J.Q 6'$?.a :g p p o O R7rXR b y ? ? °9 A? s.S 09g 9w ni e p°c R ? z" a o e? o ' ? o ? ? I vvv? z u° 03 o o ° ? I n n u vv L 3 2. B ? ? 0 O 1 a O ° t°n °i ^ !^- ?? ^ N n _ x ° n c_ vi N° co ° n$o e ? _ 4] 333 - ?c -9 ; A _ n 8 n O M L S ° 9' ^ c o' 'o i Z m .? J °n o N R• J c ^ A 3 ? _ n. : N O s a as ? Q 3 ° 'o 'n » 5, T{ s?o 0 o ?m u ! F ag GRID NORTH NAD 27 i x 1 ( 11 ?e I ? \ 27.3 1]1.76 C ' ? Pz Y y T P AO ? _ ?1 Z .iGo / m S 02'02'11-$ 288.7 (1 n \ pp rn 1 ? 1,1 Z ?o F 1 0 0 ? ! / z v .o No z ' ,? 0 vN, ' 6 a '-Ir°I 6?r---- m z ., cQ1 0 N y.ZN ZZZm y G ; ?N ? a Jo• U? !'. 4 ? U ' 9 r ?U Num mau. m w 4? Zo £ 4 4 4? f£ f ? Q N ?°N mn o r ..u Nm N m m \V R C^+ vJ A p a C? F R n C1 ° 0 (7 O u m .? o A O ° m v emoo ei- n yy O O 0 O -` N -0 i ol c L O C1 J ? O O O i O i O N k ?l p O f ? y w 3 F ? 0 O n _l j O J Z n ? 0 c--t- l J U' m m o' ae 14-- - - S 0044'60"N 230.35' 3 ;3 jr 5: 1 SR fi43 60 R\0 , s$ p33 $? ? . ? ?$> ? 0 00 ?:go-q2 m x a S m N' u?l i?J n as23'X on °aH ? ^v ^-io mad '? o N a? Q v 3 ,. °305.: mg- E o °?- 5: ^ a J ° u i ? i? Q rte.. a? i ? l ol?b ?I G1 I I 02'03'17•E 118.60' F - - I - 999-------- 1 1 '?' ry? ? ? ? H b N ? o A c 9 N o i J0.98' 42.13' 79.93' t0D,0I' Totol IG N 02.02'111 179?5 7.101 z P ? N lY ,? ° ° E+ N H u e N i n 2 b a ? 1 1? ?? ^ ? , , 17 91 8.6C,SL1011 ' 14 z o L ,BO 0 N ?c ieno v N b m o? •.z° K T otA1 S 1 ' G 1 yti sip 3.ot. c j`e 1 0 A W fn Z 4 A o\?? 1 °' 1 ? µ 1 ?SS. 'b0 1 1 1 ,LC'fSl ? ? Z 1 ? .O iW i v n 1 ? ve O N ' ?' v O g. J " Z1 Q v o N N ' m 3. ,90 101 p1 J s ?'' U c o M ?E?Tg?3 ° ° s ,a s , a o ° a m ? gauco c n : .. 9, p o o n ? Po .. n°. 2 3 wqn '.? ?L"Ow ° C _ Q U u S ^ P ° n S GGyy f n ° x 'n93q? p S » ? 4 'n 1 t ° m n o0 v ? O1 j Z a g ? iNn ? ? O to A o ? N o N ? ? ? O O u o N ? Qp? i?• Yn sV o% '? ?N N m > N Z a ? • 4 ye 6? - N ? LO.?t N m M .yy. 16. St 0 v \ A 1 v N $ Z t 1 ml CDP 1; N Ot'33'2B'E 211.37'_ 0.2679 ear. o 2399/1334 ?_ 72' 178 u p . S 01'3802 W o N ww N ? U N u ? `?! o N z ?z n uruo D+ r_ 7 u; u? n p6. .? 7S?.6JJ• F ? ? o j r N A 4 ? J V A >` Z 333 pr " ' f S o n J 4 ? N N Y 1.50'11 S )oL 3 b O n q ? 45,LSD1 '6:60 ??gz ?OOO ? N b 11. I p 0 N ? a ,y b Z N I N 1 ? U iwO Z A t ? OI wft ?!G - .S.n 6 N o-? RECEIVED SEP 1 1 2008 c m A w 0 O w m DCM WILMINGTON, PVC . +