Loading...
HomeMy WebLinkAbout20081705_EEP Acceptance Letters_20081103Q? l ??O ''r G '? 8 ,j(/ October 30, 2008 Mr John Thomas U S Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Dear Mr Thomas Subject EEP Mitigation Acceptance Letter U-2826A, Winston-Salem - Replace Bridge Numbers 256 and 257 on US 52 over the Norfolk Southern Railroad, Yadkin River Basin (Cataloging Unit 03040101), Central Piedmont (CP) Eco-Region The purpose of this letter is to notify you that the Ecosystem Enhancement Program (EEP) will provide the stream mitigation for the unavoidable impact associated with the above referenced project As indicated in the NCDOT's mitigation request dated October 24, 2008, stream mitigation from EEP is required for approximately 46 feet of warm stream impacts Stream restoration mitigation associated with this project will be provided in accordance with Section X of the Amendment No 2 to the Memorandum of Agreement between the N C Department of Environment and Natural Resources, the N C Department of Transportation, and the U S Army Corps of Engineers fully executed on March 8, 2007 (Tri-Party MOA) In the mitigation request, the NCDOT indicated this project would only require stream mitigation at a 1 1 ratio EEP commits to implement sufficient stream mitigation up to 46 stream restoration credits to offset the impacts associated with this project by the end of the MOA year in which this project is permitted If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from EEP If you have any questions or need additional information, please contact Ms Beth Harmon at 919-715-1929 Sincerely, Will m D Gilmore, P E EEP Director cc Mr Gregory J Thorpe, PhD, NCDOT-PDEA Mr Brian Wrenn, Division of Water Quality, Wetlands/401 Unit File U-2826A NCDEN North Carolina Ecosystem Enhancement Program, 1651 Mail Service Center, Raleigh, NC 27699-1652 / 919-715-0476 / www nceep net Mr Gregory J Thorpe, Ph D Environmental Management Director Project Development and Environmental Analysis Branch North Carolina Department of Transportation 1548 Mail Service Center Raleigh, North Carolina 27699-1548 Dear Dr Thorpe Subject EEP Mitigation Acceptance Letter U-2826A, Winston-Salem - Replace Bridge Numbers 256 and 257 over the Norfolk Southern Railroad, Forsyth County The purpose of this letter is to notify you that the Ecosystem Enhancement Program (EEP) will provide the stream mitigation for the subject project Based on the information supplied by you on October 24, 2008, mitigation for the impacts associated with the project are only required at a 1 1 ratio The impacts are located in CU 03040101 of the Yadkin River Bann in the Central Piedmont (CP) Eco-Region, and are as follows Warm Stream 46 feet EEP commits to implementing sufficient stream restoration mitigation to offset the impacts associated with this project by the end of the MOA Year in which this project is permitted, in accordance with Section X of the Amendment No 2 to the Memorandum of Agreement between the North Carolina Department of Environment and Natural Resources, the North Carolina Department of Transportation, and the U S Army Corps of Engineers, fully executed on March 8, 2007 If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from EEP If you have any questions or need additional information, please contact Ms Beth Harmon at 919-715-1929 Sincerely, VYI?? Will D Gilmore, P E (U? EEP Director cc Mr John Thomas, USACE - Raleigh Mr Brian Wrenn, Division of Water Quality, Wetlands/401 Unit File U-2826A z F f f w ,? ^va/L. i e "?-? d G rt??A Gf ,Js 4,e% d. ? /,../6. 4-? sd? F fs t?j`?!f t ..r E-f of . ,, iA& NCDENR North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652 / 919-715-0476 / www nceep net