Loading...
HomeMy WebLinkAbout20080828 Ver 1_More Info Letter_20081105?0F W ATFgQ Michael F. Easley, Governor 61 William G. Ross Jr., Secretary CO r North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality November 5, 2008 DWQ Project # 08-0828 Wake County CERTIFIED MAIL., CEIP-T-REQU-ESTED Mr. Alonzo Wilson White Oak Foundation 1621 White Oak Church Road Apex, NC 27523 Subject Property: White Oak Development Ut to Middle Creek [030403, 27-23-15-(1), C, NSW] REQUEST FOR MORE INFORMATION Dear Mr. Wilson: On May 15, 2008, the Division of Water Quality (DWQ) received your application dated May 15, 2008, to fill or otherwise impact 0.093 acres of 404/wetland (0.092 acres permanent impact and 0.001 acres temporary impact), 82 linear feet perennial stream impact (60 linear feet permanent impact and 22 linear feet temporary impact), and 5,016 square feet of Zone 1 Neuse River basin protected riparian buffers and 3,013 square feet of Zone 2 Neuse River basin protected riparian buffers to construct the commercial development at the site. On July 18, 2008, and September 29, 2008, the DWQ received additional information from you, however, the DWQ has determined that your application remains incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the additional information requested below, we will place this project on hold as incomplete until we receive this additional information. If we do not receive the requested information, your project will be formally returned as incomplete. Please provide the following information so that we may continue to review your project. Additional Information Requested: The Stormwater Management Plan that was approved by the Town of Apex on September 24, 2008 fails to meet the requirements of its local Phase II Program because no stormwater treatment has been provided for the-parking -lot -adjacent to the stream. Because of this, the DWQ can not accept the locally approved stormwater management program as meeting the requirements of the 401 Certification Program. Please submit a revised stormwater management plan to the DWQ for review and approval that includes the following items: 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http://h2o.enr.state.nc.us/ncwetlands One N Carolina 'Vatura!!y An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper White Oak Foundation Page 2 of 2 November 5, 2008 A stormwater management plan that removes a minimum of 85 percent TSS and 30 percent TN from the stormwater generated by the entire project including all parking areas), For each proposed BMP, please provide a completed BMP Supplement Form, with all the required items. The BMP Supplement Forms are available at the following web site: http://h2o.enr.state.nc.us/su/bmp forms.htm. 2. The Required Items Checklist portion of the Sand Filter Supplement Form, with all required items attached. In this information, please provide boring data to show the level of the seasonal high water table (SHWT) within the proposed footprint of the sand filter. The BMP Manual requires that there be at least a two-foot separation between the invert of the sand filter and the SHWT. Since the Sand Filter has been sited adjacent to a wetland, it seems likely that the SHWT is too high to provide the needed separation. If the SHWT is too high to allow for a sand filter, then please either relocate the sand filter to higher ground if possible or provide a more appropriate BMP for an area with a high groundwater table. Please submit this information within 30 calendar days of the date of this letter. If we do not receive this requested information within 30 calendar days of the date of this letter, your project will be withdrawn and you will need to reapply with a new application and a new fee. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733-1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. 7Since ly, Karoly, Supervisor A401 Oversight/Express Review Permitting Unit CBK/ijm cc: Lauren Witherspoon, DWQ Raleigh Regional Office USACE Raleigh Regulatory Field Office File Copy Matt Matthews, DWQ Branch Manager Nicole Thomson, S&EC, P.A., 11010 Raven Ridge Road, Raleigh, NC 27614 Filename: 080828W hiteOakDevelopment(Wake)On_Hold3 ¦ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ¦ Print your name and address on the reverse so that we can return the card to you. ¦ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: White Oak Foundation Attn: Mr. Alonzo Wilson 1621 White Oak Church Road Apex, NC 27523 DWQ# 08-0828-Wake A. Signat / X GZ t? gent ? Addressee B. lRe'LvW by (Printed Name C. Date of Delivery D. Is delivery address different from item 1? ? Yes If YES, enter delivery address below: ? No 3. Service Type Certified Mail Express Mail Registered Return Receipt for Merchandise ? Insured Mail ? C.O.D. 4. Restricted Delivery? (Extra Fee) ? Yes 2. Article Number (rrransferfrom servk 7008 1830 0003 8753 2461 PS Form 3811. Februarv 2004 Domestic Return Receipt 102595-02-M-1540 UNITED STATIiS 0&ifi L`SEli&C Page Fees"'l?aid • Sender: Please print your name, address, and ZIP+4 in this box • NC DENR Division of* Water Quality 401 Oversight/Express Unit 2321 Crabtree Boulevard, Suite 250 Raleigh, NC 27604