Loading...
HomeMy WebLinkAbout20170767 Ver 1_More Info Requested_20170809 Strickland, Bev From:Mitchell, Robert K Sent:Tuesday, August 08, 2017 10:42 AM To:'Guy Mull' Subject:RE: Add Info Middle Fork Baptist DWR#17-0767 - Transylvania Attachments:Stream Length.jpg Andy, Sorry for all of the back in forth. One of the things that is confusing to me is that I measured the potential for bank erosion to be approximately 60 feet in the field (see photo with red line indicating area that was measured in the field). This length of the culvert would provide plenty of access for equipment, eliminate potential bank erosion, and allow access to the playground. Why can you not minimize the impact to 60 feet plus the 20 feet downstream for a total of 80 feet? Please discuss this option with the church. I would be happy to discuss this on the phone as well. Kevin Mitchell Environmental Specialist – Asheville Regional Office Water Quality Regional Operations Section NCDEQ – Division of Water Resources 828-296-4650 Office Email Kevin.mitchell@ncdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Guy Mull \[mailto:amull@comporium.net\] Sent: Monday, August 07, 2017 11:01 AM To: Mitchell, Robert K <kevin.mitchell@ncdenr.gov> Subject: RE: Add Info Middle Fork Baptist DWR#17-0767 - Transylvania 1. Mr. Mitchell,the 100' culvert will include access for the work to be done on church bldg. We feel that if we are going to disturb branch & have to pump around that we should go ahead with putting culvert along bank between church & playground to remedy the problem with erosion & the enhancement of area. We feel that this is a reasonable request. 1 � � � -��� »�s�� �.� yy� � :� » <y �� � . . «� �,� �� � d. � . � �:¥� ym� �«s 1 © � °� °�-«: e�� y � %� ƒ� � � � ». :. � . . ,� �� ~��42y� � \� y�� y°x © < \� «K � » . > ��«��,:/�\ < . � « \}/ y \ �..� y.: . <y . \� . � ^^/d��\<k�� \. ----- Original Message ----- From: Mitchell, Robert K <kevin.mitchell@ncdenr.gov> To: amull@comporium.net Cc: Brown, David W CIV USARMY CESAW (US) <David.W.Brown@usace.army.mil>, Leslie, Andrea J <andrea.leslie@ncwildlife.org> Sent: Mon, 07 Aug 2017 09:52:32 -0400 (EDT) Subject: RE: Add Info Middle Fork Baptist DWR#17-0767 - Transylvania @font-face {font-family:"Cambria Math"; panose-1:2 4 5 3 5 4 6 3 2 4;} @font-face {font-family:Calibri; panose-1:2 15 5 2 2 2 4 3 2 4;} p.MsoNormal, li.MsoNormal, div.MsoNormal {margin:0in; margin-bottom:.0001pt; font-size:11.0pt; font-family:"Calibri",sans-serif;} a:link, span.MsoHyperlink {mso-style-priority:99; color:#0563C1; text-decoration:underline;} a:visited, span.MsoHyperlinkFollowed {mso-style-priority:99; color:#954F72; text-decoration:underline;} p.msonormal0, li.msonormal0, div.msonormal0 {mso-style-name:msonormal; mso-margin-top-alt:auto; margin-right:0in; mso-margin-bottom-alt:auto; margin-left:0in; font-size:12.0pt; font-family:"Times New Roman",serif;} span.EmailStyle18 {mso-style-type:personal; font-family:"Calibri",sans-serif; color:windowtext;} span.EmailStyle19 {mso-style-type:personal-reply; font-family:"Calibri",sans-serif; color:windowtext;} .MsoChpDefault {mso-style-type:export-only; font-size:10.0pt;} @page WordSection1 {size:8.5in 11.0in; 2 margin:1.0in 1.0in 1.0in 1.0in;} div.WordSection1 {page:WordSection1;} --> Mr. Mull, Hope you are well. On July 26, 2017, the Division of Water Resources received additional information from you regarding the proposed culvert at Middle Fork Baptist Church. Project impacts were reduced to 120 feet of impact. According to your response, the grading contractor will require a 100 foot culvert in order to gain access to the back of the church. It is unclear why an excavator would require a 100 foot crossing to access the back of the facility. Please revise the plans to minimize these impacts or provide a detailed explanation of why the activity cannot be accomplished, reduced or reconfigured to avoid impacts to the trout stream. Pursuant to Title 15A NCAC 02H .0502 (c), the applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received within 30 calendar days, of receipt of this email, the Division will be unable to approve the application and it will be returned. The return of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. You may provide your response via email or mail to the address noted below. Feel free to call me if you have any questions or need clarification. Kevin Mitchell Environmental Specialist – Asheville Regional Office Water Quality Regional Operations Section NCDEQ – Division of Water Resources 828-296-4650 Office Email Kevin.mitchell@ncdenr.gov 3 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Mitchell, Robert K Sent: Monday, July 03, 2017 4:13 PM To: 'amull@comporium.net' <amull@comporium.net> Cc: Brown, David W CIV USARMY CESAW (US) <David.W.Brown@usace.army.mil>; Aiken, Stan E <stan.aiken@ncdenr.gov>; Leslie, Andrea J <andrea.leslie@ncwildlife.org> Subject: Add Info Middle Fork Baptist DWR#17-0767 - Transylvania Mr. Mull, Please find the attached add info letter for the subject property. A hard copy will be mailed to you this week. Feel free to call me if you have any questions or need clarification. Thank you. Kevin Mitchell Environmental Specialist – Asheville Regional Office 4 Water Quality Regional Operations Section NCDEQ – Division of Water Resources 828-296-4650 Office Email Kevin.mitchell@ncdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 5