Loading...
HomeMy WebLinkAbout20100040 Ver 6_401 Application_20170817Brown's Environmental Group, Inc. Wetlands, Soils, Permitting Brownenvgrp@gmail.com 919-524-5956 August 10, 2017 Karen Higgins NCDWR — 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699 — 1617 Re: Neuse Buffer Impact Authorization Grifols Therapeutics Johnston County Karen Enclosed are 3 copies of PCN and construction plans for a buffer impact on a subject pond in Johnston County. This buffer impact was originally approved in 2011 when the pond was owned by Talecris Bio therapeutics but was never constructed. Grifols has purchased the property and desires to construct the project. I have attached the original approval for your records. We are resubmitting the originally approved design since it has not changed. Any questions, please do }lot hesitate to contact me. Thank you vV&A6Z---� Wya rown, LSS, CPESC President Brown's Environmental Group, Inc 242 Batten Farm Road, Selma, NC 27576 O�OF W A r f9, o Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version Pre -Construction Notification PCN Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: F-1 Section 404 Permit El Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ® Yes ❑ No For the record only for Corps Permit: ® Yes ❑ No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Grifols New Channel Southeast Pond 2b. County: Johnston 2c. Nearest municipality / town: Clayton 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: GRIFOLS THERAPEUTICS INC 3b. Deed Book and Page No. 4016, 306 3c. Responsible Party (for LLC if applicable): William Lane 3d. Street address: 5160 NC HIGHWAY 42 W 3e. City, state, zip: GARNER, NC 27529-8417 3f. Telephone no.: 3g. Fax no.: 3h. Email address: William.lane@grifols.com Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Wyatt Brown 5b. Business name (if applicable): Browns Environmental Group, Inc 5c. Street address: 242 Batten Farm Road 5d. City, state, zip: Selma, NC 27576 5e. Telephone no.: 919-524-5956 5f. Fax no.: 5g. Email address: brownenvgrp@gmail.com Page 2 of 11 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 167800-21-5181 1 b. Site coordinates (in decimal degrees): Latitude: 35.61938 Longitude: - 78.41583 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 56.99 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to UT to Neuse proposed project: 2b. Water Quality Classification of nearest receiving water: WS IV, NSW 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Existing pond on Grifols Plant site has multiple influent culverts directly discharging storm water through the buffer. These culverts existed prior to the adoption of the Neuse Buffer rules. The subject driveway culvert is located on the west side of the pond and is failing- collapsed in some locations with indications of piping around the culvert. There is an existing 10'- 12' wide driveway gravel drive through the buffer on the south and west sides of the pond to serve the existing Johnston County pumping station to the northwest of the pond site. The dam of the pond is to the north. There is a concrete box and outlet pipe to the north as well as an adjacent emergency concrete spillway. 3b. List the total estimated acreage of all existing wetlands on the property: —2.5 ac. wetlands in project area, 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 6700. 3d. Explain the purpose of the proposed project: Improvements to be made to the existing pond include the following: Replace failing existing culvert under existing driveway adjacent to pond with open channel designed to safely convey the 25 yr storm. Remove existing gravel driveway inside riparian buffer behind trailers and return to grass as shown on Figure F-3. 3e. Describe the overall project in detail, including the type of equipment to be used: Culvert replacement: Removal of existing culvert and channel construction through riparian buffer by grading equipment. Channel to be lined with Turf Stone. Driveway removal: Existing gravel driveway removal by grading equipment, haul off by dump truck. Seeding in buffer by methods allowed by NC Sedimentation and Erosion Control Design Manual, only one single application of fertilizer allowed 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ® Yes ❑ No ❑ Unknown project (including all prior phases) in the past? Comments: I 4b. If the Corps made the jurisdictional determination, what type ❑ Preliminary ❑ Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Gary Kreiser, Water Resources, Neuse Buffer Determination, pond is subject, 7/25/17. Page 3 of 11 PCN Form — Version 1.3 December 10, 2008 Version 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ® Yes ❑ No ® Unknown 5b. If yes, explain in detail according to "help file" instructions. August 9, 2011, approval to perform this work we are applying for now (never performed approval has expired), #2010- 0040v5, attached 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. Page 4 of 11 PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑ Streams - tributaries ® Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 5 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number — Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 ❑ PEI T 02 ❑P❑T 03 ❑P❑T 04 ❑P❑T 4E Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5E Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 6 of 11 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ® Neuse [-I Tar -Pamlico El Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary impact required Replace ❑ Yes 61 ®P ❑ T ex. UT to Neuse. ® No 1511 1239 culvert B2 ❑P❑T El Yes ❑ No B3 ❑P❑T El Yes ❑ No 6h. Total buffer impacts 1511 1239 6i. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Removing the existing driveway from the buffer and seeding with grass reduces the impervious area in the buffer. Use turf stone to allow more narrow channel and allow turf to establish in channel. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Care will be taken to perform work in dry weather when rain not imminent, stabilize immediately, finish workquickly as possible 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ❑ Yes ® No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this ❑Payment to in -lieu fee program project? ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity Page 7 of 11 PCN Form — Version 1.3 December 10, 2008 Version 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 8 of 11 PCN Form — Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ® Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ®No Comments: No new conveyance is being created through the buffer. 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 19 % a reduction of 52.5 % 2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Flow out of the project area is not being increased due to no new development of impervious area. Furthermore, the project will disturb less than one acre. Both conditions exempt this project from Johnston County Stormwater Management Plan approval. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ® Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? Johnston ® Phase II 3b. Which of the following locally -implemented stormwater management programs ® NSW ❑ USMP apply (check all that apply): ® Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. This project will not result in additional development as it addresses maintenance. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Wastewater generated from this project will be routed to the existing permitted POTW. Page 10 of 11 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ❑ No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑ No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑ No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑ No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ❑ Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Flood Maps Wyatt Brown August 10, 2017, Applicant/Agent's Printed Name plicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant Date is provided.) Page 11 of 11 PCN Form — Version 1.3 December 10, 2008 Version NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary August 9, 2011 DWQ Project # 2010-0040v5 County: Johnston Talecris Biotherapeutics Attn: Ms. Mary Kuhn 8368 US 70 Business West Clayton, NC 27520 Subject Property: Talecris Biotherapeutics, Clayton UT to Neuse River [030402, 27-(36), WSIV, NSW] AUTHORIZATION of Neuse River Buffer Rule (15A NCAC 02B.0233) Authorization Certificate Dear Ms. Kuhn: You have our authorization, in accordance with 15A NCAC 02B .0233 and ariy conditions listed below, to impact approximately 1,511 ft2 of Zone 1 and 1,239 ft2 of Zone 2 of the protected riparian buffers for the purpose of constructing the culvert replacement at the subject property as described within your application dated June 24, 2011, received by the Division of Water Quality (DWQ) on June 29, 2011. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non - discharge regulations. This authorization certification is for the purpose and design that you described in your application. If you.ohange your project, you must notify us and you way be required to send us a new application. If ..he property is sold, the new owner must be given a copy of this authorization letter and is thereby responsible for complying with all conditions. This authorization requires you to follow the conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved (Units) Plan Location or Reference Zone 1 Buffers 1,511 (square ft.) Page 7 of PCN Zone 2 Buffers 1,239 (square ft.) Page 7 of PCN 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: Wetlands, Buffers, Stormwater, Compliance and Permitting Unit (WeBSCaPe) 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 One Phone: 919-807-63001 FAX: 919-807-6494 NolrthC roliina Internet: http://po0al,ncdenr.org/web/wglws Natat`aCb�/ An Equal Opportunity 1 Affirmative Action Employer i/ Talecris Page 2 of 4 August 9, 2011 a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre -Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters without prior approval by the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or stream beds or banks, adjacent to or upstream and down stream of the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Land Resources or locally delegated program has released the project. 5. Diffuse Flow An additional condition is that all stormwater shall be directed as diffuse flow at non-erosive velocities through the protected stream buffers and will not re -concentrate before discharging into the stream as identified within 15A NCAC 2B . 0233. 6. Protective Fencing The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15A NCAC 2B . 0233. 7. Certificate of Completion Upon completion of all work approved within this authorization, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the Wetlands, Buffers, Stormwater, Compliance and Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 8. Deed Notifications Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for future wetland, water and buffer Talecris Page 3 of 4 August 9, 2011 impact. These mechanisms shall be put in place at the time of recording of the property, or of individual lots, whichever is appropriate. A sample deed notification can be downloaded from the Wetlands, Buffers, Stormwater, Compliance and Permitting Unit web site at: http://portal.ncdenr.org/web/wq/swp/ws/40 I/certsandpermits/apply/forms. The text of the sample deed notification may be modified as appropriate to suit to this project. Any disputes over determinations regarding this Authorization (associated with the approved buffer impacts) shall be referred in writing to the Director within thirty (30) days of receipt of this notice for a decision. You can contest the Director's decision as provided in Articles 3 and 4 of G.S. 150B. To contest the Director's decision you must file a petition for an administrative hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:00am and 5:00pm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed -provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Telephone: (919) 431-3000, Fax: (919) 431-3100 A copy of the petition must also be served on DENR as follows: Ms. Mary Penny Thompson, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699-1601 This Authorization shall expire five (5) years from the date of this letter. This letter completes the review of the "No Practical Alternatives" determination under 15A NCAC 2B .0233. If you have any questions or would like a copy of the buffer rules, please call Amy Chapman at (919) 807-6400 or Karen Higgins at (919) 807-6360. This letter does not authorize any impacts to either Waters of the United States or Waters of the State. Please contact the US Army Corps of Engineers (USACE) or NC Division of Water Quality (DWQ) if any impacts are proposed to either of these waters. Sincerely, �V fv4Y Co en H. Su ins CHS/kah/asc Enclosures: Certificate of Completion cc: Lauren Witherspoon, DWQ Raleigh Regional Office Talecris Page 4 of 4 August 9, 2011 DLR Raleigh Regional Office O'Brien & Gere, Attn: Mr. Michael Hall, 2610 Wycliff Rd, Suite 104, Raleigh, NC 27607 Gene Cobb, Triangle Civilworks PA, 211 Tyler Drive, Smithfield, NC 27577 File Copy Filename: l 00040v5 TalecrisB iotherapeuties(Johnston)NBR o ` v TOWN OF CLAYTON I I a —' NO GRID J' TURFST PAVER; `THICKNESS to as 3 MIM THI THICKNESS , NORTH LAY PgRALLEL TO NEW CHANNEL DIRECTION OFFSET ADJACENT PAVERSY TOTAL LENGTH q•� E..oN..wsn�, AE .x F„ii wL, MUM. - _ _ _ _ IN;-........ _':: caaPacrED sueagnnE 1 VILANI1 Y MAI' NOT TO SGA.LE. .-........- i • , / f i / • •'•• , ,...., .... � - '/ ��/ I PROPOSED 24'GRAVEL DRIVEWAY EX. GRAVEL DRIVE TO BE REMOVED TO FOR ACCESS TO EX. JOHNSTON ` .. EXTENTSHOWN. ALLBASECOURSE COUNTY PUMP STATION LAYERS UNDER TOP GRAVELTO BE r- - ""REMOVED. PREPARE SEEDBED AND �� •••� � ` - - SEED ACCOPDING TO NCDENR `\ .`.•..` m ._ STANDARD PERMANENT SEEDING ❑.' 4 O SCHEDULE 00 111 CR ♦� � � � � '--- PRO.IECT AREA LIMITS /� . . • ` rl -�=i �r Oyu`.. ` - / �EX. /ILIGHT POLE TO BE RELOCATED y� o �. PROJECT AREA SUMMARY _ BI ZONE 21MPACT D+off PROTECT AREA: D�IAC -: - D+OO c � '�Ny `` \ ♦ ♦ • EX STING IMPERVIOUS AREA OA AC (40%) E% - AREA GOB %CHANGE 325% GAC — — — _ INV. 2]4.1` 1 / • NEW IMPERVIOUS AR - AC 18%' E%. 10'WATER LINE / TO BE LOWERED EX1 T' FORCE MAIN . O / ��'ay` � B• \� TO BE LOLNEREU. \ / ♦ Z • _ _____ ______.—.—._.—__ 81 ZONE I IMPACT `\ �, \ \. /\ ♦ _ g ' V \ EX. 10" FORCE MAIN �. ~ TO BE LOWERED \ SUMMARY EX t8'CMP TO _ERE MOVED ♦ `� / \ EX. INV. O_UT=2]1.80 PERMANENT SE ING HEDULE •.(/ "* EWCHANNEL _.,dAL OF Ex G ICEw.,raF -111 ) \ I c OUTLET EL=272.01' 5% IS POND v N�,. �r v : 5' SLOPE=0.FLAT BOTTOM I NORMAALL P POOL EL=27201' m SEmI rT 31 SIDE SLOPES PERMANENTTURFSTONE LINER ) , ( IT I a.ca sD.rl .c' _, • SEE DETAILTHIS SHEET ` _ R -11 TUTFEq\ Stk TIE —N-11111 T NE D ERTNEia AP..YA q fin �A NmR IAN, VM E4E R A , .,.N R.. SED D PREPARATION / 270 ? ..La. : 1C -...E nEv _Ee .RIALBMu..rx EaLOtAFOTov.A.A n,7v,R TCPL.S vn, [FH[. cnv 3EE'XN3�CESS:WVM ,N EROS GEIESFO MFNTATro. R. 'Y 'il_6PFR�RE RAREGE, OREE:FrtX, MFEMETTS. C: TOO— ILE55'F5t S 1 PtE vA4A..V ONE' AP?FU T.C. M . t•F CL \ E6N Rc EC: : H .1„^NING IS RI.ANJEO. AEF 11 .T AVF !'8KY AMFN'lM TS FERE F dA:1E0.S£5 MA SF RCAGHEN.W A ". 9. C d.E Tw Ox nPR Iw mOFv fi FIE rw�Arx EFM FU.F APY" E6 FH'I - ' 'E 1£ CP 6 EJNG \ ... .- .. EMF . CE M Y.* I ..1 WA iwiKIL�HE - H'IDHOSEFOFR. MP,Y MF ND EH IZER OA ROJGN LOORE SJRFF.F. C A; p' {ryF Sp qF FN', sGE. FA lY NJ'AS` FEOT.V_ \` •.` .1 C - PS THE OTHE gCUW NINEMETH.ASDE CIRSEO. Y iN SIIRFAiEf:: M"TETHACRED"C' ' PYW8LMRFTHE SLOPE TO LEAVE TE -MM CEPRf.3'F.Y.JS INT -SUI w HOTHM::+4ELAP_�iRuRcrH_:TNALa NG CVTB FILE 4 GRADED AREAE THAT WLL EEM— DEFRAY::+X:. .ARFIAM., -I J -- PE -HIT C'DM11EiES kiLO JY LNEARJTG UP RGL HART. INI. C 10 FN :E.:F. AEFM TOS­­ORIYI BY MJAI ]tM 3UHEA4El-..Y 5 Et) FI H4 HOENNG Oft.AE UFEDER. MAETf£RNS AS `FAMYS WATER. Rt-YAD--STfFF'JMO .YLL - 1 ECEEPi.UT ASJOTEEE45F.AEDEY � TiLLhGCIWIEMFM GN EV H. HP "TALI. W F OE9C1411: PROECT GATE: NIOIIBT.m1I _ ILIANGLE r GRIFOLS THERAPEUTICS PRELIMINARY SHEET NO „, FR�ETNE I BUILDING 640 BUFFER IMPACTS ., ( (\ ((I ([ l JNOT RELEASED IXl]® OM: RIE M/41E. {;%�•�i`.a F(YJ {,)1I` CLAYTON NC FOR CONSTRUCTION fig Faorerltir PP.OFE,IUNAL ALYX'I A'1ION SITE ADDRESS _� PeO:I ENE: REY DESCMPiFONS �--•�"^^' TYLER DPU L 8388 US HWY, 70 BUS WEST 20 0 20 40 08/082017 REVISIONS ��--�-� SN1I I NF'ILLD NC 2;57 r CLAYTON, NC 27524 1•=20 0 O a