Loading...
HomeMy WebLinkAboutAddington Crossing Subdivision - HydroCAD Report WS2BP-3 DET-4 Det 4 DR-3 DR-3 Ex-3 Ex WS #3 Ex-4 Ex-4 P-4 Det Pond 4 CP2 CP2 XCP2 XCP2 Routing Diagram for USI Revision WS2-Detention Prepared by Cardno, Printed 8/15/2017 HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Subcat Reach Pond Link USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 2HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Pipe Listing (all nodes) Line# Node Number In-Invert (feet) Out-Invert (feet) Length (feet) Slope (ft/ft) n Diam/Width (inches) Height (inches) Inside-Fill (inches) 1 DET-4 0.00 0.00 333.0 0.0100 0.013 24.0 0.0 0.0 2 P-4 581.83 580.95 58.8 0.0150 0.013 36.0 0.0 0.0 Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 3HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment BP-3: Runoff = 102.87 cfs @ 12.65 hrs, Volume= 737,137 cf, Depth= 1.71" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (sf) CN Description 2,229,836 55 Woods, Good, HSG B 2,937,251 71 Meadow, non-grazed, HSG C 5,167,087 64 Weighted Average 5,167,087 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.5 232 0.0200 0.15 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 Shallow Concentrated Flow, Shallow Conc Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 Shallow Concentrated Flow, Shallow Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.2 1,117 0.0210 8.58 231.62 Channel Flow, Ex Channel 2 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 57.8 5,232 Total Subcatchment BP-3: Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)115 110 105 100 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 10-Year Rainfall=5.20" Runoff Area=5,167,087 sf Runoff Volume=737,137 cf Runoff Depth=1.71" Flow Length=5,232' Tc=57.8 min CN=64 102.87 cfs Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 4HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DET-4: Det 4 Runoff = 40.89 cfs @ 12.04 hrs, Volume= 103,287 cf, Depth= 2.02" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (sf) CN Description 612,612 68 1 acre lots, 20% imp, HSG B 490,090 80.00% Pervious Area 122,522 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.0 150 0.0367 0.28 Sheet Flow, Sheet Range n= 0.130 P2= 3.56" 1.2 213 0.0367 2.87 Shallow Concentrated Flow, Shallow Grassed Waterway Kv= 15.0 fps 0.7 131 0.0381 2.93 Shallow Concentrated Flow, Shallow Grassed Waterway Kv= 15.0 fps 0.8 333 0.0100 7.20 22.62 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 11.7 827 Total Subcatchment DET-4: Det 4 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 10-Year Rainfall=5.20" Runoff Area=612,612 sf Runoff Volume=103,287 cf Runoff Depth=2.02" Flow Length=827' Tc=11.7 min CN=68 40.89 cfs Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 5HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DR-3: DR-3 Runoff = 30.75 cfs @ 11.97 hrs, Volume= 59,943 cf, Depth= 2.02" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (sf) CN Description 355,530 68 1 acre lots, 20% imp, HSG B 284,424 80.00% Pervious Area 71,106 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Direct Subcatchment DR-3: DR-3 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 10-Year Rainfall=5.20" Runoff Area=355,530 sf Runoff Volume=59,943 cf Runoff Depth=2.02" Tc=5.0 min CN=68 30.75 cfs Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 6HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment Ex-3: Ex WS #3 Runoff = 96.35 cfs @ 12.65 hrs, Volume= 703,872 cf, Depth= 1.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (ac) CN Description 62.220 55 Woods, Good, HSG B 56.230 71 Meadow, non-grazed, HSG C 118.450 63 Weighted Average 118.450 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.5 232 0.0200 0.15 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 Shallow Concentrated Flow, Shallow Conc Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 Shallow Concentrated Flow, Shallow Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.5 1,117 0.0156 7.39 199.63 Channel Flow, Ex Channel 2 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 58.1 5,232 Total Subcatchment Ex-3: Ex WS #3 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)105 100 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 10-Year Rainfall=5.20" Runoff Area=118.450 ac Runoff Volume=703,872 cf Runoff Depth=1.64" Flow Length=5,232' Tc=58.1 min CN=63 96.35 cfs Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 7HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment Ex-4: Ex-4 Runoff = 14.43 cfs @ 12.41 hrs, Volume= 91,449 cf, Depth= 1.08" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (sf) CN Description 1,014,948 55 Woods, Good, HSG B 1,014,948 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.2 150 0.0200 0.09 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 5.0 921 0.0370 3.10 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 6.0 2,650 0.0250 7.41 251.86 Trap/Vee/Rect Channel Flow, Bot.W=5.00' D=2.00' Z= 6.0 '/' Top.W=29.00' n= 0.035 Earth, dense weeds 39.2 3,721 Total Subcatchment Ex-4: Ex-4 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 10-Year Rainfall=5.20" Runoff Area=1,014,948 sf Runoff Volume=91,449 cf Runoff Depth=1.08" Flow Length=3,721' Tc=39.2 min CN=55 14.43 cfs Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 8HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Pond P-4: Det Pond 4 Inflow Area = 612,612 sf, 20.00% Impervious, Inflow Depth = 2.02" for 10-Year event Inflow = 40.89 cfs @ 12.04 hrs, Volume= 103,287 cf Outflow = 36.74 cfs @ 12.09 hrs, Volume= 95,642 cf, Atten= 10%, Lag= 2.7 min Primary = 36.74 cfs @ 12.09 hrs, Volume= 95,642 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 586.94' @ 12.09 hrs Surf.Area= 10,274 sf Storage= 16,625 cf Plug-Flow detention time= 60.3 min calculated for 95,642 cf (93% of inflow) Center-of-Mass det. time= 20.7 min ( 873.3 - 852.6 ) Volume Invert Avail.Storage Storage Description #1 585.00' 40,551 cf Bio Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq-ft) (%) (cubic-feet) (cubic-feet) 585.00 7,081 0.0 0 0 586.00 8,551 100.0 7,816 7,816 587.00 10,392 100.0 9,472 17,288 588.00 11,617 100.0 11,005 28,292 589.00 12,900 100.0 12,259 40,551 Device Routing Invert Outlet Devices #1 Primary 581.83'36.0" Round Culvert L= 58.8' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 581.83' / 580.95' S= 0.0150 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 585.98'Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 12.00 12.00 12.00 12.00 #3 Secondary 588.00'10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=36.69 cfs @ 12.09 hrs HW=586.94' (Free Discharge) 1=Culvert (Passes 36.69 cfs of 64.62 cfs potential flow) 2=Custom Weir/Orifice (Weir Controls 36.69 cfs @ 3.20 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=585.00' (Free Discharge) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 9HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Pond P-4: Det Pond 4 Inflow Outflow Primary Secondary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=612,612 sf Peak Elev=586.94' Storage=16,625 cf 40.89 cfs 36.74 cfs36.74 cfs 0.00 cfs Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 10HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Link CP2: CP2 Inflow Area = 6,135,229 sf, 3.16% Impervious, Inflow Depth = 1.75" for 10-Year event Inflow = 110.30 cfs @ 12.65 hrs, Volume= 892,722 cf Primary = 110.30 cfs @ 12.65 hrs, Volume= 892,722 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP2: CP2 Inflow Primary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)120 115 110 105 100 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=6,135,229 sf 110.30 cfs110.30 cfs Type II 24-hr 10-Year Rainfall=5.20"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 11HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Link XCP2: XCP2 Inflow Area = 6,174,630 sf, 0.00% Impervious, Inflow Depth = 1.55" for 10-Year event Inflow = 108.18 cfs @ 12.59 hrs, Volume= 795,321 cf Primary = 108.18 cfs @ 12.59 hrs, Volume= 795,321 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link XCP2: XCP2 Inflow Primary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)120 115 110 105 100 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=6,174,630 sf 108.18 cfs108.18 cfs Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 12HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment BP-3: Runoff = 149.78 cfs @ 12.65 hrs, Volume= 1,036,461 cf, Depth= 2.41" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (sf) CN Description 2,229,836 55 Woods, Good, HSG B 2,937,251 71 Meadow, non-grazed, HSG C 5,167,087 64 Weighted Average 5,167,087 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.5 232 0.0200 0.15 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 Shallow Concentrated Flow, Shallow Conc Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 Shallow Concentrated Flow, Shallow Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.2 1,117 0.0210 8.58 231.62 Channel Flow, Ex Channel 2 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 57.8 5,232 Total Subcatchment BP-3: Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Type II 24-hr 25-Year Rainfall=6.20" Runoff Area=5,167,087 sf Runoff Volume=1,036,461 cf Runoff Depth=2.41" Flow Length=5,232' Tc=57.8 min CN=64 149.78 cfs Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 13HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DET-4: Det 4 Runoff = 56.52 cfs @ 12.04 hrs, Volume= 141,683 cf, Depth= 2.78" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (sf) CN Description 612,612 68 1 acre lots, 20% imp, HSG B 490,090 80.00% Pervious Area 122,522 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.0 150 0.0367 0.28 Sheet Flow, Sheet Range n= 0.130 P2= 3.56" 1.2 213 0.0367 2.87 Shallow Concentrated Flow, Shallow Grassed Waterway Kv= 15.0 fps 0.7 131 0.0381 2.93 Shallow Concentrated Flow, Shallow Grassed Waterway Kv= 15.0 fps 0.8 333 0.0100 7.20 22.62 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 11.7 827 Total Subcatchment DET-4: Det 4 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 25-Year Rainfall=6.20" Runoff Area=612,612 sf Runoff Volume=141,683 cf Runoff Depth=2.78" Flow Length=827' Tc=11.7 min CN=68 56.52 cfs Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 14HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DR-3: DR-3 Runoff = 42.17 cfs @ 11.96 hrs, Volume= 82,226 cf, Depth= 2.78" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (sf) CN Description 355,530 68 1 acre lots, 20% imp, HSG B 284,424 80.00% Pervious Area 71,106 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Direct Subcatchment DR-3: DR-3 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 25-Year Rainfall=6.20" Runoff Area=355,530 sf Runoff Volume=82,226 cf Runoff Depth=2.78" Tc=5.0 min CN=68 42.17 cfs Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 15HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment Ex-3: Ex WS #3 Runoff = 141.96 cfs @ 12.60 hrs, Volume= 996,367 cf, Depth= 2.32" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (ac) CN Description 62.220 55 Woods, Good, HSG B 56.230 71 Meadow, non-grazed, HSG C 118.450 63 Weighted Average 118.450 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.5 232 0.0200 0.15 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 Shallow Concentrated Flow, Shallow Conc Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 Shallow Concentrated Flow, Shallow Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.5 1,117 0.0156 7.39 199.63 Channel Flow, Ex Channel 2 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 58.1 5,232 Total Subcatchment Ex-3: Ex WS #3 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Type II 24-hr 25-Year Rainfall=6.20" Runoff Area=118.450 ac Runoff Volume=996,367 cf Runoff Depth=2.32" Flow Length=5,232' Tc=58.1 min CN=63 141.96 cfs Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 16HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment Ex-4: Ex-4 Runoff = 23.98 cfs @ 12.41 hrs, Volume= 138,207 cf, Depth= 1.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (sf) CN Description 1,014,948 55 Woods, Good, HSG B 1,014,948 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.2 150 0.0200 0.09 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 5.0 921 0.0370 3.10 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 6.0 2,650 0.0250 7.41 251.86 Trap/Vee/Rect Channel Flow, Bot.W=5.00' D=2.00' Z= 6.0 '/' Top.W=29.00' n= 0.035 Earth, dense weeds 39.2 3,721 Total Subcatchment Ex-4: Ex-4 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 25-Year Rainfall=6.20" Runoff Area=1,014,948 sf Runoff Volume=138,207 cf Runoff Depth=1.63" Flow Length=3,721' Tc=39.2 min CN=55 23.98 cfs Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 17HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Pond P-4: Det Pond 4 Inflow Area = 612,612 sf, 20.00% Impervious, Inflow Depth = 2.78" for 25-Year event Inflow = 56.52 cfs @ 12.04 hrs, Volume= 141,683 cf Outflow = 52.07 cfs @ 12.08 hrs, Volume= 134,037 cf, Atten= 8%, Lag= 2.4 min Primary = 52.07 cfs @ 12.08 hrs, Volume= 134,037 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 587.19' @ 12.08 hrs Surf.Area= 10,620 sf Storage= 19,244 cf Plug-Flow detention time= 47.0 min calculated for 134,024 cf (95% of inflow) Center-of-Mass det. time= 17.0 min ( 860.3 - 843.3 ) Volume Invert Avail.Storage Storage Description #1 585.00' 40,551 cf Bio Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq-ft) (%) (cubic-feet) (cubic-feet) 585.00 7,081 0.0 0 0 586.00 8,551 100.0 7,816 7,816 587.00 10,392 100.0 9,472 17,288 588.00 11,617 100.0 11,005 28,292 589.00 12,900 100.0 12,259 40,551 Device Routing Invert Outlet Devices #1 Primary 581.83'36.0" Round Culvert L= 58.8' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 581.83' / 580.95' S= 0.0150 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 585.98'Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 12.00 12.00 12.00 12.00 #3 Secondary 588.00'10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=52.04 cfs @ 12.08 hrs HW=587.19' (Free Discharge) 1=Culvert (Passes 52.04 cfs of 66.83 cfs potential flow) 2=Custom Weir/Orifice (Weir Controls 52.04 cfs @ 3.60 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=585.00' (Free Discharge) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 18HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Pond P-4: Det Pond 4 Inflow Outflow Primary Secondary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=612,612 sf Peak Elev=587.19' Storage=19,244 cf 56.52 cfs 52.07 cfs52.07 cfs 0.00 cfs Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 19HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Link CP2: CP2 Inflow Area = 6,135,229 sf, 3.16% Impervious, Inflow Depth = 2.45" for 25-Year event Inflow = 159.65 cfs @ 12.59 hrs, Volume= 1,252,724 cf Primary = 159.65 cfs @ 12.59 hrs, Volume= 1,252,724 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP2: CP2 Inflow Primary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Inflow Area=6,135,229 sf 159.65 cfs159.65 cfs Type II 24-hr 25-Year Rainfall=6.20"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 20HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Link XCP2: XCP2 Inflow Area = 6,174,630 sf, 0.00% Impervious, Inflow Depth = 2.20" for 25-Year event Inflow = 161.70 cfs @ 12.59 hrs, Volume= 1,134,573 cf Primary = 161.70 cfs @ 12.59 hrs, Volume= 1,134,573 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link XCP2: XCP2 Inflow Primary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Inflow Area=6,174,630 sf 161.70 cfs161.70 cfs Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 21HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment BP-3: Runoff = 190.21 cfs @ 12.65 hrs, Volume= 1,295,633 cf, Depth= 3.01" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (sf) CN Description 2,229,836 55 Woods, Good, HSG B 2,937,251 71 Meadow, non-grazed, HSG C 5,167,087 64 Weighted Average 5,167,087 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.5 232 0.0200 0.15 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 Shallow Concentrated Flow, Shallow Conc Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 Shallow Concentrated Flow, Shallow Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.2 1,117 0.0210 8.58 231.62 Channel Flow, Ex Channel 2 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 57.8 5,232 Total Subcatchment BP-3: Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)210 200 190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Type II 24-hr 50-Year Rainfall=7.01" Runoff Area=5,167,087 sf Runoff Volume=1,295,633 cf Runoff Depth=3.01" Flow Length=5,232' Tc=57.8 min CN=64 190.21 cfs Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 22HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DET-4: Det 4 Runoff = 69.73 cfs @ 12.04 hrs, Volume= 174,505 cf, Depth= 3.42" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (sf) CN Description 612,612 68 1 acre lots, 20% imp, HSG B 490,090 80.00% Pervious Area 122,522 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.0 150 0.0367 0.28 Sheet Flow, Sheet Range n= 0.130 P2= 3.56" 1.2 213 0.0367 2.87 Shallow Concentrated Flow, Shallow Grassed Waterway Kv= 15.0 fps 0.7 131 0.0381 2.93 Shallow Concentrated Flow, Shallow Grassed Waterway Kv= 15.0 fps 0.8 333 0.0100 7.20 22.62 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 11.7 827 Total Subcatchment DET-4: Det 4 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 50-Year Rainfall=7.01" Runoff Area=612,612 sf Runoff Volume=174,505 cf Runoff Depth=3.42" Flow Length=827' Tc=11.7 min CN=68 69.73 cfs Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 23HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DR-3: DR-3 Runoff = 51.78 cfs @ 11.96 hrs, Volume= 101,274 cf, Depth= 3.42" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (sf) CN Description 355,530 68 1 acre lots, 20% imp, HSG B 284,424 80.00% Pervious Area 71,106 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Direct Subcatchment DR-3: DR-3 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 50-Year Rainfall=7.01" Runoff Area=355,530 sf Runoff Volume=101,274 cf Runoff Depth=3.42" Tc=5.0 min CN=68 51.78 cfs Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 24HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment Ex-3: Ex WS #3 Runoff = 182.01 cfs @ 12.59 hrs, Volume= 1,250,502 cf, Depth= 2.91" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (ac) CN Description 62.220 55 Woods, Good, HSG B 56.230 71 Meadow, non-grazed, HSG C 118.450 63 Weighted Average 118.450 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.5 232 0.0200 0.15 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 Shallow Concentrated Flow, Shallow Conc Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 Shallow Concentrated Flow, Shallow Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.5 1,117 0.0156 7.39 199.63 Channel Flow, Ex Channel 2 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 58.1 5,232 Total Subcatchment Ex-3: Ex WS #3 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)200 190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Type II 24-hr 50-Year Rainfall=7.01" Runoff Area=118.450 ac Runoff Volume=1,250,502 cf Runoff Depth=2.91" Flow Length=5,232' Tc=58.1 min CN=63 182.01 cfs Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 25HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment Ex-4: Ex-4 Runoff = 32.62 cfs @ 12.41 hrs, Volume= 180,171 cf, Depth= 2.13" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (sf) CN Description 1,014,948 55 Woods, Good, HSG B 1,014,948 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.2 150 0.0200 0.09 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 5.0 921 0.0370 3.10 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 6.0 2,650 0.0250 7.41 251.86 Trap/Vee/Rect Channel Flow, Bot.W=5.00' D=2.00' Z= 6.0 '/' Top.W=29.00' n= 0.035 Earth, dense weeds 39.2 3,721 Total Subcatchment Ex-4: Ex-4 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 50-Year Rainfall=7.01" Runoff Area=1,014,948 sf Runoff Volume=180,171 cf Runoff Depth=2.13" Flow Length=3,721' Tc=39.2 min CN=55 32.62 cfs Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 26HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Pond P-4: Det Pond 4 Inflow Area = 612,612 sf, 20.00% Impervious, Inflow Depth = 3.42" for 50-Year event Inflow = 69.73 cfs @ 12.04 hrs, Volume= 174,505 cf Outflow = 64.80 cfs @ 12.08 hrs, Volume= 166,860 cf, Atten= 7%, Lag= 2.3 min Primary = 64.80 cfs @ 12.08 hrs, Volume= 166,860 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 587.38' @ 12.08 hrs Surf.Area= 10,852 sf Storage= 21,277 cf Plug-Flow detention time= 40.3 min calculated for 166,842 cf (96% of inflow) Center-of-Mass det. time= 15.4 min ( 852.7 - 837.3 ) Volume Invert Avail.Storage Storage Description #1 585.00' 40,551 cf Bio Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq-ft) (%) (cubic-feet) (cubic-feet) 585.00 7,081 0.0 0 0 586.00 8,551 100.0 7,816 7,816 587.00 10,392 100.0 9,472 17,288 588.00 11,617 100.0 11,005 28,292 589.00 12,900 100.0 12,259 40,551 Device Routing Invert Outlet Devices #1 Primary 581.83'36.0" Round Culvert L= 58.8' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 581.83' / 580.95' S= 0.0150 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 585.98'Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 12.00 12.00 12.00 12.00 #3 Secondary 588.00'10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=64.73 cfs @ 12.08 hrs HW=587.37' (Free Discharge) 1=Culvert (Passes 64.73 cfs of 68.45 cfs potential flow) 2=Custom Weir/Orifice (Weir Controls 64.73 cfs @ 3.87 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=585.00' (Free Discharge) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 27HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Pond P-4: Det Pond 4 Inflow Outflow Primary Secondary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=612,612 sf Peak Elev=587.38' Storage=21,277 cf 69.73 cfs 64.80 cfs64.80 cfs 0.00 cfs Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 28HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Link CP2: CP2 Inflow Area = 6,135,229 sf, 3.16% Impervious, Inflow Depth = 3.06" for 50-Year event Inflow = 202.45 cfs @ 12.59 hrs, Volume= 1,563,767 cf Primary = 202.45 cfs @ 12.59 hrs, Volume= 1,563,767 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP2: CP2 Inflow Primary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)220 210 200 190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Inflow Area=6,135,229 sf 202.45 cfs202.45 cfs Type II 24-hr 50-Year Rainfall=7.01"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 29HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Link XCP2: XCP2 Inflow Area = 6,174,630 sf, 0.00% Impervious, Inflow Depth = 2.78" for 50-Year event Inflow = 208.34 cfs @ 12.59 hrs, Volume= 1,430,673 cf Primary = 208.34 cfs @ 12.59 hrs, Volume= 1,430,673 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link XCP2: XCP2 Inflow Primary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)230 220 210 200 190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Inflow Area=6,174,630 sf 208.34 cfs208.34 cfs Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 30HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment BP-3: Runoff = 234.32 cfs @ 12.64 hrs, Volume= 1,580,233 cf, Depth= 3.67" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.86" Area (sf) CN Description 2,229,836 55 Woods, Good, HSG B 2,937,251 71 Meadow, non-grazed, HSG C 5,167,087 64 Weighted Average 5,167,087 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.5 232 0.0200 0.15 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 Shallow Concentrated Flow, Shallow Conc Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 Shallow Concentrated Flow, Shallow Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.2 1,117 0.0210 8.58 231.62 Channel Flow, Ex Channel 2 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 57.8 5,232 Total Subcatchment BP-3: Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)260 250 240 230 220 210 200 190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Type II 24-hr 100-Year Rainfall=7.86" Runoff Area=5,167,087 sf Runoff Volume=1,580,233 cf Runoff Depth=3.67" Flow Length=5,232' Tc=57.8 min CN=64 234.32 cfs Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 31HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DET-4: Det 4 Runoff = 83.96 cfs @ 12.04 hrs, Volume= 210,226 cf, Depth= 4.12" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.86" Area (sf) CN Description 612,612 68 1 acre lots, 20% imp, HSG B 490,090 80.00% Pervious Area 122,522 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.0 150 0.0367 0.28 Sheet Flow, Sheet Range n= 0.130 P2= 3.56" 1.2 213 0.0367 2.87 Shallow Concentrated Flow, Shallow Grassed Waterway Kv= 15.0 fps 0.7 131 0.0381 2.93 Shallow Concentrated Flow, Shallow Grassed Waterway Kv= 15.0 fps 0.8 333 0.0100 7.20 22.62 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 11.7 827 Total Subcatchment DET-4: Det 4 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 100-Year Rainfall=7.86" Runoff Area=612,612 sf Runoff Volume=210,226 cf Runoff Depth=4.12" Flow Length=827' Tc=11.7 min CN=68 83.96 cfs Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 32HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment DR-3: DR-3 Runoff = 62.10 cfs @ 11.96 hrs, Volume= 122,005 cf, Depth= 4.12" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.86" Area (sf) CN Description 355,530 68 1 acre lots, 20% imp, HSG B 284,424 80.00% Pervious Area 71,106 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Direct Subcatchment DR-3: DR-3 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)65 60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 100-Year Rainfall=7.86" Runoff Area=355,530 sf Runoff Volume=122,005 cf Runoff Depth=4.12" Tc=5.0 min CN=68 62.10 cfs Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 33HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment Ex-3: Ex WS #3 Runoff = 225.90 cfs @ 12.59 hrs, Volume= 1,530,246 cf, Depth= 3.56" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.86" Area (ac) CN Description 62.220 55 Woods, Good, HSG B 56.230 71 Meadow, non-grazed, HSG C 118.450 63 Weighted Average 118.450 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.5 232 0.0200 0.15 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 Shallow Concentrated Flow, Shallow Conc Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 Shallow Concentrated Flow, Shallow Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.5 1,117 0.0156 7.39 199.63 Channel Flow, Ex Channel 2 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 58.1 5,232 Total Subcatchment Ex-3: Ex WS #3 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)250 240 230 220 210 200 190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Type II 24-hr 100-Year Rainfall=7.86" Runoff Area=118.450 ac Runoff Volume=1,530,246 cf Runoff Depth=3.56" Flow Length=5,232' Tc=58.1 min CN=63 225.90 cfs Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 34HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Subcatchment Ex-4: Ex-4 Runoff = 42.35 cfs @ 12.38 hrs, Volume= 227,418 cf, Depth= 2.69" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.86" Area (sf) CN Description 1,014,948 55 Woods, Good, HSG B 1,014,948 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.2 150 0.0200 0.09 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 5.0 921 0.0370 3.10 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 6.0 2,650 0.0250 7.41 251.86 Trap/Vee/Rect Channel Flow, Bot.W=5.00' D=2.00' Z= 6.0 '/' Top.W=29.00' n= 0.035 Earth, dense weeds 39.2 3,721 Total Subcatchment Ex-4: Ex-4 Runoff Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 100-Year Rainfall=7.86" Runoff Area=1,014,948 sf Runoff Volume=227,418 cf Runoff Depth=2.69" Flow Length=3,721' Tc=39.2 min CN=55 42.35 cfs Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 35HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Pond P-4: Det Pond 4 Inflow Area = 612,612 sf, 20.00% Impervious, Inflow Depth = 4.12" for 100-Year event Inflow = 83.96 cfs @ 12.04 hrs, Volume= 210,226 cf Outflow = 71.04 cfs @ 12.09 hrs, Volume= 202,581 cf, Atten= 15%, Lag= 3.5 min Primary = 71.04 cfs @ 12.09 hrs, Volume= 202,581 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 587.69' @ 12.09 hrs Surf.Area= 11,233 sf Storage= 24,710 cf Plug-Flow detention time= 35.5 min calculated for 202,581 cf (96% of inflow) Center-of-Mass det. time= 14.4 min ( 846.3 - 832.0 ) Volume Invert Avail.Storage Storage Description #1 585.00' 40,551 cf Bio Pond (Prismatic) Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq-ft) (%) (cubic-feet) (cubic-feet) 585.00 7,081 0.0 0 0 586.00 8,551 100.0 7,816 7,816 587.00 10,392 100.0 9,472 17,288 588.00 11,617 100.0 11,005 28,292 589.00 12,900 100.0 12,259 40,551 Device Routing Invert Outlet Devices #1 Primary 581.83'36.0" Round Culvert L= 58.8' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 581.83' / 580.95' S= 0.0150 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 585.98'Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 1.00 2.00 Width (feet) 12.00 12.00 12.00 12.00 #3 Secondary 588.00'10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=71.03 cfs @ 12.09 hrs HW=587.69' (Free Discharge) 1=Culvert (Inlet Controls 71.03 cfs @ 10.05 fps) 2=Custom Weir/Orifice (Passes 71.03 cfs of 87.50 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=585.00' (Free Discharge) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 36HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Pond P-4: Det Pond 4 Inflow Outflow Primary Secondary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=612,612 sf Peak Elev=587.69' Storage=24,710 cf 83.96 cfs 71.04 cfs71.04 cfs 0.00 cfs Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 37HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Link CP2: CP2 Inflow Area = 6,135,229 sf, 3.16% Impervious, Inflow Depth = 3.73" for 100-Year event Inflow = 249.22 cfs @ 12.59 hrs, Volume= 1,904,819 cf Primary = 249.22 cfs @ 12.59 hrs, Volume= 1,904,819 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link CP2: CP2 Inflow Primary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)260 240 220 200 180 160 140 120 100 80 60 40 20 0 Inflow Area=6,135,229 sf 249.22 cfs249.22 cfs Type II 24-hr 100-Year Rainfall=7.86"USI Revision WS2-Detention Printed 8/15/2017Prepared by Cardno Page 38HydroCAD® 10.00-19 s/n 08568 © 2016 HydroCAD Software Solutions LLC Summary for Link XCP2: XCP2 Inflow Area = 6,174,630 sf, 0.00% Impervious, Inflow Depth = 3.42" for 100-Year event Inflow = 259.65 cfs @ 12.59 hrs, Volume= 1,757,664 cf Primary = 259.65 cfs @ 12.59 hrs, Volume= 1,757,664 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Link XCP2: XCP2 Inflow Primary Hydrograph Time (hours) 95908580757065605550454035302520151050Flow (cfs)280 260 240 220 200 180 160 140 120 100 80 60 40 20 0 Inflow Area=6,174,630 sf 259.65 cfs259.65 cfs