HomeMy WebLinkAbout20080313 Ver 1_Email_20081015Re Replacement of Bridge No 29 over Clark's Creek on SR 1007 (Po %
go:313
,, C)
Subject: Re Replacement of Bridge No 29 over Clark's Creek on SR 1007 (Poole Road) in Wake Co
TIP No B-4300
From: Rob Ridings <rob ridings@ncmail net>
Date: Wed, 15 Oct 2008 15 22 50 -0400
To: "Murray, Christopher A" <cmurray@ncdot gov>
CC: "Pearson, Donald R" <drpearson@ncdot gov>, "Jernigan, Dennis W" <dwjemigan@ncdot gov>,
"Moore, David B" <dbmoore@ncdot gov>, "Luther, Mark W" <mwluther@ncdot gov>, "Robbins,
Timothy W" <twrobbms@ncdot gov>
For your records, after seeing this site today, I am satisfied that DOT is doing
everything appropriate to get this site into compliance and stabilized as necessary
With possible rain coming in the next several days, I definitely recommend DOT
keeping a sharp eye out for further sediment loss Otherwise, the action items
listed in Chris's email seem appropriate to me and should keep everything fine at
least until the site is dewatered
Again, I appreciate DOT's speedy response to my inquiries for this project Please
keep me updated with any other noteworthy developments here
Thanks,
-Rob Ridings
Murray, Christopher A wrote
Rob,
I called folks from the Roadside Environmental Field Operations Office after
receiving your voice mail earlier today Tim Robbins (Field Ops Technician) was
at the site during mid-morning and provided me with the following information
-Grubbing activity has been conducted without perimeter erosion control measures
in place (see attached photograph), buffer has been grubbed without perimeter
erosion control measures in place, and two stumps were grubbed on creek bank (see
attached photograph) resulting in loss of material into Clark's Creek
The following action items were discussed with the contractor and the NCDOT
inspector
- Recover material lost in creek from grubbing the tree stumps along the creek,
including clearing debris immediately
- Stabilize raw areas on creek banks with coir fiber matting immediately
- Install all perimeter erosion control measures by tomorrow
- Work in buffer area must be conducted in continuous manner until stabilized
Tim indicated that he would be in contact with Resident Engineers office today to
ensure that immediate action items are addressed today, and will visit site
tomorrow to ensure that other items are addressed as directed
David Moore (NCDOT Resident Engineer) responded at noon and indicated that a
suspension of operations letter is being given to the contractor due to this
issue Until the issues are corrected and approved by Tim Robbins on his site
visit tomorrow, there will be no other work happening on the project
We wanted to thank you for bringing this issue to our attention Contact me or
Tim Robbins or Donald Pearson if you want to come out to the site at your
convenience
Chris Murray
1 of 1 10/15/2008 3 23 PM
Replacement of Bridge No 29 over Clark's Creek on SR 1007 (Poole
(D SD 313 lpl*?11
Subject: Replacement of Bridge No 29 over Clark's Creek on SR 1007 (Poole Road) in Wake Co TIP
No B-4300
From: "Murray, Christopher A" <cmurray@ncdot gov>
Date: Tue, 14 Oct 2008 16 02 00 -0400
To: Rob Ridings <rob ridings@ncmail net>
CC: "Pearson, Donald R" <drpearson@ncdot gov>, "Jernigan, Dennis W" <dwjernigan@ncdot gov>,
"Moore, David B" <dbmoore@ncdot gov>, "Luther, Mark W" <mwluther@ncdot gov>, "Robbins,
Timothy W" <twrobbins@ncdot gov>
Rob,
I called folks from the Roadside Environmental Field Operations Office after
receiving your voice mail earlier today Tim Robbins (Field Ops Technician) was at
the site during mid-morning and provided me with the following information
-Grubbing activity has been conducted without perimeter erosion control measures in
place (see attached photograph), buffer has been grubbed without perimeter erosion
control measures in place, and two stumps were grubbed on creek bank (see attached
photograph) resulting in loss of material into Clark's Creek
The following action items were discussed with the contractor and the NCDOT
inspector
Recover material lost in creek from grubbing the tree stumps along the creek,
including clearing debris immediately
- Stabilize raw areas on creek banks with coir fiber matting immediately
? - Install all perimeter erosion control measures by tomorrow
,, - Work in buffer area must be conducted in continuous manner until stabilized
Tim indicated that he would be in contact with Resident Engineers office today to
ensure that immediate action items are addressed today, and will visit site tomorrow
to ensure that other items are addressed as directed
David Moore (NCDOT Resident Engineer) responded at noon and indicated that a
suspension of operations letter is being given to the contractor due to this issue
Until the issues are corrected and approved by Tim Robbins on his site visit
tomorrow, there will be no other work happening on the project
We wanted to thank you for bringing this issue to our attention Contact me or Tim
Robbins or Donald Pearson if you want to come out to the site at your convenience
Chris Murray
wed
1'P,49
I of 3 ^?„ go66,As- 3613773 10/15/2008 8 11 AM
Replacement of Bridge No. 29 over Clark's Creek on SR 1007 (Poole...
2 of 3 10/1 x12008 8:11 AM
Replacement of Bridge No. 29 over Clark's Creek on SR 1007 (Poole...
Content-Description: DSC02910.JPG
DSC02910.JPG Content-Type: image/jpeg
Content-Encoding: base64
Content-Description: DSC02906.JPG
DSC02906.JPG Content-Type: image/jpeg
Content-Encoding: base64
3 of 3 10/15/2008 8:11 AM
S
?6
?_
??
??
s?
? ? ??
G
?'
??
H
? w
? ` ]?1//
?\
1 ? ?y?
1 ??
_L
\.\? `?
Y
<p??\
L
v
r
\v `^]
``V?
V
?J
? +
V 1
A?
VJ
.p
?J
i
0
v
1?