Loading...
HomeMy WebLinkAbout20170824 Ver 1_Corps verifications NWP 3 and 13_20170802 Carpenter,Kristi From:Hair, Sarah E CIV CESAW CESAD (US) <Sarah.E.Hair@usace.army.mil> Sent:Wednesday, August 02, 2017 3:44 PM To:Rerko, James J Cc:Steenhuis, Joanne Subject:Corps verifications NWP 3 and 13 Attachments:signed PJD.pdf Jim, The following projects are authorized as follows: Corps Action ID: SAW-2016-00800 Project Name: bridge 211 over Jockey Branch on SR 1904 County: Columbus *signed PJD attached Corps Action ID: SAW-2017-01583 Project Name: bridge 188 over Brier Creek on SR 1516 County: Columbus The 2017 NWPs 3 and 13, along with the General and Regional Conditions, are available for download at the Wilmington District website below: http://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Permits/2017- Nationwide-Permits/ This email serves as official Corps verification that the projects as proposed qualify for NWPs 3 and/or 13. No further written verification is required from this office. Please let me know if you have any questions. Liz Hair Project Manager USACE-Wilmington District Wilmington Regulatory Field Office 69 Darlington Avenue Wilmington, NC 28403 910-251-4049 Sarah.e.hair@usace.army.mil 1