HomeMy WebLinkAbout20170824 Ver 1_Corps verifications NWP 3 and 13_20170802
Carpenter,Kristi
From:Hair, Sarah E CIV CESAW CESAD (US)
<Sarah.E.Hair@usace.army.mil>
Sent:Wednesday, August 02, 2017 3:44 PM
To:Rerko, James J
Cc:Steenhuis, Joanne
Subject:Corps verifications NWP 3 and 13
Attachments:signed PJD.pdf
Jim,
The following projects are authorized as follows:
Corps Action ID: SAW-2016-00800
Project Name: bridge 211 over Jockey Branch on SR 1904
County: Columbus
*signed PJD attached
Corps Action ID: SAW-2017-01583
Project Name: bridge 188 over Brier Creek on SR 1516
County: Columbus
The 2017 NWPs 3 and 13, along with the General and Regional Conditions, are available
for download at the Wilmington District website below:
http://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Permits/2017-
Nationwide-Permits/
This email serves as official Corps verification that the projects as proposed qualify for
NWPs 3 and/or 13. No further written verification is required from this office.
Please let me know if you have any questions.
Liz Hair
Project Manager
USACE-Wilmington District
Wilmington Regulatory Field Office
69 Darlington Avenue
Wilmington, NC 28403
910-251-4049
Sarah.e.hair@usace.army.mil
1