Loading...
HomeMy WebLinkAbout20150955 Ver 1_RE Bent 8 Pier 8_ Slurry loss_ NO FRAC OUT_20170731Carpenter,Kristi From: Lane, Stephen Sent: Monday, July 31, 2017 2:47 PM To: Herndon, T. Mason Cc: Brittingham, Cathy; Shaver, Brad ; Steenhuis, Joanne; Weychert, Curtis R Subject: RE: Bent 8 Pier 8_ Slurry loss_ NO FRAC OUT Hi Mason, DCM has consulted with our fisheries experts and have determined that it is appropriate to add the additional 10' of casing to Bent 8 Pier 8 and vibrate it down to depth during the in-water work moratorium as you proposed in your July 31, 2017 email to me and our phone conversation of the same date . NCDOT shall ensure the use of the same protective measures for this casing extension and driving activity, as that which was required for the previous casing extensions on this project, and described in your May 12, 2017 email to me. Please call or email me if I may be of any further assistance with this project. Thanks, Stephen From: Herndon, T. Mason Sent: Monday, July 31, 2017 9:12 AM To: Lane, Stephen <stephen.lane@ncdenr.gov> Subject: FW: Bent 8 Pier 8_ Slurry loss_ NO FRAC OUT Per our phone conversation. Thanks! Mason Herndon Environmental Program Supervisor Division 3 NCDOT- Division of Highways 910-341-2036 office 910-604-0050 mobile tmherndon@ncdot.�ov 5501 Barbados Blvd Castle Hayne, NC 28429 a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`�� �'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� ���,����,���� �� �������� �:s�����,�. From: Carroll, Trevor K Sent: Monday, July 31, 2017 8:45 AM To: Herndon, T. Mason <tmherndon@ncdot.�ov> Cc: Stanley Powers <spowers@sepien�ineerin�.com>; Meyer, Benjamin C <bcmeyerl@ncdot.�ov>; imalek@sepien�ineerin�.com; Candela, David A <dacandela@ncdot.�ov> Subject: Bent 8 Pier 8_ Slurry loss_ NO FRAC OUT Mason_ A slurry loss was experienced while drilling yesterday, however the slurry never reached the surface. So while environmentally we did not have an incident, the constructability issue still exists. BBII needs to vibrate this casing down 10' in order to complete construction. We are planning to vibrate this down on the low tide tonight. This shaft is the last one at bent 8_ no other issues have arisen. Given the fact that no slurry was seen on the surface, no notice was sent yesterday. Please confirm we can proceed. BBII & Beck backfilled the hole after the loss was experienced. Our inspector looked for signs on slurry all around, and found none... Trevor Carroll PE Jacksonville Resident Engineer Division Three 910 347 5258 office 910 465 8053 mobile tkcarroll(a�ncdot.qov 295 Wilmington Hwy. Jacksonville, NC 28540 a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`�� �'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� ���,����,���� �� �������� �:s�����,�. I rr�7all �:urrc,��u � � � � � � � � y I�c rli��;lu�e,rl �u �C�h•ih�rl I i� ci��;e, Cu ai� rur°r7 �mii;, ;;e,i� cr i;, ;;u� ��;� �u Cmie, ,..,u� i�; ta�:ur�: ;, ..,aw ai� ir7a, I�arti��,