July 26, 2017
U.S. Army Corps of Engineers
Regulatory Field Office
151 Patton Avenue, Room 208
Asheville, NC 28801-5006
ATTN: Ms. Loretta Beckwith
NCDOT Coordinator
JAMES H. TROGDON, III
SECRETARY
Subject: Application for Section 404 Nationwide Permits 13, 23 & 33 and 401 Water Quality
Certification for the Proposed Replacement of Bridge 139 on SR ll 39 over East
Branch Toxaway Creek in Transylvania County, Federal Aid Project No. BRZ-1127(12);
TIP B- 5405, Division 14; Work Order WBS Element 46120.1.1.
Dear Madam:
The North Carolina Department of Transportation (NCDOT) proposes to replace bridge number 139 on
SR 1139 (Old Toxaway Road) over Toxaway Creek in Transylvania County with a single span, 60 feet
long cored slab bridge to the south of the existing alignment. The existing bridge will be utilized as an
onsite detour during construction. This action will result in 601f feet of permanent impacts resulting from
bank stabilization (341 fl and energy dissipaters/roadway fill (26 1�. There will be < 0.01 acres (48 1 fl of
temporary impacts to surface waters from bank stabilization installation and temporary dewatering.
Mitigation has been acquired from NCDMS for the 261f of roadway iill.
Please see enclosed copies of the Pre-Construction Notification (PCN), NCDMS Acceptance Letter,
Stormwater Management Plan, Permit Drawings, and Roadway Plansheets. A Categorical Exclusion
(CE) was completed in October 2015 and distributed shortly thereafter. Additional copies are available
upon request.
This project is located in a trout watershed; therefore comments from the NCWRC will be required prior
to authorization by the Corps of Engineers. By copy of this letter and attachment, NCDOT hereby
requests NCWRC Review. NCDOT requests that NCWRC forward their comments to the Corps of
Engineers and the NCDOT within 30 calendar days of receipt of this application.
This project calls for a letting date of February 20, 2018 and a review date of January 2, 2018.
MailingAddress: Telephone: (919) 707-6000 Location:
NC DEPARTMENT OF TRANSPORTATION Fax: (919) 212-5785 IOZO BIRCH RIDGE DRIVE
NaTuttwL ENv[xoN�N'r SECT�oN Customer Service: 1-877-368-4968 Rai.eiGx NC 27610
IS9H MAIL SERVICE CENTER
Rt�,E[GxNC27699-1598 Website: www.ncdot.gov
A copy of this permit application and its distribution list will be posted on the NCDOT Website
at: http://connect.ncdot.gov/resources/Environmental. If you have any questions or need
additional information, please call Jeff Hemphill at (919) 707-6126.
Sincerely,
�� Philip S. Harris, P.E., Manager
Environmental Analysis Unit
cc:
NCDOT Permit Application Standard Distribution List
�aF wArE9Q Office Use Only:
� � o c Corps action ID no.
��. , � � Y DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1a. Type(s) of approval sought from the
Corps: � Section 404 Permit ❑ Section 10 Permit
1b. Specify Nationwide Permit (NWP) number: 13, 23, 33 or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? � Yes ❑ No
1d. Type(s) of approval sought from the DWQ (check all that apply):
❑ 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit:
because written approval is not required? Certification:
❑ Yes � No ❑ Yes � No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � Yes ❑ No
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program.
1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes � No
below.
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes � No
2. Project Information
2a. Name of project: Replacement of Bridge 139 over East Branch Toxaway Creek on SR 1127 (Bell Hill
Road)
2b. County: Transylvania
2c. Nearest municipality / town: Rosman
2d. Subdivision name: not applicable
2e. NCDOT only, T.I.P. or state g_5405
project no:
3. Owner Information
3a. Name(s) on Recorded Deed: North Carolina Department of Transportation
3b. Deed Book and Page No. not applicable
3c. Responsible Party (for LLC if not applicable
applicable):
3d. Street address: 1598 Mail Service Center
3e. City, state, zip: Raleigh, NC 27699-1598
3f. Telephone no.: (919) 707-6126
3g. Fax no.: (919) 212-5785
3h. Email address: jhemphill@ncdot.gov
4. Applicant Information (if different from owner)
4a. Applicant is: ❑ Agent ❑ Other, specify:
4b. Name: not applicable
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name: not applicable
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): not applicable
1 b. Site coordinates (in decimal degrees): Latitude: 35.09583 Longitude: - 82.85703
(DD.DDDDDD) (-DD.DDDDDD)
1 c. Property size: 0.74 acre
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to East Branch Toxaway Creek
proposed project:
2b. Water Quality Classification of nearest receiving water: C;Tr
2c. River basin: Savannah
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Forest land, rural residential.
3b. List the total estimated acreage of all existing wetlands on the property:
0.02 acre
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
168 If
3d. Explain the purpose of the proposed project:
To replace a structurally deficient and functionally obsolete bridge.
3e. Describe the overall project in detail, including the type of equipment to be used:
The project involves replacing a single span 30-foot timber deck & steel I beam bridge with a single span, 60-foot cored
slab bridge on a new alignment to the south.The existing bridge will be utilized as an onsite detour for this project.
Standard road building equipment, such as trucks, dozers, and cranes will be used.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property / � Yes � No ❑ Unknown
project (including all prior phases) in the past?
Comments:
4b. If the Corps made the jurisdictional determination, what type � preliminary ❑ Final
of determination was made?
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company:
Name (if known): Other: NCDOT
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for � Yes � No ❑ Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project? ❑ Yes � No
6b. If yes, explain.
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
❑ Wetlands � Streams - tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ — non-404, other) (acres)
Tem orar T
Site ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
Site ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
Site ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
Site ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
Site ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
2g. Total wetland impacts
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of Average Impact length
number - (PER) or jurisdiction stream (linear feet)
Permanent (P) or intermittent (Corps - 404, 10 width
Temporary (T) (INT)? DWQ — non-404, (feet)
other)
Site 1� P❑ T Energy East Branch � PER � Corps 2 19
Dissipaters Toxaway Creek ❑ INT � DWQ
Dewatering/ East Branch � PER � Corps
Site1 ❑P�T 2 15
Installation Toxaway Creek ❑ INT � DWQ
Site 2� P❑ T Bank UT to East Branch � PER � Corps 17 19
Stabilization Toxaway Creek ❑ INT � DWQ
Site 2❑ P� T Bank UT to East Branch � PER � Corps 17 10
Stabilization Toxaway Creek ❑ INT � DWQ
Site 3� P❑ T Pipe Extension UT to East Branch � PER � Corps 5 7
Toxaway Creek ❑ INT � DWQ
Site 3❑ P� T Dewatering UT to East Branch � PER � Corps 5 18
Toxaway Creek ❑ INT � DWQ
Site 3� P❑ T Bank UT to East Branch � PER � Corps 5 15
Stabilization Toxaway Creek ❑ INT � DWQ
Site 3❑ P� T Bank UT to East Branch � PER � Corps 5 5
Stabilization Toxaway Creek ❑ INT � DWQ
3h. Total stream and tributary impacts 60 If Perm
48 If temp
. Comments:
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individuall list all o en water im acts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of
impact number — waterbody Type of impact Waterbody type Area of impact (acres)
Permanent (P) or (if applicable)
Tem ora T
01 ❑P❑T
01 ❑P❑T
03 ❑P❑T
04 ❑P❑T
4f. Total open water impacts Permanent
Temporary
4g. Comments:
5. Pond or Lake Construction
If ond or lake construction ro osed, then com lete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or (acres)
number purpose of pond Excavat
Flooded Filled ed Flooded Filled Excavated Flooded
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer
im acts below. If an im acts re uire miti ation, then ou MUST fill out Section D of this form.
6a.
❑ Neuse ❑ Tar-Pamlico ❑ Other:
Project is in which protected basin? ❑ Catawba ❑ Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number — Reason for impact Buffer Zone 1 impact Zone 2 impact
Permanent (P) or Stream name mitigation (square feet) (square feet)
Tem ora T re uired?
61 ❑P❑T ❑Yes
❑ No
62 ❑ P ❑ T ❑ Yes
❑ No
63 ❑P❑T ❑Yes
❑ No
6h. Total buffer impacts
6i. Comments:
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
1. See Stormwater Management Plan. The proposed bridge will have no direct discharge into the water. Two deck drains are
proposed to decrease spread at the 2G1 at the beginning of the bridge. The design was shifted to the south to avoid the
stream and wetland immediately to the north of the project. The new bridge spans the creek. A NCWRC Letter dated July
30, 2013 stated `a moratorium prohibiting in-stream work and land disturbance within the 25-foot trout buffer is recommended
from October 15 to April 15 to protect the egg and fry stages of trout. Sediment and erosion control measures should adhere to
the Desi n Standards in Sensitive Watersheds'.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Best Management Practices for Surface Waters will be used during all phases of construction.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for � Yes ❑ No
impacts to Waters of the U.S. or Waters of the State?
❑ DWQ ❑ Corps
❑ Mitigation bank
2c. If yes, which mitigation option will be used for this
project? � Payment to in-lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank: not applicable
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. � Yes
4b. Stream mitigation requested: 26 linear feet
4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool �cold
4d. Buffer mitigation requested (DWQ only): 0 square feet
4e. Riparian wetland mitigation requested:
4f. Non-riparian wetland mitigation requested: 0 acres
4g. Coastal (tidal) wetland mitigation requested: 0 acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes � No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1
Zone 2
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes � No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
❑ Yes � No
Comments:
2. Stormwater Mana ement Plan
2a. What is the overall percent imperviousness of this project? N/A
2b. Does this project require a Stormwater Management Plan? � Yes ❑ No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
See attached.
❑ Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program
� DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local governmenYs jurisdiction is this project? not applicable
❑ Phase II
3b. Which of the following locally-implemented stormwater management programs ❑ NSW
apply (check all that apply): ❑ USMP
❑ Water Supply Watershed
❑ Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No
attached?
4. DWQ Stormwater Pro ram Review
❑ Coastal counties
4a. Which of the following state-implemented stormwater management programs apply ❑ HQW
(check all that apply): ❑ ORW
❑ Session Law 2006-246
❑ Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ❑ Yes ❑ No NA
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No NA
5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No NA
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the � Yes ❑ No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State � Yes ❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) � Yes ❑ No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after-the-fact permit application? ❑ Yes � No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes
additional development, which could impact nearby downstream water quality? � No
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
Due to the minimal transportation impact resulting from this bridge replacement, this project will neither influence nearby
land uses nor stimulate growth. Therefore, a detailed indirect or cumulative effects study will not be necessary.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
not applicable
10
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or � Yes ❑ No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act � Yes � No
impacts?
❑ Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
❑ Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
N.C. Natural Heritage Program database; USFWS-website; biological surveys for protected species listed for
Transylvania County. A bat survey report dated July 7, 2017 found no roosting habitat nor nearby occurrences for
Gray bat or Indiana bat - NLEB is 4(d) compliant (email sent to USFWS 07/25/17). An aquatic screening for
Appalachian elktoe, turquoise shiner and little-wing pearlymussel was conducted in 2013 and determined that no
suitable mussel habitat was present in Rabbit Creek. No effect — no habitat for all other federally listed T&E species
for Macon County.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
NMFS County Index
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation � Yes � No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
NEPA Documentation
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? � Yes ❑ No
8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics Unit coordination with FEMA
8c. What source(s) did you use to make the floodplain determination? FEMA Maps
��� �
Phillip S. Harris III, P.E., C.P.M. Q�—Z6 —�0l�
ApplicanUAgent's Printed Name Applicant/AgenYs Signature Date
(AgenYs signature is valid only if an authorization letter from the applicant
is rovided.
11
Environmen tal
Quality
RC)Y COOPER
Governar
June 19, 2017
Mr. Philip S. Harris, III, P.E., CPM
Project Development and Environmental Analysis Unit
North Caroluia Department of Transportation
1598 Mail Service Center
Raleigh, Noitl� Carolina 27699-1598
Dear Mr. Harris:
Subject: Mitigation Acceptance Letter:
B-5405, Replace Bridge Number 139 over East Branch Toxaway Creek on SR 1139,
Transylvania County
The purpose of this letter is to notify you that the Division of Mitigation Services (DMS) will provide the
compensatory stream mitigation for the subject project. Based on the information supplied by you on June 16, 2017, the
impacts are located in CU 03o60101 of the Savannah River basin in the Southern Mountains (SM) Eco-Region, and are as
follows:
Savannah Stream Wetlands Buffer (Sq. Ft.)
03060101 Non- Coastal
SM Cold Cool Warm Riparian �parian Marsh Zone 1 Zone 2
Impacts (feeUacres) 26.0 0 0 0 0 0 0 0
*Some of the stream impacts may be proposed to be mitigated at a 1:1 mitigation ratio. See permit application for details.
The impacts and associated mitigation needs were under projected by the NCDOT in the 2017 impact data. DMS
will commit to implement sufficient cornpensatory stream mitigation credits to offset the impacts associated with this
project as determined by the regulatory agencies using the delivery timeline listed in Section F.3.c.iii of the In-Lieu Fee
Instrument dated July 28, 2010. If the above referenced impact amounts are revised, then this mitigation acceptance letter
will no longer be valid and a new mitigation acceptance letter will be required from DMS.
If you have any questions or need additional information, please contact Beth Harmon at 919-707-8420.
Sincerely,
James anfill
Credit Management Supervisor
cc: Mr. Lori Beckwith, USACE — Asheville Regulatory Field Office
Ms. Amy Chapman, NCDWR
File: B-5405
�`�'Nothing Compares�.
State of North Carotina I Environmental Quality
217 West Jones Street I 1G0] Mail Service Center I Raleigh, North Carolina 27699-160i
919 707 8600
t �j�0 �,,� ��.w� North Carolina Department of Transportation
St[3i'n14v�dtP'r' Highway Stormwater Program �
�� ,
STORMWATER MANAGEMENT PLAN -- -
(Version 2.06; Released June 2016) FOR NCDOT PROJECTS
WBS Element: 46120.1.1 TIP No.: B-5405 County�ies): Transylvania Page 1 of 2
General Project Information
WBS Element: 46120.1.1 TIP Number: B-5405 Pro'ect Type: Bridge Replacement Date: 3/27/2017
NCDOT Contact: William (Bill) H. Elam Jr., PE Contractor I Designer: Frank Fleming, PE - Ecological Engineering
Address: 1000 Birch Ridge Drive Address: 1151 SE Cary Parkway
Suite 101
Ralei h, NC 27610 Car , NC 27518
Phone: 919-707-6718 Phone: 919-557-0929
Email: belam ncdot. ov Email: fflemin ecolo icalen .com
CitylTown: Rosman, NC Count ies : Trans Ivania
River Basin s: Savannah CAMA County? No
Wetlands within Project Limits? Yes
Pro'ect Description
Pro'ect Len th lin. miles or feet : 0.142 Miles Surroundin Land Use: Rural area with forest and agricultural landuses
Proposed Pro'ect Existin Site
Pro'ect Built-Upon Area ac. 0.5 ac. 0.3 ac.
Typical Cross Section Description: 2@11' lane with 3'-0" shoulders (7'-0" with guardrail). 2@9' lane with 0'-0" shoulders.
Annual Avg Daily Traffic (vehlhr/day): Design/Future: 314 Year: 2038 Existi�g: 223 Year: 2018
General Project Narrative: State Project B-5405 involves the replacement of the existing NCDOT Bridge #870139 on SR 1139 over East Branch Toxaway Creek. Bridge #870139 consists of 1@30'-8"
(Description of Minimization of Water timber floor on I-beams on timber caps with timber posts and sills. The proposed bridge will be 1@60' 24" cored slab with 4'-0" caps and sloping abutments. The proposed
Quality Impacts) bridge is located in Zone X of FIRM Map number 3700854100J and is not located within a study area. The proposed bridge will provide more hydraulic opening than the exising
bridge. Two deck drains are proposed to decrease spread at the 2GI at the begin of the bridge. Deck drains are not located over the water body. One stormwater outfall is
proposed to outfall into UT to East Branch Creek a Rip Rap pad will be utilized to dissipate the energy. Two existing cross pipes will be replaced in place with rip rap added to
outlets for stabilization.
Waterbody Information
Surface Water Body (1): East Branch Toxaway Creek NCDWR Stream Index No.: 4-9
NCDWR Surface Water Classification for Water Body Primary Classification: Class C
Supplemental Classification: Trout Waters (Tr)
Other Stream Classification: None
Impairments: None
Aquatic T&E Species? No Comments:
NRTR Stream ID: Buffer Rules in Effect: N/A
Project Inciudes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A
Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)
C �j��7��.���. North Carolina Department of Transportation
�lcra'i�l�v'�eRt-'F !
, Highway Stormwater Program � �!
STORMWATER MANAGEMENT PLAN _-
(Version 2.06; Released June 2016) FOR NCDOT PROJECTS
WBS Element: 46120.1.1 TIP No.: B-5405 Count (ies : Transylvania Page 2 of 2
Additional Waterbody Information
Surface Water Body (2): UT to East Branch Toxaway Creek (1) NCDWR Stream Index No.: NA
NCDWR Surface Water Classification for Water Body Primary Classification: None
Supplemental Classification: None
Other Stream Classification: None
Impairments: None
Aquatic T&E Species? Yes Comments:
NRTR Stream ID: Buffer Rules in Effect: N/A
Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A
Deck Drains Discharge Over Water Body? N!A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)
Surface Water Body (3): UT to East Branch Toxaway Creek (2) NCDWR Stream Index No.: NA
NCDWR Surface Water Classification for Water Body Primary Classification: None
Supplemental Classification: None
Other Stream Classification: None
Impairments: Nane
Aquatic T&E Species? No Comments:
NRTR Stream ID: Buffer Rules in Effect: N/A
Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A
Deck Drains Discharge Over Water Body? N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)
= DESIGN EXCEPTION REQUIRED FOR HORIZONTAL
ALIGNMENT AND HORIZONTAL STOPPING SIGHT
. DISTANCE
�
�
�
�
0
�
��.��� �� ����� ��������.
�������� �� ��������
TRA1�S YL T�A1�lIA CD U1�1 T Y
LOCATION: REPLACE BRIDGE 1V0.139 OVER EAST BRANCH
TOXAWAY CREEK 011t SR 1139 (OLD TOXAWAY ROAD)
TYPE OF WORK GRADING, PAVING, DRAI11lAGE A11tD STRUCTURE
WETLAND AND SURFACE WATER IMPACTS PERMIT
—L— STA.11 + 00.00
SITE 1
��
THIS IS NOT A CONTROL OF ACCESS PROJECT
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUN
� PROJECT SHALL BE PERFORMED TO THE LIMITS ESTA
BEGIN BRIDGE
—L— STA.13 + 95.84
— SITE 2
END BRIDGE
—L— STA.14 + 58.16
�� �,
,���,
1/NXAVEO BflMYCH
�JS � _ �IS �5� �
\
m I -L- SR 1139
� - �Je�>
l �ir�
1 �m \ � �
�s �..
�_\
_METHOD II
-uxxweo aea.cx
SITE 3
PERMIT DRAWING
SHEET O—
��
,� � 9
��� �,�
��� �
END TIP PROJECT B-5405
—L— STA. l8 + 50.00
DOCUMENT NOT CONSIDERED FINAL �
UNLESS ALL SIGNATURES COMPLETED
GRAPHIC SCALES DESIGN DATA PROJECT LENGTH P�epared ln the Offlce of: HYDRAULICS ENGINEER
^ LOCHNER ���
ADT �0�� - 2L� H p.pOqHNER,INC P ��W'�
50 25 0 50 700 _ q� H� P`z;g„���E ��� �ECo[,oGICA[.
LENGTH ROADWAY T.I.P. PROJECT B-5405 — 0.131 �9�9�>"'»» �� ee� `��L`"`:'"`''"'"` `°'y,s"°"� ���p
ADT 2038 = 314 �� �� � ��
K = � O % 2072 STiINDARD SP&C[FICATIONS �P �p�
PLANS o BRIAN K. EASON, PE ,,E � �
50 25 0 50 loo D= 55 /o LENGTH STRUCTURE T.I.P. PROJECT B-5405 = 0.011 rno�Ecr FNc,NeEn s.cnnrunE: � �
T 22 %* RIGHT OF WAY DATE: � �
V= 40 MPH FEBRUARY 17, 2017 ROADWAY DESIGN
PROFILE /HORIZONTAL DAVID MARTIN E1�GINEER ��� ��
l � * TTST = 2%+ DUALS = 20°/a PROJECT DESIGN ENGINEER �p Q��
l0 5 0 l0 2o FUNC CLASS = TOTAL LENGTH OF T.I.P. PROJECT B-5405 = 0.142 LETTING DATE: �� g����
RURAL LOCAL FEBRUARY 20, 2018 BRYAN KEY, PE
PROFILE (VERTICAL) SUBREGIONAL TIER xcooT coNrncr �E
S7GNATURE:
N
Z
�
>
�
C
a
0
_
�
d
E
a
�
�
�
m
i
o,
�
�
C�
�
c
E
�
0
C
W
�
�
T
W
o_
� -L_
� � Pl Sta 13+02.45 Pl Sta 16+84.66
o= 52° �a oo.o° r�T�� o= 5�° 2�� oo.a r�r�
D= 39� 47' 19.4" D= 24° 48' l2/'
� L = l3/JY L 223.56'
� � � * R = l � 00' R = 23�00'
� �� SE = 6% SE = 6%
� DURF�ACE WATERTS IN L O C H N E R
�DENOTES TEMPORARY H. W. LOCHNER, INC.
IMPACTS IN SURFACE WATER Z840 PLAZA PLACE,SUITE 202
RALEIGH, NC 27612 NC i
M1� 50' 0' S0' 100' (9�9)5��-�>>> Nomber i
� 1� ��iie, i.i�in � n�,�.e-nna
�p �,� GRAPHIC SCALE �ECOLOGICAL " �W�
1 .. . a�'.. [,2JS1N
2�� 25' 0' 25' S0' ��NGINIiTRWG (ei9)ss�-09z9
INSET SCALE
w000s Ro = l08 Ro = ll4
Vo = 25 mph Vo = 30 mph
� �� � �
�j � � w000s ��-, , �_ �; ��-
- � BM °� w000s � .. -
� � � BL- STA. 5+23.13
��� ��� 33.38' LT �`„'�`�"��'.-� � 1!.'1�`u'?i'y'�
�_ \ �� \\ � . ELEV. = 1973.98' '� ` .f �
, �� �r �_�.,
�� ��\ �
, �,
� �.
\\ \\+ /c .
\` � \ � ,Pw
+ F \ "g \�j\ �X'�`�'�`ti _ ..
fSr 7�\
�HCq �
�\ ..
—L— POT STA. 11 + 00.00
�
� �
'OT Sta.10+00.00 �� –L– PT Sta. /3+63 �
05 g'�a. ;��
� �� ��
_� � ,a ��, SITE 1 -���
5 \
,� o0
��1 \� 22 CLA55 B RIP RAP
\ 00 E5T 3 TONS
� � EST 10 SY �\
� \ o� � �eorexn�e 5„
:(��� W/ELBOWS
�� F
� � � k�
��cz. g /� p`L • F BEGIN
. ,ro6� � B�, + 6
�, 3 o s E
� SPECIAL LATERAL 'V' DITCH - 0�'�8�0.
SEE DETAIL 1 , �` � � ���NCi .
O–L– PC Sta.12+3/.96 a __
2 �N��,r, . Ob T I
SITE 1 �. "' ''h� _. � '
�DESIGN EXCEPlION REQUIRED f=OR
HOR/ZONTAL ALIGNMENT AND HORIZONTAL
STOPPING SIGHT DISTANCE
_ . a ::: 'r . �` �\��-
� � F `�,
` \ � / GRAOE 70 DRAIN �, FqT_1 ' �
� �� C BEGIN 7EMP. � ��
. �,, ae° ww FENCE # E Rza�
�� -L- STAJ2+95.08
? WOODS \\ � h3:��i�QT�d��'I�NG
\\�
J \
\ KEY PAD AND
wo,rs GATE 70 BE
\\ -� RELOCATED
�� .. . ��/I^�...�:
SITE 1
�
OBANK STABILIZATION AT
JURISDICTIONAL STREAM
� � SEE DETAIL 2
� �� � � � � � � � EST 15 TONS
E5T 35 SY
CLASS B RIP RAP GEOTEXTILE
EST 2 TONS
EST 7 SY GEOTE%TILE
REMOVC
EXISTIN@ �57-RUCTE/RE
SEE DETAIL '"
�CLA55 II RIP RAP
EST 135 TONS —L— l�% Stl
EST 200 SY
�eorexn�e —L— PC SfO.
�
Pc
SITE 2 �
!��
�
GRADE
TO DRAIN G
UNNAM D BR CH __�1$-
�s � /��
RETAIN I�1,
PROJECT REFERENCE NO. SHEET NO.
B-5405 4
WJJ SHEET NO.
ROADWAY DESIGN HYDR4ULIC5
ENGINEER ENGINEER
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
�, PERMIT DRAWING
w000s ^' �1
'� `� SHEET OF
. _ . . . ., �MP _ : � _ —
–L– POT Sta.19+0680 �� � L�
. � f0=��\ �.. .
�/ \\
/—T— � pSh'��. ;
� .. \ �T:9,\',-.......
�\���� \
\ � . . " /
_ !i� '..... . �\ \\ '/
�,,
��� _ _ —� _ �' �a` I � � � SITE 3
AT-1 �� �
� ,
�FI'�OO � �� / R 20�f v R 20'
IS m \S \
\
END 7FMP.
a8 ww FFmcE�
—� srA,i4+zo.00�
ao.oa Rr
-� i
w0a
�
TIE TEMP. ` DO NOT
�l8"WW FENC DISTURB
-L- 15+93.8
TO EXISTING �
K Sl"lAB1LIZATIOf�I �� � I � w000s
�� � �� �
a
IGRI
I
�
J BE�,N TCMP.
48"WW FENCE =
y�� -L- STAI4+520(l'll
y� ( 40.00' RT � id
/ \�� �S
s �
`: °��"EN CREE,Y
DETAIL 1 DETAIL 2
SPECIAL LATERAL 'V' DITCH BANK STABILIZATION AT
�Ha��o s�oi�1 JURISDiCTIONAL STREAM
� Hm m s�oie�
Fai �nruen� eeo
SIOPe ELEVATION
G�a�nd ?:J p f��e( GROUND �'S GROT`I1ND
a
Geotex�ile M�rn. D= 1 Ft. GEOTE%TILE
Type of Liner— CL4S5 B RIP RAP Max. d— i FI_ 7yVc of L���er= Cts�55 I RIPRAP
FROM STA. 12 i 00 TO STA. 12-F 50 -L- RT s�A. 16 ��' -�- ��
—�— POT STA. 18 + 50.00
CLASS B RIP RP.P
EST a TONs
E5T 7 SY GEOTEXTILE
O
' � �.
�ED BRPNCH
��:. . �1�.-� �: �.
SITE 2
\ �—� /%
\�--��
1
'SZSZS.uuS� PAVEMENT REMOV
PAVED SHOULDER
SITE 3
REMOVAL OF EXISTING
BRIDGE & EXCAVATION
D ETAI L
NTS
rEXISTING GRADE
�
iS II—� � I LEXCAVATION
RAP(TYPI �, TO ELEV = 1958.0'
SEE SHEET 5 FOR –L– PROFILE
N
Z
�
�
� � DENOTES IMPACTS IN
� SURFACE WATER
�p �DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
_�_
�(� �� � �� Pl Sta 13+02.45 Pl Sta 16+84.66 �M1j1,� so� o� so� ioo�
� ' o= 52° ia oo.o° r�� �� o= 55° 2�� oo.o° r�r� o
� GRAPHIC SCALE
� ��-�- � �� ' . _
��� - � � � . _ D = 39� 47' 19.4" D = 24° 48' l2P` O �
� L= 13�J�' L- 223.56' �2�Q' 2s� o� 2s� so�
� � � T = 70.49' T = l2/.4/'
� R = lQtf�Q�' R='Z3�.Q�' INSET SCALE
� �� � � � � - � \ SE = 6% SE = 6% . - __
� � �� ` w000s � Ro = l08 Ro = ll4
_- A�� � � -2S p -30 p
, ;� � � � ,
Vo- _ m h Vo- m h
. � � �
�� �, � ' � �,
� -- � �
.- '., � ' _ _ � � �� � �' � �-. � - .�,- � -
` .. .. WOODS �. � ;
�� -_._ _ - -. � .. � .. , -
� , BM ��\ OQOS �
�_. � � . . �� B� 57A 5+2313 � � �
� ���33�&'-LT ` � `
r �
��-�` ���� \ E�Ev -F_ ' -= � s':�� y �,,
`,
- � �� - - -
� - _ .-..
-.. 1"`s"'�i1���
- - _ � �\ I
— , _ �\\\ \\� - `/ � ;
-
_- I��-
_ _�_�_.. �,,.,��\� � \C�e , ll;j! � II I � �, , .;,, �� � .. �� T
--� �-Q � :� : ; I I ,
/
� �:_�� y� \ \ �;� " / � . . �
� — �—��= ` �
����- � � � � �� i � � ,
_- /� � ; � � � _ � �.
�
�
�_ y ��\�.\
� i
� ��J W� \ . Np \ . � ..
r�_—. � . . �:� `'.\� � wooPs �
�
�Q
—L— POT Sta. 10+00.00 �
BEGIN TIP PR�JECT B-5405 �
—L— POT STA. 11 + 00.00 ��--._� �
�DESIGN EXCEPl�h
HOR/ZONTAL ALIG�
STOiPI�✓G SIGfiT
� r.�- �`:
SITE 1
—L— PT Sta.
SITE 1
�1/ " CLA55 B RIP RAP
� E5T 3 TONS
EST 10 SY
� GEOTEXTILE 5��
� W/i
, \F �
� BANK STABILIZATION AT
JURISDICTIONAL STREAM
--- SEE DETAIL 2
� �� �� � � � � EST 15 TONS
E5T 35 SY
CLASS B RIP RAP GEOTEXTILE
\ EST 2 TONS
EST 7 SY GEOTE%TILE
REMOVE
� — EXISTlN6.STRUCT(/RE
S�E DE7 A/L ' "
P �' � CLA55 II RIP RAP"���:
� � "� �EST 135 TONS � —�.— PT Sfl
� EST 200 SY
\� �eorexn�e -L- PC SfO.
� �-��:
r''
. � �
j� '� SITE 2
( i/N\ N
\ I GRADE
TO DR
$i-�'. DE �x�`w�
s- 5
- �s -
. � \ V �i �� il � �,o`'.�- RETAIN -
LOCHNER
H. W. LOCHNER, INC.
2840 PLAZA PLACE,SUITE 202
RALEIGH, NC 27612 NC i
(919)571-7111 N mber i
\ IIN I.I(IM1[N.Fll4A
] i C Y P kway
�ECOLOGICAL �`
ry. 2JS1N
�L;NGINIiTRWG (e9)ss�o9z9
PROJECT REFERENCE NO. SHEET NO.
B-5405 4
WJJ SHEET NO.
ROADWAY DESIGN HYDR4ULIC5
ENGINEER ENGINEER
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
� ����� � � - ------
'�'i���'��!��il!(������;%' `���' ,'�' r �-_ PERMIT DRAWING
% /�/ i � � �� �i��i� aos �' -
^ �
,_�. �!, ,,��;: �HEET_OF_
,�
—L— POT Sta.19-F06B0
�� ,
�`FO�=��` / >i /�%, i,�%/ / i/;
i
f
� � ' � � � � I � w os �� �/�1����� � woo��
� % � _ 6,��P � � ' /� �
,�/ 1 T.?y . �
l --, � �i',�,z ,� \�� � � � �/ I
. �% � I � ' �� '��� � � .�� ��.
.� � � ''- - /;'
�-' i / �
i ��
P \G
�, .�`�::
/�. � � �
�� �� b� i �
, o- Ao� �//� os/
=15 y � F/ �6 / F
/
_ P(\ �/ �
. A� i 1�
,,– , –
,�
—L— POT STA. 18 + 50.00
CLA55 B RIP RP.P
EST 2 TONS
EST 7 SY GEOTEXTILE
,�—�
��� _ _ _ F — `s I �' � SITE 3 �'���,�Eo aR,���
�
Ai-1 Fiv' `. A
f3EGlN iEMP. � I �� I�' ti'•�CLASS II RIP ftAP �'�' \ F �
J � N�58' 4/' 00 �� R 20� �'' � �R eo�
ae^ wa✓ �e occ d� E �� �i R2a � � � �
0
�- �TA. �2+ s.oa
�
iE ra exq-r�mc �� � �� � ne rEMP. �- -�oo Nar ��
� � 48"WW FENC DISTURG'
�
KEY PAD AND -L- 15+93.8
S
� GA7E TO BE r0 EXISTING \ \
�
/ -� RELDCATED - '' � � ����� w00 � � ..
'�-� � � .,. 1 / � ENi7 7F_MF `. � �' � � \ ''�..
48'WW PENCE \ yyy � �' � \ \\�� �
.. , � -L STAJ4+20.00� �� � � ..
4000'PT
�.," in in , IGRI. .
i I : I
� I
. wOc.� � I BEGIN TtMP. (��� ! , �
� 48"WW FENCE .
� ��� L- STAI4+5�0�� ��
. . . y� ( 40.00' RT
.. /�� '� . ,�L
/ ��S �S�
`aKEN CREE,Y
DETAIL 1 DETAIL 2
SPECIAL LATERAL 'V' DITCH BANK STABILIZATION AT
�Ha��o s�oi�1 JURISDICTIONAL STREAM
� Hm m s�oie�
Fai �nruen� eeo
SIOPe ELEVATION
G�a�nd ?:J p f��e( GROUND �'S GROT`I1ND
a
Geotex�ile M�rn. D= 1 Ft. GEOTE%TILE
Type of Liner- CL4S5 B RIP RAP Max. d- i FI_ 7yVc of L���er= Cts�55 I RIPRAP
FROM STA. 12 i 00 TO STA. 12-F 50 -L- RT s�A. 16 ��' -�- ��
SITE 2
�
�
- __ , ,�- ���'�!�
j
:\\�a�.� .
� _
_%�
'SZSZS.uuS� PAVEMENT REMOV
PAVED SHOULDER
SITE 3
REMOVAL OF EXISTING
BRIDGE & EXCAVATION
D ETAI L
NTS
rEXISTING GRADE
�
iS II—� � I LEXCAVATION
RAP(TYPI �, TO ELEV = 1958.0'
SEE SHEET 5 FOR —L— PROFILE
� •:1
.........I....i ..............1.........1..............i....I....i....1.........1.........I....i..............Y������
_ __ _ ___ __ _ __ _
� _
--sM •i 1
-BL- STA. S+p3.13 I
33.38' LT
ELEV. -1973.�I . .._..
��
- -�
_ � � _ _ -
_ � BEGIN GRADE � -- - -I —
-L- STAIl+00.00
I EL=1.969.36' BEGIN BRIDGE
� -L- STA/3+9584
i Pl = 12+25A0 i
i EL = 1,96298' i
I ��_` i VC = 250' i
iK=43 i
1970 ���� ; Vd = 30mph 1 �—�'
L_-_J
1960
1950
1940 :
�
10
11
i ---�
i BM ;Z i
i-L- STA.14+87.82 i
64.74' LT �
i ELEV. = 1961.40' �
L- --J
PERMIT DRAWING
SHEET OF
: _ -�
PIPE HYDRAULIC DATA
42' RCP Sta. 16+g!
DRAINAGE AREA = 43.6 AC
DESl6N FREQUENCY = 25 YR
DESIGN DISCNARGE = 5/.7 CFS
DESIGN HW ELEVATION = /965J Ff
l00 YEAR DISCHARGE = 82.3 CFS
l00 YEAR HW ELEVATION =/966.6 FT
OVERTOPP/NG FREQUENCY= 500t YR
OVERTOPP/NG DISCHARGE _ �94.9 CFS
�-; - - ----;- - OVERTOPP/NG ELEVATION = �976.4 FT
---BM •3 --
il��-BL- STa.16+85.9T
40.25' LT
�ii ELEV.= 2006.92'
�'L-------
— - — —� I _ _ _-- --;
— I Pl = 17+45.00 I . .,_,_,"
�— — —� �.� � i EL = /.980.69' i
i i �� i K= 76 i
-�- ��_�
�- — _� i iSSD = 958' i
------- -------. � Vd = 45mph _; j63'/•
i P/ _ /5+85A0 i � `----------- })$'�
--t---i—�- i EL = /.965.49' i t /��
. � VC = 222' ;
; K = 25 ;
i Vd = 20mph i �i
END BRIDGE `---------------' kj9q988� EXISTING
-L- STA/4+58J6 � �988�, GROUND-
i�+1�•
o � � �+Rf.�73.T--�_ —
Q � �54i
�V N � 18" RCP
J
� � W � PROPOSED
d
W� GRADE
STRUCTURE EXCAVATION = 145 CY
N � �$ �C� (STRUCTURE PAYITEM)
� O
O � U�� =.j�V�
�N� VN�
a��'i N��'i
zn ou -I-�� I ���I-���I��� I�.
c�Q ° aQ" � �
m�W W�W
12 13 14
42" RCP
.... .. : ..i--
END GRADE \
-�- sra is+5o.o0
EL=1,989.42'
LOCHNER
H. W. LOCHNER, WC.
2840 PLAZA PLACE,SUITE 202
RALEIGH, NC 27612 NC �
(919)571-7117 Nomber F
IIkMLI( N ('N �.'-Ilh�
] SS C y P-� I v�y
� ECOLOGICAL
— r�vc�NrrarNc, r9�vl"s� o z'
PROIECT REFERENCE NO. SHEET NO.
8-5405 5
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
io�oo�o���o����o�oo���m —
I.�::v::::.� �::::::v C.::::::.�
� ........... ....................
I.:::::::::.� .::::::::::::::::::::
I:�:::::::::�::::::::::C::::::::�
� ....................................
I:�:::::::::�::::::::::C::::::::�::::
BRIDGE HYDRAULIC DATA
DESIGN DISCHARGE = 850 CFS
OES/GN FREQUENCY = 25 YR
DESI�N HW ELEVATION = /959A FT
BASE DISCHARGE _ 1200 CFS
BASE FREQUENCY = l00 YR
BASE HW ELEVATION = /959.85 FT
OVERTOPPING DISCHAR�E = 2537 CFS
OVERTOPPING FREQUENCY= 500t YR
OVERTOPPING ELEVATION = /964.3 fT
DATE OF SURVEY = 2/1/20/6
WS. ELEVATION = �g55.7 FT
AT DATE OF SURVEY
1990
1980
1970
1960
1950
P �SURVEY I - ��. ��:—�r�� ��,� .
_ �� _ . 1940
;':'F�I-� . , -- : I � RIGHT DITCH
, , ' _ .
SEE SHEET 4 FOR -L- PLAN VIEW
15 16 17 18 19
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 12+45/13+80 18" RCP AND 15" RCP < 0.01 < 0.01 19 15
BANK STABILIZATION (1@60';
2 14+05/14+15 24" CORED SLAB) < 0.01 < 0.01 19 10
3 16+94/17+14 42" RCP (INLET) < 0.01 < 0.01 7 18
BANK STABILIZATION
3 16+60/16+85 (42" RCP OUTLET) < 0.01 < 0.01 15 5
TOTALS": < 0.01 < 0.01 60 48 0
"Rounded totals are sum of actual impacts
NOTES:
3i�ii'ili
• �
See Sheet 9 A For I ndex of Sheets
See Sheet � B For Conventi onal Symbols
/� /� I_ I A /l A � . _ /� _ /l _ I _ l /� l_ l
x DESIGN EXCEPTION REQUIRED FOR HORIZONTAL
ALIGNMENT AND HORIZONTAL STOPPING SIGHT
DISTANCE
��V" ��� ���� ��� ����
� � V � L'�J � �UG � � � � � � t5� ; �� �" � �
LOCATI01�: REPLACE BRIDGE 1�0.139 OT�ER EAST BRA11tCH
TOXA WA Y CREEI� 01� SR 1139 (OLD TOXA WA Y ROAD)
TYl'E OF WORI�: GRADII�G, PA VI1�G, DRAII�AGE A1�D STR UCTURE
�
THIS IS NOT A CONTROL OF ACCESS PROJECT
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARY
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
Prepored 1n the Offlce ofe HYDRAULICS E1VGI11tEER
GRAPHIC SCALES DESIG1�l DATA PROJECT LEI�GTH L O C H N E R ,-�
NC FIRM LICENSF. No: F-] ]48
ADT 2018 — 223 H. W. LOCHNER, INC. 1151SECaryParkway
_ � � Suite 101
2840 PLAZA PLACE, SUITE 202 �ECOLOGICAL Cary, NC 27578
50 25 0 50 100 LENGTH ROADWAY T.I.P. PROJECT 6-5405 = 0.131 I919I5�H_N i 2'6,z N�mber F�-`oi59 - �ENGINEERING �9�9,55�-o9Z9 0� �oa �
ADT 2038 = 314 �� c�g
c�
K = � O �� 2012 STANDARD SPECIFICATIONS �`? '��Q
P�ANS D= 55 % BRIAN K. EASON, PE I,E � a
LENGTH STRUCTURE T.I.P. PROJECT B-5405 = 0.011 PROJECT ENGINEER SIGNATURE: � *
50 25 0 50 100 T— 2Z %* RIGHT OF WAY DATE: � �
V= 4 0 M P H FEBRUARY 17 2017 ROADWAY DESIG11t �, a�
PROFILE (HORIZONTAL) * TTST = 2%+ DUALS = 20% ' DAVI D MARTI N E11tGI1VEER ���� QoQ�Q
TOTAL LENGTH OF T.I.P. PROJECT B-5405 = 0.142 I'ROJECT DESIGN ENGINEER o� ��p��Q
10 5 0 10 20 FUNC CLASS = LETTIIIIG DATE:
RURAL LOCAL FEBRUARY 20, 2018 BRYAN KEY, PE
PROFILE (VERTICAL) SUBREGIONAL TIER NCDOT CONTACT P'E'
SIGNATURE:
BOUNDARIES A111D PROPERTY.•
State Line ----- -----
County Line
Township Line
City Line
Reservation Line
Property Line
Existing Iron Pin �
Computed Property Corner �
Property Monument 0
Parcel/Sequence Number �23
Existing Fence Line -x X X-
Proposed Woven Wire Fence
Proposed Chain Link Fence
Proposed Barbed Wire Fence '�
Existing Wetland Boundary - - - -��8- - - -
Proposed Wetland Boundary ��B
Existing Endangered Animal Boundary EAB
Existing Endangered Plant Boundary EPB
Existing Historic Property Boundary HPB
Known Contamination Area: Soil -�' S �' -
Potential Contamination Area: Soil -� S �?. ,-
Known Contamination Area: Water -�' W �' -
Potential Contamination Area: Water - �'�.�, —W— � �
Contaminated Site: Known or Potential �' �
BUILDINGS AND OTHER CULTURE.•
Gas Pump Vent or U/G Tank Cap o
Sign �
We I I w°
Small Mine �
Foundation 0
Area Outline
Cemetery fi
Building
School �
Church �
Dam
HYDROLOGY.•
Stream or Body of Water
Hydro, Pool or Reservoir �_ __= J
Jurisdictional Stream �S
Buffer Zone 1 Bz �
Buffer Zone 2 Bz 2
F I ow Arrow E --- ---
Disappearing Stream
Spring �-�--�_,..�
Wetland �
Proposed Lateral, Tail, Head Ditch
� FLO{N
False Sump �
����� �� � ���� ��������; �9 �� ��� �� (�� ����� �����
RAILROADS.•
Standard Gauge -
RR Signal Milepost
Switch
RR Abandoned —
RR Dismantled —
Note: Not to Scale *S. U.E. _
CSX TRANSPORTATION
O
MILEPOST 35
0
SW/TCH
� i i i
RIGHT OF WAY � PROJECT CONTROL:
Secondary Horiz and Vert Control Point ♦
Primary Horiz Control Point 0
Primary Horiz and Vert Control Point �
Exist Permanent Easment Pin and Cap �i
New Permanent Easement Pin and Cap O
Vertical Benchmark �
Existing Right of Way Marker 0
Existing Right of Way Line
New Right of Way Line R
New Right of Way Line with Pin and Cap
New Right of Way Line with
Concrete or Granite R1W Marker
New Control of Access Line with
Concrete C/A Marker
Existing Control of Access
New Control of Access
Existing Easement Line
New Temporary Construction Easement -
New Temporary Drainage Easement
New Permanent Drainage Easement
New Permanent Drainage / Utility Easement
New Permanent Utility Easement
New Temporary Utility Easement
New Aerial Utility Easement
�
rv
i� 0
� W
in� 0
.�. �—
�c�
T
�A�
c
E
E
TDE
PDE
DUE
PUE
TUE
AUE
ROADS AND RELATED FEATURES:
Existing Edge of Pavement
Existing Curb �
Proposed Slope Stakes Cut --- C-
Proposed Slope Stakes Fill --- F-
Proposed Curb Ramp cR
Existing Metal Guardrail —
Proposed Guardrail =
Existing Cable Guiderail —
Proposed Cable Guiderail —
Equality Symbol
Pavement Removal
I�EGETATION.•
Single Tree
Single Shrub
�
����������i
�
�
Subsurface Utility Engineering
Hedge
Woods Line
Orchard
Vi neya rd
EXISTING STRUCTURES:
MAJ O R:
Bridge, Tunnel or Box Culvert
Bridge Wing Wall, Head Wall and End Wall -
MINOR:
Head and End Wall
Pipe Culvert
Footbridge
Drainage Box: Catch Basin, DI or JB
Paved Ditch Gutter
Storm Sewer Manhole
Storm Sewer
UTILITIES:
POWER:
Existing Power Pole
Proposed Power Pole
Existing Joint Use Pole
Proposed Joint Use Pole
Power Manhole
Power Line Tower
Power Transformer
U/G Power Cable Hand Hole
H-Frame Pole
U/G Power Line LOS B(S.U.E.*)
U/G Power Line LOS C(S.U.E.*)
U/G Power Line LOS D(S.U.E.*)
TELEPHONE:
Existing Telephone Pole
Proposed Telephone Pole
Telephone Manhole
Telephone Pedestal
Telephone Cell Tower
U/G Telephone Cable Hand Hole
U/G Telephone Cable LOS 6(S.U.E.*) -
U/G Telephone Cable LOS C(S.U.E.*) -
U/G Telephone Cable LOS D(S.U.E.*) -
U/G Telephone Conduit LOS B(S.U.E.*)
U/G Telephone Conduit LOS C(S.U.E.*)
U/G Telephone Conduit LOS D(S.U.E.*)
U/G Fiber Optics Cable LOS B(S.U.E.*)
U/G Fiber Optics Cable LOS C(S.U.E.*)
U/G Fiber Optics Cable LOS D(S.U.E.*)
�-�.-�-�.-�-�.-�-�.-�-�.-�
� � � �
Vineyard
CONC
� �oN� WW �
WATER:
Water Manhole
Water Meter
Water Valve
Water Hydrant
U/G Water Line LOS B(S.U.E*)
U/G Water Line LOS C(S.U.E*)
U/G Water Line LOS D(S.U.E*)
Above Ground Water Line
TV:
�oN� Hw � Pedestal
TV Towe r
�.________� U/G TV Cable Hand Hole
U/G TV Cable LOS 6(S.U.E.*)
� CB
U/G TV Cable LOS C(S.U.E.*)
U/G TV Cable LOS D(S.U.E.*)
O
U/G Fiber Optic Cable LOS B(S.U.E.*)
s
U/G Fiber Optic Cable LOS C(S.U.E.*)
U/G Fiber Optic Cable LOS D(S.U.E.*)
�
�
O
❑T
�
HH
- - - - T - - - -
- T
T
- - - -TC- - - -
- -TC- -
TC
- - - -T FO- - -
- -T FO- -
T FO
GAS :
Gas Va lve
Gas Meter
U/G Gas Line LOS 6(S.U.E.*)
U/G Gas Line LOS C(S.U.E.*)
U/G Gas Line LOS D(S.U.E.*)
Above Ground Gas Line
SANITARY SEWER:
Sanitary Sewer Manhole
Sanitary Sewer Cleanout
U/G Sanitary Sewer Line
Above Ground Sanitary Sewer
SS Forced Main Line LOS B(S.U.E.*)
SS Forced Main Line LOS C(S.U.E.*)
SS Forced Main Line LOS D(S.U.E.*)
MISCELLANEOUS:
Utility Pole
Utility Pole with Base
Utility Located Object
Utility TrafFic Signal Box
Utility Unknown U/G Line LOS B(S.U.E.*j
U/G Tank; Water, Gas, Oil
Underground Storage Tank, Approx. Loc. -
A�G Tank; Water, Gas, Oil
Geoenvironmental Boring
U/G Test Hole LOS A(S.U.E.*)
Abandoned According to Utility Records -
End of Information
�
A/G Water
- -TV- - -
TV
- - - -TV FO- - -
- -TV FO-
TV FO
0
�
—c
G —
A/G Gas
OO
O
55
A/G Sanitary Sewer
- - - -FSS- - - -
- - FSS - -
FSS
•
�
0
❑s
- 7UTL
0
UST
0
�
0
AATU R
E.O.I.
��
Pi� � NT
DEJCa
B�-1
BL-2
B�-3
BL-4
Pi.-5
NORTH
51226607���
51213801244
5122150582�
5123�7 0 `�4`�8
�"1�7] 5� ���'�
ERSI
846�670683�
84647502261
846653e��37
8468660�226
g4��1�,11�3
E�EV�TION
1 �76 0 63
1 �63 0 52
1 �62 e 25
1 �7`� 0 8�
��� 1 � � :�7
i' ����
G�
/�Q���� /
�
i
/� p / '�OODS
\ /
�
\� \\�i� /
\ �
\
\ \ \
\ � NCDOT BASELINE MONUMENT (BL-Z)
\ \ \ � LOCALIZED PROJECT COORDINATES
� � N = 512,266. 7000
� � � E = 846, 067. 6839
� � � � _ ELEV. =1, 976. 63'
\ ` � _ ` `� \ � BM-1=1,973.98'
� � �
\\� \�
�.�������������������������������������� �� �
� �
�'`/I 1 E�EVRT I ON = 1�73 0�b' v�000s \� \\
`� 5122�1058 E 846���07� ,
�— STRTION 5+23013 33038' �EFT �\ �\ S
�/R SP I KE I N BRSE OF 1�" POP�RR � `"��� �\
�*�*�*���*�**��*�*�**�**��*�********��.� . �
X���***���*******�����**����*���***��*x�
�'�`�2 E�EVRT I ON = 1�61 � 4�'
'� 512278 0�`� E 846652 0 75
�3��_ ST�TION 11+61072 47065' �E�T
�/R SPIKE IN BRSE OF 24" WHITE
x�**�*��*��������*��*�*��*�**���*�����x�
��**�**��***���**���*�**��**������**:���*
3��I3 E�EVRTION = 2��60�2'
�I 5126g5 o C�3 E 846�7� 0 8`�
��_ STRTION 16+850�7 4�025' �EFT
�/R SPIKE IN BRSE OF 16" POPLRR
X N � * � � N X ��. � Y X :K :K * X * % � *�. k � � X ;K � * k � * * Y � X * k_ H�. � x X
PRE�IMIN�RY
—L — POT Sto.10+00.00
—L— POT STA. 11 + 00.00
DATUM DESCRIPTION
THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT
IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
NCDOT FOR MONUMENT ��GPS-101 "
WITH NAD 83/NA 2011 STATE PLANE GRID COORDINATES OF
NORTHING: 513941.5830(ft) EASTING: 847723.9060(ft)
ELEVATION: 2108.16(ft)
THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT
(GROUND TO GRID) IS: 0.99978022
THE N.C. LAMBERT GRID BEARING AND
LOCALIZED HORIZONTAL GROUND DISTANCE FROM
"GPS-101 " TO -L- STAT I ON 1 1+00. 00 I S
S 38°33�29.4" W 2235.65'
ALL LINEAR DIMENSIONS ARE �OCALIZED HORIZONTAL DISTANCES
VERTICAL DATUM USED IS NAVD 88
S UR T�E Y C01�1 TR OL SHEET 8-�40�
-PRELIMI1�lAR Y-
� STRTION OFFS�T
OUTSID� PRC�JECT �IMIIS
12�5407� 10�� R—
14 � 55 0 54 1 1 e 2� I_T
17�4�088 12013 �I
�I.ITS I �E �'RO ,J�CT I. I M I TS
—L — PC Sto.12f3/.96
NCDOT BASELINE MONUMENT (BU2) �
LOCALIZED PROJECT COORDINATES
/ — GR — � N = 512,138.1244
/ / �— � � E = 846,475.2261
, � � \ � ELEV. =1, 963.52' yyErI
�
� AREJ
�� ,
\�
�� /
\�
\ \ /\
\ �� � I
� � �
\ GR
_ �
1
�I
�'
//
- _,5��,;,�;.;r
A�KEH CREEK
GEOID MODEL: G12NC
NOTE: DRAWING NOT TO SCALE
-PRE�IMIN�RY- ROW M�R�<;�R �ERMPNENT E�SEMENT-E
��I�N ST�TION O��SET NORTH E�S-��
� 12�4�0�� -440�8 51218606�456 8464740�5219
� 12�4�0�� -650�� 5122�506821� 8464810�2216
� 12���0�� -65a�� 5122�1099971 8465�2058392
� 12���0�� -52073 51218�073533 8465�2021261
L 1��630�7 -540"l� 5122�402�3�� 846551067572
� 13��C3o�7 -650�� 512213047323 8465460�3624
� 13���0�� -650�� 51222704727� g4656�0�4641
� 14�750�� -65oG� 5122710653�4 846641066256
L 14�75oGG -5105� 51226�01198� 84664go67�42
L 16�6�o�PJ -4�044 51235�089357 846787046843
� 16�6�o�G -650�� 512364087�2� 846767027326
� 17���o�J�J -650�� 5123g�o8�i117 84678105�843
� 17���00� -32og5 51237603335�3 84681�07�16�3
� NCDOT GPS MONUMENT (GPS-ZOl)
� � LOCALIZED PROJECT COORDINATES
� �� N= 513, 941.5830
� E = 847, 723.9060
� � � ELEV. = 2,108.16'
�
�
�
�
�
�
�
�
�
NCDOT BASELINE MONUMENT (BU4)
LOCALIZED PROJECT COORDINATES
N= 512,397.9498
E = 846, 866. 0226
ELEV. =1, 979.89'
NOTES:
NCDOT BASELINE MONUMENT (BL-5)
LOCALIZED PROJECT COORDINATES
N=512,713.1238
E = 846, 916.1103
� . ELEV. = 2, 013.37'
� w/ � i�0
� i
_ ,
i
- PRE� I M I N�F�Y -��W �iPF���ER
�ND L�P -E
���IGN ST�TION OFFSET NORIH E��T
� 11���0�� -250�� �12216072�5� 84633�03�434
� 11�42084 -250�� 5122�1047583 84637�033628
—�� � 13��go�5 -5105� 51222�0124�7 8465g2o�4225
� 15��1038 -5�016 51231704���7 846742og4185
� 16�7�0�7 -3604� 512362082735 8467��075437
� 17+2707� -3�051 5123�70734�2 846821o56g3�
� 18+5�0�� -250�� 51251�08�913 84684�0�111�
� 18�5�0�� 250�� 5125�70�8��1 84688�0�315�
� 18�5�Jo�� 4�0�� 5125�7014298 846��40��762
� 17�86081 4�0�� 5124440�5328 846��1034354
L 15�63025 4�0�� 512227082��4 8467710631�7
� 13�63a�7 4�0�� 512123077��2 8466��061184
� 12��1oq6 4�0�� 5121��0�126� 84643�048484
� 11��i�o�� 4�0�� 5121550�7��3 846316016�37
� 1 1��i� 0 7i7i 2� o'�'� 512 � 6� o��E 7E� �4G321 0�!��21
1. THE CONTROL DATA FOR THIS PROJECT CAN BE FOUND ELECTRONICALLY BY SELECTING
PROJECT CONTROL DATA AT:
HTTPS✓/CONNECT.NCDOT. GOU/RESO URCES✓LOCATION/
THE FILES TO BE FOUND ARE AS FOLLOWS:
B-5405 LS CONTROL.TXT
SITE CALIBRATION INFORMATION HAS NOT BEEN PROVIDED FOR THIS PROJECT.IF FURTHER
INFORMATION IS NEEDED, PLEASE CONTACT THE LOCATION AND SURVEYS UNIT.
� INDICATES GEODETIC CONTROL MONUMENTS USED OR SET FOR HORIZONTAL PROJECT CONTROL
BY THE NCDOT LOCATION AND SURVEYS UNIT.
PROJECT CONTROL ESTABLISHED USING GLOBAL POSITIONING SYSTEM.
N
Z
0
N
>
W
�
C1
C2
C3
FINAL PAVEMENT SCHE�ULE
PROP. APPROX. 1.25" ASPHALT CONCRETE SURFACE COURSE, TYPE SF9.5A,
AT AN AVERAGE RATE OF 137.5 LBS. PER SQ. YD.
PROP. APPROX. 2.5" ASPHALT CONCRETE SURFACE COURSE, TYPE SF9.5A,
AT AN AVERAGE RATE OF 137.5 LBS. PER SQ. YD. IN EACH OF TWO
LAYERS.
PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE SF9.5A,
AT AN AVERAGE RATE OF 110 LBS PER SQ YD PER 1" DEPTH TO
BE PLACED IN LAYERS NOT TO EXCEED 1 1/2" IN DEPTH
E1 PROP. APPROX. 5" ASPHALT CONCRETE BASE COURSE, TYPE B25.0B, AT
AN AVERAGE RATE OF 570 LBS. PER SQ. YD.
PROP. VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE B25.OB,
E 2 AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH. TO
BE PLACED IN LAYERS NOT LESS THAN 3" IN DEPTH OR GREATER
THAN 5 %2„ IN DEPTH.
NOTE: PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE.
3'-0"
�
7'-0"
W/G R
C2)
� �:
.
ORIGINAL � P�L• ���NS
G RO U N D �,S�G
__i S�� T E1
GRADE TO THIS LINE
E3,_�„
7'-0"
W/G R
� �_
ORIGINAL � P�. ����5 '
GRO�D �,5� T
S��
GRADE TO THIS LINE—
VAR.
0' TO 10'-0"
�
�
�
• VAR.
J_ 0' TO 10'-0"
-,- -
�
GRADE I C1
PO I NT i
, 0.02 0.02 �
---- - --- ----I
� �� I
�7.5 u w
�
TYPICAL SECTION NO. 1
USE TYPICAL SECTION NO. 1
–L– STA. 11 + 00.00 TO STA. 12 + 50.35
–L– STA. 16 + 2 6.06 TO STA. 18 + 50.00
11'-0"
C2
, 0.02
�
-,
�
GRADE �
PO I NT i
E1
11'-0"
C2
0.02 �
7.5"
El
T
�
V
W
(C2
EARTH MATERIAL.
EXISTING PAVEMENT.
MILLING (VARIABLE DEPTH- SEE DETAIL)
VARIABLE DEPTH ASPHALT PAVEMENT (SEE WEDGING DETAIL)
3'-0"
7'-0„
W/G R
� �:
.
8,_p„
SFF�
E1 T
GRADE TO THIS LINE
3'-0"
7 0
W/G R
� �:
.
8,_�„
SFF\
T
—GRADE TO THIS LINE
TYPICAL SECTION NO. 2
USE TYPICAL SECTION NO. 2
-L- STA. 12 + 50.35 TO STA. 13 + 95.84 (BEGIN BRIDGE)
-L- STA. 14+58.16 (END BRIDGE) TO STA. 16+26.06
� c��oNs
X�SE
ORIGINAL
GROUND
D ETAI L A
PAVED SHOULDER
WITH GUARDRAI L
S��C '� � U 1'-3„
USE DETAIL A TYP.
–L– STA. 13 + 41.75 TO STA. 13 + 91.75 LT
–L– STA. 13 + 32 .15 TO STA. 14 + 00.00 RT
–L– STA. 14 + 54.07 TO STA. 15 + 04.57 LT
–L– STA. 14 + 62.25 TO STA. 15 + 95.35 RT
� c��oNs
X,S�
– f
ORIGINAL
GROUND
�
LOC H N E R
H. W. LOCHNER, INC.
2840 PLAZA PLACE, SUITE 202
RALEIGH, NC 27612 NC License
(919)571-7111 Number F-0159
� NC FIRM LICENSE No: F-1148
ll51 SE Cary Parkway
ECOLOGICAL S°'te 1°1
Cary, NC 27518
�� ENGINEERING C919) ss�-o9a9
37.5'
MILLING 1" EVERY 25'
0" TO 1.5"
C�
PROJECT REFERENCE NO.
B –5405
R�W SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
2A –/
HYDRAULICS
ENGINEER
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
\'I
MILLING DETAIL
USE MILLING DETAIL AT RESURFACING TIES
C1
E2
C3
�
-�--�---�---�--„--�-�-��---------------
I 3 MIN. ,� I
�-- ----------------------------------------�
U Wedging Detail For Resurfacing
WEDGING DETAIL
�
I
3 3'-0"
�
TYPICAL SECTION NO. 3
USE TYPICAL SECTION NO. 3
-L- STA. 13 + 95.84 (BEGIN BRIDGE) TO STA. 14 + 58.16 (END BRIDGE)
1'-3"
TYP.
N
Z
O
>
w
�
�
�
�
� � �
�
� �
� �
1 � ��
��,� `�-�
\ �
�
�
��
� �
\ �
\ �_
��
�
� � ,
�
DS
-L- POT S'
�
WOODS
\\ \\r"� \��Si
� \� TNC
EIP\ \ � �p �
�
\ o
� o°° � 1
EIP \ � \• �
• F�� T \
� ST�C9�\\ \\
� �, �� \
� � \ \� � WOODS
\ �
\� \\�i9' -L-11
� p �
-L - POT Sto. l0 +00.00 � �< ��T `9 `�
\ �� ���0
\\�f `9 \`G�
� �� o\� � ��
\ �o �� �
� �o \ p;
'� • k� '
� � \
\
WOODS \\ O� O� \�
\�
-L-11 + 00.00 \ p0
EXIST. WW & � O�
40.00' RT LL \
\
1
Pl Sto 13+02.45
0= 52° l0' 00.0" fLTI
D = 39° 47' 19.4"
L = /3/.//'
T = 70.49'
� R = 144.00'
SE = 6%
Ro = l08
Vo = 25 mph
�
� WOODS
��
�
�~,�~-,��
� �.
��
��
�
�
�z
� �z
� �
0
f
� ��
�� ,
� �
�
�
-L - PT Sto. l3 +6 . 7 �
-L-13 + 98.05 �
-L-11 +42.84 EXIST. RrW
EXIST. R�W _L- 13 + 90.00 \
65.00' LT
-L- 13 + 63.07
� EXIST. RiW &
65.00' LT
CLASS B RIP RAP � �,
EST 3 TONS
EST 10 SY WOODS
GEOTEXTILE 15"
; -L- 12+40.00 y,��ELBOWS
EXIST. R�W -L-12 + 80.00
F 5.00' LT EXIST.
� � 65.00' LT
403 F BEGIN
��
-L -
Pl Sto 16+84.66
0= 55° 27' 00.0" ILTI
D = 24° 48' l2.1"
L = 223.56'
T = l2/.4/'
R = 23/.00'
SE = 6%
Ro = ll4
Vo = 30 mph
i ��,�,-,� �� �,.,s` .
WOODS
�,�,
�
�� O BRIDGE DESCRIPTIONa
� TWO LANE SINGLE SPAN BRIDGE WITH A WOOD DECP
y' AND BST OVERLAY ON STEEL BEAMS,
� GUARDRAILS, HEADWALLS, AND WINGWALLS ARE WOOC
\ HIGH WATER ELEV,
1960' +/-
1 UTILITY OWNERS
POWERe
HAYWOOD ELECTRIC MEMBERSHIP
298 BLUE RIDGE ROAD
LAKE TOXAWAY,NC 28747
WOODS
RIDGE HAVEN.INC. TE�EPHONE;
DB 243 PG 532 COMPORIUM COMMUNICATIONS
CLASS B RIP RAP BREVARD,I NC 287E2
EST 2 TONS
EST 7 SY GEOTEXTILE -g�- 3 BM #2
REMOVE -�-18 + 00.00
-BL- STAo 11+6107
EX/STl 47065' LT EXIST. RrW &
S E DETA/L ELEVo = 1961040' 45.00' LT
CLASS II RIP RA
EST 135 TONS � -L- PT Sto. �7+86.8�
S EST 200 SY
\ �C. GEOTEXTILE �
j°�:�. � ������ ►r � , � p . � ��
;; � ���'� : • "■
� ::.� ��.A 7�� • : � �� � � :c4- /• �
�' �,'�� °,.>� �ID��� I .
, ��'' .�'.�'�._ `������������1'�'y ;' � � I1` ii� �;
� • �'���'• �������N.�I`r '�I �/�%%/l�
I . � �� •�• �.� ��� � �����������J��i��►� � i1ii��t!
i `� • �l ��������►t'�� ►� ��
��� ��� ►` �����. i� �.�i'�i�� � i�Yi1i!
•.. • . �- �..,, o � ' �,.��3��J�j�-,� ���:��+�
� � �. ��'��`rin ,����U.
' ,. �
'i1'4
� 1 11 I ���� -���
'� ��` -.
� ' 1 � ' � �'�.�r ����+iT��►^����
1: `�ij �►iM•I�M'�1���I,��i��
� u � �1��i��.��� 1�
w�� �.i
�I , v� l�.��._-;�.�� s•.
� ' � �\ I� : � ��, ,Pv�'� : "�
� . � �� � - �.�_ ��If�
�
11 � ��.v��� �, • ���
:•9 b'a�� � '��
. � � � R�� /��'� '�
.� � ' �. I \��, .�� �
\ ��
- - '�•
.
� � , ���
.�
���
.e �� •
-.i . �
� / :
. � , �
-• � -•
�. , �. .. �
.� ��
. 11 '
�
u+
�WO DS
'DE�
�JS
-L - PC Sto. l5 +63.25
L-14 + 75.00 P -L-17 + 00.00
EXIST. R�W WooDs ON BANKS ONLY EXIST. RrW &
65.00' LT EST 15 TONS 65.00' LT R/0'
EST 35 SY -L-17+27.
GEOTEXTI LE EXIST.
-L-16 + 60.00 wET -L-16 + 7 .97
EXIST. RrW & AREA EXI�
- % RADE 65.00' LT
� � TO DRAIN -L-15+91.38
� i �� U AMED B N�"/7'S�,js y F/
�� 3 0') C M� s � -���� C',�i ��/
�
,'GR � ' - _ _ 04 -.
��� N ��,
� r T FO- i '
E-III G ' � �i -
-- - �- - -�_ EIP
- - - ` \ ���
�C1 y
�C1
4' RAIL N M � p �%�86, MOON
�G i
n
a' E-II�/� � ���' 040 . ��
F 1984,3 ' F 18" HDPE
-- /#Tr� �� K E Y D
�
, CLASS II RIP RAP wET F -�-�-� ENTRY
� J�B� 4�` ��.��� AREA _L- 5�+63.25 i MT�
-L- 3+8 . /H WIRE ELEV, 40.00' RT i I i GATE
1 �98�,�0� , I � oo Nor
40.00' T/E TEMP. D/STURB
-L-15 + 50.00 x i i
�' �s 40.00' RT 48 WW FENC i I i
� -L - l5 +93.8 �
w000s TO EX/ST/NG � � � -L-16+05.00
�
� D i � i 65.00' RT
'�•, -� rn, EXPOSED POWER LINE i� i
E TEMP. ��' FOR GATE OPERATION i� i WOODS
48" FENCE � � ' p '
-L - S7�A /4+20.0 � � � � ', �
�� �
40.00�'` T � z � �
�rn � ��
�w_��� � _ ✓ � GR � �t,:
i i
i i
i i
woo�s EG/N TEMP. ,� ,�
48" WW FENCE �
�� -L - STA.14+52.0 �' '
�� 40.00' RT , �
\� WOODS � �
� �_r'� � � � �
� \ � �
�JS� k�
-A�KEN CREEK W 0 0 D S
DETAIL 1
SPECIAL LATERAL 'V' DITCH
( Not to Scale)
� Fill
Natural �,'.� ��yt Slope
Ground ?•j p F�a
d
Geotextile Min. D= 1 Ft.
Type of Liner= CLASS B RIP RAP Max. d= 1 Ft.
FROM STA. 12 + 00 TO STA. 12 + 50
LOC H N E R
H. W. LOCHNER, INC.
2840 PLAZA PLACE, SUITE 202
RALEIGH, NC 27612 NC License
(919)571-7111 Number F-0159
NC FIRM LICENSE No: F-ll48
1151 SE Cary Parkway
ECOLOGICAL S°'te 1°1
Cary, NC 27518
ENGINEERING (919) 557-0929
_ �, . ,� w- _
WOODS
BM #3
-BL- STAo 16+85097
40025' LT
ELEVo = 2006092' i5 �MP_
��
�
-L - POT St 19+06 80 ���h�
-L-18 + ;
EXI�ST. I
WOOD
-L-18 + 30.00
EXIST. fLW &
45.00' LT
i
�6>_ �
�. �� � `-1,
-B�- 5
PROJECT REFERENCE NO.
B -5405
R�W SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
4
HYDRAULICS
ENGINEER
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
WOODS
�� --�
� j F� -= �
� �/
� � \ \ WOODS WOODS
i
i�
�/ � -T - � o�s� \
� , /� � � 0�9 � .�
� / � / � � � \ \�q/-��s\ �
� � / � �,-'� \090 \ / �
/
� /�,� � � � �� �/
;� / �� � � �� �� //
Q(�� �+ j �/ �OO�j WOODS \\ /�
o P��, x �/ �`�`� E N D TI P PROJ ECT B-5405 � -
h J F� /� _ _ � _ _ ..� � �
�o��P �� , L POT STA. 18 + 50.00 ,,
p \ 06 O
� � CLASS B RIP RAP
'�� EST 2 TONS
/
� EST 7 SY GEOTEXTILE
0 �
0 06 So � � � � , -L-18 + 50.00
� °� �'� EXIST.ILW &
/` i ,�`'�� _ B �- q 40.00' RT.
F°%// � �
� � �
�/
/� �� -L-�+86.81
�� OODS 40. 'OCRT. JOEL D. GALLOWAY
� � DB 230 PG 771
� �� /
O_
� -r��,� "-
---� WET AREA
-�,
H �`,\ �_�" � WOODS
\ -
�� �
�S
X3 WOODS NAME� gRANCH
� 3�
93 -L-16 + 90.00 ��
40.00' RT -L-17 + 15.00 �
_R 20' 50.00' RT 40.00' RT c,
50.00' RT �-, �^ "`� �,�
�-L-16 + 2 5.00 S V Y'� v,� c�
40.00' RT ��� Sio \�Y�
� �?93- F WOODS
�
�cc,,
� WOODS
� PAVEMENT REMOVAL
0 PAVED SHOULDER
1'
WOODS
SEE SHEET 5 FOR -L - PROFILE
�
�
_
�
�
� L O C H N E R PROJECT REFERENCE NO. SHEET NO.
\
� B -5405 5
� H. W. LOCHNER, INC. ROADWAY DESIGN HYDRAULICS
�' 2840 PLAZA PLACE, SUITE 202 ENGINEER ENGINEER
- RALEIGH, NC 27612 NC License
— � � �
. �I I - � (919)571-7111 Number F-0159
I I - �� NC FIRM LICENSE No: F-1148
1151 SE Cary Parkway
� ECOLOGICAL S°`te 1°1
Cary, NC 27518
ENGINEERING �9ia� ss�-o9za
- '_ _--
_ _ _ __ _ _ _.' _'
-- - � �
__�_
. _
__ � C —
i � � _
___ :- '— — � - _
-__ _, � !
___ ___
DOCUMENT NOT CONSIDERED FINAL
� __--� � � � � � � � � � � � � � � � �� � � _� �� � � � UNLESS ALL SIGNATURES COMPLETED
__ i
-- — i _
— -
' � � � � � � � � � , , , ,
_—_ __�
__
_. . _
_
--- -;-�-�- -� --�- --�- -�-- -� -�- -�- � ---I- --�- -I- --�-- � -�-- �-- --�- -�-- --�-- �- --�- -�-�-- �- -�- -�- -� -�
___ i_ i —_ _ —_ -_ _
. _ _ i � - — _ _ — _
--- ,_ _
� � �
i_ _
_ _� _ �. � � � � � � �_ � � �_ � � � � � � � � � � � � � .� � �
�--,
__ __ � �
PIPE HYDRAULIC DAT A PIPE HYDRAUUC DAT A
l8" RCP Sta. l2 +5/ 42" RCP Sto. l6 +9/
' DRAINAGE AREA = l.3 AC ' DRAINAGE AREA = 43.6 AC ' ' ' '
DESIGN FREQUENCY = 25 YR DESIGN FREQUENCY = 25 YR
BM "� DESIGN DISCHARGE = 2.5 CFS BM #2 DESIGN DISCHARGE = 5/.7 CFS BM �3
-BL 33 38' LT23•�3 DESIGN HW ELEVATION = 1962.4 FT � 64.744L87'82 DESIGN HW ELEVATION = 1965.1 FT -BL 0 25!6 s5.9� : :
ELEV. = 1973.98� l00 YEAR DISCHARGE = 3.� CFS ELEV. = 1961.40� l00 YEAR DISCHARGE = 82.3 CF$ ELEV. = 2006.92'
� l00 YEAR HW ELEV AT lON = 1962.5 FT -�-- l00 YEAR HW ELEV AT lON = 1966.6 FT -�- -�- � � -�
OVERTOPPING FREQUENCY = 500� YR OVERTOPPING FREQUENCY = 500+ YR BRIDGE HYDRAULIC DAT A
OVERTOPPING DISCHARGE _ 14.8 CFS OVERTOPPING DISCHARGE _ 194.9 CFS
�- OVERTOPPING ELEVATION = 1964.8 FT OVERTOPPING ELEVATION = 1976.4 FT DESIGN DISCHARGE = 850 CFS
__ I . I�. I� DESIGN FREQUENCY = 25 YR .
DESIGN HW ELEV AT lON = 1959.0 FT
Pl = 17+45.00 BASE DISCHARGE _ 1200 CFS
EL = 1,980.69' BASE FREQUENCY = l00 YR
---_
K= 76 BASE HW ELEV AT lON = 1959.85 FT
�
__ __
� ' . — — VC = 90' , � 1
_ . � OVERTOPPI G DISCHARGE = 2537 CFS
N
19 9 � SSD - 958 , ��' OV ERT OPPING FREQUENCY= 500 + YR 19 9 �
Vd = 45mph
-L- STA. 1+00.00 Pl = 15f85.00 � �83��,� OVERTOPPING ELEVATION = 1964.3 FT
_ _� EL=1,969. � � B lN BRID _�. � � EL _ 1,965.49 _� � � � � .� � �.
VC - 222 ��.i
1980 -L- STA.l3+9 .84 K - 25
Pl = l2 +25.00 d= 20m h � DAT E OF SURVEY = 2/l/20/6 19 8 0
EL = 1,962.98' V p a8`�� ��� W.S. ELEV AT lON _
�- --� VC = 250' -�- � _�_ - END BR DGE t�9 ---�- �-- AT DATE OF SURVEY - 1955.7 FT � � � �
EXISTIN _
,, 19• �� _ .
—� K= 43 L STA.4+58.16 � g8a% GROUND 1970
1970 ��,. Vd = 30mph
�
�.� .� � k i, i� i
__ __ ' �� _ EN GRADE
l ���2i -' — � .
__ _ �,__, ° �— .--- ---,_ sTRucTURE ,(+)0697 % ��' _ —I -L- STA.l8+5 .00
1960 0 �, � � �+10.69 % --- _ --- �.�— �---- EL= ,989.42'
1960
Q � ° �
� �
. � I J N � 18" RCP � _� � �� RCP .
_ _ �
� , !_ � � ; � � � PR POSED � : : :
1950 1950
� Q a
�� � O Q O STRUCTURE EXCAVATIO = 145 CY I I I i
�___� � � O � O (STRUCTU E PAYITEM) WS EL — 195507' �—
� � I = O � � � 2/I/2016 � � � � � � � _� �_ � � �_ I � .� � �
, '' , J O O DATE 0 SURVEY
1940 � N� �N� . 1940
,
; ;
n 4 u � RIGHT Dl CH
�__� � � Q �� 4 Q �� � � � � � � � � � � �
— —
I_
,
� i I� J Z I� J
m� W W� W ' ' ' SEE SHEET 4 FOR -L- PLAN VIEW
�
�
�
10 11 12 13 14 15 16 17 18 19
�_�