Loading...
HomeMy WebLinkAbout20081377 Ver 1_More Info Letter_20081007?QF Vv n t ?Rp Michael F. Easley, Governor ,C QQ G William G. Ross Jr., Secretary co r North Carolina Department of Environment and Natural Resources p -? Coleen H. Sullins, Director Division of Water Quality October 7, 2008 DWQ Project # 08-1377 Caldwell County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Ms. Connie South Town of Cajah's Mountain 1800 Connelly Springs Road Lenoir, NC 28645 Subject Property: Fairway Acres Sanitary Sewer Ut to Gunpowder Creek [030832, 11-55-(0.5), C] REQUEST FOR MORE INFORMATION Dear Ms. South: On September 8; 2008, the Division of Water Quality (DWQ) received your application dated September 3, 2008, to fill or otherwise impact 0.06 acres of 404/wetland, 160 linear feet of stream (not identified as perennial or intermittent), and 0.00 square feet of Zone 1 Catawba River basin protected riparian buffer and 0.00 square feet of Zone 2 River basin protected riparian buffer to remove sediment from a drained lake at the site. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the additional information requested below, we will place this project on hold as incomplete until we receive this additional information. If we do not receive the requested information, your project will be formally returned as incomplete. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. Please provide stream determination documentation on the site (upstream and downstream photos and DWQ stream identification forms). 2. Please provide a location map, and the most recent bound and published Caldwell County soil survey and USGS 1:24,000 topographic map with the project boundaries located on them. 3. Please indicate all wetland impacts including fill slopes on the site plan at a 1"=50 ` scale. 4. Please enumerate all riparian buffer impacts on the site plan and clearly label impacts (Buffer Impact 1, etc.), and enumerate buffer impacts in the Pre-Construction Notification application. 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http://h2o.enr. state. nc. us/ncwetlands N e hCarolina Noaturally An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Town of Cajah's Mountain Page 2 of 2 October 7, 2008 5. If your proposed impacts to wetlands are temporary, please describe the existing condition of the wetlands (dominant vegetation) and your replanting proposal for reestablishing the wetlands post- construction. 6. Your proposed stream crossing at C105 appears to be aligned at less than 75°. Please re- configure your proposed stream crossing to show it aligned approximately perpendicular (between 75° and 105°). 7. Please clearly locate all isolated or non-isolated wetlands, streams, and other waters of the State, and Zone 1 and Zone 2 buffers as overlays on the site plan. Please submit this information within 30 calendar days of the date of this letter. If we do not receive this requested information within 30 calendar days of the date of this letter, your project will be withdrawn and you will need to reapply with a new application and a new fee. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733- 1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sinc ly, Cyndi Karoly, Supervisor 401 Oversight/Express Review Permitting Unit CBK/i m cc: Kevin Barnett, DWQ Asheville Regional Office USACE Asheville Regulatory Field Office File Copy Matt Matthews, DWQ Branch Manager Clarence M. Lockamy, The Wooten Company, 1430B Old Lenoir Road, NW, Hickory, NC 28601 Filename: 081377Fai rwayAcresSa nits rySewer(Caldwell)O n_Hol d