HomeMy WebLinkAbout20061040 Ver 2_CAMA Application_20081002
?X-
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor James H. Gregson, Director William G. Ross Jr., Secretary
September 30, 2008
Cyndi Karoly, Supervisor
401 Oversight & Express Permits Unit
0 C T 2 2008
MEMORANDUM:
TO:
FROM
SUBJECT:
Applicant
DENR - WATER QUALITY
WETUWDS AND STORIAWATER BRANCH
Doug Huggett, NC DENR-DCM Major Permits Coordinator
400 Commerce Ave., Morehead City, NC 28557 (Courier 11-12-09)
CAMA Major Permit Application Review
Southport Marina, Inc. MM99-01
Project Location: 606 W. West St., adjacent to the AIWW in Southport, Brunswick Co.
Proposed Project: Additional dry storage "slips" and reconfiguration of existing storage racks.
Please indicate below your agency's position or viewpoint on the proposed project and return
this form by October 24, 2008. If you have any questions regarding the proposed project,
contact Heather Coats at (910) 796-7424, when appropriate, in-depth comments with supporting
data is requested.
REPLY:
SIGNED
LT-WIFAA ou - l o4 o V2.
DATE
127 Cardinal Drive Ext., Wilmington, North Carolina 28405-3845
Phone: 910-796-72151 FAX: 910-395-39641 Internet: www.nccoastaimanagement.net
This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
An Equal Opportunity \ Affirmative Action Employer -50% Recycled 110% Post Consumer Paper
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Southport Marina, Inc.
2. LOCATION OF PROJECT SITE: 606 W. West Street, adjacent to the Atlantic Intracoastal
Waterway, within the Town of Southport, in Brunswick County
Photo Index - 2006: 9-6125 13, O 2000: 9-9112-13, 14 1995: 9-79 18-19, H-1
State Plane Coordinates - X: 2294798 Y: 63069
Lat:33°55'09.53799"N Long: 78°01'42.38401"W
3. INVESTIGATION TYPE: CAMA ROVER FILE #: Q070914B
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 7/9/08
Was Applicant Present - No
5. PROCESSING PROCEDURE: Application Received - 9/11/08 (complete)
Office - Wilmington
6. SITE DESCRIPTION:
(A) Local Land Use Plan- Southport
Land Classification From LUP - Open Space/VLDR
(B) AEC(s) Involved: ES
(C) Water Dependent: Yes
(D) Intended Use: Public
(E) Wastewater Treatment: Existing- Public sewer
Planned- Same
(F) Type of Structures: Existing- 198 slip marina, office building, parking area, travel lift,
lift well, bulkheads.
Planned- Add 161 dry slips to permitted 239 unit dry stack storage
facility.
(G) Estimated Annual Rate of Erosion: N/A
Source - N/A
7. HABITAT DESCRIPTION: [AREA]
DRF,DGF,D FTT.T,FD 0TNFR
(A) Vegetated Wetlands (Coastal / 404)
(B) Non-Vegetated Wetlands (Open
Water)
(C) Other - Highground disturbance 1.36 acres
(disturbed)
(D) Total Area Disturbed: 1.36 acres
(E) Primary Nursery Area: No
(F) Water Classification: SC Open: No
8. PROJECT SUMMARY: Major modification request to Permit No. 99-01 for an additional
161 dry stack storage "slips" and reconfiguration of the dry stack storage racks, to accommodate a
total of 400 vessels.
Southport Marina, Inc.
Page 2
9. PROJECT DESCRIPTION
The project site is located at 606 W. West Street, adjacent to the Atlantic Intracoastal Waterway, within
the Town of Southport, in Brunswick County. To locate the property from Wilmington, travel south on
NC Hwy-133 to Southport. Turn left on N. Howe Street and travel approximately 1.3 miles to W. West
Street. Turn right onto W. West Street and travel approximately 0.45 miles to the Southport Marina
property.
The property is a 44-acre tract of land owned by the North Carolina State Ports Authority and leased to
Southport Marina, Inc. The existing marina is a full service facility consisting of 251 permitted wet
slips, boat ramps, a fork lift haul out/dropzone and a 75-ton open hoist travel lift. The facility also
includes a boat ramp, shower and laundry facilities, pump out station, a full service boat yard and fuel.
The existing facility consists of the following six main docking structures: a commercial dock located
just to the east of the boat ramp; A, B and C-Docks, which are located just to the west of the boat ramp
with floating docks and finger piers along each side (the end of C-Dock also includes an existing
covered dock house and fueling docks); D-Dock and E-Dock, with associated finger piers, located east
of the fork lift dropzone. The western side of E-Dock also serves as a staging area for the dropzone. A
long, U-shaped dock is located on the far west end of the basin. A restaurant, marina office, parking
areas and 132 dry slip racks are located on the high ground portion of the property.
The property is bordered by Cottage Creek to the west, the AIWW to the south and the Southport Yacht
Basin to the east. The marina facility pre-dates the Coastal Area Management Act, however, the facility
has been issued State Permits for maintenance excavation of the marina basin and modifications /
additions to the docking structures. (See State Permits 5-75, 138-87, 32-95 and 99-01.) The most recent
permit (99-01) authorized the maintenance excavation of the existing basin to a depth of -6 feet at MLW
and added floating docks. A modification to State Permit 99-01 was issued on November 17, 2003,
authorizing the construction of additional floating docks. A modification on April 17, 2006 authorized
the maintenance dredging of the boat basin, the construction of a 12' wide by 612' long boardwalk along
the marina basin and modifications to the docks. A CAMA General Permit (No. 44036) was issued on
May 1, 2006 for the replacement of the existing boat ramp dock. On September 20, 2006 a major
modification of State Permit 99-01 was issued authorizing replacement and expansion of the docking
facility to accommodate a total of 251 vessels in wet slips, construction of a new forklift pad, an elevated
boardwalk and fill of the previously existing lift well. A refinement to this permit was issued on
November 28, 2007 authorizing reconstruction of the dry stack facility. Southport Marina, Inc. was able
to provide documentation for 167 dry slips as previously existing. Six two-story racks, measuring
approximately 30' in height, were authorized to accommodate the vessels. The refinement also
authorized paving and installing gravel over existing parking areas, constructing a new boardwalk and
decks over existing impervious. Southport Marina, Inc. modified the permit again on January 16, 2008
to allow for an additional 72 dry slips that they were also able to document as pre-existing, with no
resulting change in footprint. These have not yet been constructed although the project area has been
graded.
A State stormwater permit (SW8 060626) was issued on August 31, 2007. A State erosion and
sedimentation control plan was approved on May 3, 2007.
Southport Marina, Inc.
Page 3
The waters of the AIWW in this location are classified as "SC" by the North Carolina Division of Water
Quality and are included in the Southport Restricted Area. The area is not designated as a Primary
Nursery Area by the North Carolina Division of Marine Fisheries and is closed to the harvest of
shellfish.
PROPOSED PROJECT
The applicant is currently proposing to further expand the dry stack facility to accommodate an
additional 161 vessels, creating a total of 400 dry slips. A dry-stack storage building is now proposed,
which would measure 266' in length and 170' in width. Seven-foot long mini-storage units would also
be constructed at the south end of the dry stack building. The modification does not appear to result in an
increase in footprint from the January 16 refinement, although the racks have been reconfigured to allow
for the additional dry slips. The building would have a maximum height of 50 feet (maximum elevation
of 56.83' above mean sea level). The City of Southport has a maximum height restriction of 40',
however, a special use permit was granted to Southport Marina, Inc. on August 26, 2008, to allow for a
building height of 50'.
10. ANTICIPATED IMPACTS:
The project would result in approximately 1.36 acres of high ground disturbance and impervious surface.
The additional dry slips will likely result in increased boat traffic in public trust area and estuarine
waters.
Submitted by: Heather Coats Date: September 29, 2008 Office: Wilmington
DCM MINI
C) U- 1 0 4 i) V?,
APPLICATION for
Major Development Permit
(last revised 12127/06)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant/ Landowner Information
Business Name Project Name (if applicable)
Southport Marina, Inc. Southport Marina
Applicant 1: First Name MI Last Name
Southport Marina, Inc N/A N/A
Applicant 2: First Name
MI Last Name
Land Owner Is North Carolina State Port
Authority. Permission Letter Attached. NA NA
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address PO Box City State
100 Weston Estates Way Cary NC
ZIP Country Phone No. FAX No.
27513 USA 919 -481 - 3000 ext. 5 919 -677 - 8600
Street Address (if different hom above) City State ZIP
N/A -
Email
robin@prestondev.com
2. Agent/Contractor Information
Business Name
Land Management Group, Inc.
Agent/ Contractor 1: First Name MI Last Name
William S Morrison
Agent/ Contractor 2: First Name MI Last Name
N/A
Mailing Address PO Box City State
Land Management Group, Inc 2522 Wilmington N.C.
ZIP Phone No. 1 Phone No. 2
28402 910 - 452 - 000 1 ext. - - ext.
FAX No. Contractor #
910 452 0060 N/A
Street Address (if different from above) City State ZIP
3805 Wrightsville Avenue Wilmington N.C. 28403-
Email
smorrison@Imgr
K 16V _ lJ
pC.T `? ?008 <Form continues on back>
RECEIVED
WETLANDS AND S*f0KMWA1c O?O
Form DCM MP-1 (Page 2 of 6)
APPLICATION for
Major Development Permit
2008
Dc iJ WIr:ll JNGTON, NC
Form DCM MP-1 (Page 3 of 6)
APPLICATION for
Major Development Permit
3. Project Location
County (can be multiple) Street Address State Rd. #
Brunswick 606 W. West Street
Subdivision Name City State Zip
N/A Southport N.C. 28461-
Phone No. Lot No. (s) (if many, attach additional page with list)
910 - 457 - 5261 ext. 6 N/A, ,
a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project
C'^A ' I-WP, Intracoastal Waterway
c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site.
®Natural ?Manmade ?Unknown Cape Fear River
e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed
®Yes ?No work falls within.
City of Southport
4. Site Description
a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.)
2,741 LF, Not including upland islands outside of basin. 44 acres
c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or
N/A, NWL (normal water level)
(If many lot sizes, please attach additional page with a list) +4 feet ®NHW or ?NWL
e. Vegetation on tract
Marsh species, live oaks, lawn gasses, ornamental shrubs
f. Man-made features and uses now on tract
Marina facility, buildings, parking, boat ramp
g. Identify and describe the existing land uses adiacent to the proposed project site.
Commercial
h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning?
Commercial (Attach zoning compliance certificate, if applicable)
®Yes ?No ?NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? ?Yes ®No
k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ?Yes ®No ?NA
If yes, by whom?
1. Is the proposed project located in a National Registered Historic District or does it involve a ?Yes ®No ?NA
National Register listed or eligible property?
<Form continues on next page>
'VED
SEP 1 12008
DCM WILMINGTON,
Form DCM MP-1 (Page 4 of 6)
APPLICATION for
Major Development Permit
m. (i) Are there wetlands on the site? ®Yes ?No
(ii) Are there coastal wetlands on the site? ®Yes []No
(iii) If yes to either (i) or (ii) above, has a delineation been conducted? ®Yes ?No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
Public sewer
o. Describe existing drinking water supply source.
City water
p. Describe existing storm water management or treatment systems.
Infiltration basins, SW8 060626, 8/31/07
5. Activities and Impacts
a. Will the project be for commercial, public, or private use? ®Commercial ®PublictGovemment
[]Private/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
See attached description in cover letter. Proposed activities include increased rack storage slips.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
Standard construction techniques, equipment
d. List all development activities you propose.
Additional rack storage slips in area permitted for rack storage slips. New total of authorized rack slips to be increased from
239 to 400.
e. Are the proposed activities maintenance of an existing project, new work, or both? Both
f. What is the approximate total disturbed land area resulting from the proposed project? See SW8 060626. 1.36 Previously
approved ?Sq.Ft or
Acres
g. Will the proposed project encroach on any public easement, public accessway or other area ?Yes ?No ®NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
N/A
i. Will wastewater or stormwater be discharged into a wetland? ?Yes ?No ®NA
If yes, will this discharged water be of the same salinity as the receiving water? ?Yes ?No ®NA
j. Is there any mitigation proposed? ?Yes ?No ®NA
If yes, attach a mitigation proposal.
<Form continues on back>...
DCM WILMINGTON, NC
Form DCM MP-1 (Page 5 of 6)
APPLICATION for
Major Development Permit
6. Additional Information
In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) - (f) are always applicable to any major development application. Please consult the application
instruction booklet on how to properly prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name City of Southport Phone No. 910-457-7988
Address 201 E. Moore St. Southport, N.C. 28461
Name Phone No.
Address
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
CAMA Permit #32-95, 12/2/97, NC State Port Authority CAMA Permit #138-87, 416/94, NC State Port Authority
CAMA Permit # 99-01, NC State Port Authority 9-20-06 Major Mod to CAMA Permit # 99-01, Southport Marina,
Inc.
SW8 060626, Southport Marina, Inc. 8/31/07, copy attached
Bruns-2007-382, Southport Marina, Inc. 5/3/07, copy attached
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
7. Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date 9/11/08 Print Name William S. Morrison, Agent
Signature
Please indicate application attachments pertaining to your proposed project. R E C E
?DCM MP-2 Excavation and Fill Information ?DCM MP-5 Bridges and Culverts SE?
®DCM MP-3 Upland Development 112008
DCM WILMINGTON, IBC
Form DCM MP-1 (Page 6 of 6)
®DCM MP-4 Structures Information
APPLICATION for
Major Development Permit
i.sIV El. C)
5EP 1 12008
DCM WILMINGTON, NC
Form DCM MP-3
UPLAND DEVELOPMENT
(Construction and/or land disturbing activities)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
GENERAL UPLAND DEVELOPMENT
a. Type and number of buildings, facilities, units or structures
proposed.
161 additional dry stack storage units to be authorized.
(239 units currently authorized, 400 total proposed)
Authorized dry stack building to be built to 50' above FIFE
as approved by City of Southport. Mini-storage units to be
incorporated into south end of building footprint.
c. Density (give the number of residential units and the units per
acre).
NA
e. If the proposed project will disturb more than one acre of land, the
Division of Land Resources must receive an erosion and
sedimentation control plan at least 30 days before land-disturbing
activity begins.
(i) If applicable, has a sedimentation and erosion control plan been
submitted to the Division of Land Resources?
®Yes ?No ?NA
(ii) If yes, list the date submitted: Bruns-2007-382, permitted
5/3/07, attached
b. Number of lots or parcels.
NA
d. Size of area to be graded, filled, or disturbed including roads,
ditches, etc.
1.36 acres previoulsy approved.
f. List the materials (such as marl, paver stone, asphalt, or concrete)
to be used for impervious surfaces.
Concrete, gravel
g. Give the percentage of the tract within the coastal shoreline AEC to h. Projects that require a CAMA Major Development Permit may also
be covered by impervious and/or built-upon surfaces, such as require a Stormwater Certification.
pavement, building, rooftops, or to be used for vehicular driveways (i) Has a site development plan been submitted to the Division of
or parking. Water Quality for review?
No new impervious surfaces proposed. See SW8 060626 ®Yes ?No ?NA
i. Give the percentage of the entire tract to be covered by impervious
and/or built-upon surfaces, such as pavement, building, rooftops,
or to be used for vehicular driveways or parking.
No new impervious surfaces proposed.
(ii) If yes, list the date submitted: SW8 060626 permitted
8/31/07, attached
j. Describe proposed method of sewage disposal.
NA.
k. Have the facilities described in Item (i) received state or local
approval?
?Yes ?No ®NA
If yes, attach appropriate documentation.
Does the proposed project include an innovative stormwater
design?
?Yes ®No ?NA
If yes, attach appropriate documentation. RECEIVED
1. Describe location and type of proposed discharges to waters of the M.
state (e.g., surface runoff, sanitary wastewater, industrial/
commercial effluent, "wash down" and residential discharges).
NA. No new discharges proposed.
SEP 1 1 2008
DCM WILMINGTON, N,
m. Describe proposed drinking water supply source (e.g., well, n. (i) Will water be impounded? ?Yes ®No ?NA
community, public system, etc.) (ii) If yes, how many acres?
NA
o. When was the lot(s) platted and recorded?
1964
p. If proposed development is a subdivision, will additional utilities be
installed for this upland development?
?Yes ?No ®NA
9/11/08
Date
Southport Marina
Project Name
Southport Marina, Inc.
Applicant Name
Applicant Signature
RECEIN,
SEP 1 12008
DCM WILMINGTON, NC
Form DCM MP-4
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. DOCKING FACILITY/MARINA CHARACTERISTICS
a. (i) Is the docking facility/marina:
OCommercial ®Public/Government ?Private/Community
?This section not applicable
b. (i) Will the facility be open to the general public?
®Yes ?No
c. (i) Dock(s) and/or pier(s)
(ii) Number N/A
(iii) Length
(iv) Width
(v) Floating ?Yes ?No
e. (i) Are Platforms included? ?Yes ®No
If yes:
(ii) Number
(iii) Length
(iv) Width
(v) Floating ?Yes ?No
Note: Roofed areas are calculated from dripline dimensions.
g. (i) Number of slips proposed
total of 400 rack storage slips to be authorized
(ii) Number of slips existing
144 existing (239 rack storage slips currently authorized)
i. Check the proposed type of siting:
? Land cut and access channel
?Open water; dredging for basin and/or channel
?Open water; no dredging required
®Other; please describe:
Dry Stack Storage
k. Typical boat length: 18'-32'
d. (i) Are Finger Piers included? ?Yes ®No
If yes:
(ii) Number
(iii) Length
(iv) Width
(v) Floating ?Yes ?No
f. (i) Are Boatlifts included? ?Yes ®No
If yes:
(ii) Number
(iii) Length
(iv) Width
h. Check all the types of services to be provided.
? Full service, including travel lift and/or rail, repair or
maintenance service
? Dockage, fuel, and marine supplies
? Dockage ("wet slips") only, number of slips:
® Dry storage; number of boats: 161 additional boats to be
authorized to total of 400 rack storage slips
? Boat ramp(s); number of boat ramps:
? Other, please describe:
j. Describe the typical boats to be served (e.g., open runabout,
charter boats, sail boats, mixed types).
Mixed
1. (i) Will the facility be open to the general public?
RECEI'VED
SEP 1 12008
(rCM WILMINGTON, NBC
m. (i) Will the facility have tie pilings? ®Yes ?No
?Yes ?No
(ii) If yes number of tie pilings?
N/A
2. DOCKING FACILITY/MARINA OPERATIONS 0This section not applicable
a. Check each of the following sanitary facilities that will be included in the proposed project.
? Office Toilets
? Toilets for patrons; Number: ; Location:
? Showers
? Boatholding tank pumpout; Give type and location:
b. Describe treatment type and disposal location for all sanitary wastewater.
c. Describe the disposal of solid waste, fish offal and trash.
d. How will overboard discharge of sewage from boats be controlled?
e. (i) Give the location and number of "No Sewage Discharge" signs proposed.
(ii) Give the location and number of "Pumpout Available" signs proposed.
f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
g. Where will residue from vessel maintenance be disposed of?
h. Give the number of channel markers and "No Wake" signs proposed.
i. Give the location of fuel-handling facilities, and describe the safety measures planned to protect area water quality.
j. What will be the marina policy on overnight and live-aboard dockage?
k. Describe design measures that promote boat basin flushing?
RECEIVED
""I' 1 12008
DCM WILMINGTON, NC
I. If this project is an expansion of an existing marina, what types of services are currently provided?
m. Is the marina/docking facility proposed within a primary or secondary nursery area?
?Yes ?No
n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area?
?Yes ?No
o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom
(SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected.
?CW ?SAV ?SB
?WL ?None
p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ?Yes ?No
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
3. BOATHOUSE (including covered lifts) ®This section not applicable
a. (i) Is the boathouse structure(s):
?Commercial ?Public/Govemment ?Private/Community
(ii) Number
(iii) Length
(iv) Width
Note: Roofed areas are calculated from dripline dimensions.
4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ® This section not applicable
a• (i) Number
(ii) Length
(iii) Width
5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable
a• Length b. Average distance from NHW, NWL, or wetlands
c. Maximum distance beyond NHW, NWL or wetlands
6. MOORING PILINGS and BUOYS ®This section not applicable
a. Is the structure(s):
?Commercial ?Public/Govemment ?Private/Community
c• Distance to be placed beyond shoreline
Note: This should be measured from marsh edge, if present.
b. Number
d. Description of buoy (color, inscription, size, anchor, etc.)
V'T F%
SEP 1 12008
DCM WILMINGTON, NO
if -4
e. Arc of the swing
7. GENERAL
a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities.
N/A N/A
Note: For buoy or mooring piling, use arc of swing including length
of vessel.
C. Width of water body
N/A
d. Water depth at waterward end of structure at NLW or NWL
N/A
e. (i) Will navigational aids be required as a result of the project?
?Yes ?No ?NA
(ii) If yes, explain what type and how they will be implemented.
N/A
18. OTHER ?This section not applicable
a. Give complete description:
9/11/08
Date
Southport Marina
Project Name
Southport Marina, Inc.
Applicant Name
dcW4ryo-) 0(/ 64X4-l s r#6£nl7)
Applicant Signature
:' C'
1 2008
"I W"fv INGTON, N(
? ?t?,r Ellah 174 17 0-11 m,ington
706
Pal#M
Sp 0 r-in
E? 03
tits G*r r t} Q 3
00 a L ?p?"? plliPi_ abo i li a' Lake #J
ti
Rousso11s Crook Ord Tarim myttle a ?.,
Now Hope, I
Koo10011 lp?i
Bolivia -
Midklim River KnRy WOW*. Boiling Spring Lik1q-q camlinaeach
Ahtloch
Uf'? h
S*kidy Hill mldw-ly
r
1 S plh iad R*ck
HobdeO long Ben*
Ya on Boac i - k
SCALE 1" = 5 Miles
Land Management Group, Inc.
Southport Marina Environmental Consultants 1
Brunswick County, NC Wilmington, N.C.
July 2008
DCM WILMINGTON, NC
r
L ? .. .
Alf
• f
? .?-
'
? •
? ? ' ?
•• ??
Stevens
?
;f --?
?
4
Perk ?r• - 'r 1;1 ?, # t
f
eNchal
t 1 f ? - ?s i+ j
`
CeRP; -.?
Site
SCALE 1" = 0.3 Miles
Southport Marina
Brunswick County, NC
Land Management Group, Inc.
Environmental Consultants
Wilmington, N.C.
July 2008
1
?llUs*
USCsStiJe-ItpIy?tCipy, ?{( Uap
i< L
SEP 112008
??`..
??.^L'?.yYI t
I
_I
^ {
w
y.
M pb ?
(
[{}(.
(j
?. r
6 3t
N N r
' CO) X ,Y
LU CC.
V
2008
1
Z
Z
f-
W M Z
U
LLi -? 3
ix
U
0
{
M
y
"V
0
@ C
lA
w
N
N
0
1
- Z
W
W
Q C
11
?? c c-==7=7)) F--
X
W
0 ?
V)
w'
U
U
Q
z
d
J
d Ln Ln
?1J
W
N L U-
M M
h
II -I O Q
0 ? p W W.
O_
'tel.
CC) c) p Li C1
d r- U) 0 vi 0 .
_
>
:D
c?
>
o
Q
cno
o 0 c CL
cy w w CL
ly- . U)
w
w
L
f
Y o
U)
1' u'
V)
LLJ
W U
d U.
Q
Q. ft, W
(f) d w U U
W
U U d a .
a
d W D U w d d d 0 n .
c . c
n
0 d U U E. jr d W 4- U CL
?
V)
(n Cl_
n m
O
U) ?
d
d
W 4 ? O
CD
Z
d Z U (D d
z z U
I-- .
u _
5 _
J
V) d Q Y Y Y. H. .
?- r 0 >- ?- ?- -j cr- Q- ? lz n? z Q d
(mo w(
o w
of rx Ld
c?s?-mina d d
a.a s o
m 0
m
y??4
t 'r 1 . 4'? .t ? ?t 1 t S <{ O t t t
ti t G t t?-? .,tl ,t z
k T W 1 tll '. t':'{ 4 ?1 ' f? {' ,' tt fl:, A.il
1
t ?;1
W
Ca
t'NON3NL NollvNI AN
t Nisve NOtiyuLlum, -,oz
w
z wZ
J
d ?a
CU
? g z
U g
Q
V
N
z
m
ape
d
f
d d
Q ? S
U
Lrn o
r? M
'X O
_
dui
<
cad ?7U O.
. o
C
a
4iCY O ?<p? E.
i
?
. ,
o
? n
` II
?tw?ttnt _
M ., a ? W ? ,n ,
F- g I
U C 7
--
O
V)
D
Q (jl
"4
Of
O Q
NW4
X
W Q'
C r)
Qc N/y
LL
CD -
1- L
F Ld
O
0..
O
W
IZ
o
N
O
O
00
LLJ
l
O
O 4
ry
w
Q
:2: N
o
(
' Z rk
--
O w o
LLJ
U
Z Q
OU ?
U
N
zw
N >_ cn
IYi O h
",N-
EL Z.
O ¢v
H
O'
t!1
r '. Q
N
O
o
N p
O gym'
N U Y
Ilb
.. L. t
M'
4Z? u tC}
z cU R E
MEL ? [
N ?. 2
U) U)
Q 00
w 0-0-
(-) U U
J a. CL
a
GA00wel
ul t to linnnn"n. ,., .. v.. ?F.....?....,.,..,.,...?... ,... .. ..... ....... R......-, ......,. ......... ....a...?.._ .... _.. __..._
ramoore
N
0
CC??
too
g;g s3A
3^. ,o c
R g wok.
°
:< m
e°
0
1
N
N
W
O
-3
C-) > O.
3 y
Z -u
n C
N W
4 N
m
H
:U 0
[ C
no..
z; X
<>
f m D
D ;u
>
x z
D
m ° S
0
? s
O s ? ,
AO r
n
W
0
:Cl
O
C)
D D
m
Q C C-j
O')
0
-o v r
x7 ;u rr,
cc) o
z
00 p
VV)
M, m
?- Q
x
0
m
?
rrtl
rrl
v
W
J
N
U)
J
D? p-•z
:X)O
rno0
Om()0
Z U)
--1?=rn
OcnOU.
u°0
Xo>^D?
? m ? M
? rn
D.?
Dn? ]o
(? 7C D
0
Z 7"% .
2
' -, C)
vv ? ,
?`dr?rrrr?f?dT?
as
N
G)
^ _n
_n
gin. ,n .
n
.n gin' A. _n
^ n ?
+ _n . . .. . . .gin , t; ? .. n
.
VY .---vw V..
-
,.
Am?
^ _?
n
n A n.. n
i? n
? n? _w •-
`'n n "
`^ .nn
w n. n-^ . " n iA
n _w_n n _
?
n '-T?
n r
n
_ ' _ .
n A
_ n
170',
V
L
C
C
0
c
0
c
a
c
a
e
c
a
CL
Q
c
F-
u
c
u
u
a
h
O
M
p
CD C7 O
iii
Q Z
? O v
fy-
F- 0
W C)0 O O .. O
O O O O 0 N O Q O f N
- c 0 ? -
i
I
J
?
I 'I
i
H I M
i
!
W
i
ll { i7 I I ?
? ?I
i
I i
1
II
;
I?
f
('
?
I
?i I
I?
r
I i
i
?
...
l .
i
11
1111I
11 i i
I
.! ;i
I li I ?, i
M li
1
1
I
I li
E
I' ? i
,
1
? ' I ( i 14i , ?1
(
i
? it I { ? i i
! it t
?
, I I
0 o
I? 0 O O O ci
rte . N 1`
0 0 0 0 O
I N: r7 .
,08'LV
rA ? o ??-
C
otteff'o", C)
Ono to
co ,
z LL o Q C). 1 ? x n Q < J P. CD cciae `' `
Cn Cl n .
Lo 0 zz Lu 4D ' O III ?t
Ul N W F O P Q. ee'eeffflfllltlN???, &, 6
1-Jfn(n ma os 89111
Q'Q 0 ?J
X" Q O w
O O .F- a. W.
o Cl) 0 (n a L-
w=fir ZW
w o?W z ?oac
a z ¢
??}3
aWz00 a Q? 3:
¢ w
o z?Irap c?iQcw 0? v;j O ?- <¢w
_ o
a o u-
(n (If
a
D
0 [if
D
-f-
7
:71 ..
n
r
O
0
N
CD
ul).
CD
0
Ln
2
-f-
O
?M
?U)
di O N
az
? U Q
C> Q U
.
P, (n
x
E-H
0
v?
N.
N p
U V.
W u??
Nwo u
a 0
LLZO w
910OWLIJ
4nu cn. ccr onn7rn i 10 '17% amn iA 'Rnen•fii nnunn a,nnn_, nn i mon_ 1 n-nn rvni l"%CRI IIMP,n-nnl ci a ivini i inrh nnno i.nnn% i nn i %-c