Loading...
HomeMy WebLinkAbout20170161 Ver 1_Certification of Completion_20170608Water Resources I'm ironniental oiialit\ ROY COOPER Govet-1101. MICHAEL S. REGAN .Yecrercu-v JAY ZIMMERMAN Dii-eclor DWR Project No.: DWR # 17-0161 County: Montgomery Applicant: Duke E ergy Progress, Inc. 1104,�/ Project Name: Clarks Creek Tillery Tailrace Trail 0(y 114�b Date of Issuance of 401 Water Quality Certification: March 6, 2017 11k41V Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the DWR Central Office — Wetlands and Buffers Permitting Unit at 1650 Mail Service Center, Raleigh, NC 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer, It is not necessary to send certificates from all of the". Applicant's Certification 1, -, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification Da 1, 1 hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If thiZyect was designed by a Certified Professional as a duly registered Professional &J4%ef r (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the appr d I ns and specifications, and other supporting materials. Signature: Registration No. Date CAR04 **.Ss/o* SEAL 032421 A0 0 A % --:��--,-Noitlhing Colnnpares'�-�, Stateot'North Carolina I Environmental Quality 1611 Mail Sm ice Center I Raleigh, North Carolina 27699-1611 919-707-9000