Loading...
HomeMy WebLinkAbout20140090 Ver 3_Re U-2579B Compliance__20170705Wanucha, Dave From: Byran Tabor <byrantabor@gmail.com> Sent: Wednesday, July 05, 2017 11:44 AM To: Wanucha, Dave; Suzanne Tabor; Byran Tabor Subject: Re: U-2579B Compliance_ David, They had not cleaned out that basin since it was first built. It was no need to for the water and mud just flowed thru it. It even had cattails growing in it. They came in a few days ago and completely re-constructed the entire basin. You saw the videos where the basis was not properly constructed and I complained about it for over a year. It allowed untold amounts os mud to flow directly into the lake. I invite you to come back out and see the new one they have properly installed. I am Sind you pics and the new one in no way resembles the old one. There is no way they were in compliancei BTT On Ju15, 2017, at 9:38 AM, Byran Tabor <bvrantabor(a�,�mail.com> wrote: Dave, I did not hear back from you on the below concern. Please let me know your thoughts BTT On May 22, 2017, at 1:52 PM, Byran Tabor <bvrantabor(a�,�mail.com> wrote: Dave, If they were in compliance why did they have to redo the catch basin? The two basins could not be any more different. The first as you saw, was nothing more than a"flow Basin" and not a"catch Basin' as needed. They now have constructed what looks like a first class catch basin. I complained for over a year and am disappointed and upset they are getting by with it. The basin allowed untold amounts of mud to enter the lakei Now I am still faced with the water meal and duck weeds because of their not correcting what was as obvious problem. Your report now clears them from all the wrongs they have done out here. But, I trust your judgement, but disappointed. If they were compliant, why did they have to redo the basin? Thanks BTT On May 22, 2017, at 9:54 AM, Wanucha, Dave <dave.wanucha(a�ncdenr.gov> wrote: Hi Mr. Tabor, Thanks for inviting us to review your property and taking the time to show us pictures and videos of storm events and erosion control measures on and around your property on April 26 and May 3. I understand your concerns and frustrations. Attached is NCDWR's compliance memo to NCDOT of which reports our findings. Please let me know if you have any questions. Thanks. Dave W. Dave Wanucha Division of Water Resources Transportation Permitting Unit NC Department of Environmental Quality 336-776-9703 office 336-403-5655 mobile A::� � v � .1i'� � ir� �� �:n Ir�n � �� ir� �:n �:� � ir� ir . ¢:� �:� v NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27105 a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`�� �'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� ���,����,���� �� �������� �:s�����,�. <U-2579B Compliance Memo.pdf�