Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20170837 Ver 1_Build Maps_20170706
� � See Sheet 9-A For Index of Sheets �� ��� �� ����� �������� �������� �� �������� WA Y1�lE CO U1�T Y DU LEY f LOCATI0111: C011lSTRUCT I11lTERCHANGE AT US-117 A11tD � 2 SR-1120 (O'BERRY ROAD) �eek R° WETLI�DS IMPACTS PERMIT r TYPE OF WORIZ: GRADIIVG, DRAIIVAGE, PAVI11tG, A11tD STRUCTURE. O C �� �� _ \\ j'r VICII�ITY MAP ���� ♦ ��N\� �>>3 S�'SR Sp�,: 4 —L— POT 173 + 60.00 �R� BEGIIV PROJECT U-5796 � TO NC 55 SITE 1 US-117 —L— % � TO SR-1006 \����� ;�/ MqSSEY RD. 3✓ '��. / —Y8— POC 13 + 00.00 NSRS 2007 \�. /� BEGIN CONST , SR 1120 O'BER Y RD. _Y _ —YS— POC 26 +38.72 BEGI11t BRIDGE —Y8— POC 28 + 42. 72 EDN BRIDGE THIS IS A CONTROLLED ACCESS PROJECT WITH ACCESS BEING LIMITED TO INTERCHANGES � 1120 RY RD. -$— TO D UDLEY —Yl SR-1130 DURHAM LAKE RD. '�,�_�._ —Y12— _�:�=% J R-1 TTHEWS RD. SR-1154 LUDWELL DR. �7 —Y8— POC 39 + 35.00 E111D C01VST US-117 —L— � TO GOLDSBORO —L— POC 219 + 92.08 END PROJECT U-5796 INCOMPLETE PLANS DO .�'OT U98 FOR R/W ACRU[S1T[ON PRELIMINARY PLANS DOCUMENT NOT CONSIDERED FINAL � NOT use eox coxsTnvcr�ox UNLESS ALL SIGNATURES COMPLETED GRAPHIC SCALES DESIGN DATA PROJECT LENGTH P�epo�ed ln the Offlce of: H1'DRAULICS ENGINEER DIVISION OF HIGHWAYS DIVISION OF HIGHWAYS sTaTE oF NonTx CAROLINA �j0 Zrj 0 �j� j00 ADT 2017 = 15�20� Division 4 DDC NOpT 509 Ward Bivd., Wilson NC, 27895 �Of N� ADT 2037 = 25�HOO 2012 STANDARD SPEClFICATlONS `�� '90� PLANS K = g o�o LEIVGTH ROADWAY TIP PROJECT U-5796 = 0.877 P,E. A > S7GNATURE: � oz 50 25 0 50 l00 D= 55 % TOTAL LEIVGTH TIP PROJECT U-5796 = 0.877 RIGHT OF WAY DATE: TIM LITTLE, PE ` ' T= 13 %* AUGUST Ol, 2016 pRo�Ecz ExcrxsEn ROADWAY DESIGN �.�,T o�,a PROFILE (HORIZONTAL) ENGINEER Op TpANBf V = 70 MPH l0 5 0 l0 20 * nST 8% DUAL 5% LETTING DATE: D.R. ETHRIDGE PRINCIPAL ARTERIAL June 20, 2017 PRo�scr Dssrcx sNc,xsEn PROFILE (VERTICAL) STATEWIDE TIER PE. P.E. S7GNATURE: STATE HIGHWAY DES/GN ENG/NEER 3 v v� o�� i� � °a w WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS EXISTING CHANNEL EXISTING EXISTING PERMANENT MECHANIZED HAND IMPACTS TEMP. FILL IN EXCAVATION PERMANENT TEMP. SW CHANNEL CHANNEL SITE STRUCTURE SIZE / STATION FILL IN CLEARING IN CLEARING IN PERMANENT NO. TYPE WETLANDS IN WETLANDS SW IMPACTS IMPACTS IMPACTS IMPACTS (FROM/TO) WETLANDS WETLANDS WETLANDS BANK (AC) (AC) (AC) (AC) (AC) (AC) (AC) PERMANENT STABILIZATIO TEMP. (FT) N (FT) (FT) 1 176+35-179+22 0.001 0.000 0.004 0.028 0.100 0.000 0.000 0.000 0.000 0.000 2 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 TOTALS: 0.001 0.004 0.028 0.100 N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS WAYNE COUNTY PROJECT: U-5796