HomeMy WebLinkAbout20170824 Ver 1_Bridge230188CLPCN-packet_20170705STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
ROY COOPER
Govers�oa
July 6, 2017
Wilmington Regulatory Field Office
US Army Corps of Engineers
69 Dazlington Avenue
Wilmington, NC 28403
ATTN: Liz Hair,
NCDOT Coordinator
Dear Madam:
JAMES H. TROGDON, III
Secaernrtv
Subject: Pre-Construction Notification for bridge 230188 repair due to damage by
Hurricane Matthew
State project DF15006.2024026 involves the rebuilding of the existing NCDOT Bridge
#230188 on SR 1516 over Brier Creek. Bridge #230188 consists of 2@17'-10" RC deck
on timber joist on timber caps and piles. The proposed bridge at #230188 will be 1@70-
24" Cored Slab with 2'-6" caps and sloping abuhnents. The existing structure and
roadway were blown out during hurricane Matthew creating a lazge scour hole at the
bridge. The channel will be re-built to the dimension and geometry of the existing
downstream channel; an 8 ft base with 2:1 side slopes lined with class II rip rap for
stabilizafion. The stream alignment will be altered to an alignment that is conducive for
stream channel stability and hydraulics of high flows at the crossing. The proposed
bridge is located in Zone AE of FIRM Map number 3720022400K and was studied by
"Limited Detailed" methods. No deck drains are proposed. Two stormwater outfalls ate
proposed which will be placed at a distance to minimize disturbance to adjacent wetlands.
A Rip Rap pad will be utilized to dissipate the energy at the end of the outfall.
Please see enclosed copies of the Pre-Construction Notification (PCN), Preliminary
Jurisdictional Determination Form, stormwater management plan, and the permit
drawings for the above-referenced project.
T'he project was let on Apri16, 2017 and construcrion will begin as soon as possible.
Mnifing Address: Te(ephone: (910) 364-0834 Locatiort:
NC DEPARTMENT OF TRANSPORTATION Fax: (910}137-2577 500 TRANSPORTATION DRIVE
DIVISION 6 Customer Serviee: 1-877368-4968 FAYE7'CEVILLE, NC 28312
558 GILLESPIE STREET
FAYE7"fEVILLE, NC 28302 Website: www.ncdot.gov
Regulatory Approvals
Section 404 Permit: The NCDOT requests that these activities be authorized under
Nationwide 3 and 13 permits.
Section 401 Permit: The NCDOT requests that these activities be authorized under Water
Quality General Certification Numbers 4085 (Maintenance) and 4087 (Bank
Stabilization). We anticipate that written approval from the NC Department of Water
Resources will not be required.
If you have any questions or need additional information, please contact me at (910) 364-
0834.
S' cerely, �
/�� �S
�' / �
ames J✓Rerko, PWS
Division Environmental Officer — Division 6
O��F W ATF9QG
�%J y
� r
O T
Office Use Only:
Corps action ID no.
DW4 project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification PCN) Form
A. A licant Information
1. Processing
1a. Type(s) of approvai sought from the
Corps: � Section 404 Permit ❑ Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number: 3& 13 or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? � Yes ❑ No
1d. Type(s) of approval sought from the DWQ (check all that apply):
� 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit:
because written approval is not required? Certification:
� Yes ❑ No � Yes ❑ No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � Yes � No
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program.
1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes � No
below.
1h. Is the project located within a NC DCM Area of Environmental Concem (AEC)? ❑ Yes � No
2. Project Information
2a. Name of project: Replacement of Bridge No. 230188 on SR 1516 (Paul Willoughby Rd) over Brier Cr.
2b. County: Columbus
2c. Nearest municipality / town: Evergreen
2d. Subdivision name: not applicable
2e. NCDOT only, T.I.P. or state NCDOT TIP Project: C204005
project no:
3. Owner Information
3a. Name(s) on Recorded Deed: North Carolina Department of Transportation
3b. Deed Book and Page No. Not applicable
3c. Responsible Party (for LLC if �ames J. Rerko, Division Environmental Officer
appiicable):
3d. Street address: PO Box 1150
3e. City, state, zip: Fayetteville, NC 28302
3f. Telephone no.: (910) 437-0207
3g. Fax no.: (910) 486-1959
3h. Email address: jjrerko@ncdot.gov
Page 1 of 11
4. Applicant Information (if different from owner)
4a. Applicant is: ❑ Agent ❑ Other, specify:
4b. Name:
4c. Business name
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. AgenUConsultant Information (if applicable)
5a. Name: Not applicable
5b. Business name
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
Page 2 of 11
B. Project Information and Prior Project History
1. Property Identification
1a. Property identiflcation no. (tax PIN or parcel ID): Not applicable
1b. Site coordinates (in decimal degrees): Latitude: 34.456413 Longitude: - 78.902025
(DD.DDDDDD) (-DD.DDDDDD)
1 c. Property size: Approx. 1 acre
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to grier Creek
proposed project:
2b. Water Quality Classification of nearest receiving water: C; Sw
2c. River basin: Lumber
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Existing conditions at the Project Site include maintained/ disturbed roadside shoulder and forest areas. Land use in the
Project �cinity is predominately agriculture and forest with scattered residential properties.
3b. List the total estimated acreage of all existing wetlands on the property:
Approximately 0.10 acres
3c. List the total es6mated linear feet of all existing streams (intermittent and perennial) on the property:
Approximately 50 linear feet
3d. Explain the purpose of the proposed project:
To replace a bridge damaged during Hurricane Matthew.
3e. Describe the overall project in detail, including the type of equipment to be used:
Bridge No. 230188 consists of 2@ 17'-10" RC deck on timber joist on timber caps and piles. The proposed bridge will be 1
@ 70-24" Cored Slab with 2'-6" caps and sloping abutments. The existing roadway were blown out during Hurricane
Matthew creating a large scour hole under the bridge. The channel will be re-built to the dimension and geometry of the
existing downstream channel; an 8 ft. base with 2:1 side slopes lined with class II rip rap for stabilization. The stream
alignment will be altered to an alignment that is conducive for stream channel stability and hydraulics of high flows at the
crossing. Traffic will follow an off-site detour during construction. Standard road building equipment, such as trucks,
bulldozers, and cranes will be used.
4. Jurisdictional Determinations
4a. Have jurisdicUonal wetland or stream determinations by the
Corps or State been requested or obtained for this property / � Yes � No
project (including all prior phases) in the past? ❑ Unknown
Comments:
4b. If the Corps made the jurisdictional determination, what type
of determination was made? ❑ Preliminary ❑ Final
4c. If yes, who delineated the jurisdictional areas? AgencylConsultant Company:
Name (if known): Other: Unknown
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certlfications been requested or obtained for � Yes � No ❑ Unknown
this project (including alI prior phases) in the past?
Sb. If yes, explain in detail according to "help file" instructions.
Page 3 of 11
Page 4 of 11
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ — non-404, other) (acres)
Tem ora T
W1 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
WZ � P� T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W3 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W4 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W5 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W6 ❑ P 0 T ❑ Yes ❑ Corps
❑ No ❑ DWQ
2g. Total wetland impacts
2h. Comments:
No wetlands will be impacted as a result of project implementation.
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perenniai Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ — non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
Site 1❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
Site 2❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
Site 3❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
Site 4❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
Site 5❑ P � T ❑ PER ❑ Corps
❑ INT ❑ DWQ
Site 6❑ P 0 T ❑ PER ❑ Corps
❑ INT ❑ DWQ
3h. Total stream and tributary impacts
3i. Comments:
NCDOT has coordinated with the USACE and NCDWR and determined there will be no permanent impacts to streams
associated with this project.
Page 5 of 11
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the AUantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number— (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Tem ora T
01 ❑POT
02 ❑P�T
03 ❑P❑T
04 ❑P�T
4f. Total open water impacts
4g. Comments:
No open water impacts will occur as part of project implementation.
5. Pond or Lake Construction
If ond or lake construction ro osed, then com lete the chart below.
Sa. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID proposed use or purpose (acres)
number of pond
Flooded Filled Excavated Flooded Filled Excavated Flooded
P1
P2
SE Total
5g. Comments:
No ponds or lakes will be constructed as part of project implementation.
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surtace area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
Page 6 of 11
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list ali buffer impacts
below. If an im acts re uire miti ation, then ou MUST fill out Section D of this form.
6a.
❑ Neuse ❑ Tar-Pamlico ❑ Other:
Project is in which protected basin? ❑ Catawba ❑ Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number— Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Tem ora T im act re uired?
B1 ❑P❑T ❑Yes
❑ No
B2 ❑POT ❑Yes
❑ No
B3 ❑P❑T ❑Yes
❑ No
6h. Total buffer impacts
6i. Comments:
The project site is not located in a river basin with jurisdictional buffers in place.
D. ImpactJustification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
The proposed bridge will provide an effective hydraulic opening. Promotion of sheet flow and infiltration over stabilized banks
and grass surfaces is proposed. Side slopes will be 2:1. No impacts to streams or wetlands will occur as part of project
implementation.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Best Management Practices for Protection of Surface Waters and for Bridge Demolition and Removal will be implemented
during the construction phase.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for ❑ Yes � No
impacts to Waters of the U.S. or Waters of the State?
2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps
❑ Mitigation bank
2c. If yes, which mitigation option will be used for this
project? ❑ Payment to in-lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of'Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
Page 7 of 11
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ❑ Yes
4b. Stream mitigation requested:
4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold
4d. Buffer mitigation requested (DWQ onfy): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastai (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes � No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1 3(2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page 8 of 11
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified � Yes � No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
Comments: ❑ Yes ❑ No
2. Stormwater Mana ement Plan
2a. What is the overall percent imperviousness of this project? Not applicable
2b. Does this project require a Stormwater Management Plan? ❑ Yes � No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
The Stormwater Management Plan is designed in accordance with NPDES Permit #NCS000250. Please see attached
permit drawings and stonnwater management plan.
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
❑ Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program
❑ DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local govemmenYs jurisdiction is this project? Not applicable
❑ Phase II
3b. Which of the following locally-implemented stormwater management programs ❑ NSW
apply (check all that apply): ❑ USMP
❑ Water Supply Watershed
❑ Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No
attached?
4. DWQ Stormwater Pro ram Review
❑ Coastal counties
❑ HQW
4a. Which of the following state-implemented stormwater management programs apply � ORW
(check all that apply):
❑ Session Law 2006-246
❑ Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ❑ Yes � No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? � Yes ❑ No
5b. Have all of the 401 Unit submittal requirements been met? � Yes ❑ No
Page 9 of 11
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federat/state/local) funds or the � yes ❑ No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ❑ Yes � No
(North Carolina) Environmental Policy Act (NEPAISEPA)?
1c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) ❑ Yes ❑ No
Comments: Not applicable
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after-the-fact permit application? ❑ Yes � No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in � Yes � No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
Not applicable
Page 10 of 11
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
habitat? � Yes ❑ No
5b. Have you checked with the USFWS conceming Endangered Species Act � yes
impacts? � No
❑ Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
❑ Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
USFWS Website and field survey
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
NOAA Essentlal Fish Habitat Mapper
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
govemments have designated as having historic or cultural preservation � Yes � No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
NCDOT PDEA— Human Environment Section
8. Flood Zone Designation (Corps Requirement)
Sa. W ill this project occur in a FEMA-designated 100-year floodplain? � Yes ❑ No
8b. If yes, explain how project meets FEMA requirements: NCDOT-NCFMP Memorandum of Agreement (MOA) Type 2b.
Sc. What source(s) did you use to make the floodplain determination? FEMA Maps/NC Floodpiain Mapping Program
b�D��/J
James J. Rerko, PWS ne 20, 2017
ApplicanUAgenYs Printed Name � pplicanUA�„ ' Sign tur � Date
(AgenYs signatur rs valid only � an authorization letter from the applicant
s rovided.
Page 11 of 11
t �j�0 �,,� ��,w. North Carolina Department of Transportation
St[3i'n14v�dt�r' Highway Stormwater Program �
�� ,
STORMWATER MANAGEMENT PLAN -- -
(Version 2.04; Released November 2015) FOR NCDOT PROJECTS
WBS Element: DF150062024026 TIP No.: County�ies): Columbus Page 1 of 1
General Project Information
WBS Element: DF150062024026 TIP Number: Pro'ect Type: Brid e Replacement Date: 5/24/2017
NCDOT Contact: Jonathan Moore Contractor I Designer: Reid Robol, PE - Ecological Engineering
Address: 1000 Birch Ridge Drive Address: 1151 SE Cary Parkway
Raleigh, NC 27610 Suite 101
Car , NC 27518
Phone: 919-707-6738 Phone: 919-557-0929
Email: 'Imoore6 ncdot. ov Email: rrobol ecolo icalen .com
Cit ITown: Ever reen Count ies): Columbus
River Basin s: Lumber CAMA County? No
Wetlands within Project Limits? Yes
Pro'ect Description
Pro'ect Len th lin. miles or feet : 0.082 Miles Surroundin Land Use: Rural area with forest and agricultural land use
Proposed Pro'ect Existin Site
Pro'ect Built-Upon Area ac. 0.4 ac. 0.3 ac.
Typical Cross Section Description: 2@10.0 ft lane with 5.4 ft shoulders and a total bridge width of 33.0 ft and a total bridge 2@10.0 ft lanes with total bridge width of 24.0 ft and total bridge length of 36 ft.
length of 70 ft.
Annual Avg Daily Traffic (veh/hr/day): Design/Future: 280 Year: 2017 Existi� : 280 Year: 2007
General Project Narrative: State project DF15006.2024026 involves the rebuilding of the existing NCDOT Bridge #230188 on SR 1516 over Brier Creek. Bridge #230188 consists of 2@17'-10" RC deck
(Description of Minimization of Water on timberjoist on timber caps and piles. The proposed bridge at #230188 will be 1@70-24" Cored Slab with 2'-6" caps and sloping abutments. The existing structure and
Quality Impacts) roadway were blown out during Hurricane Matthew creating a large scour hole at the bridge. The channel will be re-built to the dimension and geometry of the existing
downstream channel; an 8 ft base with 2:1 side slopes lined with class II rip rap for stabilization. The stream alignment will be altered to an alignment that is conducive for
stream channel stability and hydraulics of high flows at the crossing. The proposed bridge is located in Zone AE of FIRM Map number 3720022400K and was studied by
"Limited Detailed" methods. No deck drains are proposed. Two stormwater outfalls are proposed which will be placed at a distance to minimize disturbance to adjacent
wetlands. A Rip Rap pad will be utilized to dissipate the energy at the end of the ouffall.
Waterbody Information
Surface Water Body (1): Brier Creek NCDWR Stream Index No.: 14-22-17
NCDWR Surface Water Classification for Water Body Primary Classification: Class C
Supplemental Classification: Swamp Waters (Sw)
Other Stream Classification: None
Impairments: None
Aquatic T&E Species? No Comments:
NRTR Stream ID: Brier Creek Buffer Rules in Effect:
Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? No Dissipator Pads Provided in Buffer? N/A
Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)
�
O
O
�
O
N
V
• �
�
V
�
�
0
V
��
See Sheet 9A For Index of Sheets
THIS PROJECT IS NOT LOCATED WITHIN MUNICIPAL BOUNDARIES.
���1�� �ll' ����� �������� �
�.����y������' � �� ��.���.�����v�
COLUMBUS COU11tTY
LOCATI011L• BRIDGE 1110. 230188 ON SR 1516 (PAUL WILLOUGHBY RD)
O VER BRIER CREEK
TYPE OF WORK: GRADING, DRAl11lAGE, PAVING AND STRUCTURE
WETLAND AND SURFACE WATER IMPACTS PERMIT
��� �����
PERMIT DRAWING
SHEET OF
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II MODIFIED.
PIdELIMINARY IDLANS DOCUMENT NOT CONSIUEREU FINAL
DO NOT U5E FOR CONSTRUCTION UNlE55 ALl SIGNATURES COMPLETED
GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Prepored ln the Offlce of: H1'DRAULICS ENGLNEER
ADT 2017 = 330 DIVISI0IV OF HIGHWAYS
l0 5 0 l0 2� V= 55 MPH �ENGTH ROADWAY T.I.P. PROJECT C204005 = 0.068 MILES �ooa st.�h xtdge n.., nar�tgh xc, z�6�o �� ���P,�
�
T= b% LENGTH STRUCTURES T.I.P. PROJECT C204005 = 0.014 MILES z°iz srAxnnnn srEciFrcATroxs ���� �°���
PLANS , g
*TTST= 3% DUAL 3% TOTAL LENGTH T.I.P. PROJECT C204005 = 0.082 MILES sichArunE: P� � �
10 5 0 10 20 RIGHT OF WAY DATE: JOHN P. MAZERES � �
APRIL b, 2017 PRo�scr sxcr�ssn ROADWAY DESIGN �
PROFILE (HORIZONTAL) ENGINEER A���� ����
FUNC CLASS = LOCAL LETTING DATE: JACOB DUKE �� p�����
2 1 0 2 4 NCDOT CONTACT: VIRGINIA MABRY vxo�scz ossicx s,vc,,vsEx
SUB—REGIONAL TIER n�axacea,Pnroe�rr �ao�Ecrs uxrr APRIL b, 2017
PROFILE (VERTICAL) pE
S7GNATURE:
II
Z
�
N
w
�
�
�
�
�
� � � �-L�J/AJ3
� � � �
/
� � � � � � � � � � ��
_ — _w�6— — — — — — — — — — — — — — wl8— — _ — _ _
w�e— — — — — — — — — — — — — —w�a— — — — — — — — — — — — — — CLA55 B RIP RAP
EST 1 TONS
. , E5T 5 SV GEOTE%TILE
�
''' -C-_-------- � N � 8:1
- � GRAU 350 TL-3
/ BEGM SBG-
0 0 0-�- o o +e�
l9' BST `�AUL V�l LOU H�-b' RD (S� l5/6 0
� \ � GRAU 350 TL-3
\\��---------- _FN � 8•/
-F- ��� BEGIN SBG +87 �S„
— ^' �������F-
� P�E
- DETAIL 2 `P�E�
�y�e\ SPECIAL L4TERAL 'V' DITCH
�Nollo Scale�
� \
� Nafvrol � ,�\ °� Fill
Ground 3� p F��e� slove
'C Min. D— 1.0 Ft.
FROM STA.12+00 TO STA.13+25 -L- RT
�
SPECIAL LATERAL 'V' DITCH
SEE DETAIL 2
' PDE —
CLA55 B RIP RAP
EST 2 TONS —
EST 7 SY GEOTE%TILE
�
20' 0' 40'
GRAPHIC SCALE
E ��
AT -1
RIP RAP
' }�—PDE------PDE
� ._
8.0' BASE CHANNEL E
CLASS II RIP RAP
SEE DETAIL 7
��1is' VV ���A Y �
BRIDGE N0. 230188
PERMIT DRAWING Nq�N�
SHEET OF B3'�Ri�
4
— — 2pG
�`\\\��� N
C i � � --��'---
— — — � GRAU 350 TL-3
�
PROJECT REFERENCE NO. SHEET NO.
DF15006.2024026 4
RhV SHEET NO.
ROADWAY DESIGN HYOR.4ULIC5
ENGINEER ENGINEER
II�RE]LIMIN RY I'LANS
DO NOT UBB PO CON3TRUCTION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMP�ETED
NC iIflM LICENSE No: F�11J8
�isi se cary re wey
suixe oi �
jeisj ss �ovze
�ECOLOG[CAL
ENGINEERIIVG
DETAIL 1
STANDARD BASE CHANNEL
Moir F96e. I N � �a Scale�
aHin Mai; F96or
G�i N�
ound 2:� ry�� Groun
d D
ceo�e.�ile B Min. D- �, /-4.0 Ft.
Max. d- +/-4.0 Ft.
WneN s i: -. 6.0' B- 8.0 H.
S+A. 0.8�60�
I � CL STA. 13 �- 50 -L-
I� /
_______ _______
; ; ; ; , BEGIN 6'RIDGE eM' •i END ;BRIDGE ' - ' -
; ; � - -C- -� � � � � 1 �- 4.�6.33.5a Rr . - EL r 9/.l5 -� , _� _ ND GR DE
, B STA. 9 6/ 5/.00' RT L— ST ��3 f8�=�3
- - ���1/V GR�tDE , - -- --� - — _- _ - L EL T A _30.�7 8 - Ec = 92.0�° - - - - - - - - - - -
f- �- sra.i4+i STA 1�+55,00
-LT STA 11+20,0 , � - : _.. -: , --:-;- - , ; �L 92,72 _ _
EL = $9,77 ; ; ; -- Pi = i5-ro5.00 - ,
� „
� ,
; ; _ � - -- ___ ---- ----- - _
;
9 � ' ' Pl; _ 1H-70�0 ! _ - --
EL , 9/95' �
� � � � � - . ' _� , , � � � vc � �oa - - -
; ; EL = 8970' , , - � -_� '' � �. �
�� � � �� � �� � �� �� � � � ' OS , 55 mph ;
VC = l00' ; _ - - - - °' ,
� � �„ � ,
, ,
. . , , _ � � �� � _ � _ — --
_ _ _ K - / _ ----
92 _ � _ _ � _ �� = 55 mAh_ _ . _.- - - - - - -
, � , ; ; - , - - _----- --- +�.6728%' (+11.5313y
--- , , , , -- -- -- -- --- ------- -� , --'— _
---- — � (-10J506% (+J0.6728% '
� , , , - -- -- -,- �;
i'� -----
t'
��I
Il��i� '--------
�'' - -
�ill -
�'
' .---
� '� -
� :_ - -- - - � -
�� �
w _ � _ ` I�
�
� _ � ,� � � ,� - _� �_ , �
__ , - - -
° � $ - - - �- ---� - - - -, - -.- �_---- _.� � � _.. _ � - _ �- - - - �- - --- - ._. _ - -__�.�.:_._ �._._. ._ � _.��- _._�:� ._.__�.�.__ �._ �___ __�._..�._ __ _ _ . - --'- -= _ - - - - _ _ _ _ .;�.____. �_ _' - � � _ _._�_�._.: _.._ -_ - -
_ �� �
� ; � � ; ; � ' � ' ; �
,� , , , , � � � � � � � � ,
I=, 11 12 13 14 15 16
m --
° $8 _ , , , , , -- -
s � - � - � - � - - � - � - - -----�-� F _ �� � '� '� '� � � _
� =--C = : :_ - _ __-_ -- _c— , ' _ _ - _ ; - - � _ _ � � 1 a J ,�1 �i / �i ; -
�: � �� � � �
-� � — - - � � _ ���, � _
_ l-J1.2800% {-�- �� i l f y '� � � �
= 84 _:�- -� - - - - - - _ _� - _ - ' h \ - � _ T �';-i � - - ---- - "
_
m . - � , , U� ` � '' . _
_
� _ � - � - - � - -- - '� / __ _
..... . . J . . ... _ ...
\ ..
i p ..... ii i�i i �i i �...i�i ii���i . i i . �i��i i �. �. �. � ... _ ...
i .� . I ' .. _ii ' � ,
oi UD ._. ii i — I i,i, i — I i �_____Z > . I ' _�__ �___I_ __\_ ,_I_ __'___/____ ' _� . ____
.. _ _ = C �� I I I I I I I I �� I �y�� I I I I I I_
� . - . . N , �,`�� ; . :�: - — . .
o...._ — — — - . 2� II 1' ... , . .. .
, - -I-- - -I- Q� � � : �J. I , I _
� � _
� �� -. -' - �-W- I�� � � - -����- - - -- -_ ' - --
� - -
N
E �- - _� �+� I� 1 I� __ �
o - � o¢ i, - � � -. � �- �
� , ,
� I � I �
. _ --- w �i,w : I - - - � � I - --�- �
72 1- � I � �_�. I -- --� , I � � �
w � I _ � � _
, ��� - -
�, - � � � _
� : � ��� � � � � ��� � �� � � ��� �� � � � _ � � � _�� �� � �
� --- � � � � � � �'
T� PROJECT REFERENCE NO. SHEET NO.
� � � � � Jl� � � � DF15006.2024026 4
� BRIDGE N0. 230188 WW SHEET NO.
--- ��� ��� j � - � ROADWAY DESIGN HYOR.4ULIC5
J \� \ �' 1 ENGINEER ENGINEER
� \
�/�� � � ��: �. zo� o� 40� PERMIT DRAWING N,oN�
/�� �—�_— � � !'� � � V'� SHEET OF � �'�R'°
� ,,,�,;
�, GRAPHIC SCALE — — A2oir 1[�RE]LIMIN RY IDLANS
� � ��\`` DO NOT U58 PO CONSTRUCTION
N��� � ,..,.. �
� "� � . . . � . � � . . � . �—� � ..� . / �
� / � � / �\ / DOCUMENT NOT CONSIDERED FINAL
/� �/ � � � . 1/_ � � � // � � E�—E���E--- � � ( �� i UNLESS ALL SIGNATURES COMP�ETED
�/ C �
— — — — — — —WLB— — — — — — . E � � ;�� NC iIflM LICENSE No F�11J8
— — —WLB— -- — — — — — _ — _ _ _ _ _W� _ _ — — — — — — —WLB— — 7 � ' . i J / I 1151 SE CarY ParkweY
a—� ---- � . EST 15TQNSP RAP � I � I. J. �' y��. � � �\ F A L W �/ suvxe ioi
EST 5 SV GEOTE%TILE ^� U� . -:
� iv � leis) ss �ovze
J
�I� !-,�Ll. aV � . �� F � . �
. i , _ . Jf y , _ . �
� V � - �PDE � i � � � � _ �ECOLOG[CAL
- . � �,� �'� . � . l� _. ENGINEERING
-� �
� -' PC Sta.12+83A9 ° _F I � i I ,i ����1 � �rrrTl� AT-/ _ _-- �,�� �
� --- -C- �-� � TYPE � ,'�;fa�� �Ll l � I I 1 Y�E-ll ���� cti
-���-- ------ N 8:1 GRAU 350 TL-3 T i-� _,, I�f lil 8:l �_------- Sto.15+75.3/
N O� BEGM SBG TB 2G1 oao� ��� i 1 � � � I��� �
0 0-�- o o +e� o O l�: � i I' ���� �' '- o 0
l9'BST `�AUL V�l LOU H�-b' RD lS� l5/6 0 0 0,03 _�� :��;� � �=�;_ ��.. o
-C- � � a z�i ---
_ �� N GRAU 350 TL-3 �i�i �n , �� ___--- - -
_,,, ��---------- —F- �� B�` \ _ 15"WhL60W5 TYPE ' I _` � 1 _��-- N ---
�__ -F- �� eEciN ssc +a� I�I, �a -
—� _ _� � � , �- c n u aiP enP �.� f, � Y�Ei-lll _--�-- _
�� �� �� F_ , i 1} i �i I f�l,� � i,�c�.ssai,ur-trnP GRAU 350 TL-3 �_
—� �_ � _ — a � Q =F— —
:: �� `:" �.
�� �pOE ° a ���� ��,�� �,�'� � ' _ . � DETAIL 1 1
_ E f. - � ,
SPECIALDL4TEARAL'V'DITCH � ��'��� PDE— /� .�. I I�'` . , -�. \� " - � �,.- STANDARD BASE CHANNEL `�/ �
i
\w�a �No�io 6m1o1 � �� CLA55 B RIP RAP DE� - // �� � - e� Fb�� INo��o s�lel \\ li
� / � i esr2roNs PDE----PDE P�E � �� � � � co�Feo�
�
`�/ ` j EST 7 SY GEOTEXTILE ,..� w I j , ./ aan9 i NM����9 I-
` SEEDETAIL2 . ..��- ' I 1��� � ��f �V / � d , BD ry'
� c�a��n ,1.�� �o siope �\ �� �� / � SPECIAL LATERAL V' DITCH F I � GeO'eN,le �ou^ �I I
o / �-� — / �
3 e�
��d 2. �
p F � _, � °
� �
� GLASS II RIP R .
i ` '
` \/ / _ _ .\ � B 8.0 H /-d.0 FL I
Mn D
Min. D- 1.0 Ft. �� , � ,'� / _ Max d +/-4.0 Ft_
�� � �� \ ��� ,� �� / / / - WA 9- : 6.'
� \ SEE DETAIL 7 � ' �'
- ` SA. 0.8 60
FROM STA. 12+00 TO STA. 13+25 -L- RT -- _--_ �� �/ '. � - \ $ 0' BASE CHP;NNEL I I . Type af L�ner= eLnSs ii R��Rop �
� � � � � CL STA. 73 �-50 -L-
�
_______ _______
; ; ; ; � BEGIN 6'RIDGE eM' •i END ;BRIDGE ' - ' -
; ; � - -C- -� � � � � �- 4.�6.33.5a Rr . EL r 9/.l5 -� , _-_ L' ND GR DE
, B STA. 9 6/ 5/.00' RT L- ST ��3 f8�=�3
- - ���1/V GR�tDE , - -- --� - — -- _ _ L EL T A _30.�7 8 - Ec = 92.0�° - - - - - - - _ - - -
f- �- sra.i4+i STA 1�+55,00
-LT STA 11+20,0 , � - : _.. -: , --:-;- - , ; �L 92,72 _ _
EL = $9,77 ; ; ; -- Pi = i5-ro5.00 - ,
� „
� ,
; ; _ � - -- ___ ---- ----- - _
;
9 � ' ' Pl; _ 1H-70�0 ! _ - --
EL , 9/95' �
� � � � � - . ' _� , , � � � vc � �oa - - -
; ; EL = 8970' , , - � -_� '' � �. �
�� � � �� � �� � �� �� � � � ' OS , 55 mph ;
VC = l00' ; _ - - - - °' ,
� � �„ � ,
, ,
. . , , _ � � �� � _ � _ — --
_ _ _ K - / _ ----
92 _ � _ _ � _ �� = 55 mAh_ _ . _.- - - - - - -
, � , ; ; - , - - __T-- --- +�.6728%' (+11.5313y
� , , , , ----
, , `
,
, ,
, ,
i '
m
° --- -- -- -- -- --- ------- - , --'— - -- .
o ---= = ; ; (-10J506% (+J0.6728% -'- - -
- -- -- ; �;
i� -----
t'
i�
� I��i � _ ' _ _. _ _ _ _ _
tll
�,, ----
�' �
' -
� '� -
� :_ - -- - - � -
�� �
w _ � _ _` _ __ _ . I �
�
� _ � , � � � , � _� �_ , �
__ ; -
� 6$ _ � � � _ � - - ---
. - - - ?- -- - - - -' - ,-.,-! ---- _.�! � _.. _ � , - �- - - - - - - -- - _. - - -_ _�.�.._._���._._,. ._ _,�_.__- ,_._�.� ._.__�.�. __,_._ _ ___ , ___._..�._ _. _ _ . - - -'- -- - - - - - _ _ _ ,_ ,.,�.�__�.: �_, - _ _._�_�._..: .,_..- -
�� ; ' ' ; ; ' � ; '
a� � � � � � � � � � � � � ,
�
o=, 11 12 13 14 15 16
° $8 � � � � � � � _ - _ -
s -----�-� -F� � - � � -
� _-- _ : :_ - _ ---_ -- -- � _ _ _ - - '_ _ � _ _ ' � 1 ' l �1 �i / �i - i _ .
� =C =- - _ C- _ �=�i2a - � _ C _ -
_ �� {-�- i I f '���� _
�: ' , � �
�
- - - � -- -- - Y � - +, � 't N -
_ $4 ___�- � -- - - -- - --` Fr' T�i;-i -- � - - -__ _
� � �' � . � �
m _ -- - - ~ � - - - � � � / _ _ -
i . �i i �i �i i — �i i i i �i i i �i — I i i -- x J �i I . , I \ .� � ��. I , . � . �. ._. . �. �. �.
� �0 - i i i i , i .. I - i : , , � �, -i i � � � �
� . . . _ _ �_ _ _ _ _
-' ----- NCQ� -- -��--- ---- ----- ----
� �- - —I � `F � I I ��. I '�. I I I I � \�` � I � yr� � , I '�. I I I I I _.
o._ — — — _ — � . 2� II ' ' .. ... � I ... � � ; .� i _ —...
- I-_ r- Q� ', :�J I, � _
� _
- - - - � � +
� Jh � � �iw_ ���� �� � ' __ -
� _ �'�`�- � - - - - ' ' - - --
� ;
E - - — _ - - "+. :. ,
� ,, �, , � � I 1 I '�
_ . . . -- .. ��II � .. ,-- - � i _ � ��� - � - ...
o �� �
w 72 _ � I- - W�i� ! I _' � ' -
� - � '� � � � ��- : _�� _
__ � I�� � L
� . � ��� � � � � ��� � �� '� '� ��� �� � � � _ � � � _�� �� � �_
� - --- � � � � � � �'