HomeMy WebLinkAbout20071840 Ver 1_Email_20071207moratoriums Subject: moratoriums From: Sue Homewood <Sue Homewood@ncmail net> Date: Fri, 07 Dec 2007 10 41 24 -0500 To: Brian Wrenn <Brian Wrenn@ncmail net> just out of curiosity, has DOT ever given us a schedule to show how in-water work moratoriums delay work and cost more money? they verbally make the argument, but in talking to the Division folks who would do the work, they disagree The only action that needs to be scheduled carefully is the installation of the causeway and the removal of the causeway they can continue work throughout the moratorium period on the causeway As someone who has gone to many preconstruction meetings and discussed this issue with Division employees and contractors, its never been an issue I've only known of 1 project in the last 3 years where the project was completed during the moratorium and the contractor had to leave the site and come back later to remove the causeway I would agree that costs more money, but it did not delay the project and it was 1 of many bridge projects I've dealt with I know that WRC should have good documentation and justification for their moratoriums, but I also believe the DOT should have good documentation to show its a hardship and we should consider relieving them of the requested moratorium Both sides should have burden of proof to us before we decide what action to take just some 2 cents for a Friday Sue Homewood NC DENR Winston-Salem Regional Office Division of Water Quality 585 Waughtown Street Winston-Salem, NC 27107 Voice (336) 771-5000 FAX (336) 771-4630 1 of 1 9/15/2008 2 57 PM