Loading...
HomeMy WebLinkAbout20170084 Ver 1_Certification of Completion_20170504Water Resources ENVIRONMENTAL QUALITY RECEIVED MAY 0 4 2017 DENR-LAND QUALITY STORMWATER PERMITTING PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary S. JAY ZIMMERMAN Director WR Project No.: 11— 60M County: M' - J)0 W E Applicant: .)05h Qn d C 141 4610 W 11l f S M 5 Project Name: Short l iv . e�AII#►1rt44*4 l5 kd Lit A4aw> DrNe A/cbo AIC Date C - Date of Issuance of 401 Water Quality Certification: 141-1? Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 and Buffer Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, J0o,1,t -1 0, -"ibex ��'� , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: 94, WU`- Date: �a r)117 Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date Registration No. State of North Carolina I Environmental Quality I Water Resources 1611 Mail service Center I Raleigh, North Carolina 27699-1611 919 707 9000