Loading...
HomeMy WebLinkAbout20081042 Ver 1_More Info Letter_20080917O?Q? W A r?RQG Michael F. Easley, Governor William G. Ross Jr., Secretary t- North Carolina Department of Environment and Natural Resources Mi Coleen H. Sullins, Director Division of Water Quality September 17, 2008 DWQ Project # 08 1042 Pender County CERTIFIED MAIL: 7007 0220 0000 8224 7892 RETURN RECEIPT REQUESTED Commercial Property Analysts Attn: Joseph Boan 1437 Military Cutoff Road Suite 201 Wilmington, NC 28403 Subject Property: Surf City Commons REQUEST FOR MORE INFORMATION Dear Mr. Boan: On July 3, 2008, the Division of Water Quality (DWQ) Wilmington Regional Office (WiRO) received your 401 Individual Permit (IP) application dated June 27, 2008 for 8.65 acres of wetlands to be filled for your proposed commercial development. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and will place this project on hold as incomplete until we receive this additional information. Please provide all of the following information so that we may continue to review your project. Additional Information Requested: 1. Information needs to be provided that shows all considerations to avoid and minimize wetland impacts for this project was considered and that there are no practical alternatives. Please note, in our meeting on July 24, 2008 we discussed that buildings located entirely on wetland fill are not usually considered as avoidance. No minimization of wetland impacts has been achieved on your proposed design. Please consider incorporating bridges with the large road crossing, reducing the road crossing foot print at crossing #1 by having it go directly towards the larger store (sheet W5) and accessing the other stores (Sheet W4) via road crossing 42, hence the parking spaces (Sheet W4) could then be relocated to areas that are now shown as roads. Include the location of utilities to show that additional wetland impacts will not be required. 2. In the July 24, 2008 meeting, we discussed the number of parking spaces that will be required by Surf City. You had stated that Surf City had not yet approved the proposed commercial facility. Have you presented your proposal to the Planning Board for Surf City for their approval so that the number of parking places required could be correctly calculated and used in the avoidance and minimization requirement for this project? Mailing Address Phone (919) 807-6300 Location NorthCarolina 1617 Mail Service Center Fax (919) 807-6492 512 N. Salisbury St. NQAra"ki Raleigh, NC 27699-1617 Raleigh, NC 27604 Internet: www.newateruualitv.org Customer Service 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Page Two Commercial Property Analysts Attn: Joseph Boan DWQ # 08 1042 September 17, 2008 3. Please provide the date of incorporation/organization of "Commercial Property Analysts" and Mr. Joseph Boan's connection to the business. The business is not recognized by the Secretary of State's website when I searched the database. Please provide the correct name of the business, in some places in the application it is referred as incorporated and other places it referred to as a limited liability corporation. 4. Please provide additional information as to the alternative off sites looked at (including the ones we discussed in the meeting) and detail the criteria reviewed and why they were deemed unsuitable for this project include such things as costs and additional environmental factors. Include a draft copy of your "preservation document" for the remaining on-site wetlands. Please be aware that the State requirement for mitigation is 1:1 for this project. Please respond within three weeks of the date of this letter by sending this information to me in writing and two copies to Ian McMillan c/o 401 Wetlands Unit, 2321 Crabtree Blvd, Raleigh, NC 27604-2260. Please reference the DWQ Project # of 20081042 in all future correspondence. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call me at 910.796.7215 or Ian McMillan at 919.715.4631 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sincerely, Joanne Steenhuis Senior Environmental Specialist cc: Kim Williams - Land Management Ian McMillan - DWQ 401 Oversight and Express Unit, Raleigh Ronnie Smith - USACE Wilmington Regulatory Field Office Stephen Rynas - DCM Morehead Office Central Files W iRO