HomeMy WebLinkAbout20081173 Ver 1_Triage Check List_20080813Triage Check List
S 3
Date. Project Name. a? 2
DWQ#. 0
T ILE County: ?b ? - -
To: ARO Kevin Barnett ? WaRO Kyle Barnes
FRO Ken Averitte ? WiRO Joanne Steenhuis/Chad Coburn
? MRO Alan Johnson ? WSRO Sue Homewood
? RRO JLaren itherspoon ? Telephone : (919)
From:
The file attached is being forwarded to your for your evaluation.
Please call if you need assistance.
? Stream length impacted
? Stream determination
? to blue-line surface waters on USFW topo maps
Wetland determination and distance
? Minimization/avoidance issues
? Buffer Rules (Neuse, Tar-Pamlico, Catawba, Randleman)
? Pond fill
? Mitigation Ratios
? Ditching
? Are the stream and or wetland mitigation sites available and viable?
? Check drawings for accuracy
? Is the application consistent with pre-application meetings?
? Cumulative impact concern
Comments: