Loading...
HomeMy WebLinkAbout20071505 Ver 5_McElrath Culvert Removal_Revised Fig 3 5-5-17_20170510Culvert Removal - Tributaries to Little Willow Creek Henderson County, North Carolina for McElrath Carolina Investments, LLC Vicinity Map Not to Scale 0 BEFORE YOU DIG! CALL 1-800-632-4949 N.C. ONE -CALL CENTER IT'S THE LAW! 60% PLANS ISSUED 4/5/2017 Sheet Index Title Sheet 0.1 Legend and Notes 0.2 Overview / ESC 1.0 Plan & Profile 1.1-1.3 Details 2.1-2.2 Project Directory Engineering/Surveying: Owner: Wildlands Engineering, Inc McElrath Carolina Investments, 167-B Haywood Road LLC Asheville, NC 28806 Jacob McLean, PE 828-774-5447 Q�o��oo ��� W 3znmZ Z .6 -4 s=oo �n v - �Z�Q�LLE r, u LL K J General Construction and Erosion Control Notes 1. THE EXACT ALIGNMENTS SHALL BE BASED ON FIELD CONDITIONS AND IS GENERALLY A STRAIGHT-LINE FOLLOWING THE EXISTING PIPES. 2. SOME STONE MAY BE GENERATED ON-SITE FOR USE IN RIFFLES (UP TO 30%) AND ADDITIONAL STONE WILL BE BROUGHT IN FROM QUARRY FOR RIFFLE CONSTRUCTION. ON-SITE STONE SHALL BE GENERALLY FREE OF SILT, CLAY AND FINES. 3. EROSION CONTROL MEASURES WILL BE INSTALLED AND MAINTAINED DURING ALL PHASES OF WORK AND WILL BE REMOVED UPON COMPLETION. INSTALL ALL EROSION CONTROL FOR PRELIMINARY ACTIVITIES PRIOR TO BEGINNING WORK. 4. ALL DISTRUBED AREAS WILL BE SEEDED WITH TEMPORARY AND PERMANENT SEED. 5. THE CONTRACTOR WILL RETURN PUBLIC AND PRIVATE PROPERTY TO ITS PREEXISTING CONDITION, TO INCLUDE BUT NOT LIMITED TO ROADS, UTILITIES, VEGETATION NOT SPECIFIED TO BE ALTERED IN PLANS, AND FENCING, AND IS FINANCIALLY RESPONSIBLE TO CONDUCT ANY AND ALL NECESSARY REPAIRS TO THIS END. 6. APPLY EROSION CONTROL MATTING TO ALL SLOPES STEEPER THAN 3:1. 7. PERMANENT STABILIZATION MUST BE ACHIEVED WITHIN 14 DAYS AFTER COMPLETION OF ANY PHASE OF WORK. 8. INSPECT EROSION CONTROL AFTER ALL RAIN EVENTS AND REPAIR/MAINTAIN MEASURES IMMEDIATELY. 9. THE ENGINEER OR OWNER MAY STOP WORK AT ANY TIME DUE TO FAILURE TO ADEQUATELY INSTALL AND MAINTAIN EROSION CONTROL MEASURES. Ground Stabilization Requirements per NCG01 Site Area Description Stabilization Time Stabilization Time Frame Frame Exceptions Perimeter dikes, swales, 7 days None ditches and slopes High Quality Water 7 days None (HQW) Zones Slopes Steeper than 3:1 7 days If slopes are 10' or less in length and are not steeper than 2:1, 14 days are allowed Slopes flatter than 3:1 14 days 7 days for slopes > than 50' in length All other areas with 14 days None (except for perimeters and slopes < 4:1 HQW) Extensions of time may be approved by the permitting authority based on weather or other site-specific conditions that make compliance impracticable. Inspection and Record Keeping Requirements per NCG01 Measures shall be inspected once per 7 calendar days and within 24 hours of a rainfall event of greater than 0.5" per 24 hour period. Corrective actions shall be performed as soon as possible before the next storm event. Records must be kept on-site and available for review during construction and must be maintained for 3 years and be available upon request. A rain gauge must be installed at the site. Abbreviated Construction Seauence PRE -MOBILIZATION - SCHEDULE AND ATTEND PRE -CONSTRUCTION MEETING. CONTACT HENDERSON COUNTY INSPECTIONS TO NOTIFY OF INTENT TO BEGIN CONSTRUCTION AT LEAST 72 HOURS BEFORE MOBILIZATION. PHASE 1 - MOBILIZATION AND SITE PREP 1. MOBILIZE EQUIPMENT AND MATERIALS TO THE SITE. LOCATE LIMITS OF DISTURBANCE. ESTABLISH STAGING AREAS, HAUL ROADS, SILT FENCES AND OTHER BMPS. INSTALL RAIN GAGE AND LOCATION FOR STORING EROSION AND SEDIMENT CONTROL INSPECTION REPORTS. 2. ALL HAUL ROADS WILL BE MONITORED FOR SEDIMENT LOSS ON A DAILY BASIS. IN THE EVENT OF SEDIMENT LOSS, SEDIMENT FENCE OR OTHER APPROPRIATE PRACTICE WILL BE INSTALLED. PHASE 2 - CHANNEL GRADING AND IN -STREAM STRUCTURE INSTALLATION 3. INSTALL PUMP -AROUND FLOW DIVERSION AND DEFINE WORK REACH BASED ON LENGTH OF DIVERSION HOSES AND LENGTH OF CHANNEL THAT CAN BE STABILIZED BY THE END OF EACH WORK DAY. PROCEED DOWNSTREAM IN SECTIONS. COMPLETE BANK GRADING AND IN -STREAM STRUCTURES AND ENSURE THAT CHANNEL BED AND BANKS ARE FULLY STABILIZED BEFORE REMOVING FLOW DIVERSION AND MOVING TO THE NEXT DOWNSTREAM REACH. 4. WITH FLOW DIVERTED, HARVEST COBBLE AND GRAVEL MATERIALS FROM BED OF DEWATERED CHANNEL FOR RE -USE IN CONSTRUCTED RIFFLES AND OTHER IN -STREAM STRUCTURES. PHASE 2A - BIOENGINEERING AND PLANTING 5. TREE AND SHRUB PLANTING AND LIVE STAKING WILL BE COMPLETED AFTER GRADING OPERATIONS ARE COMPLETE AND DURING THE DORMANT SEASON (GENERALLY BETWEEN DECEMBER AND APRIL). PHASE 3 - DEMOBILIZATION 6. UPON COMPLETION OF STREAM AND FLOODPLAIN GRADING OPERATIONS, THE CONSTRUCTION HAUL ROUTES AND STAGING AREAS WILL BE GRADED, RAKED, SEEDED AND MULCHED AS NEEDED TO STABILIZE AREAS. ONCE THE SITE IS STABILIZED, SILT FENCES WILL BE REMOVED. 7. THE CONTRACTOR WILL ENSURE THAT THE SITE IS FREE FROM TRASH AND EXCESS CONSTRUCTION MATERIALS PRIOR TO DEMOBILIZATION OF EQUIPMENT FROM THE SITE. 8. NOTIFY HENDERSON COUNTY INSPECTOR OF PROJECT COMPLETION. Existing Features Proposed Features Erosion and Sediment Control Features Existing Tree �' Proposed Rock Sill Proposed Silt Fence Existing Pipe _ _ _ _ Proposed Stream Centerline Alignment _—� Proposed Brush Check Dam Proposed Stream Bankfull Top of Bank \ _ Flow Direction EELLL� Proposed Pump Around System LLL Proposed Permanent Fill (Seed &Mulch) L _ _ Old Sediment Basin (Existing) Proposed Staging Area Proposed Pipe Access Road / Route Proposed Construction Entrance FEMA Cross Section Location (as necessary) v7 Qc o��oo o 3anmz Q�mv - �Z�Q�LLE �J LL 6 KO: FEMA Stream q- Survey Notes Proposed Limits of Disturbance N � E FEMA Regulatory Floodplain SURVEY DATA WAS COLLECTED BY WILDLANDS ENGINEERING ON AN ASSUMED GRID N USING A LASER LEVEL. EACH OF THE CULVERT SITES WAS SURVEYED ON A O County GIS Parcels SEPARATE GRID. HORIZONTAL DATA WAS OBTAINED USING NC FLOODPLAIN m MAPPING PROGRAM (NCFMP) GEOREFERENCED AERIALS, REFERENCED TO NAD83. z m I / i WASTE FILL AREA (TYP) / STAGING AREAS / WITH SILT FENCE (TYP) UT1, REMOVE 156 LF 48" HDPE PIPE, �� � -- REBUILD STREAM ' � AND VALLEY, SEE U SHT 1.1 syffrl 1 Or j ; \ / LIMITS O DISTURBANCE (TYP), 22,000 SC! FT J I I / ALT. ACCES II ROUTE (TYP) II I I I I I / 8 START PAVED ROAD NO FILL PLACEMENT WITHIN 100 -YEAR FLOODPLAIN SNffT1Z UT2, REMOVE 489 LF— ` PI4VALLEY, STREAM I I `__,.•,I� APPLY PUMP AROUND— DETAIL DURING CULVERT REMOVAL AND STREAM WORK (TYP) 100 -YR FLOODPLAIN Cp L, N RKK6 2010 AERIAL FROM NC FLOODPLAIN MAPPING PROGRAM (NCFMP) E w 0' 100' 200' 300' i v (HORIZONTAL) u FEMA XS 4311 j I I i I _ r] FEMA XS 4907 — — — -JA I I 500 -YEAR FLOODPLAIN (OUTER LINE) - BACKWATER " FROM FRENCH BROAD RIVER 100 -YR FLOODPLAIN Cp L, N RKK6 2010 AERIAL FROM NC FLOODPLAIN MAPPING PROGRAM (NCFMP) E w 0' 100' 200' 300' i v (HORIZONTAL) u 0+00 95 90 85 80 75 0+00 0+50 1+00 1+50 1+77 RIFFLE LENGTHS ARE 30' PER RIFFLE. DROP IS 1.0' PER RIFFLE. CONSTRUCT RIFFLES USING STONE MIX SPECIFIED IN TYPICAL SECTION. POOLS ARE 20' LONG PER POOL. SLOPE AT 10:1 FROM TAIL OR RIFFLE TO POOL MAX DEPTH SPECIFIED ON TYPICAL. SLOPE AT 10:1 BACK UP TO HEAD OF NEXT RIFFLE. POOLS ARE CONSTRUCT BRUSH CHECKDAMS PMM TO PLUG EXISTING DITCH AND PREVENT FUTURE EROSION ISSUE Nww" Nwm(, moo* go fxl STAGING AREA UT1 TO LITTLE WILLOW CK REMOVE 155± LF 48" HDPE, CONSTRUCT RIFFLES AND POOLS ALONG ti, SEE TYPICAL SECTIONS 0+05 TO 1+60 BEGIN STREAM DAYLIGHTING UT1, 0+05± FILL AREA (SEED AND STRAW) TIE-IN WITHIN 5' UPSTREAM OF CULVERT SLOPE AND MAT ERODING BANK, 10-15 LF LOWER EXISTING BANKFULL BENCH ON LEFT BANK TO MATCH TYPICAL RIFFLE DIMENSION, DO NOT DISTURB CHANNEL END DAYLIGHTING UT1, 1+60± PUMP AROUND 1,77 EXISTING FILL HEIGHT ALONG PIPE 4, APPROX. (TO BE REMOVED PER TYPICAL SECTION) — — 95 _ 1 U RIFFLES, APPLY TYPICAL 90 i BANKFULL o � N 71 85 EX. 48" HDPE 80 EXCAVATE POOLS U TIE IN TO EXISTING STREAM UPSTREAM AND DOWNSTREAM OF PIPE a 75 FILL OLD SEDIMENT BASIN ACCESS EXISTING STABLE STREAM OUTLET (RIPRAP) EXISTING SEDIMENT BASIN (TYP) im Q�o��oo Z 00po M LL Z 3znmZ Z vaov� s=oo �n v - 7Z�Q�LLE —VARIES - VALLEY XSECS AVAILABLE FROM ENGINEER O TIE TERRACE SLOPE TO EXISTING GROUNDN- x 5' (MIN) 6.0' 5' (MIN) �_q F251 � X3:1 VALLEY / TOE�PROPOSED WALL SLOPES o.75' BOTH SIDES (TYP) BANKFULL PROPOSED GRADE MIX EXISTING 10% POOL TYPICAL, 1.5' DEPTH (SAND/GRAV), BALLAST 50% (NO LINING IN POOL) (1-3.5"), CLASS A 10% (2-6") 3.5'x9" DEPTH FIRM SUBGRADE PROPOSED THALWEG 0.1DEEPER THAN TOE NOTE: SEED, STRAW AND MAT STREAM BANKS, BENCH AND TERRACE SLOPE UTI Typical Sections (Not to Scale) EACH PLAN -PROFILE SHEET IS ON ITS OWN LOCAL VERTICAL GRID, HORIZONTAL DATA BASED ON AERIAL PHOTOGRAPHY AND FIELD TRANSECTS WITH TAPE AND LEVEL 0' 3' 6' 9' (VERTICAL) 1111001 0 N U 3 o � N 71 0 N � -_1 4- U a 4- Osa O 4- QJ 0' 10' 20' 30' ,- (HORIZONTAL) 4� �! 7 O U H � i —VARIES - VALLEY XSECS AVAILABLE FROM ENGINEER O TIE TERRACE SLOPE TO EXISTING GROUNDN- x 5' (MIN) 6.0' 5' (MIN) �_q F251 � X3:1 VALLEY / TOE�PROPOSED WALL SLOPES o.75' BOTH SIDES (TYP) BANKFULL PROPOSED GRADE MIX EXISTING 10% POOL TYPICAL, 1.5' DEPTH (SAND/GRAV), BALLAST 50% (NO LINING IN POOL) (1-3.5"), CLASS A 10% (2-6") 3.5'x9" DEPTH FIRM SUBGRADE PROPOSED THALWEG 0.1DEEPER THAN TOE NOTE: SEED, STRAW AND MAT STREAM BANKS, BENCH AND TERRACE SLOPE UTI Typical Sections (Not to Scale) EACH PLAN -PROFILE SHEET IS ON ITS OWN LOCAL VERTICAL GRID, HORIZONTAL DATA BASED ON AERIAL PHOTOGRAPHY AND FIELD TRANSECTS WITH TAPE AND LEVEL 0' 3' 6' 9' (VERTICAL) 1111001 0 IO 21 Qe 0+00± OUTLET OF PIPED SECTION UNDER PAVED ACCESS ROAD o+00 1+00 - BEGIN WORK AT LARGER UPSTREAM HEACUT (34) UT2, 0+45± FILL TO MATCH VALLEY PROFILE SHOWN BELOW 2+Oo SMALL HEADCUT (<1') BEGIN STREAM DAYLIGHTING, 0+90± 1.5' DROP ON 1stEXISTING FILL HEIGHT ALONG PIPE (AND PROPOSED RIFFLE VALLEY/STREAM) rL, APPROX. EXCAVATE POOLS EX. 18" HDPE FILL 2' MIN. ABOVE TOP OF PIPE REMOVE 18" HDPE, CONSTRUCT RIFFLES AND POOLS ALONG ti, SEE TYPICAL SECTIONS 0+90-6+30 INSTALL 20 LF 48" DIA HDPE (REUSE FROM ONSITE UT1) `REMOVE EX. MANHOLE TOP=89.6 MANHOLE AND PIPE SYSTEM MAY BE HERE, LID WAS STUCK DURING SURVEY INSTALL 20 LF 48" HDPE, EMBED EX. STREAM RIFFLES, APPLY INVERT, 1.25' BELOW PROPOSED HEADGUTS GRADE (TYP)ffi STREAM GRADE TYPICAL 0+50 1+00 1+50 2+00 2+50 3+00 RIFFLE LENGTHS ARE 30' PER RIFFLE. TYPICAL DROP IS 1.0' PER RIFFLE. CONSTRUCT RIFFLES USING STONE MIX SPECIFIED IN TYPICAL SECTION. POOLS ARE 20' LONG PER POOL. SLOPE AT 10:1 FROM TAIL OR RIFFLE TO POOL MAX DEPTH SPECIFIED ON TYPICAL. SLOPE AT 10:1 BACK UP TO HEAD OF NEXT RIFFLE. POOLS ARE INTENDED TO BE GENERALLY FLAT- UP TO 0.3' DROP ACROSS POOLS IS ACCEPTABLE. EXCESS FILL WASTE AREA EX. EL.=79.5 (INVERT OLD SED. BASIN) END DAYLIGHTING, END PROJECT UT2, 6+30 FLUENCE LITTLE WILLOW CREEK 0' 30' 60' 90' (HORIZONTAL) VARIES - VALLEY XSECS AVAILABLE FROM ENGINEER TIE TERRACE SLOPE TO EXISTING GROUND r-5' (MIN)�y� 3:1 VALLEY 0.4 WALL SLOPES BOTH SIDES PROPOSED GRADE '(MIN) -TO PROPOSED (TYP) BANKFULL MIX EXISTING 10% (SAND/GRAV), ABC 30%, BALLAST 50% (1-3.5"), CLASS A 10% (2-6") 3'x9" DEPTH POOL TYPICAL, 0.75' DEPTH \_PROPOSED THALWEG FIRM SUBGRADE 0.1' DEEPER THAN TOE NOTE: SEED, STRAW AND MAT STREAM BANKS, BENCH AND TERRACE SLOPE UT2 Typical Sections (Not to Scale) TIE IN TO EXISTING VALLEY UPSTREAM AT HEADCUT AND DOWNSTREAM OF PIPE AT CHANNEL INVERT PROFILE GRADE BREAK, TRANSITION TO 1.0'/30' RIFFLES AND 0.4' ROCK SILLS INTO POOLS —BELOW HERE 0.4' ROCK SILL DROP (TYP) 3+50 4+00 4+50 5+00 5+50 6+00 0' 5' 10' 15' (VERTICAL) 6+30 EACH PLAN -PROFILE SHEET IS ON ITS OWN LOCAL VERTICAL GRID, HORIZONTAL DATA BASED ON AERIAL PHOTOGRAPHY AND FIELD TRANSECTS WITH TAPE AND LEVEL Re W' MATCH BANKFULL TO EXISTING GROUND ABOVE PIPE 100 95 90 85 80 0+00 EXISTING FILL HEIGHT ALONG PIPE (AND PROPOSED STREAM) 4, APPROX. RIFFLES, APPLY TYPICAL BANKFULL TO FOLLOW EXISTING GROUND FROM HERE DOWN, ADJUST TYPICAL ACCORDINGLY FILL 2' MIN. ABOVE TOP OF PIPE BANKFULL- REFER TO _ TYPICAL -7 ORA EXCAVATE INSTALL 20 LF 48" HDPE, POOLS EMBED INVERT, 1' BELOW PROPOSED STREAM GRADE USE ROCK STRUCTURE FOR PUMP AROUND AND TO SET NEW GRADE AT EXISTING PIPE ENTRANCE 0+50 1+00 1+50 TIE IN TO EXISTING STREAM UPSTREAM OF PIPE (ABOVE HEADCUTS), AND DOWNSTREAM OF PIPE (BELOW 1ST BEAVER DAM) RIFFLE LENGTHS ARE 30' PER RIFFLE. DROP IS 1.0' PER RIFFLE. CONSTRUCT RIFFLES USING STONE MIX SPECIFIED IN TYPICAL SECTION. POOLS ARE 20' LONG PER POOL. SLOPE AT 10:1 FROM TAIL OR RIFFLE TO POOL MAX DEPTH SPECIFIED ON TYPICAL. SLOPE AT 10:1 BACK UP TO HEAD OF NEXT RIFFLE. POOLS ARE INTENDED TO BE GENERALLY FLAT- UP TO 0.3' DROP ACROSS POOLS IS ACCEPTABLE. BEAVER PONDS T1 LOWER LOW FIRST AM, 2+65± WSF BELOW 1ST BEAVER DAM (TARGET END OF VARIES - VALLEY XSECS AVAILABLE FROM ENGINEER PROJECT TIE-IN ELEV.) 100 TIE TERRACE SLOPE � TO EXISTING GROUND 95 5' (MIN) 7' 5' (MIN) 90 IllI — _FT3 l (— BANKFULL BENCH BANKFULL BENCF INVERT, EX. 85 3:1 VALLEY s ' TOE � PROPOSED DOUBLE PIPE 09' (TYP) BANKFULL WALL SLOPES FOOTER OUTLET BOTH SIDES MIX EXISTING 10% (SAND/GRAV), (DROWNED) BALLAST 50% (1-3.5"), CLASS A 10% (2-6") 80 PROPOSED GRADE I 2+00 2+50 2+80 3.5'x9" DEPTH POOL TYPICAL, PROPOSED THALWEG 1.4' MAX DEPTH 0.1' DEEPER THAN TOE FIRM SUBGRADE NOTE: SEED, STRAW AND MAT STREAM BANKS, BENCH AND TERRACE SLOPE 0' 5' 10' 15' �' c UT1 Lower Typical Sections (Not to Scale) (VERTICAL( E EACH PLAN -PROFILE SHEET IS ON ITS OWN LOCAL VERTICAL GRID, HORIZONTAL DATA v 3 BASED ON AERIAL PHOTOGRAPHY AND FIELD TRANSECTS WITH TAPE AND LEVEL " m 0 o ff N U 3 o � � o 4_1 U 4- N a 4- O o 4- a� .- 4 � s~ 7 O H U 0' 10' 20' 30' (HORIZONTAL) O O N � x � 4- U INVERT, EX. 85 3:1 VALLEY s ' TOE � PROPOSED DOUBLE PIPE 09' (TYP) BANKFULL WALL SLOPES FOOTER OUTLET BOTH SIDES MIX EXISTING 10% (SAND/GRAV), (DROWNED) BALLAST 50% (1-3.5"), CLASS A 10% (2-6") 80 PROPOSED GRADE I 2+00 2+50 2+80 3.5'x9" DEPTH POOL TYPICAL, PROPOSED THALWEG 1.4' MAX DEPTH 0.1' DEEPER THAN TOE FIRM SUBGRADE NOTE: SEED, STRAW AND MAT STREAM BANKS, BENCH AND TERRACE SLOPE 0' 5' 10' 15' �' c UT1 Lower Typical Sections (Not to Scale) (VERTICAL( E EACH PLAN -PROFILE SHEET IS ON ITS OWN LOCAL VERTICAL GRID, HORIZONTAL DATA v 3 BASED ON AERIAL PHOTOGRAPHY AND FIELD TRANSECTS WITH TAPE AND LEVEL " m 0 o ff m O O F B SILL ELEVATI PER PROFILE HEAD OF RIFFLE ELEVATION POINT PER PROFILE FLOW SEE PROFILE FOR LENGTH OF RIFFLE — 7 B' TOE OF SLOPE (TYP) Plan View B z D W O A m s N wo_ TAIL OF RIFFLE ELEVATION POINT PER PROFILE EXTEND CHANNEL LINING ABOVE TOE OF SLOPE AS SHOWN IN STREAM SPECIFIC TYPICAL SECTION 9-12" THICKNESS, OK TO INCORPORATE ON-SITE BRANCHES AND LIMBS (WOOD) RIFFLE INVERT PER PROFILE NOTES: 1. SUPPLY MATERIAL SPECIFIED IN TYPICAL. ` T 2. MATERIALSHALLBE WELLMIXEDAND COMPACTED., / TOP OF BANK (TYP) 3. THALWEG SHALL BE CONSTRUCTED IN CENTER OF RIFFLEli�C<`i� (INVERT). EDGES MAY BE 1-2" HIGHER. Profile A -A' 4.0.5-3" DEAD OR NON -SPOUTING WOOD MAYBE MIXED Section B -B' OR SUBSTITUTED FOR UP TO 30% OF GRAVEL VOLUM E WITH ENGINEER APPROVAL. Riffle 2.1 Not to Scale Plan View Profile A -A' TOP OF BANK SILL ELEVATION PER PROFILE EMBED 3' INTO BANK (TYP) Section B -B' 3 Rock Sill 2.t Not to Scale 12-18" THICKNESS OF EQUAL PARTS CLASS A, B, GRAVEL OR EXISTING ON-SITE STREAM GRAVEL WHERE APPROVED ON-SITE BOULDERS ARE PRESENT AND SHALL BE USED AS DIRECTED PRICE FOR OFFSITE BOULDERS WILL ALSO BE SOLICITED FOOTERS, SEE NOTE 3 FILTER FABRIC EXTEND FILTER FABRIC 5' MIN. UPSTREAM NOTES: 1. HARVESTED OR OFFSITE BOULDERS SHOULD BE MINIMUM OF 1.Sx1.5x1 2. BOULDERS SHOULD FITTOGETHER WELL AND GAPS SHALL BE CHINKED WITH STONE TO PLUG BEFORE APPLYING FABRIC 3. USE THE N OF FOOTERS DESIGNATED ON PROFILE, OR USE 1 FOOTER IF NOT SHOWN IN PROFILE NOTES: 1. LIVE STAKES TO BE PLANTED IN AREAS AS SHOWN ON PLANS AND DIRECTED BY THE ENGINEER. 2. 3' SPACING IN STAGGERED DIAMOND PATTERN 3. LIVE STAKING SHOULD BE COMPLETED DURING THE DORMANT SEASON, GENERALLY DECEMBER TO APRIL. LIVE STAKE (TYP) BASEFLOW WATER ELEVATION TOE OF SLOPE --- LIVE STAKE 17VD1 Section View aT`ty0 / TOP OF BANK 3N `/„" 0 Live Stakes EROSION CONTROL (use at least three of species listed) Scientific Name Common Name Comus amomum Silky Doga od Salix sencea Silky Willow Physocarpus opulifoli us Ninebark Sambucus canadensis Elderberry Cephalanthus occidentalis Buttonbush \j STAGGER ABOUT BANKFULL STAGGER AT TOE AND HALF BANK Live Stake Detail Plan View TOE OF SLOPE BASEFLOW WATER ELEVATION Plan View Live Staking 2.1 Not to Scale 1/2" TO 2" DIAMETER 1.25" as \ r I HARDWOOD STAKE Eco Stake m AD Z ry m W 3z—z a amv� Zi=rv�ov E W S U �r r EROSION CONTROL I 6" MIN. OVERLAB IN MATTING (TYP) TOP OF BANK 1. TOE STAKE NOT REQUIRED WHEN SECURE MATTING IN DOWNSTREAM DIRECTION MATTING IS SECURED UNDER 12-18" OF 6" DEEP TRENCH AT MAP ENDS ECO -STAKE (TYP) TOP OF BANK ECO -STAKE (TYP) + + + TOE OF SLOPE + SP'Mq l gejNG �+ + + + + + + + + + + + + +;,' ECO -STAKE (TYP) Section View TOE OF SLOPE Plan View Live Staking 2.1 Not to Scale 1/2" TO 2" DIAMETER 1.25" as \ r I HARDWOOD STAKE Eco Stake m AD Z ry m W 3z—z a amv� Zi=rv�ov E W S U �r r EROSION CONTROL I NOTES: MATTING (TYP) TOP OF BANK 1. TOE STAKE NOT REQUIRED WHEN SECURE MATTING IN MATTING IS SECURED UNDER 12-18" OF 6" DEEP TRENCH RIFFLE MATERIAL, MIN. OF 12" OVERLAP ECO -STAKE (TYP) TOE OF SLOPE STAKE (TYP) Section View STAKE (TYP) " w Erosion Control Matting 2.1 Not to Scale 8 N Ew` x d tl 3EF 0 IMPI (S Table 6.24a Teri Seeding Recommendations Riparian Seed Mix NOTES: Common Name Scientific Name Rte r Seeding Rate: 20 Ib/acre Optimal Planting Dates Species Name Common Name Percentage Panicum clandestinum Deer Tongue Mountains Piedmont Coastal PFain Rye grain Sewle —le 30 6s Aug. 15 -May 15 Aug. 15 - May 1 Aug. 15 -Apr. 15 Wheat Triticum aestivum 30 lbs Aug. 15 -May 15 Aug. 15 - May 1 Aug. 15 -Apr. 15 German millet Selena italica. 10 b May 15 -Aug. 15 May I - Aug. 15 Apr 15 -Aug. 15 Browntop millet Urochloa ramosa 10 bs May 15 -Aug. 15 Mayt - Aug. 15 Apr. 15 -Aug. 15 SEEDING: 1. SEEDBED WILL BE AMENDED WITH TOPSOIL APPLICATION. 2. PH LEVEL OF SOIL SHALL BE 5.5 T07 3. SEEDBED SHALL BE LOOSE AND FREE OF ROCKS AND DEBRIS PRIOR TO SEEDING AND MULCHING 4. FOR PERMANENT SEEDING, REFER TO NOTES ON SHEET 1.1. TEMPORARY AND PERMANENT SEED SHOULD BE APPLIED TOGETHER IF PLANTING DATES ALLOW. MULCHING: 1. 2 TONS PER ACRE 2. GRAIN STRAW PREFERED, NCDOT ALTERNATIVES WILL BE CONSIDERED UPON REQUEST, AS WILL LEAVES 3. SEEDBED SHALL BE LOOSE AND FREE OF ROCKS AND DEBRIS PRIOR TO SEEDING AND MULCHING 1 Temporary Seeding and Mulching 2.2 Not to Scale 2. STREAM HAS SMALL BASE FLOW. A SUITABLE OUTLET LOCATION IN THE WOODS MAY BE IDENTIFIED ATTHE DISCHARGE LOCATION SO THAT NATURAL FILTRATION CAPACITY OF FOREST FLOOR AND TO AVOID UNNECESSARY DISTURBANCE FOR STONE DEWATERING PAD OR STONE OUTLET. GENERAL PUMPING SEQUENCE: 1. USE PUMP TO PUMP FLOW AROUND DURING NEW STREAM CONSTRUCTION. 2. SET UP ROCK SILT CHECK DAM AT DOWNSTREAM END OF THE NEWLY CONSTRUCTED CHANNELATTHE END OF EACH DAY (SANDBAGS ARE AN ACCEPTABLE ALTERNATIVE). 3. BELOW THE CHECK DAM, WATER WILL FLOW INTO THE EXISTING PIPE. MAKE SURE NO LOOSE SOIL IS PRESENT AROUND THE PIPE INLET. USE SOD MATS, COIR MATTING OR STONE TO STABILIZE ANY BARE GROUND. 4. ATTHE BEGINNING OFTHE NEXT DAY, RESHAPE AS NECESSARY AND USE THE CHECK DAM ASTHE IMPERVIOUS DIKE FOR THE PUMP AROUND OPERATION - INSTALL IMPERVIOUS SHEETING AS SHOWN. Plan View HIGH STRENGTH DOUBLE STITCHED "J" TYPE SEAMS. BAG PLACED ON AGGREGATED OR STRAW. 15' Inset "A" Dewatering Ba, Permanent Riparian Seed Mix 2.2 Not to Scale EWN IN SPOUT HIGH STRENGTH STRAPPING FOR HOLDING HOSE IN PLACE. -WATER FLOW FROM PUMP FLEXIBLE DISCHARGE HOSE EXISTING TERRAIN Riparian Seed Mix NOTES: Stream Banks, Disturbed Buffer and Upland Areas 1. USE WIRE A MINIUM OF 32" IN WIDTH AND WITH RIFFLE STONE MIX Seeding Rate: 20 Ib/acre 8" of CLASS B RIPRAP Species Name Common Name Percentage Panicum clandestinum Deer Tongue 20 Andropogon gerardii Big Bluestem 20 Elymus drginicus Virginia wildrye 20 Sorghastmm nutans Indiangrass 20 Chasmanthium latifolium Riper Cats 10 Juncus effusus Soft Rush 1 10 Permanent Riparian Seed Mix 2.2 Not to Scale EWN IN SPOUT HIGH STRENGTH STRAPPING FOR HOLDING HOSE IN PLACE. -WATER FLOW FROM PUMP FLEXIBLE DISCHARGE HOSE EXISTING TERRAIN DEWATERING BAG NOTES: STREAM BED 1. USE WIRE A MINIUM OF 32" IN WIDTH AND WITH RIFFLE STONE MIX A MINIMUM OF 6 LINES OF WIRES WITH 12" STAY 8" of CLASS B RIPRAP SPACING. FILTER FABRIC AND FASTEN ADEQUATELY TO THE WIRES AS 15'to 20' NOTE: SANDBAG 1. PROVIDE STABILIZED OUTLET TO IMPERVIOUS DIKE (24" X 12" X 6") STREAMBED. (SEE INSET "B") OR STONE. IMPERVIOUS SHEETING FLOW ?ED OUTLET RIPRAP AND °ILTER FABRIC. (SEE INSET "C") Inset"B" Impervious Dike STABILIZED OUTLET USING CLASS B RIPRAP TRENCHED INTO EXISTING GROUND A MINIMUM OF 6". SIZE AND LOCATION TO BE DETERMINED IN THE FIELD BY THE ENGINEER. FLEXIBLE DISCHARGE HOSE FROM 10' MIN. / PUMP AROUND PUMP HELD IN PLACE WITH SAND BAGS AS NEEDED. FILTER FABRIC Pum Around System Inset O 4 Stabilized Outlet 2.2 Not to Scale 8' MAX. WITH WIRE (6' MAX. WITHOUT WIRE) MIDDLE AND VERTICAL W RES SHALL BE 12 } GAGE MIN. FILTER FABRIC TOP AND BOTTOM STRAND SHALL BE 10 GAUGE MIN. WIRE 3 Temporary Silt Fence 2.2 of to Scale Plan View NO.57 STONE INSTALL AND MAINTAIN THREE CHECK DAMS LOCATED AT FILTER FABRIC NOTES: COMPACTED FILL 1. USE WIRE A MINIUM OF 32" IN WIDTH AND WITH RIFFLE STONE MIX A MINIMUM OF 6 LINES OF WIRES WITH 12" STAY SPACING. 77777 2. USE FILTER FABRIC A MINIMUM OF 36" IN WIDTH AND FASTEN ADEQUATELY TO THE WIRES AS - DIRECTED BY THE ENGINEER. 3. PROVIDE S'STEEL POST OF THE SELF -FASTENER ANGLE STEELTYPE. ANGLE STEELTYPE. / EXTEND FABRIC J INTO TRENCH 3 Temporary Silt Fence 2.2 of to Scale Plan View NO.57 STONE INSTALL AND MAINTAIN THREE CHECK DAMS LOCATED AT CLASS B DOWNSTREAM LIMITS OF PROJECT RIPRAP OR CAN BE REDUCED RIFFLE STONE MIX TO ONE CHECK DAM WHEN PONDS ARE PRESENT UPSTREAM EXISTING GROUND as �o wo �ry O` Plan View 2'MIN. SPILLWAY CRES NO. 57 STONE 4 INCHES WIDE ON UPSTREAM FACE CLASS B RIPRAP OR RIFFLE FLOW - - STONE MIX vy — MAY SERVE AS IMPERVIOUS DIKE 5' MIN. I.� 20 20 WORK FLOW AREA /�� �� �— TOP OF BANK CONTRACTOR SHALL REMOVE Profile View SEDIMENT WHEN DEPTH REACHES9" CLASS B RIPRAP — TOE OF SLOPE Rock Silt Check Dams 2.2 Not to Scale co,a,.., A -A' f STREAM WIDTH Section B -B' �or�oro z°LL QIrc 3 o ' w Zrmz a .6Z==�gv aZ1E H W S K, r 4� H Ma N (V (SEE INSET "A") NOTES: I. IF PUMPING CLEAN WATER, NO DEWATERING BAG IS REQUIRED. 15