HomeMy WebLinkAbout20081433 Ver 1_EEP Acceptance Letters_20080910September 4, 2008
Mr Eric Alsmeyer
U S Army Corps of Engineers
Raleigh Regulatory Field Office
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Dear Mr Alsmeyer
Subject EEP Mitigation Acceptance Letter
f
,a q
y
B-4302, Replace Bridge Number 336 over Terrible Creek on
SR1301 (Sunset Lake Road), Wake County, Neuse River Basin
(Cataloging Unit 03020201), Central Piedmont (CP) Eco-Region
The purpose of this letter is to notify you that the Ecosystem Enhancement
Program (EEP) will provide the compensatory riparian wetland mitigation and the buffer
mitigation for the unavoidable impact associated with the above referenced project As
indicated in the NCDOT's mitigation request dated September 3, 2008, riparian wetland
mitigation from EEP is required for approximately 0 48 acre of riparian wetland impacts
Also, this project will impact buffers located in CU 03020201 of the Neuse River
Basin The total buffer impacts are 1,891 square feet in Zone 1 and 3,667 square feet in
Zone 2 with a total buffer mitigation requirement of 11,173 5 square feet If the buffer
impacts or the amount of mitigation required from EEP increases or decreases for this
project, then this mitigation acceptance letter will no longer be valid and a new mitigation
acceptance letter will be required All buffer mitigation requests and approvals are
administrated through the Riparian Restoration Buffer Fund (Fund 2982)
The NCDOT will be responsible to ensure that the appropriate compensation for
the buffer mitigation will be provided in the agreed upon method of fund transfer Upon
receipt,of the NCDWQ's Buffer Authorization Certification, EEP will transfer funds
from Fund 2984 (Tri-Party MOA Account) into Fund 2982 and commit to provide the
appropriate buffer mitigation to offset the impacts associated with this project
r s ??
117 -/
yam. =NC® NP.
North (arolina Ecosystem Enhancement Program. 1652 Mail Service Center- Raleiah_ NC 77699-1657 / 919.71 AVA / www
Riparian wetland mitigation associated with this project will be provided in
accordance with Section X of the Amendment No 2 to the Memorandum of Agreement
between the N C Department of Environment and Natural Resources, the N C
Department of Transportation, and the U S Army Corps of Engineers fully executed on
March 8, 2007 (Tri-Party MOA) EEP commits to implement sufficient riparian wetland
mitigation up to 0 96 riparian wetland credits to offset the impacts associated with this
project by the end of the MOA year in which this project is permitted If the above
referenced impact amounts are revised, then this mitigation acceptance letter will no
longer be valid and a new mitigation acceptance letter will be required from EEP
If you have any questions or need additional information, please contact Ms Beth
Harmon at 919-715-1929
Sincerely,
Jzzze
1?4?ZK "? William D Gilmore, P E
EEP Director
cc Mr Gregory J Thorpe, Ph D, NCDOT-PDEA
Mr Brian Wrenn, Division of Water Quality, Wetlands/401 Unit
File B-4302
PROGRAM
September 4, 2008
Mr Gregory J Thorpe, PhD
Environmental Management Director
Project Development and Environmental Analysis Branch
North Carolina Department of Transportation
1548 Mail Service Center
Raleigh, North Carolina 27699-1548
Dear Dr Thorpe
Subject EEP Mitigation Acceptance Letter
B-4302, Replace Bridge Number 336 over Terrible Creek on
SR1301 (Sunset Lake Road), Wake County
The purpose of this letter is to notify you that the Ecosystem Enhancement
Program (EEP) will provide the compensatory riparian wetland mitigation and buffer
mitigation for the subject project Based on the information supplied by you on
September 3, 2008, the impacts are located in CU 03020201 of the Neuse River Basin in
the Central Piedmont (CP) Eco-Region, and are as follows
Riparian Wetland 0 48 acre
Buffer - Zone 1 1,891 square feet
Buffer - Zone 2 3,667 square feet
All buffer mitigation requests and approvals are administrated through the
Riparian Restoration Buffer Fund The NCDOT will be responsible to ensure that
appropriate compensation for the buffer mitigation will be provided in the agreed upon
method of fund transfer Upon receipt of the NCDWQ's Buffer Authorization
Certification, EEP will transfer funds from Tri-Party MOA Fund into the Riparian
Restoration Buffer Fund Upon completion of transfer payment, NCDOT will have
completed its riparian buffer mitigation responsibility for TIP B-4302 Subsequently,
EEP will conduct a review of current MOA mitigation projects in the river basin to
determine if available buffer mitigation credits exist If there are buffer mitigation credits
??r.ooar st??e, -rA
-11 NCDENR
mlina Frnmtam FAnnramant Prnarnm 1AQ Mntl Carmra rnnfnr RnInurh Mr 77400.140 / 010 71 [ AA74 /
available, then the Riparian Restoration Buffer Fund will purchase the appropriate
amount of buffer mitigation credits from Tri-Party MOA Fund
EEP commits to implementing sufficient riparian wetland mitigation credits to
offset the impacts associated with this project by the end of the MOA Year in which this
project is permitted, in accordance with Section X of the Amendment No 2 to the
Memorandum of Agreement between the North Carolina Department of Environment and
Natural Resources, the North Carolina Department of Transportation, and the U S Army
Corps of Engineers, fully executed on March 8, 2007 If the above referenced riparian
wetland or buffer impact amounts are revised, then this mitigation acceptance letter will
no longer be valid and a new mitigation acceptance letter will be required from EEP
If you have any questions or need additional information, please contact Ms Beth
Harmon at 919-715-1929
Sincerely,
William D Gilmore, P E
EEP Director
cc Mr Eric Alsmeyer, USACE - Raleigh Regulatory Field Office
Mr Brian Wrenn, Division of Water Quality, Wetlands/401 Unit
File B-4302