HomeMy WebLinkAbout20081208 Ver 1_DCM Permit_20080908Permit C:ass Pei:: It Number
_ Etiti p "O 138-08
STATE OF'tiORTH CAROLI'vA
Department of Environment and Natural Resources
X
and
r
Coastal Resources Connrission p;
2008
for r?r;i???:?.burs?
Major Development in an Area of Environmental Concern ?' `TE ?a??;i
pursuant to NCGS 113A-118
Excavation and/or filling pursuant to NCGS 113-229
Issued to Phillip Taylor, 135 Bayshore Drive, Parkton, NC 2853719503
Authorizing development in Carteret County at adj. to Taylors Creek, at 1707 Front Street,
in Beaufort , as requested in the permittee's application dated 7/21/08, including the
attached workplan drawings (1), dated 7/18/08
This permit, issued on August 28, 2008 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Docking Facility
1) This permit authorizes only the additional boatlift at the existing docking facility, and associated uses
located in or over the water that are expressly and specifically set forth in.the permit application. No
other structure, whether floating or stationary, shall become a permanent part of this expanded
docking facility without permit modification. No non-water dependent uses of structures shall be
conducted on, in or over public trust waters without permit modification.
2) No attempt shall be made by the permittee to prevent the full and free use by the public of all
navigable waters at or adjacent to the authorized work.
(See attached sheet for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2011
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
`_
v
James . Gregson, Director
/Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
} Phillip Taylor Permit # 138-08
} Page 2 6f 2
ADDITIONAL, CONDITIONS .f
3) The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he abandons the
permitted activity without having it transferred to a third party.
4) This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury
which may be caused from existing or future operations undertaken by the United States in the public
x interest.
5) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
6) This permit authorizes a maximum of three formalized boat slips.
General
7) The permittee understands and agrees that, if future operations by the United States requires the
removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the
opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause
unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon
due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions
caused thereby, without expense to the United States or the state of North Carolina. No claim shall be
made against the United States or the state of North Carolina on account of any such removal or
alteration.
8) No open water or vegetated wetlands shall be excavated or filled, even temporarily.
9) This permit shall not be not be assigned, transferred, sold, or otherwise disposed of to a third party
without the written approval of the Division of Coastal Management.
NOTE: Should the adjacent property to the west sold prior to the initiation of construction, the permittee
shall be required to obtain a signed riparian corridor waiver from the new property owner prior to
the placement of any structures within the 15 foot riparian corridor.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (252) 808-2808 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non-water
dependent activities are not authorized within 30 feet of the normal high water level.
NOTE: The N.C. Division of Water Quality has authorized the proposed project under Project No. 08-
1208.
NOTE: The U.S. Army Corps of Engineers authorized the proposed project under General Permit No.
197800056 (COE Action Id. No. SAW-2008-02489-016).
? y
o -z
a?
1, %J
v %J
'7" ?'-s r^ x
PAD W ti
i ui__ t, ZOlll
DGM
,6/
Li" B-CA M
>QMAI
L,O W,,,)40-
4 ?I ?I E?i6f:M5
I I/_Zol
KrrzorsEb UW+
-8\1 ?; II ? p SAY
a-td?l
-82A U46iff, t-3L Z8SI4,
(A I e- zol
C. ?o?Je.S
By #,