Loading...
HomeMy WebLinkAboutSW3170403 - McBride Place Energy (3)MCBRIDE PLACE ENERGY, LLC SOLAR FARM A 7409 Mme/ SOLAR FARM LOCATED ON 627.6+ ACRES � N CABARRUS COUNTY, NORTH CAROL0NA ; PROPERTY INFORMATION .y y MCBRIDE PLACE ENERGY, LLC u 9375 US HWY. 601 ARd MIDLAND, NC 28107 " PINS 5556-24-4136, 5557-23-9335, 5557-30-6731) 5556-46-9765, 5556-48-2132) 5557-13-4338 SHEET INDEX ,C NOTE: ACREAGE WITHIN PROJECT IS SHOWN ON SHEET 3, SHEET DESCRIPTION E - ZONED: CR 8c AO PROPOSED USE: COMMERCIAL SOLAR FARM 1 TITLE SHEET Y „_ Reed Gold "��rtiotVip 627.55± ACRES (27,338,256 SF) 1.1 EXHIBITS -"�rc„w�#� ,ks T THIS PROPERTY IS SUBJECT TO A FEMA SPECIAL FLOOD HAZARD ZONE 2 LAYOUT - OVERALL L AS PER THE NCFRIS, PRELIMINARY PANEL 5556, DATED AUGUST 30, 2016 g FEMA FLOOD ZONE: ZONE AE - 8.00 ACRES ADJACENT TO BOST CREEK 3 ADJACENT PROPERTY OWNERS r` ZONE X FOR REMAINDER OF SITE 4 CONSTRUCTION AREAS R'aBr'°e'f'u TOTAL PROPOSED DISTURBED AREA = 484.7± ACRES 5.0 GRADING -ESC PLAN - OVERALL C7 x 5.1 GRADING -ESC PLAN - AREA 1.1 VICINITY MAP 5.2 GRADING -ESC PLAN - AREA 1.2 SCALE: 1 " = 2000' B 5.3 GRADING -ESC PLAN - AREA 2.1 Q LAk0_'/KWELL DEVELOPER: 5.4 GRADING -ESC PLAN - AREA 2.2 MCBRIDE PLACE ENERGY, LLC 1 0�'N INE E RIN 5.5 GRADING -ESC PLAN - AREA 3.1 TAL M � 5.6 GRADING -ESC PLAN - AREA 3.2 2002 LEE HIGHWAY, 1 6005 566 EAST MARKET STREET HARRISONBURG, VA 22801 5.7 GRADING -ESC PLAN - AREA 3.3 VA 24209 PHONE: (540) 432-9555BRISTOL o 5.8 GRADING -ESC PLAN - AREA 4.1 , 571 0 2 2 8° 51 05 ,, FAX. (540) 434-7604 NC `;�o�o��s�,o�`'�.� =, LICENSE P0633 (n 5.9 ESC PLAN NARRATIVE = SEAL - - - J CERTIFICATE OF PLAN APPROVAL = 044128 = 5.10 ESC PLAN NARRATIVE E.ac STAiE o, ,.o r"ti o N ' �v`' >1 5.11 GRADING DETAILS a) "gaw.oe'` 6 DRAINAGE AREAS & SOILS The posting of this certificate certifies that an erosion and sedimentation control plan has N been approved for this project by the North Carolina Department of Environmental Quality U 7.0 LANDSCAPING - OVERALL in accordance with North Carolina General Statute 113A - 57 (4) and 113A - 54 (d) (4) and 4-25-17 PER North Carolina Administrative Code, Title 15A, Chapter 413.0107 (c). This certificate must C0UNTY8 be posted at the primary entrance of the job site before construction begins and until ���I�����REVISED: Pvramid 9 7.1 LANDSCAPING - SOUTH REVISED : 4-19-17 PER C 0 U N TY® establishment of permanent groundcover as required by North Carolina Administrative REVISED: 4-3-17 PER COUNTY code, Title 15A, Chapter 413.0127 (b). LAND SURVEYORS °' 7.2 LANDSCAPING - MID -SOUTH REVISED: 3-22-17 PER REVISED : 3-10-17 PER COUNTY MCC3R,�� PLACt �N, r .� LLQ C e C Z� ��ZA E"9'0 C C -"o , t'AT�( COUNTY 14805 E Rock V River R d, J � 7.3 LANDSCAPING - MID -NORTH REVISED: 2-15/2017 - T Project Name and Location PER NCDEQ,& eA3�,�_-2-4VI-�;a Davidson N C 2 8 0 3 6 M U 12 7 4 LANDSCAPING - NORTH REVISED: 1/26/2017 - ORIGINAL PLAN DATE: 1/5/2017 PER NCDEQ 0 � �� � S k Date of Plan Approval Regional Engineer w,4,he;F� ,�,� p2. cl_ t, PHONE: (704) 892-4249 PROJECT 2377 Environmental 3 Quality NUMBER: SOLAR FARM EXHIBITS PHOTO ILLUSTRAFRI,TING EXAMPLE OF FIXED SOLAR PANEL ARRAYS a Hzgml IMp �MIST � , lEVIV�r i6ifiA FILM a A. . PHOTO ILLUSTRATING TYPICAL TRACKER PANEL��~-'w f _ 1 PHnTn HnWINC, F, n1 AP ARRAY (-,IIPPnRT� PHOTO GENERALLY DEPICTING PROPOSED BREAKER/SUBSTATION TO BE LOCATED ON MT. PLEASANT ROAD `,% 111111 f 1, ft' OQ'� F SS1R0�!',��', � •�;o oN9l!!�9 SEAL 044128 = G fH BLP ''�111111i1111\ c W N U N m 12 PROJECT 2377 NUMBER: Course LEGEND Bearing UNDERGROUND FIBER OPTICS Distance L1 N 81 °04'43" E 100.00' L2 N 88°49'19" E 100.00' L3 S 82°04'53" E 100.00' L4 S 7538'43" E 100.00' L5 S 62°07'43" E 90.05' L6 S 59.15'17" E 100.00' L7 S 58'40'10" E 100.00' L8 S 61'53'05" E 100.00' L9 S 67°14'14" E 100.00' L10 S 69°23'58" E 100.00' L11 N 30°20'21" E 121.15' L12 N 29°44'46" E 106.17' L13 N 31.03'37" E 96.64' L14 N 32.02'14" E 103.55' L15 N 3338'47" E 104.62' L16 N 3433'44" E 105.69' L17 N 31'59'24" E 53.38' L18 N 41 °54'07" E 89.72' L19 N 14°27'02" W 172.46' L20 S 19.20'44" E 163.76' L22 N 68.54'24" E 64.39' L23 N 70'10'56" E 102.39' L24 N 74'07'13" E 117.49' L25 S O8°54'51" W 109.50' L26 S 02'25'12" W 88.04' L27 S 09°25'48" E 98.13' L28 S 1732'47" W 14.27' L29 S 1134'16" W 148.74' L30 S 04.17'51 " W 136.20' L31 S 01 °40'36" W 251.88' L32 S 01 °11'50" W 48.65' L33 N 86°44'00" W 29.98' L34 N 87'00'26" W 269.78' L35 S 50°07'55" W 49.93' L36 S 61 °02'44" E 71.27' L37 S 7037'30" E 43.79' L38 N 49.27'31 " E 55.24' L39 N 85.50'40" E 22.54' L40 S 71 °18'05" E 21.98' L41 S 50°12'12" E 60.08' L42 S 83°07'01" E 65.76' L43 S 75'21'46" E 38.18' L44 S 62°15'12" E 88.27' L45 S 71 °01'24" E 112.64' L46 S 61°53'51" E 55.80' L47 S 67.56'25" E 60.62' McBride Place Energy LLC - Entrance Locations \ / Latitude Longitude Address \ Entrance #1 35.285N 80.508W 9711 US HWY 601 S \ / f _ Entrance #2 25.297N 80.489W 8910 Mt. Pleasant Rd S \ \oo FFE '°ry^'�� Entrance #3 35.303N 80.487W 8380 Mt. Pleasant Rd S \ y �' Entrance #4 35.308N 1 80.491 W 14822 Joyner Rd S Array 1 zssk ® Entrance #5 35.309N 1 80.491 W 14825 Joyner Rd S 100' BUFFER / \ Array 2 / \ / $ Array 3 / Array 4 / Array 5 / a�[ ` 0 POWER R/W 100' BUFFER M L2 L3 Al, m NTRANCE #5 0.3SSANT RO J _ - M1tE AD - - �� •zz'sz'w D- = = = = = = = �NT-R£�NjaE=#_4= ` / Ne E N Array 6 � Array 7 a� Array 9 IArray 8 / 1583.90•_ / - NW4014'W J/ Array 10 Array 11 Array 12 T­r`-� I mmII Array 13 Array 14 Array 15 Array 16 Array 17 Array 18 - - - Array 19 - --------- / I Q \ I & 0v \ I rn PHASE II �' N - I I 4,0,,x• o o• j� PHASE I I 11 II Array 20 l i Array 21 11 I II 11 I I I 11 II I Array 23 i 1 111 1 Array 24 I 11 � I � I M Array 26 \ SBT22'04"E 47E !p p 545.38' _" N az,.79' 1 \ s N- / Array 28 / I � / ===Array 29 INTERMITTENT STREA / r (CLASS 2 BUFFER WITH _= Array -31 - 10' NO BUILD SETBACK) N� PERENNIAL 4TREAM (BOST CREEK • __ (LASS 1 BUFFER WITH - 20' NO BUILD SETBACK) \ I ` � I I Array 42 Array 43 \ / / 344.44• I /� _ �p ��I Array 44 Array 22 Array 25 Array 27 S88.59'39"E 2273.13 /'-100' BUFFER E #3 / LEGEND XISTING UNDERGROUND FIBER OPTICS ' Array 46 LINE -TO BE FIELD -LOCATED (BOST CREEK) / 100' TRANS. LINE R/W (CLASS 1 BUFFER PER DEED: 6796-133 ,8,5.88• � aW / STORM SYSTEM NBB•59•oew � SETBACK) / srE dd - - SETBACK LINE EXISTING ROAD � ETf�CI THIS PROPERTY IS SUBJECT TO A Of LU 0 YEAR FLOOD PLAIN FLOOD FEMA SPECIAL FLOOD HAZARD ZONE PROPOSED ROAD Array 30 AS PER THE NCFRIS, PRELIMINARY REAKER - 0 ; STATION & SUB -STATION 1. 47'* `- 100' BUFF R �, y --------------- Q ((0 J / \ Ig / Array 32 _`\�- � o :2 \ -------------- �fl � Array 33 i Array 34 21 l =--------_ ___ \ Array 35 Array 36 N �� 30' CLASS 2 STREAM UFFER yN 10' CLASS 2 NO -BU D ZONE Array 37 Array 38 1 see. �\ Array 39 `\ Array 40 494 Array 45 Array 47 vM_ Z �N � 1 a / \ �Ljj - -ADJACENT NEIGHBOR 100' LANDSCAPING BUFFER EASEMENT 0 I� I 1� -INAL LOCATIONS OF ARRAYS VlAY DIFFER SLIGHTLY FROM I THOSE SHOWN DEPENDING I PON FINAL SITE CONDITIONS. 0 E #2 PANEL 5556, DATED AUGUST 30, 2016 Array 48 Array 49 Array 50 (J1 (fixed) OST CREEK / \ r Al 8 479.58' I Q \ I NB518'1T1y -- \O,O, 1 30' BUFFER/NO-BUILD NE N85.01.381y / \ 4� 90.70- R/NO-BUILD / \ � RO.Pp I � � / l NSrss•s4w \ .er FENCE CR@2S NG\1QF>STREAM MAY, \ \ / 0 ALTERNATIVELY, 'BE RUN ALONG CHER SIDVOF BOST CREEK. GRAPHIC SCALE INT � � # \', \yg9' I I / / \ \ \ / 500' 0 500' 1000' \ , S8744'25"W u' 88.00' SCALE: 1 "=500' / \ \ / / / PROPOSED GATE / \ / \ / \ (TYPICAL -FIVE LOCATIONS) Jy \ LEGEND EASEMENT LINE ERENNIAL STREAM ' Array 46 Array 41 -E/T- ELECTRIC/TELEPHONE (BOST CREEK) / 0 � 0 ZZ 0 (CLASS 1 BUFFER / "-: WITH 20' NO BUILD / STORM SYSTEM PROPOSED RACK PATH PROPOSED DITCH SETBACK) / srE dd - - SETBACK LINE EXISTING ROAD � ETf�CI THIS PROPERTY IS SUBJECT TO A YEAR FLOOD PLAIN FLOOD FEMA SPECIAL FLOOD HAZARD ZONE PROPOSED ROAD Q N W AS PER THE NCFRIS, PRELIMINARY PANEL 5556, DATED AUGUST 30, 2016 Array 48 Array 49 Array 50 (J1 (fixed) OST CREEK / \ r Al 8 479.58' I Q \ I NB518'1T1y -- \O,O, 1 30' BUFFER/NO-BUILD NE N85.01.381y / \ 4� 90.70- R/NO-BUILD / \ � RO.Pp I � � / l NSrss•s4w \ .er FENCE CR@2S NG\1QF>STREAM MAY, \ \ / 0 ALTERNATIVELY, 'BE RUN ALONG CHER SIDVOF BOST CREEK. GRAPHIC SCALE INT � � # \', \yg9' I I / / \ \ \ / 500' 0 500' 1000' \ , S8744'25"W u' 88.00' SCALE: 1 "=500' / \ \ / / / PROPOSED GATE / \ / \ / \ (TYPICAL -FIVE LOCATIONS) Jy \ 1-1 B'ae_S kD ■ ��1�uoa1§d f T4s La. SITE LOCATED IN YADKIN-PEE DEE RIVER BASIN .: �: /12'-3' k �Qha So/Qn 4 CQ cit, 7'-110" • Q Flo -lical Anchor/ Typical fixed -tilt array West elevation LEGEND EASEMENT LINE CENTER LINE ' a d%• d -E/T- ELECTRIC/TELEPHONE -: ❑E METER/ TRANSFORMER 0 � 0 ZZ C GUY WIRE �S EXISTING UTILITY POLE DITCH LINE 1-1 B'ae_S kD ■ ��1�uoa1§d f T4s La. SITE LOCATED IN YADKIN-PEE DEE RIVER BASIN .: �: /12'-3' k �Qha So/Qn 4 CQ cit, 7'-110" • Q Flo -lical Anchor/ Typical fixed -tilt array West elevation VICINITY MAP - - - - - NO -BUILD SETBACK -CLASS 1-20'/CLASS 2-10' SCALE: 1 " = 2000' ------ INTERMITTENT STREAM -30' CLASS 2 BUFFER i2'-3'- \c I aJ`Q a,�o 45 Qokw 7'-2' 4 7'-2' 4'-3' 2'-6' Galvanized steel I-beo a I,; 17 17' Typical 1 -axis Tracker Array South Elevation e REBAR 12' D.C. 33' 2' ABOVE FINISHED GRADE BOTH DIRECTIONS �8" CONCRETE FI COMPACTEDINVERTER MV �I• •a XFMR MV SWITCH GEAR METERING AND COMPACT SUB -GRADE TO COMMUNICATIONS 95% PROCTOR DENSITY. INVERTER PAD -NTS- - - - - - PROPOSED BOUNDARY BUFFER PROPOSED ADJACENT NEIGHBOR BUFFER TEMPORARY CONTRUCTION STAGING TEMPORARY CONCRETE WASHOUT NOTES: 1. TOPOGRAPHIC AND GEOPHYSICAL DATA, INCLUDING WATERS OF THE US, SHOWN ON THIS PLAN ARE FROM COUNTY -PROVIDED SHAPE FILES (.SHP) 2. NO IMPACTS TO THE WATERS OF THE US ARE PROPOSED FOR THE DEVELOPMENT OF THIS PROJECT, THEREFORE A 401/404 IS NOT REQUIRED. ®3. THE PROPOSED PROJECT PROPERTY CONTAINS SPECIAL FLOOD HAZARD AREAS SUBJECT TO INUNDATION BY THE 1% ANNUAL CHANCE FLOOD (I.E„ 100 YR. EVENT) PER THE NCFRIS, PRELIMINARY PANEL 5556, DATED AUGUST 30, 2016 4. ALL RIGHTS OF WAY ARE PUBLIC, UNLESS OTHERWISE NOTED. I 5. UTILITY LINES AND SERVICES SHOWN ARE APPROXIMATE PER AERIAL PHOTOGRAPHY OR AS PROVIDED BY VARIOUS RESPONSIBLE PARTIES. LOCATION OF UNDERGROUND UTILITIES, SHOWN AND NOT SHOWN, MUST BE FIELD VERIFIED. CALL NC ONE CALL CENTER BEFORE DIGGING AT 811. 6. COPIES OF ALL PERMITS AND APPROVED SITE PLANS SHALL BE KEPT ON-SITE IN A PERMIT BOX THAT IS CONSPICUOUSLY LOCATED AND EASILY ACCESSIBLE DURING CONSTRUCTION. 7. AN EROSION AND SEDIMENT CONTROL PLAN SHALL BE APPROVED BY NCDEQ PRIOR TO ISSUING A ZONING PERMIT. 0 8. DRIVEWAY PERMITS SHALL BE APPROVED BY NCDOT PRIOR TO ISSUING A ZONING PERMIT. Q 9. PROJECT AREA, INCLUDING CONSTRUCTION STAGING AREAS, SHALL BE CLEARED AND GRUBBED, AS NECESSARY, RETAINING PRE -DEVELOPMENT DRAINAGE PATTERNS (I.E., NO MASS GRADING). A PORTION OF PROJECT AREAS MAY CONSIST OF TREE CLEARING AND GRUBBING TO ALLEVIATE SHADING OF THE ARRAY, AS INDICATED ON THE SITE PLAN. MINOR GRADING ONLY WILL OCCUR AROUND INVERTER AREAS TO DIVERT SURFACE DRAINAGE. CONSTRUCTION STAGING AND AREAS SUBJECT TO RUTTING DURING CONSTRUCTION WILL BE TEMPORARILY STABILIZED WITH LOGGING MATS, WHICH WILL BE REMOVED FOLLOWING CONSTRUCTION. 10. ACCESS AND SERVICE AISLES AND PATHS SHOWN INDICATE CONSTRUCTI N AND MAINTENANCE ACCESS POINTS FOR INGRESS/EGRESS PRIOR TO CONSTRUC 4 . THESE AISLES ARE CONSTRUCTED AS SHOWN IN THE DETAIL ON SHEET 5.10. LOGGING MATS MAY BE PLACED IN HIGH TRAFFIC OR POORLY DRAINED AREAS. GRASS SHALL BE PLANTED FOLLOWING CONSTRUCTION WHEN LOGGING MATS ARE REMOVED. 11. PROPOSED 24' ACCESS GATES (TWO 12' SECTIONS), 6' TALL CHAIN LINK SHALL BE LOCKED AT EACH ENTRANCE WITH STANDARD KEYED OR COMBINATION LOCKS. EMERGENCY PERSONNEL, AS DESIGNATED BY CABARRUS COUNTY, WILL BE PROVIDED WITH KEYS OR COMBINATION FOR ACCESS. 12. NO LIGHTING IS PROPOSED FOR THIS SITE, BUT DEVELOPER RESERVES THE RIGHT TO INSTALL SECURITY AT ENTRANCES, AS NEEDED. ALL LIGHTING SHALL COMPLY WITH © APPENDIX D OF THE CABARRUS COUNTY ORDINANCE 13. ALUMINUM SIGNS ("DANGER -HIGH VOLTAGE" AND "DANGER -NO TRESPASSING"), EACH MEASURING 14"X10" IN SIZE, SHALL BE PLACED ON PERMANENT 6' CHAIN LINK SECURITY FENCING, ALTERNATING EVERY 100' AROUND THE PERIMETER OF THE PROJECT. SEE DETAIL - SHEET 5.11. 14. SYSTEMS, EQUIPMENT, AND STRUCTURES SHALL NOT EXCEED TEN (10) FEET IN HEIGHT, WHEN GROUND -MOUNTED. EXCLUDED FROM THE HEIGHT REQUIREMENT ARE 0 OVERHEAD ELECTRIC DISTRIBUTION LINES AND UTILITY POLES. 15. SOUND LEVELS GENERATED BY THE SOLAR ARRAYS AS MEASURED AT THE PROPERTY LINES SHALL NOT EXCEED 35 dBa. SPECIAL PROVISION S 1. Notify More Morgan, PE at 704-982-01 04 at least 24 hours prior to construction - 2. Notify owners of conflicting utilities to provide for adjustments prior to the onset of construction. Any utility that may, upon completion of the roadway widening, create a safety hazard to the traveling public, will be relocated at the expense of the developer. 3. A copy of the approved street entrance permit is to be kept on the job site during working hours. 4. Working hours shall be from 9:00 a.m. to 4:00 p.m. with all lanes open to traffic by 4:00 p.m. S- Complete restoration including fertilizing, seeding and mulching of all arms disturbed during construction will follow within a maximum of thirty (30) working days of the initial disturbing activity in accordance with NC DOT specifications. See attached seeding schedule. 6. During construction operations, no material is to be left on the pavement, and at the end of each work day, the roadway is to be cleaned. 7. Any damages caused to the roadway, bridges, culverts or storm drains due to the construction of this entrance will be repaired at the discretion of the engineer in charge. S. All OSHA rules and regulations shall be adhered to as pertain to this operation. 9. Contact Division Traffic Engineer at 704-982-0101 at least 48 hours prior to construction if any work is to be done within 500 feet of any traffic signals. Any damage to any signal related equipment will be repaired by NCDOT at the expense of the permit applicant. 10. The Division Engineer or a representative thereof reserves the right to stop any work for non-compliance with the terms of this contract. 11- All roadway signs removed due to this construction are to be re -installed as soon as possible. 12. During non -working hours, equipment is to be parked off the right-of- way. 13. responsible for any claims or damages brought by any property owner. 14. Allwork shall be constructed in accordance with the attached plans and `typiccls.' 15. The Department of Transportation reserves the right to require compensation for any vegetation located within the right of way that is disturbed or destroyed due to the construction of this entrance. 16. Strict compliance with the "POLICY ON STREET AND DRIVEWAY ACCESS TO NORTHCAROLINA HIGHWAYS" manual shall be required - 17. Backfill shall achieve 95% density in accordance with AASHTO T99 as modified by the NC DOT. 18. Any work requiring equipment or personnel within 5' of the edge of the travel lane shall require a lane closure with appropriate taper. 19. The developer, at his expense, shall correct any offsite drainage problems created or made apparent by the construction of these improvements. 20. Any future development or change in use from that which is specified herein will require additional review and possible driveway modification. LEGEND EASEMENT LINE CENTER LINE ' SITE BOUNDARY d%• d -E/T- ELECTRIC/TELEPHONE -: ❑E METER/ TRANSFORMER 0 � 0 ZZ C GUY WIRE �S EXISTING UTILITY POLE DITCH LINE EXISTING LIGHT POLES PROPOSED UTILITY POLE `` STORM SYSTEM PROPOSED RACK PATH PROPOSED DITCH - - EXISTING PROPERTY LINE srE dd - - SETBACK LINE VICINITY MAP - - - - - NO -BUILD SETBACK -CLASS 1-20'/CLASS 2-10' SCALE: 1 " = 2000' ------ INTERMITTENT STREAM -30' CLASS 2 BUFFER i2'-3'- \c I aJ`Q a,�o 45 Qokw 7'-2' 4 7'-2' 4'-3' 2'-6' Galvanized steel I-beo a I,; 17 17' Typical 1 -axis Tracker Array South Elevation e REBAR 12' D.C. 33' 2' ABOVE FINISHED GRADE BOTH DIRECTIONS �8" CONCRETE FI COMPACTEDINVERTER MV �I• •a XFMR MV SWITCH GEAR METERING AND COMPACT SUB -GRADE TO COMMUNICATIONS 95% PROCTOR DENSITY. INVERTER PAD -NTS- - - - - - PROPOSED BOUNDARY BUFFER PROPOSED ADJACENT NEIGHBOR BUFFER TEMPORARY CONTRUCTION STAGING TEMPORARY CONCRETE WASHOUT NOTES: 1. TOPOGRAPHIC AND GEOPHYSICAL DATA, INCLUDING WATERS OF THE US, SHOWN ON THIS PLAN ARE FROM COUNTY -PROVIDED SHAPE FILES (.SHP) 2. NO IMPACTS TO THE WATERS OF THE US ARE PROPOSED FOR THE DEVELOPMENT OF THIS PROJECT, THEREFORE A 401/404 IS NOT REQUIRED. ®3. THE PROPOSED PROJECT PROPERTY CONTAINS SPECIAL FLOOD HAZARD AREAS SUBJECT TO INUNDATION BY THE 1% ANNUAL CHANCE FLOOD (I.E„ 100 YR. EVENT) PER THE NCFRIS, PRELIMINARY PANEL 5556, DATED AUGUST 30, 2016 4. ALL RIGHTS OF WAY ARE PUBLIC, UNLESS OTHERWISE NOTED. I 5. UTILITY LINES AND SERVICES SHOWN ARE APPROXIMATE PER AERIAL PHOTOGRAPHY OR AS PROVIDED BY VARIOUS RESPONSIBLE PARTIES. LOCATION OF UNDERGROUND UTILITIES, SHOWN AND NOT SHOWN, MUST BE FIELD VERIFIED. CALL NC ONE CALL CENTER BEFORE DIGGING AT 811. 6. COPIES OF ALL PERMITS AND APPROVED SITE PLANS SHALL BE KEPT ON-SITE IN A PERMIT BOX THAT IS CONSPICUOUSLY LOCATED AND EASILY ACCESSIBLE DURING CONSTRUCTION. 7. AN EROSION AND SEDIMENT CONTROL PLAN SHALL BE APPROVED BY NCDEQ PRIOR TO ISSUING A ZONING PERMIT. 0 8. DRIVEWAY PERMITS SHALL BE APPROVED BY NCDOT PRIOR TO ISSUING A ZONING PERMIT. Q 9. PROJECT AREA, INCLUDING CONSTRUCTION STAGING AREAS, SHALL BE CLEARED AND GRUBBED, AS NECESSARY, RETAINING PRE -DEVELOPMENT DRAINAGE PATTERNS (I.E., NO MASS GRADING). A PORTION OF PROJECT AREAS MAY CONSIST OF TREE CLEARING AND GRUBBING TO ALLEVIATE SHADING OF THE ARRAY, AS INDICATED ON THE SITE PLAN. MINOR GRADING ONLY WILL OCCUR AROUND INVERTER AREAS TO DIVERT SURFACE DRAINAGE. CONSTRUCTION STAGING AND AREAS SUBJECT TO RUTTING DURING CONSTRUCTION WILL BE TEMPORARILY STABILIZED WITH LOGGING MATS, WHICH WILL BE REMOVED FOLLOWING CONSTRUCTION. 10. ACCESS AND SERVICE AISLES AND PATHS SHOWN INDICATE CONSTRUCTI N AND MAINTENANCE ACCESS POINTS FOR INGRESS/EGRESS PRIOR TO CONSTRUC 4 . THESE AISLES ARE CONSTRUCTED AS SHOWN IN THE DETAIL ON SHEET 5.10. LOGGING MATS MAY BE PLACED IN HIGH TRAFFIC OR POORLY DRAINED AREAS. GRASS SHALL BE PLANTED FOLLOWING CONSTRUCTION WHEN LOGGING MATS ARE REMOVED. 11. PROPOSED 24' ACCESS GATES (TWO 12' SECTIONS), 6' TALL CHAIN LINK SHALL BE LOCKED AT EACH ENTRANCE WITH STANDARD KEYED OR COMBINATION LOCKS. EMERGENCY PERSONNEL, AS DESIGNATED BY CABARRUS COUNTY, WILL BE PROVIDED WITH KEYS OR COMBINATION FOR ACCESS. 12. NO LIGHTING IS PROPOSED FOR THIS SITE, BUT DEVELOPER RESERVES THE RIGHT TO INSTALL SECURITY AT ENTRANCES, AS NEEDED. ALL LIGHTING SHALL COMPLY WITH © APPENDIX D OF THE CABARRUS COUNTY ORDINANCE 13. ALUMINUM SIGNS ("DANGER -HIGH VOLTAGE" AND "DANGER -NO TRESPASSING"), EACH MEASURING 14"X10" IN SIZE, SHALL BE PLACED ON PERMANENT 6' CHAIN LINK SECURITY FENCING, ALTERNATING EVERY 100' AROUND THE PERIMETER OF THE PROJECT. SEE DETAIL - SHEET 5.11. 14. SYSTEMS, EQUIPMENT, AND STRUCTURES SHALL NOT EXCEED TEN (10) FEET IN HEIGHT, WHEN GROUND -MOUNTED. EXCLUDED FROM THE HEIGHT REQUIREMENT ARE 0 OVERHEAD ELECTRIC DISTRIBUTION LINES AND UTILITY POLES. 15. SOUND LEVELS GENERATED BY THE SOLAR ARRAYS AS MEASURED AT THE PROPERTY LINES SHALL NOT EXCEED 35 dBa. SPECIAL PROVISION S 1. Notify More Morgan, PE at 704-982-01 04 at least 24 hours prior to construction - 2. Notify owners of conflicting utilities to provide for adjustments prior to the onset of construction. Any utility that may, upon completion of the roadway widening, create a safety hazard to the traveling public, will be relocated at the expense of the developer. 3. A copy of the approved street entrance permit is to be kept on the job site during working hours. 4. Working hours shall be from 9:00 a.m. to 4:00 p.m. with all lanes open to traffic by 4:00 p.m. S- Complete restoration including fertilizing, seeding and mulching of all arms disturbed during construction will follow within a maximum of thirty (30) working days of the initial disturbing activity in accordance with NC DOT specifications. See attached seeding schedule. 6. During construction operations, no material is to be left on the pavement, and at the end of each work day, the roadway is to be cleaned. 7. Any damages caused to the roadway, bridges, culverts or storm drains due to the construction of this entrance will be repaired at the discretion of the engineer in charge. S. All OSHA rules and regulations shall be adhered to as pertain to this operation. 9. Contact Division Traffic Engineer at 704-982-0101 at least 48 hours prior to construction if any work is to be done within 500 feet of any traffic signals. Any damage to any signal related equipment will be repaired by NCDOT at the expense of the permit applicant. 10. The Division Engineer or a representative thereof reserves the right to stop any work for non-compliance with the terms of this contract. 11- All roadway signs removed due to this construction are to be re -installed as soon as possible. 12. During non -working hours, equipment is to be parked off the right-of- way. 13. responsible for any claims or damages brought by any property owner. 14. Allwork shall be constructed in accordance with the attached plans and `typiccls.' 15. The Department of Transportation reserves the right to require compensation for any vegetation located within the right of way that is disturbed or destroyed due to the construction of this entrance. 16. Strict compliance with the "POLICY ON STREET AND DRIVEWAY ACCESS TO NORTHCAROLINA HIGHWAYS" manual shall be required - 17. Backfill shall achieve 95% density in accordance with AASHTO T99 as modified by the NC DOT. 18. Any work requiring equipment or personnel within 5' of the edge of the travel lane shall require a lane closure with appropriate taper. 19. The developer, at his expense, shall correct any offsite drainage problems created or made apparent by the construction of these improvements. 20. Any future development or change in use from that which is specified herein will require additional review and possible driveway modification. 1-26-17 PER EASEMENT LINE h COUN DISTURBED AREA d%• d -► -► TIME OF CONCENTRATION wS `r 0 � 0 ZZ DIVERSION DIKE ------------- DITCH LINE Reed Laid Mln PROPOSED PAD `` }- PROPOSED RACK PATH PROPOSED SERVICE AISLE (D ---- EXISTING ROAD � ETf�CI Q LTJ EXISTING UG FIBER OPTICS LINE PROPOSED ROAD Q N W ---- CII- PROPOSED FENCE - 0 CONCRETE PAVING w U > HEAVY PAVEMENT N Rik Brt�g� Golf' ll.ltr C 0 LIGHT PAVEMENT }_ ® GRAVEL AREA ARRAY FIXED SOLAR PANELS ARRAY TRACKING SOLAR PANELS 27 DELINEATED WETLANDS CL ID O 100 YR FLOODPLAIN --------- TOP OF STREAM BANK _ - _ - - PERENNIAL STREAM -50' MINIMUM CLASS 1 BUFFER VICINITY MAP - - - - - NO -BUILD SETBACK -CLASS 1-20'/CLASS 2-10' SCALE: 1 " = 2000' ------ INTERMITTENT STREAM -30' CLASS 2 BUFFER i2'-3'- \c I aJ`Q a,�o 45 Qokw 7'-2' 4 7'-2' 4'-3' 2'-6' Galvanized steel I-beo a I,; 17 17' Typical 1 -axis Tracker Array South Elevation e REBAR 12' D.C. 33' 2' ABOVE FINISHED GRADE BOTH DIRECTIONS �8" CONCRETE FI COMPACTEDINVERTER MV �I• •a XFMR MV SWITCH GEAR METERING AND COMPACT SUB -GRADE TO COMMUNICATIONS 95% PROCTOR DENSITY. INVERTER PAD -NTS- - - - - - PROPOSED BOUNDARY BUFFER PROPOSED ADJACENT NEIGHBOR BUFFER TEMPORARY CONTRUCTION STAGING TEMPORARY CONCRETE WASHOUT NOTES: 1. TOPOGRAPHIC AND GEOPHYSICAL DATA, INCLUDING WATERS OF THE US, SHOWN ON THIS PLAN ARE FROM COUNTY -PROVIDED SHAPE FILES (.SHP) 2. NO IMPACTS TO THE WATERS OF THE US ARE PROPOSED FOR THE DEVELOPMENT OF THIS PROJECT, THEREFORE A 401/404 IS NOT REQUIRED. ®3. THE PROPOSED PROJECT PROPERTY CONTAINS SPECIAL FLOOD HAZARD AREAS SUBJECT TO INUNDATION BY THE 1% ANNUAL CHANCE FLOOD (I.E„ 100 YR. EVENT) PER THE NCFRIS, PRELIMINARY PANEL 5556, DATED AUGUST 30, 2016 4. ALL RIGHTS OF WAY ARE PUBLIC, UNLESS OTHERWISE NOTED. I 5. UTILITY LINES AND SERVICES SHOWN ARE APPROXIMATE PER AERIAL PHOTOGRAPHY OR AS PROVIDED BY VARIOUS RESPONSIBLE PARTIES. LOCATION OF UNDERGROUND UTILITIES, SHOWN AND NOT SHOWN, MUST BE FIELD VERIFIED. CALL NC ONE CALL CENTER BEFORE DIGGING AT 811. 6. COPIES OF ALL PERMITS AND APPROVED SITE PLANS SHALL BE KEPT ON-SITE IN A PERMIT BOX THAT IS CONSPICUOUSLY LOCATED AND EASILY ACCESSIBLE DURING CONSTRUCTION. 7. AN EROSION AND SEDIMENT CONTROL PLAN SHALL BE APPROVED BY NCDEQ PRIOR TO ISSUING A ZONING PERMIT. 0 8. DRIVEWAY PERMITS SHALL BE APPROVED BY NCDOT PRIOR TO ISSUING A ZONING PERMIT. Q 9. PROJECT AREA, INCLUDING CONSTRUCTION STAGING AREAS, SHALL BE CLEARED AND GRUBBED, AS NECESSARY, RETAINING PRE -DEVELOPMENT DRAINAGE PATTERNS (I.E., NO MASS GRADING). A PORTION OF PROJECT AREAS MAY CONSIST OF TREE CLEARING AND GRUBBING TO ALLEVIATE SHADING OF THE ARRAY, AS INDICATED ON THE SITE PLAN. MINOR GRADING ONLY WILL OCCUR AROUND INVERTER AREAS TO DIVERT SURFACE DRAINAGE. CONSTRUCTION STAGING AND AREAS SUBJECT TO RUTTING DURING CONSTRUCTION WILL BE TEMPORARILY STABILIZED WITH LOGGING MATS, WHICH WILL BE REMOVED FOLLOWING CONSTRUCTION. 10. ACCESS AND SERVICE AISLES AND PATHS SHOWN INDICATE CONSTRUCTI N AND MAINTENANCE ACCESS POINTS FOR INGRESS/EGRESS PRIOR TO CONSTRUC 4 . THESE AISLES ARE CONSTRUCTED AS SHOWN IN THE DETAIL ON SHEET 5.10. LOGGING MATS MAY BE PLACED IN HIGH TRAFFIC OR POORLY DRAINED AREAS. GRASS SHALL BE PLANTED FOLLOWING CONSTRUCTION WHEN LOGGING MATS ARE REMOVED. 11. PROPOSED 24' ACCESS GATES (TWO 12' SECTIONS), 6' TALL CHAIN LINK SHALL BE LOCKED AT EACH ENTRANCE WITH STANDARD KEYED OR COMBINATION LOCKS. EMERGENCY PERSONNEL, AS DESIGNATED BY CABARRUS COUNTY, WILL BE PROVIDED WITH KEYS OR COMBINATION FOR ACCESS. 12. NO LIGHTING IS PROPOSED FOR THIS SITE, BUT DEVELOPER RESERVES THE RIGHT TO INSTALL SECURITY AT ENTRANCES, AS NEEDED. ALL LIGHTING SHALL COMPLY WITH © APPENDIX D OF THE CABARRUS COUNTY ORDINANCE 13. ALUMINUM SIGNS ("DANGER -HIGH VOLTAGE" AND "DANGER -NO TRESPASSING"), EACH MEASURING 14"X10" IN SIZE, SHALL BE PLACED ON PERMANENT 6' CHAIN LINK SECURITY FENCING, ALTERNATING EVERY 100' AROUND THE PERIMETER OF THE PROJECT. SEE DETAIL - SHEET 5.11. 14. SYSTEMS, EQUIPMENT, AND STRUCTURES SHALL NOT EXCEED TEN (10) FEET IN HEIGHT, WHEN GROUND -MOUNTED. EXCLUDED FROM THE HEIGHT REQUIREMENT ARE 0 OVERHEAD ELECTRIC DISTRIBUTION LINES AND UTILITY POLES. 15. SOUND LEVELS GENERATED BY THE SOLAR ARRAYS AS MEASURED AT THE PROPERTY LINES SHALL NOT EXCEED 35 dBa. SPECIAL PROVISION S 1. Notify More Morgan, PE at 704-982-01 04 at least 24 hours prior to construction - 2. Notify owners of conflicting utilities to provide for adjustments prior to the onset of construction. Any utility that may, upon completion of the roadway widening, create a safety hazard to the traveling public, will be relocated at the expense of the developer. 3. A copy of the approved street entrance permit is to be kept on the job site during working hours. 4. Working hours shall be from 9:00 a.m. to 4:00 p.m. with all lanes open to traffic by 4:00 p.m. S- Complete restoration including fertilizing, seeding and mulching of all arms disturbed during construction will follow within a maximum of thirty (30) working days of the initial disturbing activity in accordance with NC DOT specifications. See attached seeding schedule. 6. During construction operations, no material is to be left on the pavement, and at the end of each work day, the roadway is to be cleaned. 7. Any damages caused to the roadway, bridges, culverts or storm drains due to the construction of this entrance will be repaired at the discretion of the engineer in charge. S. All OSHA rules and regulations shall be adhered to as pertain to this operation. 9. Contact Division Traffic Engineer at 704-982-0101 at least 48 hours prior to construction if any work is to be done within 500 feet of any traffic signals. Any damage to any signal related equipment will be repaired by NCDOT at the expense of the permit applicant. 10. The Division Engineer or a representative thereof reserves the right to stop any work for non-compliance with the terms of this contract. 11- All roadway signs removed due to this construction are to be re -installed as soon as possible. 12. During non -working hours, equipment is to be parked off the right-of- way. 13. responsible for any claims or damages brought by any property owner. 14. Allwork shall be constructed in accordance with the attached plans and `typiccls.' 15. The Department of Transportation reserves the right to require compensation for any vegetation located within the right of way that is disturbed or destroyed due to the construction of this entrance. 16. Strict compliance with the "POLICY ON STREET AND DRIVEWAY ACCESS TO NORTHCAROLINA HIGHWAYS" manual shall be required - 17. Backfill shall achieve 95% density in accordance with AASHTO T99 as modified by the NC DOT. 18. Any work requiring equipment or personnel within 5' of the edge of the travel lane shall require a lane closure with appropriate taper. 19. The developer, at his expense, shall correct any offsite drainage problems created or made apparent by the construction of these improvements. 20. Any future development or change in use from that which is specified herein will require additional review and possible driveway modification. a� 0 I E O -.4- o ) C M U N o s` N � c r ,a v c > Lr) 3 I� Ln U rn 0 a 1 m wMLLJ 0 m o U-) •L v O = w w Z 0 a_ 1-26-17 PER Date: 4-25-17 -10-17 PER COUN 4-3-17 PER d%• d ti �vO�P Scale: AS NOTED :W 0 � 0 ZZ .d Designed by: EHB O '11/11j11f11,1�111 `` }- =Drown RIJ a (D Checked by: EHB J Q LTJ a� 0 I E O -.4- o ) C M U N o s` N � c r ,a v c > Lr) 3 I� Ln U rn 0 a 1 m wMLLJ 0 m o U-) •L v O = w w Z 0 a_ Revision Dates 1-26-17 PER NCDEQ -10-17 PER COUN 4-3-17 PER d%• d ti �vO�P J 00 mry :W 0 � 0 ZZ .d O '11/11j11f11,1�111 `` Revision Dates 1-26-17 PER NCDEQ -10-17 PER COUN 4-3-17 PER COUNTY 4-21-17PER COUNTY Drawing No. 2 of 23 Sheets Job No. 2377 O }- O a (D J Q LTJ LLJ z W ~ Q N W m� Q w U > Q J W J O I- L,J ( IN J - O LTJ N m CL ID O O O W m CL U 12 Drawing No. 2 of 23 Sheets Job No. 2377 kB Farms LLC a NC LLC \ \ ) BOX 18 \ )RWOOD, NC 28128 iYSICAL ADDRESS: 7700 EDGEFIELD RD \ CONCORD NC 28025 N 14: 55571343380000 \ 20PERTY REAL ID: 10-003 -0001.30 -ED BOOK: 7164 PG.: 0001 \ ?EA: 6.83 AC PORTION OF 185.73 AC BOST III \ 11 HWY 200 JCORD, NC 28025 / 'SICAL ADDRESS: 4738 JOYNER ROAD CONCORD NC 28025 14: 55573067310000 O )PERTY REAL ID: 10-003 -0001.40 :D BOOK: - PG.: - / :A: 1.27 AC / ` I 28 / / / 26 27 / / / / I/ / / I 1 I 1 1 � - 1 1 24 / / 22 2 2C X19 X18 17 16 15 13 14 12� 11 O � 10 7 9 i d ONCORD, NC 28025 HYSICAL ADDRESS: 8500 MT PLEASANT RD MIDLAND NC 28107 IN 14: 55572393350000 ROPERTY REAL ID: 10-003 -0013.00 EED BOOK: 6745 PG.: 0281 - E T BOST III 4701 HWY 200 CONCORD, NC 28025 PHYSICAL ADDRESS: 8500 MT PLEASANT RD S MIDLAND NC 28107 PIN 14: 55572393350000 PROPERTY REAL ID: 10-003 -0013.00 DEED BOOK: 6745 PG.: 0281 AREA: 155.02± OF 558.94 AC JAB FARMS LLC A NC LLC PO BOX 18 NORWOOD, NC 28128 PHYSICAL ADDRESS: 8500 MT PLEASANT RD S MIDLAND NC 28107 PIN 14: 55564821320000 PROPERTY REAL ID: 10-003 -0001.20 DEED BOOK: 7164 PG.: 0001 AREA: 94.99 AC 38 / JOHN P & ADELAIDE MCNEILL PO BOX 656 I NORWOOD, NC 28128 PHYSICAL ADDRESS: 8900 MT PLEA ANT RD CONCORD NC 8025 PIN 14: 55564697650000 PROPERTY REAL ID: 10-003 -0001.2 DEED BOOK: 7674 PG.: 0122 REA: 21.42 AC 40 41 142 O 0 O � F- Ld \ - O I ADJACENT NEIGHBOR 1 Q� 5M'S LLC A VA LLC LANDSCAPING BUFFE TT I 1583 RIDGEDALE RD EASEMENT ROCKINGHAM, VA 22801 PHYSICAL ADDRESS: 9375 US HWY 601 S \ I O MIDLAND NC 28025 4 PIN 14: 55562315630000 \ PROPERTY REAL ID: 10-004 -0001.00 I DEED BOOK: 10231 PG.: 0113 AREA: 299.24 AC I / /V 63 62 G� \ \ 6 yam\ \ �60� o, \ / 59 oP 53 / O 52 51 0 �R O C\ 58 57 \ 54 56 l o . SCALE: 1 "= 600' Address 10. Kristy Bullock and 8739 Hayden Way 55562503110000 10-005A-0089.00 Troy Bullock, husband Concord, NC 28025 Zoned: CR 8739 Hayden Way Concord, NC 28025 11. ADJACENT PROPERTY OWNERS 55562505730000 10-005A-0088.00 40., 41, Owner Name and Mailing Address Property Address Parcel Number Real ID 62 Regina Giocondo, wife Concord, NC 28025 55469235270000 Zoned: CR 28. Luther Thompson Hartsell, 4700 Joyner Rd. 55571195160000 10-003 -0012.00 Owner Name and Mailing Address Property Address Parcel Number Real ID 44 IV and Jane Hartsell Crawford, brother & sister (1/2 interest) and Heath H. Hedgpeth (1/2 interest) 1217 Greenside Dr. Concord, NC 28025 55469229160000 Zoned: CR 1. Berry Blane Criswell, Jr. and Carrie Ann Criswell, wife 9419 Hwy 601 Midland, NC 28107 55469371270000 10-004 -0001.20 Zoned: CR 9419 Hwy 601 5833 Kristi Ln. 55565622050000 10-003A-0002.00 64. Concord, NC 28027 7700 Edgefield Rd. 55571343380000 10-003 -0001.30 Midland, NC 28107 Concord, NC 28025 Zoned: CR 12. Kevan G. Lovin and 8717 Hayden Way 55562517050000 0-005A-0087.00 65. Treva J. Lovin, wife Concord, NC 28025 55573283500000 Zoned: CR 30. & 34 E. T. Bost, III 4701 Hwy 200 Concord, NC 28025 5855 Kristi Ln. 55565651940000 10-003A-0001.00 2. Kevin D. Pressley and Stephanie Pressley, wife 9365 Hwy 601 Midland, NC 28107 55560364000000 10-004 -0013.30 Zoned: CR U 9365 Highway 601 Concord, NC 28025 � Zoned: CR 66. Concord, NC 28025 4828, 5299 and 5300 55574217500000 10-003 -0013.00 Midland, NC 28107 Concord, NC 28025 Zoned: AO Concord, NC 28025 Joyner Rd. Zoned: AO 9000 Mt. Pleasant Rd. Midland, NC 28107 and 55565547180000 10-003A-0005.00 Zoned: CR 13. James G. Jolly and Concord, NC 28025 55562509150000 10-005A-0088.00 3. & 4. Nollie C. Pressley and 9355 Hwy 601 55560366360000 10-004 -0013.10 Janna H. Pressley, wife Midland, NC 28107 Zoned: CR 31. Robert E. Lyons 5050 Joyner Rd. 55575034230000 10-003 -0007.10 9355 Hwy 601 Midland, NC 28107 9353 Hwy 601 Midland, NC 28107 55560476130000 10-004 -0013.00 Zoned: CR 5050 Joyner Road Concord, NC 28025 Concord, NC 28025 Zoned: CR 32. Whispering Pines Holding, LLC a North Carolina LLC 5083 Joyner Rd. Concord, NC 28025 55576248840000 10-003 -0007.00 Zoned: AO 5. David W. Foster and Loree T. Foster, wife 8622 Hayden Way Concord, NC 28025 55561525730000 10-005A-0099.10 Zoned: CR 14. 8622 Hayden Way 4504 Chanel Ct. 55562620540000 10-005A-0117.00 213 Union St. N. Concord, NC 28025 Zoned: CR Concord, NC 28025 Concord, NC 28025 6. James J. Walker 8754 Hayden Way 8754 Hayden Way Concord, NC 28025 55561551270000 10-005A-0093.00 Zoned: CR 33. Whispering Pines Holding, LLC 7876 Mt. Pleasant Rd. Midland, NC 28107 5557619121000010-003-0008.10 Zoned: AO Concord, NC 28025 Pleasant Rd. Zoned: CR 363 Church St. N. Charlotte, NC 28227 Midland, NC 28107 15. Concord, NC 28025 4512 Chanel Ct. 55562632410000 0-005A-1116.00 7. Kevin L. Cliff and 8766 Hayden Way 55561550800000 10-005A-0092.00 46. Sandra J. Cliff, wife Concord, NC 28025 55563290630000 Zoned: CR 35. & 36. Frank E. Williams and 7937 Mt. Pleasant Rd. 55567978110000 10-003 -0001.11 8766 Hayden Way Concord, NC 28025 Midland, NC 28107 Zoned: CR Nanette J. Williams, wife 26450 Red Barn Trail Midland, NC 28107 Zoned: AO 9700 Mt. Pleasant Rd. Locust, NC 28097 8055 Mt. Pleasant Rd. Midland, NC 28107 55568424730000 10-003 -0001.12 Zoned: AO 8. Erica Massey and 8767 Hayden Way 55561479950000 10-005A-0091.00 16. Christopher Massey, Concord, NC 28025 55562644240000 Zoned: CR Stacey Eggers, wife Concord, NC 28025 Zoned: CR 47. & 48 husband 9714 Mt. Pleasant Rd. 55563168590000 10-004 -0006.20 37. Pharr Capital, LLC 8399, 8925 & 9001 Mt. 55567696660000 10-003 -0001.50 8767 Hayden Way Midland, NC 28107 Zoned: CR 58 Oak Creek Ln. Pleasant Rd. Zoned: AO Concord, NC 28025 Hendersonville, NC 28739 Midland, NC 28107 9. George R. Jones and 8755 Hayden Way 55561590480000 10-005A-0090.00 38. Mark A. Stewart, Jr., Truste 8600 Mt. Pleasant Rd. 55564783150000 10-003 -0001.80 Deanna C. Jones, wife Concord, NC 28025 Zoned: CR 8600 Mt. Pleasant Rd. Midland, NC 28107 Zoned: CR 8755 Hayden Way 49. Midland, NC 28107 9901 Hwy 601 55562132590000 10-004 -0008.00 Concord, NC 28025 4558 Chanel Ct. 55562658440000 10-005A-0113.00 Corp., a NC corp. Midland, NC 28025 Zoned: CR Concord, NC 28027 Concord, NC 28025 Zoned: CR Owner Name and Mailing Address Property Address Parcel Number Real ID Owner Name and Mailing Property Address Parcel Number Real ID Address 10. Kristy Bullock and 8739 Hayden Way 55562503110000 10-005A-0089.00 Troy Bullock, husband Concord, NC 28025 Zoned: CR 8739 Hayden Way Concord, NC 28025 11. Mark Adam Glocondo and 8725 Hayden Way 55562505730000 10-005A-0088.00 40., 41, Gary W. Laton, LLC 5811 Kristi Ln. 55564672640000 10-003A-0003.00 62 Regina Giocondo, wife Concord, NC 28025 55469235270000 Zoned: CR 42, 43 & a NC LLC Concord, NC 28025 L0 Zoned: CR 8725 Hayden Way O 44 P.O. Box 1129 9450 Hwy 601 55469229160000 10-009 -0001.20 Q O W Concord, NC 28025 Midland, NC 28107 Zoned: CR Concord, NC 28026 5833 Kristi Ln. 55565622050000 10-003A-0002.00 64. JAB Farms LLC a NC LLC 7700 Edgefield Rd. 55571343380000 10-003 -0001.30 PO Box 18 Concord, NC 28025 Zoned: CR 12. Kevan G. Lovin and 8717 Hayden Way 55562517050000 0-005A-0087.00 65. Treva J. Lovin, wife Concord, NC 28025 55573283500000 Zoned: CR Cindy L Riley, wife 5855 Kristi Ln. 55565651940000 10-003A-0001.00 UN 8717 Hayden Way a U Concord, NC 28025 Concord, NC 28025 � Zoned: CR 66. Concord, NC 28025 7450 Edgefield Rd. 55574217500000 10-003 -0007.30 7450 Edgefield Rd. Concord, NC 28025 Zoned: AO Concord, NC 28025 9000 Mt. Pleasant Rd. Midland, NC 28107 and 55565547180000 10-003A-0005.00 Zoned: CR 13. James G. Jolly and 8705 Hayden Way 55562509150000 10-005A-0088.00 Sally E. Jolly, wife Concord, NC 28025 Zoned: CR 5822 Kristi Ln. 8705 Hayden Way Concord, NC 28025 Concord, NC 28025 5800 Kristi Ln. Concord, NC 28025 55564598540000 10-003A-0004.00 Zoned: CR 14. Arthur R. Hoyle, IV and 4504 Chanel Ct. 55562620540000 10-005A-0117.00 Jennifer P. Hoyle, wife Concord, NC 28025 Zoned: CR 4504 Chanel Ct. 45. Nancy A. Kucera 9220 & 9225 Mt. 55564358710000 10-004 -0002.00 Concord, NC 28025 6308 Gold Wagon Lane Pleasant Rd. Zoned: CR Charlotte, NC 28227 Midland, NC 28107 15. Evan Moore and 4512 Chanel Ct. 55562632410000 0-005A-1116.00 Laura Moore, wife Concord, NC 28025 Zoned: CR 46. Kristopher L. Finsel and 9700 Mt. Pleasant Rd. 55563290630000 10-004 -0006.40 4512 Chanel Ct. Joli A. Finsel, wife Midland, NC 28107 Zoned: CR Concord, NC 28025 9700 Mt. Pleasant Rd. Midland, NC 28107 16. Darrell J. Eggers and 4524 Chanel Ct. 55562644240000 0-005A-0115.00 Stacey Eggers, wife Concord, NC 28025 Zoned: CR 47. & 48 Lana M. Hathcock 9714 Mt. Pleasant Rd. 55563168590000 10-004 -0006.20 4524 Chanel Ct. 4135 Brownwood Lane Midland, NC 28107 Zoned: CR Concord, NC 28025 Concord, NC 28027 9730 Mt. Pleasant Rd. Midland, NC 28107 55563156760000 10-004 -0006.30 Zoned: CR 17. & 18. Kenney Everett Henderson 4544 Chanel Ct. 55562646960000 10-005A-0114.00 and Constance Shiflett Concord, NC 28025 Zoned: CR Henderson, wife 49. Alexander Development 9901 Hwy 601 55562132590000 10-004 -0008.00 4778 Rocky River Rd. 4558 Chanel Ct. 55562658440000 10-005A-0113.00 Corp., a NC corp. Midland, NC 28025 Zoned: CR Concord, NC 28027 Concord, NC 28025 Zoned: CR 7755 Hilliard Ln. Concord, NC 28025 Owner Name and Mailing Property Address Parcel Number Real ID Address 50. David E. Wheeler and Sarah Wheeler 9889 Hwy 601 Midland, NC 28025 55562240890000 10-004 -0011.70 Zoned: CR 19. Timothy E. Cook and 4570 Chanel Ct. 55562760040000 10-005A-0112.00 Amy F. Cook, wife Concord, NC 28025 Zoned: CR 8501 Rock Hole Rd. 4570 Chanel Ct. Stanfield, NC 28163 Concord, NC 28025 Owner Name and Mailing Address Property Address Parcel Number Real ID 20. Rodney Gaston and 4586 Chanel Ct. 55562762730000 10-005A-0110.00 Mary Ann Gaston, wife Concord, NC 28025 Zoned: CR 51. & 54 Alfred Odell Morgan, Jr. Hwy 601 (vacant land) 55562220880000 10-004 -0011.40 4586 Chanel Ct. 9801 Hwy 601 Zoned: AG Concord, NC 28025 Midland, NC 28107 9801 Hwy 601 55561115690000 10-004 -0011.10 Midland, NC 28107 Zoned: AG 21. George G. Tyler and 4598 Chanel Ct. 55562774060000 10-005A-0109.00 Glenda Tyler, wife Concord, NC 28025 Zoned: CR 52. & 53 Kevin G. Little and Hwy 601 (vacant land) 55561169920000 10-004 -0011.60 4598 Chanel Ct. Lori N. Little, wife Zoned: AG Concord, NC 28025 9825 Hwy 601 9881 Hwy 601 55561240090000 10-004 -0011.20 Midland, NC 28107 Midland, NC 28107 Zoned: AG 22. George Lee McManus and 4599 Chanel Ct. 55562754190000 10-005A-0108.00 Barbara Burris McManus, Concord, NC 28025 Zoned: CR 55. Sara Scott 9775 Hwy 601 55560173670000 10-004 -0012.00 wife 9775 Hwy 601 Midland, NC 28107 Zoned: AG 4599 Chanel Ct. Midland, NC 28107 Concord, NC 28025 56. Zaris, Inc. 9690 Hwy 601 9690 Hwy 601 Midland, NC 28107 55560131690000 10-009 -0004.80 Zoned: LC 23. Bobby Alan Widenhouse 4200 Nesbitt Dr. 55561774810000 10-005 -0003.20 and Nyra Widenhouse, wife Concord, NC 28025 Zoned: CR Midland, NC 28107 4200 Nesbitt Rd. Concord, NC 28025 57. James H. Altman and Corner of Hwy 601 and 55469174100000 10-009 -0004.00 Brenda L. Altman, wife 6423 E. Mercer Way Cal Bost Road Zoned: CR 24. John A. Beatty, Jr. and 4179 Nesbitt Dr. 55561833940000 10-005 -0003.00 Carol Lynn Beatty, wife Concord, NC 28025 Zoned: CR Mercer Island, WA 98040 3220 Winding Trail Matthews, NC 28105 58. Union Lodge 618 AF & AM 9650 Hwy 601 55469188100000 10-009 -0004.50 Trustee P.O. Box 497 Midland, NC 28107 Zoned: CR 25. Richard N. Deas, Sr. and 4380 Joyner Rd. 55561990410000 10-005 -0003.30 June Beatty Deas, wife Concord, NC 28025 Zoned: CR Midland, NC 28107 4380 Joyner Road Concord, NC 28025 59. John L. Kane 9580 Hwy 601, 55469270590000 10-009 -0004.60 9700 Hwy 601 Midland, NC 28107 Midland, NC 28107 and 3965 Cal Bost Rd., Zoned: CR 26. Al Properties, LLC 4600 Joyner Rd. 55560961330000 10-005 -0002.00 a North Carolina LLC Concord, NC 28025 Zoned: CR Midland, NC 28107 P.O. Box 215 Midland, NC 28107 60. Mark A. Hatcher and 9540 Hwy 601 55469252830000 10-009 -0004.20 Pamela T. Hatcher, wife 890 Rock Rd. Midland, NC 28107 Zoned: CR 27. A. J. Vanderburg and 4500 Joyner Rd. 55563917510000110-005 -0003.10 Mary H. Vanderburg, wife Concord, NC 28025 Zoned: CR Rutherfordton, NC 28139 4506 Wild Oak Lane Greensboro, NC 27406 61. William B. King 9500 Hwy 601 55469254310000 10-009 09993.10 [Date: 4-25-17 9500 Hwy 601 Midland, NC 28107 Zoned: CR W Midland, NC 28107 ti QvO�P J 00%0 mz :W 62 Louis J. Tucker Life Estate 9470 Hwy 601 55469235270000 10-009 -0003.00 9470 Hwy 601 Midland, NC 28107 L0 Zoned: CR Midland, NC 28107 O 63. Rebecca Lynn Barnhardt 9450 Hwy 601 55469229160000 10-009 -0001.20 Q O W 9450 Hwy 601 Midland, NC 28107 Zoned: CR Midland, NC 28107 W Q cV 64. JAB Farms LLC a NC LLC 7700 Edgefield Rd. 55571343380000 10-003 -0001.30 PO Box 18 Concord, NC 28025 Zoned: AO Q �= J Norwood, NC 28128 C <w o N 65. David B Riley and 7491 Edgefield Rd. 55573283500000 10-003 -0013.30 Cindy L Riley, wife Concord, NC 28025 Zoned: AO UN 7491 Edgefield Rd. a U Concord, NC 28025 � 66. Cliff W Honeycutt 7450 Edgefield Rd. 55574217500000 10-003 -0007.30 7450 Edgefield Rd. Concord, NC 28025 Zoned: AO Concord, NC 28025 [Date: 4-25-17 0 Scale: AS NOTED W Designed by: EHB ti QvO�P J 00%0 mz :W Drawn by: RIJ Z •.v0 Checked by: EHB .d Revision Dates 0 W d%• d ti QvO�P J 00%0 mz :W LLI 0 `zt 0: Z •.v0 o .d '11/11111f111141\\\\♦ L0 Revision Dates Drawing No. 3 of 23 Sheets Job No. 2377 0 W �..1..� U Z L0 00 O (D v 0) Q O W LLJN Z W Q cV � m� a W U� > Q �= J C <w o N ~ J W N m W O UN °° a U � C Q Drawing No. 3 of 23 Sheets Job No. 2377 /f —/ Array 1 \ Array 2 \ CONSTRUCTION AREA #4 \ \ / Array Array 4 / Array 13 / / I I I I I I �- I I 0 Array 5 Array 6 Array 7 Array 8 Array 10 Array 14 Array 15 Array 16 Array 17 CONSTRUCTION AREAS I l- - I Array 20 Array 21 I I Array 23 / Array 26 \ I \ I I I Array 42 I / Array 43 Array 45 Array 24 28 Array 29 Array 31 2 / Array 32 CONSTRUCTION AREA #1 Array 33 Array 34 Array 35 Array 36 Array 37 Array 38 Array 46 CONSTRUCTION AREA #2 Array 48 Array 49 Array 50 (fixed) l / Array 39 / Array 40 Array 41 / CREEK Array 30 Array 9 / Array 11 L Array 12 Array 18 Array 19 / Array 22 Array 25 Array 27 1/ ENT NEIGHBOR 100' CAPING BUFFER I ENT 500' GRAPHIC Soo LE 1000' SCALE: 1 "=500' CONSTRUCTION NOTES A A 1.Obtain site plan approval and other applicable permits. 2.Hold a pre—construction conference at least one week prior to any construction activity. 3.Construction Area #1 a. Flag the work limits, including the perimeter buffer area and no—build area along Bost Creek for protection of trees and creek. b. All perimeter Erosion/Sediment Control measures in all areas, such as sediment fencing, diversions, and sediment basins shall be installed before any clearing, grubbing, or topsoil stripping takes place. Temporary diversion ditches designed to direct clean water entering the site to an area off—site must be stabilized immediately after installation with vegetation and matting. Due to the nature of this project and the required number and size of temporary sediment basins and associated control measures, it is necessary to install erosion control measures within the prescribed perimeter Buffer Area and in areas where Solar Arrays will ultimately be installed. Once the need for the temporary measures ceases, the Buffer Area shall be re—established and the grade beneath Solar Arrays created and stabilized. c. Obtain permission from County/DEQ ESC Inspector to proceed. d. Install temporary gravel Construction Entrance/Exit. e. Complete site clearing and grubbing. f. Construct Construction Staging Area and Concrete Washout Area as shown on Sheet 5.10, details "Service Aisle, Rack Path & and Construction Staging Area Soil Section" and Concrete Washout. g. Grade Construction Area #1 portion of the site as shown on the Site Plan, Sheets 5.0, 5.1 , & 5.2. Bare areas should be vegetated or mulched, if grading ceases for more than two weeks. h. Construct Service Roads and Service Paths as shown on Sheet 5.0, 5.1 & 5.2 and Sheet 5.10, detail "Service Aisle, Rack Path & and Construction Staging Area Soil Section." i. Install solar array inverter pads per solar manufacturer's directions at locations shown on Sheets 5.1 & 5.2. j. Install solar array anchors/support beams per manufacturer's instructions in areas not impacted by sediment basins. Anchors and beams for solar arrays located within temporary sediment basins shall be installed after removal of temporary erosion control measures and full site stabilization. Installation of anchors and beams causes no risk of soil erosion or creation of sediment. k. Install cabling from array pads to a location, to be determined, near the Union Power pad. I. Inspect all erosion and sediment controls weekly and after all rainfall events. Needed repairs are to be completed immediately. m.After obtaining approval from the County/DEQ ESC Inspector, remove temporary sediment control measures, and stabilize the entire Construction Area #1. n.lnstall remaining solar array anchors/support beams in areas previously occupied by temporary sediment control measures. o. Establish permanent vegetation. p. Install solar arrays onto supports and test. q. Estimated time before final stabilization — 7 months 4.Construction Areas #2 — #4 Repeat steps 3.a. — 3.q. for Areas #2 — #4. 5.Any off—site borrow and waste required for this project must come from a site with an approved erosion control plan, a site regulated under the mining act of 1971, or a landfill regulated by the division of solid waste management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules and regulations. [15a NCAC 4b .0110] 6.Pursuant to the NPDES permit that went into effect August 3, 201 1 , ground stabilization must occur within 7 days on perimeter areas and slopes greater than 3:1, and ground stabilization must occur within 14 days on other areas. These requirements supersede any less stringent stabilization requirement on the plans and apply for any section of the project for any period of inactivity or project completion. [G.S. 143-215.1] /.Construction Entrances must contain at least 2-3 inch stone and be maintained in a condition that will prevent tracking or direct flow of mud onto streets. Periodic top dressing with stone will be necessary. Install water bars, ditch diversions or other suitable measures so that stormwater does not leave the limits of disturbance through the construction entrances, as needed. [G.S. 113a-57(3), 15a NCAC 4b .0105] Maintenance In general, all erosion and sediment control measures shall be checked daily and after each significant rainfall. The following items shall be checked, in particular: 1 . The seeded area shall be checked regularly to ensure that a good stand is maintained. Areas shall be fertilized and re—seeded as needed. 2.The gravel Construction Entrances shall be maintained in a condition which will prevent tracking or flow of mud onto public rights—of—way. Periodic top dressing with additional stone or the washing and reworking of existing stone shall be required when the stone is covered or has been pushed into the soil and shall be returned to its original minimum depth of 6". 3.The Silt Fence barrier, if used, shall be checked regularly (no less than weekly) for undermining or deterioration of the fabric. Sediment shall be removed when the level of sediment deposition becomes 6" deep at the fence. 4.Self —Inspection requirements: As a minimum, the inspections shall be performed after each of the following phases of a plan: 1.Installation of perimeter erosion and sediment control measures. LEGEND CONSTRUCTION AREA 1230 EXISTING CONTOURS 1230 PROPOSED CONTOURS + 28.5 PV PROPOSED SPOT ELEVATION Scale: AS NOTED DRAINAGE FLOW cE CONSTRUCTION ENTRANCE cRs CONSTRUCTION ROAD STABILIZATION sF SILT FENCE iP INLET PROTECTION ciP CULVERT INLET PROTECTION / TEMPORARY DIVERSION DIKE FD TEMPORARY FILL DIVERSION RwD RIGHT OF WAY DIVERSION sT SEDIMENT TRAP oP OUTLET PROTECTION / ROCK CHECK DAMS To TOPSOILING is TEMPORARY SEEDING Ps PERMANENT SEEDING so SODDING / MULCHING DISTURBED AREA Q CONSTRUCTION AREA CENTER LINE _J O _J �w N SITE BOUNDARY E/T ELECTRIC/TELEPHONE ❑E METER/ TRANSFORMER C GUY WIRE 0 EXISTING UTILITY POLE � EXISTING LIGHT POLES / PROPOSED UTILITY POLE DQ— STORM SYSTEM 000000 PROPOSED DITCH — — EXISTING PROPERTY LINE — — — SETBACK LINE / EASEMENT LINE --------- DISTURBED AREA —► —► TIME OF CONCENTRATION DIVERSION DIKE DITCH LINE / PROPOSED PAD PROPOSED RACK PATH PROPOSED SERVICE AISLE --------- EXISTING ROAD �^ EXISTING UG FIBER OPTICS LINE / PROPOSED ROAD 1-1 PROPOSED FENCE Q CONCRETE PAVING HEAVY PAVEMENT D LIGHT PAVEMENT / GRAVEL AREA ARRAY FIXED SOLAR PANELS ARRAY TRACKING SOLAR PANELS DELINEATED WETLANDS 100 YR FLOODPLAIN / TOP OF STREAM BANK — — — — — PERENNIAL STREAM -50' MINIMUM CLASS 1 BUFFER — — — — — NO—BUILD SETBACK—CLASS 1-20'/CLASS 2-10' --------- INTERMITTENT STREAM -30' CLASS 2 BUFFER — — — — — PROPOSED BOUNDARY BUFFER / Array 13 / / I I I I I I �- I I 0 Array 5 Array 6 Array 7 Array 8 Array 10 Array 14 Array 15 Array 16 Array 17 CONSTRUCTION AREAS I l- - I Array 20 Array 21 I I Array 23 / Array 26 \ I \ I I I Array 42 I / Array 43 Array 45 Array 24 28 Array 29 Array 31 2 / Array 32 CONSTRUCTION AREA #1 Array 33 Array 34 Array 35 Array 36 Array 37 Array 38 Array 46 CONSTRUCTION AREA #2 Array 48 Array 49 Array 50 (fixed) l / Array 39 / Array 40 Array 41 / CREEK Array 30 Array 9 / Array 11 L Array 12 Array 18 Array 19 / Array 22 Array 25 Array 27 1/ ENT NEIGHBOR 100' CAPING BUFFER I ENT 500' GRAPHIC Soo LE 1000' SCALE: 1 "=500' CONSTRUCTION NOTES A A 1.Obtain site plan approval and other applicable permits. 2.Hold a pre—construction conference at least one week prior to any construction activity. 3.Construction Area #1 a. Flag the work limits, including the perimeter buffer area and no—build area along Bost Creek for protection of trees and creek. b. All perimeter Erosion/Sediment Control measures in all areas, such as sediment fencing, diversions, and sediment basins shall be installed before any clearing, grubbing, or topsoil stripping takes place. Temporary diversion ditches designed to direct clean water entering the site to an area off—site must be stabilized immediately after installation with vegetation and matting. Due to the nature of this project and the required number and size of temporary sediment basins and associated control measures, it is necessary to install erosion control measures within the prescribed perimeter Buffer Area and in areas where Solar Arrays will ultimately be installed. Once the need for the temporary measures ceases, the Buffer Area shall be re—established and the grade beneath Solar Arrays created and stabilized. c. Obtain permission from County/DEQ ESC Inspector to proceed. d. Install temporary gravel Construction Entrance/Exit. e. Complete site clearing and grubbing. f. Construct Construction Staging Area and Concrete Washout Area as shown on Sheet 5.10, details "Service Aisle, Rack Path & and Construction Staging Area Soil Section" and Concrete Washout. g. Grade Construction Area #1 portion of the site as shown on the Site Plan, Sheets 5.0, 5.1 , & 5.2. Bare areas should be vegetated or mulched, if grading ceases for more than two weeks. h. Construct Service Roads and Service Paths as shown on Sheet 5.0, 5.1 & 5.2 and Sheet 5.10, detail "Service Aisle, Rack Path & and Construction Staging Area Soil Section." i. Install solar array inverter pads per solar manufacturer's directions at locations shown on Sheets 5.1 & 5.2. j. Install solar array anchors/support beams per manufacturer's instructions in areas not impacted by sediment basins. Anchors and beams for solar arrays located within temporary sediment basins shall be installed after removal of temporary erosion control measures and full site stabilization. Installation of anchors and beams causes no risk of soil erosion or creation of sediment. k. Install cabling from array pads to a location, to be determined, near the Union Power pad. I. Inspect all erosion and sediment controls weekly and after all rainfall events. Needed repairs are to be completed immediately. m.After obtaining approval from the County/DEQ ESC Inspector, remove temporary sediment control measures, and stabilize the entire Construction Area #1. n.lnstall remaining solar array anchors/support beams in areas previously occupied by temporary sediment control measures. o. Establish permanent vegetation. p. Install solar arrays onto supports and test. q. Estimated time before final stabilization — 7 months 4.Construction Areas #2 — #4 Repeat steps 3.a. — 3.q. for Areas #2 — #4. 5.Any off—site borrow and waste required for this project must come from a site with an approved erosion control plan, a site regulated under the mining act of 1971, or a landfill regulated by the division of solid waste management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules and regulations. [15a NCAC 4b .0110] 6.Pursuant to the NPDES permit that went into effect August 3, 201 1 , ground stabilization must occur within 7 days on perimeter areas and slopes greater than 3:1, and ground stabilization must occur within 14 days on other areas. These requirements supersede any less stringent stabilization requirement on the plans and apply for any section of the project for any period of inactivity or project completion. [G.S. 143-215.1] /.Construction Entrances must contain at least 2-3 inch stone and be maintained in a condition that will prevent tracking or direct flow of mud onto streets. Periodic top dressing with stone will be necessary. Install water bars, ditch diversions or other suitable measures so that stormwater does not leave the limits of disturbance through the construction entrances, as needed. [G.S. 113a-57(3), 15a NCAC 4b .0105] Maintenance In general, all erosion and sediment control measures shall be checked daily and after each significant rainfall. The following items shall be checked, in particular: 1 . The seeded area shall be checked regularly to ensure that a good stand is maintained. Areas shall be fertilized and re—seeded as needed. 2.The gravel Construction Entrances shall be maintained in a condition which will prevent tracking or flow of mud onto public rights—of—way. Periodic top dressing with additional stone or the washing and reworking of existing stone shall be required when the stone is covered or has been pushed into the soil and shall be returned to its original minimum depth of 6". 3.The Silt Fence barrier, if used, shall be checked regularly (no less than weekly) for undermining or deterioration of the fabric. Sediment shall be removed when the level of sediment deposition becomes 6" deep at the fence. 4.Self —Inspection requirements: As a minimum, the inspections shall be performed after each of the following phases of a plan: 1.Installation of perimeter erosion and sediment control measures. LEGEND Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ CONSTRUCTION AREA 1230 EXISTING CONTOURS 1230 PROPOSED CONTOURS + 28.5 PV PROPOSED SPOT ELEVATION Scale: AS NOTED DRAINAGE FLOW cE CONSTRUCTION ENTRANCE cRs CONSTRUCTION ROAD STABILIZATION sF SILT FENCE iP INLET PROTECTION ciP CULVERT INLET PROTECTION DD TEMPORARY DIVERSION DIKE FD TEMPORARY FILL DIVERSION RwD RIGHT OF WAY DIVERSION sT SEDIMENT TRAP oP OUTLET PROTECTION cD ROCK CHECK DAMS To TOPSOILING is TEMPORARY SEEDING Ps PERMANENT SEEDING so SODDING Mu MULCHING DISTURBED AREA Q CONSTRUCTION AREA CENTER LINE _J O _J �w N SITE BOUNDARY E/T ELECTRIC/TELEPHONE ❑E METER/ TRANSFORMER C GUY WIRE 0 EXISTING UTILITY POLE � EXISTING LIGHT POLES o PROPOSED UTILITY POLE DQ— STORM SYSTEM 000000 PROPOSED DITCH — — EXISTING PROPERTY LINE — — — SETBACK LINE — — — EASEMENT LINE --------- DISTURBED AREA —► —► TIME OF CONCENTRATION DIVERSION DIKE DITCH LINE PROPOSED PAD PROPOSED RACK PATH PROPOSED SERVICE AISLE --------- EXISTING ROAD �^ EXISTING UG FIBER OPTICS LINE PROPOSED ROAD 1-1 PROPOSED FENCE Q CONCRETE PAVING HEAVY PAVEMENT D LIGHT PAVEMENT ® GRAVEL AREA ARRAY FIXED SOLAR PANELS ARRAY TRACKING SOLAR PANELS DELINEATED WETLANDS 100 YR FLOODPLAIN --------- TOP OF STREAM BANK — — — — — PERENNIAL STREAM -50' MINIMUM CLASS 1 BUFFER — — — — — NO—BUILD SETBACK—CLASS 1-20'/CLASS 2-10' --------- INTERMITTENT STREAM -30' CLASS 2 BUFFER — — — — — PROPOSED BOUNDARY BUFFER PROPOSED ADJACENT NEIGHBOR BUFFER TEMPORARY CONSTRUCTION STAGING TEMPORARY CONCRETE WASHOUT SEDIMENT BASIN BAFFLE Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ Date: 4-25-17 J d%• d ti QvO�P '<.� Scale: AS NOTED = (1 :C0 w �} _ 't 0: ZZ (n Designed by: EHB Q LO '11/11111f111141\\\\♦ LTJ [Drawn by: RIJ c0 0-) Checked by: EHB Q of T- O Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ J d%• d ti QvO�P '<.� J 00 4�' Z:flp� = (1 :C0 w �} _ 't 0: ZZ (n Q LO '11/11111f111141\\\\♦ Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ Drawing No. 4 of 23 Sheets Job No. 2377 J (n Q LO LTJ o c0 0-) Q of T- O W LLJ zoQ Z 0 N W m� Q W U� > V Q D _J O _J �w N J — rY m 0 Z o 0 o V v Drawing No. 4 of 23 Sheets Job No. 2377 EROSION CONTROL MINIMUM STANDARDS A. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE LEGEND \ ' SHALL BE DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR \ ' 1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR CONSTRUCTION AREA \ / IF DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF \ , \ PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN 1230 EXISTING CONTOURS THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED. EROSION/SEDIMENT C0NTR0L \ y00' FFE ' SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL 1230 PROPOSED CONTOURS _ I Qt REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT STABILIZATION SHALL B. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE + 28.5 PV PROPOSED SPOT ELEVATION PAGE LOCATION KEY FE -SC --XX\ BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE FOLLOWING MANNER: \ ♦ 100' BUFFER -EE] 1 YEAR. DRAINAGE FLOW \ TS ® ® c (1) THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE cE CONSTRUCTION ENTRANCE \ MU PS S S B 2 AREAS U SHALL BESSTABILIIIZEDOOR PROTECTED OT,WITH SEDIMENTTRAPPING MEASURES. AREA TO THE POINT OF ANALYSIS WITHIN THE CHANNEL IS ONE cRs CONSTRUCTION ROAD STABILIZATION \ F / THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND HUNDRED TIMES GREATER THAN THE CONTRIBUTING DRAINAGE sF SILT FENCE DD S` / S B 3 PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREA OF THE PROJECT IN QUESTION; OR NOTES: 1 / AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. IP INLET PROTECTION -� TS (2) (A) NATURAL CHANNELS CONSTRUCTED MAN-MADE CHANNELS ciP CULVERT INLET PROTECTION 1. FLOOD PLAIN IS BASED ON BEST AVAILABLE / DISTURBED AR 3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM 44.1 AC MU PS t TO VERIFY THAT STORMWATER WILL NOT OVER TOP DD TEMPORARY DIVERSION DIKE DATA IN PRELIMINARY DATA RELEASED FOR / s POWER R/W / / NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CHANNEL BANKS NOR CAUSE EROSION OF CHANNEL BED TEMPORARY FILL DIVERSION � CABARRUS COUNTY I N AUGUST 2016 � �' � 100' BUFFER � / S B 5 CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT, IS UNIFORM, OR BANKS; AND FD �" - '�,,.r / MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. E0 RIGHT OF WAY DIVERSION CONTAINED IN NFIP, FIRM MAP NOS. \ (B) ALL PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS NTRANC 5 / sT SEDIMENT TRAP / e \ \ I ` SB 6 4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM 3710554600J, 3710555500J, & 3710555700J. ,_ �� OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A TO VERIFY THAT STORMWATER WILL NOT OVER TOP ITS SOUTLET PROTECTION 2. PROJECT SITE IS SUBJECT TO THE CABARRUS / \ \\\ / FIRST STEP IN ANY LAND ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE BANKS AND BY THE USE OF A TWO-YEAR STORM TO co ROCK CHECK DAMS \� _ / UPSLOPE LAND DISTURBANCE TAKES PLACE. DEMONSTRATE THAT STORMWATER WILL NOT CAUSE COUNTY FLOOD DAMAGE PREVENTION ORDINANCE. _ E-58 _ _ - - - / / EROSION OF CHANNEL BED OR BANKS; AND To TOPSOILING SB� / / 5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH Ts TEMPORARY SEEDING 3. PROJECT SITE IS SUBJECT TO CABARRUS COUNTY D-------�� = \ AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. (C) PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED DEVELOPMENT ORDINANCE CHAPTER 4 PART 2 / / BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT Ps PERMANENT SEEDING WAT E R B 0 DY BUFFER ZONE, NUMBER 10 BUFFER\ FSC` $s / 6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND STORMWATER WILL BE CONTAINED WITHIN THE PIPE OR so SODDING ENCROACHMENT REGULATIONS. / �I\ "^� TRAPTORCBASI DD pp BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE STREAM. Mu MULCHING � DD ,� C. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY DISTURBED AREA C s -__ / A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE CONSTRUCTED MAN-MADE CHANNELS OR PIPES ARE NOT ADEQUATE, Q DRAINAGE AREA C S 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE THE APPLICANT SHALL: CENTER LINE DD TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE (1) IMPROVE THE CHANNEL TO A CONDITION WHERE A TEN-YEAR 7 TS I�� ACRES. STORM WILL NOT OVER TOP THE BANKS AND A TWO-YEAR SITE BOUNDARY MU PS / STORM WILL NOT CAUSE EROSION TO THE CHANNEL BED OR-E/T- ELECTRIC/TELEPHONE ESC -5.6 I =________- T== I B. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED BANKS; OR / OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO (2) IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE A ❑E METER/ TRANSFORMER / THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. TEN-YEAR STORM IS CONTAINED WITHIN THE APPURTENANCES; C GUY WIRE \ THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL OR 0 EXISTING UTILITY POLE i I BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE (3) DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE- EXISTING LIGHT POLES _ TS----- / OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE DEVELOPMENT PEAK RUNOFF RATE FROM A TWO-YEAR STORM STRUCTURAL INTEGRITY OF THE BASIN DURING A TWENTY-FIVE TO INCREASE WHEN RUNOFF OUTFALLS INTO A NATURAL PROPOSED UTILITY POLE MU PS TS YEAR STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS CHANNEL OR WILL NOT CAUSE THE PRE -DEVELOPMENT PEAK STORM SYSTEM I CD MU PS MU PS \ USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A RUNOFF RATE FROM A TEN-YEAR STORM TO INCREASE WHEN o�ooc> PROPOSED DITCH BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO RUN-OFF OUTFALLS INTO MAN-MADE CHANNEL; OR I L \ EXIST WHILE THE SEDIMENT BASIN IS UTILIZED. (4) PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, - - EXISTING PROPERTY LINE \ I STORMWATER DETENTION OR OTHER MEASURES WHICH IS - - - SETBACK LINE II c s 7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER D �T� _. SATISFACTORY TO THE PLAN AUTHORITY TO PREVENT EASEMENT LINE THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING DOWNSTREAM EROSION. EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED DISTURBED AREA II II MU PS N RANCE #3 WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS PROPOSED PAD I D. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE CORRECTED. THE IMPROVEMENTS. --------- PROPOSED RACK PATH ZL Q CD I II =______ __________= )a SB B jl DD II PROPOSEDIM N BASIY 8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS E. ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING PROPOSED SERVICE AISLE -SEE SHEET 5.11 FOR DETAIL CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR --------- EXISTING ROAD II p DRAINAGE EAE - ESC -5.7 0 WATERSHED CHARACTERISTICS AND THE ULTIMATE DEVELOPMENT OF DD SLOPE DRAIN STRUCTURE. - EXISTING UG FIBER OPTICS LINE p R4X��(� - _- __ THE SUBJECT PROJECT.,,_ \ S B�NZA-. C l! DID 100' FFER 9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR PROPOSED ROAD / SB F. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER '� OTHER PROTECTION SHALL BE PROVIDED. DETENTION HE SHALL OBTAIN APPROVAL FROM THE LOCALITY OFA PROPOSED FENCE PLAN FOR MAINTENANCE OF THE DETENTION FACILITIES. THE PLAN 0 CONCRETE PAVING \ 10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL SET FORTH THE MAINTENANCE REQUIREMENTS OF THE 0 LIGHT PAVEMENT SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE \ESC -5.5 CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO FACILITY AND THE PERSON RESPONSIBLE FOR PERFORMING THE ® GRAVEL AREA D \ MAINTENANCE. ---EXISTING UNDERGROUND FIBER OPTICS REMOVE SEDIMENT. ARRAY I FIXED SOLAR PANELS / LINE -TO BE FIELD -LOCATED G. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO ARRAY Q TRACKING SOLAR PANELS ' I\ ~/ 100' ANS. LINE R/W 11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR RECEIVING CHANNEL, AND ENERGY DISSIPATERS SHALL BE PLACED \ / / PER D 6796-133 D PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED AT THE OUTFALL OF ALL DETENTION FACILITIES AS NECESSARY TO DELINEATED WETLANDS / TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE PROVIDE A STABILIZED TRANSITION FROM THE FACILITY TO THE 100 YR FLOODPLAIN ESC -5.5 SB 10 CONVEYANCE CHANNEL AND RECEIVING CHANNEL. - .. RECEIVING CHANNEL. --------- TOP OF STREAM BANK PERENNIAL STREAM -50' MINIMUM CLASS 1 BUFFER ' R -MU PS - MU PS SB 12. NO WORK OR VEHICLES ARE ANTICIPATED TO CROSS ANY OF THE STREAMS OR H. ALL ON-SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE. ® WETLANDS LOCATED ON THE PROJECT SITE. IF IT IS NECESSARY TO CROSS A - - - - - NO -BUILD SETBACK -CLASS 1-20'/CLASS 2-10' REAKER WATERCOURSE, SPECIAL PERMISSION MUST BE GRANTED BY USACOE AND STATION & SUB -STATION I. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR --------° INTERMITTENT STREAM -30' CLASS 2 BUFFER / CABARRUS COUNTY MUST BE NOTIFIED OF THIS PERMISSION. SEDIMENTATION ON ADJACENT PROPERTY SHALL BE DIVERTED TO A - - PROPOSED BOUNDARY BUFFER DISTURBED�ARU STABLE OUTLET, ADEQUATE CHANNEL, PIPE OR PIE SYSTEM, OR TO l 1350.3 AC pNTRANCE #2 13. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL A DETENTION FACILITY. PROPOSED ADJACENT NEIGHBOR BUFFER DID 100 F R BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND TEMPORARY CONTRUCTION STAGING _________ _ STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING J. IN APPLYING THESE STORMWATER RUNOFF CRITERIA, INDIVIDUAL LOTS OR TEMPORARY CONCRETE WASHOUT CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION PARCELS SHALL NOT BE CONSIDERED TO BE SEPARATE DEVELOPMENT OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THE PROJECTS. INSTEAD, THE DEVELOPMENT, AS WHOLE, SHALL BE CONSIDERED TIME OF CONCENTRATION SB 15 STRUCTURES S IF ARMORED BY NONERODIBLE COVER MATERIALS. TO BE A SINGLE -DEVELOPMENT PROJECT. HYDROLOGIC PARAMETERS THAT SILT -LADEN WATER DIVERSION DIKE 14. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES REFLECT THE ULTIMATE DEVELOPMENT CONDITION SHALL BE USED IN ALL ® CLEAN WATER DIVERSION DIKE 1 \ SB 14 MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM ENGINEERING CALCULATIONS. DITCH LINE / \ - /^\, MU PS - - /- - - � I CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE PROVIDED. K. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE SEDIMENT BASIN BAFFLE SB 13 q " DD -� I EMPLOYED IN A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL, SLOPES > 3:1 ��' 15. ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND OTHER c s . I WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET. WATERS OF THE STATE. -- DD I McBride Place LLC- Impervious Percentage Calculation DD I I 16. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELYExisting Condtions I Area (sf) Area (AC) % of Total DD �, AFTER WORK IN THE WATERCOURSE IS COMPLETED. X50' I e1 Impervious DD 17. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARD IN ADDITION TO OTHER APPLICABLE CRITERIA: Drives (concrete/asphalt) 0 0.000 0.0% MU PS pp ADJA ENT NEIGHBOR 100' I \ A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT Strutures 0 0.000 0.0% LANDS PING BUFFER ONE TIME. SEME 01 \ Pervious SB 16 I \ B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF F S I \ TRENCHES. Wooded Areas 8,895,481 204.212 31.4% 0 _ DD SB 1 7 \ Agricultural/Cleared Areas 19,408,866 445.566 68.6% C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR SB 11 - �� ` (, ��� • _ _ I PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR Total Area= 28,304,347 649.778 100.0% S 11 SB 18 I \ BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY / Existing Impervious= 0.0% MU P " \ AFFECT FLOWING STREAMS OR OFF-SITE PROPERTY. g p Proposed Conditions Area (sf) Area (AC) % of Total (( D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE Impervious 0 y" DD \ \`-------- -------- SB 20 Q STABILIZATION. p l� Proposed Drives (Concrete/Asphalt/Gravel) Breaker Pad Total SB 12 E. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH TS / DD T THESE REGULATIONS. Breaker Panel Pad # of Pads Area/Pad Area (sf) Area (AC) % of Total I / / MU 11 I DISTURBED AREA: D ��t I D _ U PS , ) F. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. 1 62,500 62,500 1.435 0.2% 9 .3 AC I } \ C DD �� Area/ �. D / #of Inverters Total Inverter Pads 18. WHERE CONSTRUCTION VEHICLES ACCESS ROUTES INTERSECT PAVED OR Inverter Area Inverter \ / - / PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF -ESC /4 SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT 50 445 22,250 0.511 0.1% \ IS TRANSPORTED ONTO A PAVED OR PUBIC ROAD SURFACE, THE ROAD SURFACE ' \_ „_ / t` / SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE Area/Post o \ TS RS ` REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A Rack Posts Posts/Rack # of Racks (int) Area (sf) Area (AC) % of Total SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY i \\ _________ ll TS 1 ESC -5.1 / AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO O TEMPORARY CONSTRUCTION STAGING 11 MU PS INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND -DISTURBING 2 37711-1-0 523.75 0.012 0.0% \ p 50'x18o' (NP. F 5) SEE SH. 5.11 1 _ / / ACTIVITIES. Sq. Ft. Width Length Area (sf) Area (AC) % of Total DD DD Impervious Entrance Roads OST CREEK \ / 19. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE Pavement 24/20 Varies 18,840 0.433 0.1% \ i \ no / `/ / / GRAPHIC SCALE TEMPORARY MEASURES AARE ANORLONGER NEEDED, UNLESS OTH RWISE AUTHORIZED Entrance #1 1,164 Total Proposed Impervious= 104,114 2.390 0.4% 500' 0 500' 1000' BY THE LOCAL PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED Entrance #2 940 Pervious 30' BUFFER/NO-BUILD NE SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL Entrance Road for Substation 13,985 \� EMPORARY1CRETE WASHOUT < BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. Wooded Areas 7,959,610 182.728 28.1% 0'X30", (TYP. F,5) SEE SH. 1 / \ a SCALE: 1 "=500' Entrance #3 937 \ \ �\ \ ® 20. THE OVERALL TRACT BUILT -UPON AREA PERCENTAGE FOR THE PROJECT MUST Entrance #4 907 Agricultural/Cleared Areas 20,344,737 467.051 71.9% NOTE: BE MAINTAINED BELOW 24%, AS REQUIRED BY 15A NCAC 2H.1017 OF THE Entrance #5 907 Total Area= 28,304,347 649.778 100.0% II FOR THE PURPOSES OF PLAN REVIEW AND APPROVAL �I�TRANC� # \ \\ [ - - A # PROPOSED 24' GATE (TYPICAL -FIVE LOCATIONS) ,\ / �`\ _ / / / / \\ / / \ \ \ / \ / / / ESC -5.3 \ \/ \ / \ NCDEQ TAL MCBRIDE IS RESPONSIBLE FOR MAINTENANCE OF EROSION AND SEDIMENT CONTROL MEASURES. THE CONTRACTOR SHALL PROVIDE A REPLACEMENT CONTACT TO THE CABARRUS COUNTY E&SC ADMINISTRATOR AT TIME OF CONSTRUCTION. CONTACT INFORMATION: TAL MCBRIDE tal®mcbrideenergy.com 571-228-5105 STORMWATER RULES 21. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA: Total Impervious = 18,840 SF o Proposed /o Impervious= 0 0.4/0 MAXIMUM ALLOWABLE IMPERVIOUS SURFACE IN CR ZONING DISTRICT IS 20% AND MAXIMUM ALLOWABLE IMPERVIOUS SURFACE IN AO ZONING DISTRCT IS 15%. MAXIMUM ALLOWABLE STRUCTURAL COVERAGE IN CR ZONINGDISTRICT IS 15% AND MAXIMUM ALLOWABLE STRUCTURAL COVERAGE IN AO ZONING DISTRICT IS 10%. Revision Dates 1-26-17 PER Date: 4-25-17 2-15-17 PER NCDEQ 4-3-17 PER COUNTY 4-21-17PER Scale: AS NOTED Ld '1 0: _ .Cyd Designed by: EHB '11/11111f111141\\\\♦ Z Drawn by: RIJ J Checked by: EHB ♦O V Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ 4-3-17 PER COUNTY 4-21-17PER _j N �' Z:flp� 4:C0 Ld '1 0: _ .Cyd '11/11111f111141\\\\♦ Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ 4-3-17 PER COUNTY 4-21-17PER COUNTY Job No. 2377 Drawing No. 5,*0 of 23 Sheets O Z J ♦O V In O Z � LLJ Q O W _ Z "I�Q N Nm3: W Q LTJ U > Z QJ J o N F- LJ( J O w Nm o O W � O N M !I V Z 12 0 Q V Job No. 2377 Drawing No. 5,*0 of 23 Sheets Job No. 2377 TaPS01L STOCKPILE\ �\ I •,/� .,\ \ — ` — \ \ / \APPROXIMATE IOCA •. N�1' . 50 FROM \ES AS/6RE8 I 1, J� \ / / // �� - OR 1ST �ra �— dso=0.8' / / 21 �_ La=19 SEDIMENT BASIN 13. \SEE SEDIMENT BASIN TABLE ON SHEET 5.11 FOR BASIN / DETAILS. INSTALL SILT FENCE 5 �r% /// / / _ -54o TO 10 OFF THE TOE OF THE EMBANKMENT AVTIE INTO THE ( / EMBANKMENT\ON 'EITHER SIDE �// OF THE SPILLWAY $0 THAT / / I / / / \ WATER FLOW DdES INOT DIVERT \ I f AI_OUND -HE BASINj& \ 1 \ I I I \ 1 \ \ 5$0 5sQ -540— \ \Arra� '4W# 41V\ \ I I I 1 \ \\ \\ \ \ \ \\ 550 * �� ( , , \ 5�° \ \ GRAPHIC SCALE I (I► /; I, I I I / 1 - \ ` 1 I \ 10\01 ` O , - - 100' -,-200, mil . 5 ;{1111� \ 1 I I 0 \ 'CAt6;� 100' \ I DD \ \ \ \ - �_ SEDIMENT BASIN 18. I�,I�I► I / I 'I I / / / I I �� \ \ / // / \ I SEE SEDIMENT BASIN TABLE ON D I I 1 \ �� \ _ _ / / / // \ SHEET 5.11 FOR BASIN DETAILS. 590 / / / 560 INSTALL SILT FENCE 5 TO 10 OFF THE TOE OF THE EMBANKMENT AND i TIE INTO THE EMBANKMENT ON ' \ \ EITHER SIDE OF THE SPILLWAY SO I ,\ \ -THAT WAT R FLOW DOES NOT DIVERT AROUND THE BASIN. / DD x--5+0-- / I �• \ \ \ \ \ \ \ \ \ Array \ \ \ \ \ \ 530— 5$0 \ / • � '�� 2 \\ \ \\- --_�\ I \ I \ \\ \ \ \ \ --568 ___ � / � I I � —540 A V / I ////�_\ \ \\ \ \\ - \\ /,�° I/ % I/ GRAPHIC SCALE 5�0 \ \ / I \ • 100' 0 100' 200' �- 1 5�0 1 / I I I I I \ I \ \ — — SCALE: 1"=100' � �I � I \ I I \ DD V7m Aii 3 I \ /,� ; /) ■I I I I / / / \ / '/ \\ \ \ \ \ 0 / 1 // / I I SEDIMENT BASIN 19. �2 sJo \ �II � � / 1 / \ l ■/ / / \ 1 \ \ \ \ / / J / / / SEE SEDIMENT BASIN TABLE ON 5 \� V I — —' / / / SHEET 5.11 FOR BASIN DETAILS. 5,0 / / INSTALL SILT FENCE 5' TO 10 OFF 1 ■\ \ \ \ \ 1 I I \ / / / \ \ \ / / / / / / / / / / //' THE TOE OF THE EMBANKMENT AND SIE INTO THE EMBANKMENT ON \ \ \ \ \ \ \ _ / / — \ \ \ / / / / / / / EIT' 'ER SIDE OF THE SPILLWAY SO 4 �\/ �� \ \ \ I \ \ — J / / / / \ \ \ — I / / / / / / 5 / "THAT WATER FLOW DOES NOT DIVERT 0 1m rAROUi THE .BASIN. 4## \ \\ \ ----------1--- 1--- 14LO_-I--- / ---1 -- 56 \ \ \ \ \ I ► I I I 1 \ 1 \ \ / _ \ \ l� TOPSO STO�CKPIL� \) \ \,■ �.\ \ \ \ \ \ \ / / /PROX ATE LOCATION J MIN\ 50' ROM\ESC MENS -ORES I `_ \ \ ■ �� T� 1 \ — / // OR STREA I I \\ \\\\\ \ \ \ \ \� \ \\ \ \\ \ 11 I / // / I 1 I I \♦I� \ \� \ •�� \ / / \ \ I \ \\5ko SLOPES > 3:1 Date: 4-25-17 CONSTRUCTION AREA 1230 EXISTING CONTOURS 1230 PROPOSED CONTOURS + 28.5 PV PROPOSED SPOT ELEVATION DISTURBED AREA DRAINAGE FLOW cE CONSTRUCTION ENTRANCE cRs CONSTRUCTION ROAD STABILIZATION sF SILT FENCE iP INLET PROTECTION ciP CULVERT INLET PROTECTION DD TEMPORARY DIVERSION DIKE FD TEMPORARY FILL DIVERSION E0 RIGHT OF WAY DIVERSION sr SEDIMENT TRAP oP OUTLET PROTECTION co ROCK CHECK DAMS ro TOPSOILING rs TEMPORARY SEEDING Ps PERMANENT SEEDING so SODDING SEDIMENT BASIN 18. I�,I�I► I / I 'I I / / / I I �� \ \ / // / \ I SEE SEDIMENT BASIN TABLE ON D I I 1 \ �� \ _ _ / / / // \ SHEET 5.11 FOR BASIN DETAILS. 590 / / / 560 INSTALL SILT FENCE 5 TO 10 OFF THE TOE OF THE EMBANKMENT AND i TIE INTO THE EMBANKMENT ON ' \ \ EITHER SIDE OF THE SPILLWAY SO I ,\ \ -THAT WAT R FLOW DOES NOT DIVERT AROUND THE BASIN. / DD x--5+0-- / I �• \ \ \ \ \ \ \ \ \ Array \ \ \ \ \ \ 530— 5$0 \ / • � '�� 2 \\ \ \\- --_�\ I \ I \ \\ \ \ \ \ --568 ___ � / � I I � —540 A V / I ////�_\ \ \\ \ \\ - \\ /,�° I/ % I/ GRAPHIC SCALE 5�0 \ \ / I \ • 100' 0 100' 200' �- 1 5�0 1 / I I I I I \ I \ \ — — SCALE: 1"=100' � �I � I \ I I \ DD V7m Aii 3 I \ /,� ; /) ■I I I I / / / \ / '/ \\ \ \ \ \ 0 / 1 // / I I SEDIMENT BASIN 19. �2 sJo \ �II � � / 1 / \ l ■/ / / \ 1 \ \ \ \ / / J / / / SEE SEDIMENT BASIN TABLE ON 5 \� V I — —' / / / SHEET 5.11 FOR BASIN DETAILS. 5,0 / / INSTALL SILT FENCE 5' TO 10 OFF 1 ■\ \ \ \ \ 1 I I \ / / / \ \ \ / / / / / / / / / / //' THE TOE OF THE EMBANKMENT AND SIE INTO THE EMBANKMENT ON \ \ \ \ \ \ \ _ / / — \ \ \ / / / / / / / EIT' 'ER SIDE OF THE SPILLWAY SO 4 �\/ �� \ \ \ I \ \ — J / / / / \ \ \ — I / / / / / / 5 / "THAT WATER FLOW DOES NOT DIVERT 0 1m rAROUi THE .BASIN. 4## \ \\ \ ----------1--- 1--- 14LO_-I--- / ---1 -- 56 \ \ \ \ \ I ► I I I 1 \ 1 \ \ / _ \ \ l� TOPSO STO�CKPIL� \) \ \,■ �.\ \ \ \ \ \ \ / / /PROX ATE LOCATION J MIN\ 50' ROM\ESC MENS -ORES I `_ \ \ ■ �� T� 1 \ — / // OR STREA I I \\ \\\\\ \ \ \ \ \� \ \\ \ \\ \ 11 I / // / I 1 I I \♦I� \ \� \ •�� \ / / \ \ I \ \\5ko ■� \ \ 1 / I ■ \ �' J ` \ \\ deo=0.6' \ \ \ \\ \\\ \\`` \\\ \\ \ X540 ----\\ \\ // 7'1� W=22 I \ \ - s 1\ \ \\ ♦ \�C � 05 0 Ile i Q CLASS 1 STREAM BUFFER AND NO—BUILD ZONE �'�� \''., — — \\ — \ \ \ \ \\ \ \ \ \ \ \ _ _ — _ _ 550 1 \ \ kN \ \ \ \ \ \ \ \ --. LEGEND Date: 4-25-17 Mu MULCHING EXISTING UG FIBER OPTICS LINE _ O —____--_— EXISTING ROAD :W DISTURBED AREA �Z •..0 �--1 PROPOSED ROAD v DRAINAGE AREA D <1 ----- G__ PROPOSED FENCE CENTER LINE 0 CONCRETE PAVING H SITE BOUNDARY Nof(.0O � LIGHT PAVEMENT —E/T— ELECTRIC TELEPHONE / ® GRAVEL AREA METER/ TRANSFORMER ARRAY FIXED SOLAR PANELS GUY WIRE ARRAY TRACKING SOLAR PANELS EXISTING UTILITY POLE DELINEATED WETLANDS EXISTING LIGHT POLES 100 YR FLOODPLAIN 1 PROPOSED UTILITY POLE --------- TOP OF STREAM BANK STORM SYSTEM — — — — PERENNIAL STREAM -50' MINIMUM CLASS 1 BUFFER PROPOSED DITCH — — — — — NO—BUILD SETBACK—CLASS 1-20'/CLASS 2-10' — — EXISTING PROPERTY LINE -------- INTERMITTENT STREAM -30' CLASS 2 BUFFER — — — SETBACK LINE — — — — — PROPOSED BOUNDARY BUFFER a EASEMENT LINE PROPOSED ADJACENT NEIGHBOR BUFFER __--_--_- DISTURBED AREA TEMPORARY CONTRUCTION STAGING PROPOSED PAD TEMPORARY CONCRETE WASHOUT Q PROPOSED RACK PATH ® CLEAN WATER DIVERSION DIKE PROPOSED SERVICE AISLE ® SILT—LADEN WATER DIVERSION DIKE —► TIME OF CONCENTRATION SEDIMENT BASIN BAFFLE DITCH LINE ■� \ \ 1 / I ■ \ �' J ` \ \\ deo=0.6' \ \ \ \\ \\\ \\`` \\\ \\ \ X540 ----\\ \\ // 7'1� W=22 I \ \ - s 1\ \ \\ ♦ \�C � 05 0 Ile i Q CLASS 1 STREAM BUFFER AND NO—BUILD ZONE �'�� \''., — — \\ — \ \ \ \ \\ \ \ \ \ \ \ _ _ — _ _ 550 1 \ \ kN \ \ \ \ \ \ \ \ --. r-� V0 I E O � o Q) CN CN M U o � i, sy aC a w > 3 I� In U � � O m m Ld M m �° o � L v O = ww Z 0 0 ``y151..,r'rl,'''�'�� Date: 4-25-17 Z P _ O Scale: AS NOTED :W cwi? 't C?: �Z •..0 C:) Q` Designed by: EHB U J D Drawn by: RIJ Checked by: EHB H > o r-� V0 I E O � o Q) CN CN M U o � i, sy aC a w > 3 I� In U � � O m m Ld M m �° o � L v O = ww Z 0 0 ``y151..,r'rl,'''�'�� Drawing No. Z P _ O J ` 00 W : m :W cwi? 't C?: �Z •..0 C:) Q` U J Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ —21-17 PER COUN Job No. 2377 4 Drawing No. Z 5,ol of 23 Sheets O U J D H > o Nof(.0O Z N WLj Q N W m = Q W U� > Q= J J 0 F -WN a J — W �/ W N m Q o N � U N L1..I Job No. 2377 4 Drawing No. 5,ol of 23 Sheets Job No. 2377 4 ° -2-8 0.9 EL 570 / 7 5' R. EpEMENT / 1— -4- 570- / 4 , WINE A 14 ------- - - - - - - �'----- ----'----------� ---� — ----r - 1--- fi--- f- \ \ / // I d� °P ; I -- --- \-------- �- / / / / 250.0' al/ d / / a / / 1 rray 29TOPSO L OAC PILE 1 \ / i / / — — ° n APPROXI 142 APPROXI CATON 550 \ \ 1 ` ( OR d . 5 F 0 E MEASURES 1 \ \I \\, d 1 d I < I A i "/I I I 1581 p1 \ / / / / / I \ ° I I I \ rr / I / / /// I g /da \a d I° I 1 a / / / / / \ / / / / / // I --_ --_\_\- -------II-�---- _1------\---�-- ------ �^----/ --/-- ---- --r ---/----/-s_•:/,< , ' r i�./ ,,/,-/� -,-/ I// // /// /// / �\ 1 /X560 Array— -� --- SB15 -T — /—� L -_R 6-0 ' 1 --��--CJ_L�II R60' 7L----- \\ \ / / I — / —560_ lw_02' I �w=12' /M/ // I / / // /� / ---- �./ La=10' I \ 15 DIMENT SEDIMENT NT ASIN SEEBASIN TABLE 0 / / _ SHEET 5.11 FOR BASIN D TAIL . _ - ) I / I / / / / / I / I\ \ 1 \ / / / / J / // / - \ INSTALL SILT FENCE 5' T 10 OFF \ / -/----------------- -/--- /------/-/-- I----/ I -- _ — \ -T- �---�--- / --- f-- t- � -- �-- � ---�- \ � -------- J� / � F__7_ / / l / / � - SEDI T BASIN 14. THE TOE OF THE EMBANKMENT AND J --------- _____ l �__1__�__ L - 1__�__ L__\_________________J___ __ / / / / / 1 - _ 0 SEE IMENT BASIN TABLE ON TIE INTO THE EMBANKMENT 0 7 - ---- / T \ \ \ / I )- rt / // / / - EITHER SIDE OF THE SPIL&A SO SHEET\5.1 1 FOR BASIN DETAILS. THAT WATER FLOW DOES INOT DIVERT INST\ /// THETOE SILT OF THECEMBAN EMBANKMENT OFFAROUNDAROUND THE BASIN. Ar ra / 5�° I I \ I ( ' \ \ \ - / / / / / � � 1 / / / / / / EITHER TIE 0 iTHEOFEMBANKMENT SPILLWAOY SO � /// / Jt THAT WATER FLOW DOES NOT DIVERT 570 ! / / I \ / 5 0 / / / / J / / / / / // / / AROUND TH� BASIN. 5�0 / /- 1 IN- I- 1Psol 170CI PyL�� 3s0 \ I I I I / / I \ \ / / / / / /APPR ATE /1590f'� \ \ \ 1 \ 1 \ \ \ \ ---- ---- -- \ -- MIN. FROM/ $C / RE/S / �---------)----,1----�--/----------- 0 REAM bD 1 5 0 Qz 1 I / / / / 1 I / / / I / / — \ I I w_°2, / / / / / / / / I / / / / ( SLOPES > 3:1 / / / / I I \ / / / I `\ ` / � I =10' ��� / / / I l l I I I / / I ® CONSTRUCTION AREA �/ // // /// // ` /I I i I / \ \ -�- / \\ �\ 1 \ / 1 / / / /I / I 1 1230 EXISTING CONTOURS 1230 PROPOSED CONTOURS // / \ + 28.5 PV PROPOSED SPOT ELEVATION S��D`MQ ASIN -16. DRAINAGE FLOW EE S ENT BASIN TABLE ONcE CONSTRUCTION ENTRANCE /5 / I / / / / \ ` / / I \ \ \ \ \ / I I 11\ / / / / i SIE.1 1 FOR BAS I� DETAILS. O CRs CONSTRUCTION ROAD STABILIZATION // �I / / / / - - I I \ 1 I I //// INS L SILT FENCF 5 TO 10 OFF 540 / / \ ` - - I /T TOE OF THE EMBANKMENT AND O SILT FENCE QPSrL STOCKPILE T. / / INTO THE EMBANKMENT ON �P INLET PROTECTION IAPPROXINI, .i E LOCATION / / / ER SIDE OF THE SPILLWAY SO ciP CULVERT INLET PROTECTION I M11N. 50' FROM ESC MEASURES / / I AT WATER FI -OW DOES NOT DIVERT O OR STREAM AROUND THE BASIN. Do TEMPORARY DIVERSION DIKE TEMPORARY FILL DIVERSION 540 SEDIMENT BASIN 7. - RWD RIGHT OF WAY DIVERSION SB17 / , Q2 SEE SEDIMENT BASIN (ABLE ON sr SEDIMENT TRAP SHEET 5.11 FOR BASIN L, -:TAILS. oP OUTLET PROTECTION INSTALL SILT FENCE 5' TO 1(, OFF O ROCK CHECK DAMS W �M 1 _ THE TOE OF THE EMBANKMENT ANN cD d'°=o / TIE INTO THE EMBANKMENT ON ro TOPSOILING \ \ \ \ \ =1 EITHER SIDE OF THE SPILLWAY SO rs TEMPORARY SEEDING La= , -- \--+- i - l\--- \\ _��--- I ( // \ \ \ \\ \\ \ \ \ i THAT WATER FLOW DOES NOT DIVERT Ps PERMANENT SEEDING - _-------------- AROUND THE BASIN. --- -�---- kms.._--------- ------------ - so SODDING -.` _ \ ` _ GRAPHIC SCALE 777 A, 100' 0 100' 200' \ \ - - - - - -- 2 \\ Ta RS01L STOCKPILE\ I 1 / \ I \ / / / �/ • SCALE: 1"=100' �pMRUCTION MFA /4 ----- \ \ \ \APPRUXIMATE LOCAT / / / / \ \ ( \-_-_ / / 50' FROM ESr ASGREG - B13 / / /� rray// / // I I /' //.--,Array �/r ra I I 2 QD / SEDIMENT BASIN 13. \ JI \/SEE SEDIMENT BASIN TABLE ON / // // // \ I I I ► I I/// / Ot)NiRUCIIUN MEA/ SHEET 5.11 FOR BASIN _ DETAILS. INSTALL SILT FENCE 5` / / / / \ / 1 \ 1 \ SB 18 O I 1 W 1I'/ / __1 . \ - - 1Q 10 OFF THE TOE OF THE / I La 0' / EMBANKMENT AND TIE INTO THET - \ ,EMBANKMENT',ON EITHER SIDE 1 ( I --OF-THE SPILLWAY SO THAT I 1 / \ I I 1 I / I \\ DD WAT-E.0 FLOW DOES NOT DIVERT/ / \APOUND- -HE BASINS \ I 1\ I \ i I / I i I / 550 SEDIMENT BASIN 18. /SEE SEDIMENT BASIN TABLE ON SHEET 5.11 FOR BASIN DETAILS. / 5$0 / / / \ 5so INSTALL SILT FENCE 5' TO 10 OFF THE TOE OF THE EMBANKMENT AND TIE INTO THE EMBANKMENT ON / / ( EITHER SIDE OF THE SPILLWAY SO _ / - • THAT WATER FLOW DOES NOT DIVERT / / CONiRUCIION AREA #Z AROUND THE BASIN. / — — — — — ----�---�-�---- ------ -------_ DID - -5+0- 1 0 0 I E 0 t O L N L fT i, sy a w > L 3 I� ll1 U y rn o L J m Ld M �_ 0 .�-� m Q � It ��•L v O = z w z 0 LEGEND Date: 4-25-17 Mu MULCHING _---_-_ EXISTING UG FIBER OPTICS LINE d%• d ti �vO�P .cn -- EXISTING ROAD :U:cn DISTURBED AREA PROPOSED ROAD v DRAINAGE AREA ---- EF ------ PROPOSED FENCE CENTER LINE Z CONCRETE PAVING SITE BOUNDARY W N Q O LIGHT PAVEMENT -E/T- ELECTRIC/TELEPHONE ® GRAVEL AREA ❑E METER/ TRANSFORMER ARRAY FIXED SOLAR PANELS C GUY WIRE I ARRAY TRACKING SOLAR PANELS �S EXISTING UTILITY POLE DELINEATED WETLANDS EXISTING LIGHT POLES100 YR FLOODPLAIN PROPOSED UTILITY POLE --------- TOP OF STREAM BANK STORM SYSTEM PERENNIAL STREAM -50' MINIMUM CLASS 1 BUFFER PROPOSED DITCH - - - - - NO -BUILD SETBACK -CLASS 1-20'/CLASS 2-10' — - EXISTING PROPERTY LINE INTERMITTENT STREAM -30' CLASS 2 BUFFER - - - SETBACK LINE - - - PROPOSED BOUNDARY BUFFER EASEMENT LINE TEMPORARY CONTRUCTION STAGING DISTURBED AREA TEMPORARY CONCRETE WASHOUT PROPOSED PAD ® CLEAN WATER DIVERSION DIKE PROPOSED RACK PATH ® SILT -LADEN WATER DIVERSION DIKE PROPOSED SERVICE AISLE SEDIMENT BASIN BAFFLE -► TIME OF CONCENTRATION PROPOSED ADJACENT NEIGHBOR BUFFER DITCH LINE 0 0 I E 0 t O L N L fT i, sy a w > L 3 I� ll1 U y rn o L J m Ld M �_ 0 .�-� m Q � It ��•L v O = z w z 0 Date: 4-25-17 O 5,o2 of 23 Sheets d%• d ti �vO�P .cn Scale: AS NOTED :U:cn w �t = Designed by: EHB '11/11111f111141\\\\♦ Drawn by: RIJ NofO Z Checked by: EHB Q 0 0 I E 0 t O L N L fT i, sy a w > L 3 I� ll1 U y rn o L J m Ld M �_ 0 .�-� m Q � It ��•L v O = z w z 0 Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ Z Drawing No. O 5,o2 of 23 Sheets d%• d ti �vO�P .cn 00 J 4 :U:cn w �t = '11/11111f111141\\\\♦ Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ Z Drawing No. O 5,o2 of 23 Sheets U Lf) > O NofO Z O Q W N Q N W m Q N w > Q= J J O F -WN a J - LLI W N m Q O N � U (10 W Job No. 2377 Drawing No. 5,o2 of 23 Sheets Job No. 2377 MIN. bUQrR /.-- /--1 —d5o=0.8 . `'1/ rw=22, -550 La=20,_ // — — — _ \ \ \ \ \ / `_ \ \ —/ �/ / 5,40 // // / / / / /// / �— \ \ • , Seo-/ / I / I / �--' \ \\\\ / // // / // I \ / 520 I \ \ Jill JO/ \ ( / • ���/ / I 5�0 i� // I r ,a. \pp, --�41111111111111it_ 5/90580 4(4 — //540 - -\ // \I ) 1 \ 5\ \ -550 — ------ /------------ -------------- -------------------- / ---------�_-- �— — --- ----- ----� — �—-------------------------- --- \ ------ / _ — ----- 560 \ \ \ DD / \ \ \ \ I I \ / \ --/ j / /1 \\ \ \ \ \ \ \ \ - / / / / 510 Array' 50 --AM Array 49 1 D 0 \ \ \\ \TEMPORARI\ TRUCTION STAGING _ _ I \ 5 X180 (TYP. 5) SEE SH. 5.10 SB20 /_ / o 530 d5o=o.8'% / SF SF /// \ -�\ ��-----� /---\DD _-// (/ / I I 1 / // �// La=20' - \� �O-F-RC�iVI ESQ' I�A�I�E \\To\ -/ ■■��■■■■■■■ORII111 IWOIION1-1 V� TREAM 1 Big ki WIN _ 41,1111 0P -STOP EI / - /r , / ----- L T\---,�-� �,■ ���� / ///// / -/- -- _ \ \\ , \ \ \ \ A ROXI LQCTION / / / / - - - / \ / / / , // 0/ IN. FRO MEASURES / (\ I ( / �o / / - -' / / / \ / -L / I/ \ ,\ \ \ • / / \ �0 TREAMO// / / /-j 510/526 / 1 Ili/� " _ i \ ` \ \ \ ' \ \ \ \ \ \ / / / - /�/ I I I\ I\ 1\ `\ / / / / // /5 501 I T 30' \BUFFER/NO-BUILD E \ \ / - \ 1 ' / II \ \ \ \ 1 \ 7EMPORARYICONCRETE WASHOUT \ \ \ \ \\ I \ \\ 20'X30' (TYP. F 5) SEE SH. 5.10 DIBASIN SEE S I DIM NTBASIN TABLE ON SHEET 5.11 FOR BASIN DETAILS. / INSTALL SILT FENCE 5' TO 10 OFF THE TOE OF THE EMBANKMENT AND TIE INTO THE EMBANKMENT ON EITHER SI(_DE OF THE SPILLWAY SO THAT WATER FtOW-fZOES NOT DIRT AROUND' T-HE70ASIN. \ / ENTRANCE #1 \ \ \ `� \\v/// - \\\ \\\� \ \ \ 50 PROPOSED 24 GATES \ \ \ l I \ CONR2UC110N MFA / / / (TYPICAL -FIVE LOCATIONS) \\ _ I \ \ I I I \ I I 1 \ \ _ - \ LEGEND SLOPES > 3:1 Mu MULCHING EXISTING UG FIBER OPTICS LINE _________ EXISTING ROAD CONSTRUCTION AREA DISTURBED AREA — \ 1230 EXISTING CONTOURS Q PROPOSED ROAD DRAINAGE AREA ,23o �0 PROPOSED FENCE �— — — — — — / / / / / / / I PROPOSED CONTOURS i / / / / CONIRUCTION MFA Q CONCRETE PAVING CENTER L + 28.5 PV PROPOSED SPOT ELEVATION SITE BOUNDARY LIGHT PAVEMENT DRAINAGE FLOW —E/T— ELECTRIC/TELEPHONE O CONSTRUCTION ENTRANCE ® GRAVEL AREA E METER/ TRANSFORMER ARRAY I FIXED SOLAR PANELS CONSTRUCTION ROAD STABILIZATION ARRAY TRACKING SOLAR PANELS C GUY WIRE \ �\ \, \ — _ I sF \ SILT FENCE EXISTING UTILITY POLE DELINEATED WETLANDS INLET PROTECTION EXISTING LIGHT POLES CULVERT INLET PROTECTION 100 YR FLOODPLAIN IMMUMoNMFA01 O PROPOSED UTILITY POLE --------- TOP OF STREAM BANK TEMPORARY DIVERSION DIKE STORM SYSTEM — — — — — PERENNIAL STREAM -50' MINIMUM CLASS 1 BUFFER TEMPORARY FILL DIVERSION — — — — — \ PROPOSED DITCH NO—BUILD SETBACK—CLASS 1-20'/CLASS 2-10' �C Rwo RIGHT OF WAY DIVERSION — — EXISTING PROPERTY LINE INTERMITTENT STREAM -30' CLASS 2 BUFFER \\ \ SEDIMENT TRAP — — — SETBACK LINE — — — PROPOSED BOUNDARY BUFFER / GRAPHIC SCALE \\ \ \\� \ \ _ — — — / / /� oP OUTLET PROTECTION — — — EASEMENT LINE PROPOSED ADJACENT NEIGHBOR BUFFER 100' 0 100' 200' \\\� ( — / / cD ROCK CHECK DAMS DISTURBED AREA TEMPORARY CONTRUCTION STAGING PROPOSED PAD TEMPORARY CONCRETE WASHOUT / TOPSOILING 0 / SCALE: 1=100' / \ \ \ \\\ �\ / rs TEMPORARY SEEDINGPROPOSED RACK PATH ® CLEAN WATER DIVERSION DIKE PERMANENT SEEDING PROPOSED SERVICE AISLE ® SILT—LADEN WATER DIVERSION DIKE / SODDING —' TIME OF CONCENTRATION SEDIMENT BASIN BAFFLE / DITCH LINE 0 0 E p -.4- o 00 L N 'C Y a L � L L.L > 3 I� Lon U 0) 0 Fn aILL] r7 LAJ 0 m L L v 0 = ww Z 0 a_ Date: 4-25-17 O 5,*3 of 23 Sheets d%• d Scale: AS NOTED J 00 �' Z:flp� 4CD U Designed by: EHB Drawn by: RIJ > O Checked by: EHB 0 0 E p -.4- o 00 L N 'C Y a L � L L.L > 3 I� Lon U 0) 0 Fn aILL] r7 LAJ 0 m L L v 0 = ww Z 0 a_ Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ Z Drawing No. O 5,*3 of 23 Sheets d%• d ti QvO�P 'd J 00 �' Z:flp� 4CD U '11/11111f111141\\\\♦ Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ Z Drawing No. O 5,*3 of 23 Sheets U > O Nof Z o WN �Q � N W m= Q T- W U� > N Q J 0 F -WN a J — W �/ W N m Q O N m U � U (10 L1..I Job No. 2377 Drawing No. 5,*3 of 23 Sheets Job No. 2377 / / / \ V�1 ATE RRQI. I I I 550 al I \ \\ \ I / ) \''., _---___�_� — \\ —_-- \moo' I I I I t♦\ �-�,. 'a I Ind I I � I 1 1 \ \ \ 1\ jWo/) l� I ,_\ _-�'\--_����� --_ \_— /l 11 I I ♦� I `;h�'�I I\I�t;l\ 11� \ \\ I \ \ \ \ \\\\ _______ 520 ` \/ \\\ j� / I 11/ \ I/ PO <\ -- ' \\\ \\ \\ \\\ % � %♦ / � / /: ;' \ '1� \ \ \ \ \_ \ \ \\ ` x'540-- \ 3G- 40P 11 , / 1 1\ 'rT, iiiijill "I /I _ \ \ \ -530— — — 40 41 \ �\ \ \ \\\ \\_\ \ \\ i�4*\ \ \\\\\\\\\\ \ \gin /:510 _ 5n— 5V 540 I \ I \ \ / --� � __ -- -�_ \ \ \ \ \ \ \ \ \�\ \ \ \ 1 1 I \ \ \ \ \ ` I 14• �'• \ 1 I I 1 \ �I / I � DD 1 1 0 \ \ \ 1m, �_ -� __- _\ \ \ \ \ \ \ \ \ 1 \ \ \ \\ I I ;I , 111 ♦ I \\\520 \ \ I I — \\\\ \ \ \+�► W— �\ \ \ \ \:\\\\\ \\ vm— II \I 1 1 \ \ 5\O\\ 1 I I 1 0/ /' f \ \ \ _ / / / / / Eff BASIN 1. I / / 1 \\I \ I I \ ,.� \ SH'SEDIME P/SIN TABLE ION ---SHEET 5.1 1 F BASIN DET ILS. \\ \ \� _—INSTA ENCE 5' TO 10 OFF1\�\VA-o / \ 'TSE THE EM.ANKMVNT AIN / / / / �// / \ 550 E DD INTO T E EN'S MENT/ON / / / / / I ♦ I \''�,, 1 i / / DE TSoHE Y / , / / I 1 / �':; \ ♦ 1 / / THAT D S / / I� I ■ // I s ) ■ I I I%'\ 520 1 q /54e t7, 540 _ / — _ BAFFLE ' `I ♦I n \ ' i \ \ �• \ \ \ \ I � /l / / / / / �/// / I I — -- /,--/ — / _,moo _—/ / ■ / / / />�/ \ � 1�\� \ \ \\ \ \ 1 ------------ /Y# deo=0.8'\ La=20'- \ \� 530 \FINAL GRADING IN o \ D / / - SEDIMENT BASIN 5�O T ASSN h2. 2 /� \ R'�GION TO BE �:;\\'v\ \ ■ \� IMEN'T BASIN 1ABL\E 'ON /' EFO'"ED AFTER FOR \BASIN IDE�AIL)S. - REMOVAL OF BASIN NCE Ifo 110 I OF'F \ IS ALLOW BY ESC THE T EMPANKMdNTA0 \TO ADMINISTRA OR. \ \ \ TIE INTb TH E BANKMIE4 OW / HER SIDE 0 T E �PILLNV 1 NII \ q SO WATER FL D ES NO/T DIV AR6UN ASIN. BAFFLE_ TOPSOIL STOICKPILF '' AOPROXIMATE LQCATION / / / / / _ / MIN. 50/SROM ;ESC Iv�EASU(�ES/ 4 0R SSR / / / / / d5o=o.8'� 44W I p / I / / / / / / / J52it La=20 / /- ----\\ \ / / / / /---I--ice / / / / / / / � �♦ zz 540 J� AN _ \\ \\ \\\ // 520 \ \ 1 17 r //a r/ \ I 17 Aft \�l4%t4 ,.CLASS 1 STREAM BUFFER AND NO—BUILD �O 3N\E \ IN I \ 530 \ /-GRAPHIC,,SCALE- _ I \ \ \ �\ 5sa 100' --0---, 100' 2 j-7 \--- SCALE: 1'=K10' Arr / \ 41r. SLOPES > 3:1 LEGEND CONSTRUCTION AREA 1230 EXISTING CONTOURS t2ao PROPOSED CONTOURS + 28.5 PV PROPOSED SPOT ELEVATION w ¢ _ DRAINAGE FLOW cE CONSTRUCTION ENTRANCE cRs CONSTRUCTION ROAD STABILIZATION sF SILT FENCE iP INLET PROTECTION ciP CULVERT INLET PROTECTION DD TEMPORARY DIVERSION DIKE FD TEMPORARY FILL DIVERSION RwD RIGHT OF WAY DIVERSION sr SEDIMENT TRAP oP OUTLET PROTECTION cD ROCK CHECK DAMS To TOPSOILING Ts TEMPORARY SEEDING Ps PERMANENT SEEDING so SODDING LEGEND Date: 4-25-17 ; 0 MULCHING -`° °— EXISTING UG FIBER OPTICS LINE -U:(n = w ¢ _ --- EXISTING ROAD J DISTURBED AREA ''''ffff lfll411ti\1`�\ Drawn by: RIJ L0 PROPOSED ROAD Q DRAINAGE AREA V) U rn Z PROPOSED FENCE CENTER LINE-, W OQ N41N W CONCRETE PAVING M Q w U > SITE BOUNDARY N Q=J Q 0 LIGHT PAVEMENT —E/T— ELECTRIC/TELEPHONE ® GRAVEL AREA ❑E METER/ TRANSFORMER ARRAY FIXED SOLAR PANELS C GUY WIRE ARRAY TRACKING SOLAR PANELS �7 EXISTING UTILITY POLE 7 DELINEATED WETLANDS U EXISTING LIGHT POLES 100 YR FLOODPLAIN PROPOSED UTILITY POLE --------- TOP OF STREAM BANK STORM SYSTEM - - PERENNIAL STREAM -50' MINIMUM CLASS 1 BUFFER 000�o PROPOSED DITCH - - - - - NO -BUILD SETBACK -CLASS 1-20'/CLASS 2-10' — - EXISTING PROPERTY LINE -_- INTERMITTENT STREAM -30' CLASS 2 BUFFER - - - SETBACK LINE PROPOSED BOUNDARY BUFFER — - — EASEMENT LINE PROPOSED ADJACENT NEIGHBOR BUFFER DISTURBED AREA TEMPORARY CONTRUCTION STAGING PROPOSED PAD TEMPORARY CONCRETE WASHOUT PROPOSED RACK PATH ® CLEAN WATER DIVERSION DIKE PROPOSED SERVICE AISLE ® SILT -LADEN WATER DIVERSION DIKE TIME OF CONCENTRATION - SEDIMENT BASIN BAFFLE DITCH LINE 3�. � a 0 I E p t o + Da U N 0 'C r 41 Q) l 1 1 NC) v C_ a= 0> Lr) 3 � 0 rn0 fn I m � Ih � W I�0 M 'L v o o � = w w Z 0 Date: 4-25-17 ; 0 O :O ` 4 '�Q Scale: AS NOTED -U:(n = w ¢ _ Designed by: EHB J ''''ffff lfll411ti\1`�\ Drawn by: RIJ L0 Checked by: EHB O � a 0 I E p t o + Da U N 0 'C r 41 Q) l 1 1 NC) v C_ a= 0> Lr) 3 � 0 rn0 fn I m � Ih � W I�0 M 'L v o o � = w w Z 0 Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ —21-17 PER COUN Z Drawing No. ; 0 O :O ` 4 '�Q J� r --1_z: co -U:(n = w ¢ _ V J ''''ffff lfll411ti\1`�\ Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ —21-17 PER COUN Z Drawing No. O F— V J L0 O V) U rn Z Q:��N W OQ N41N W N M Q w U > N Q=J Q 0 Q � W J N LLI N m Q o � N U � U(10 w Job No. 2377 Drawing No. 5,o4 of 23 Sheets Job No. 2377 1\ \Lxu ' rrci A rray\ \ Arra\v\ \�J \ I/' \ -- -- — — -J — / 4QW V_/ LEGEND SLOPES > 3:1 EXISTING UG FIBER OPTICS LINEMULCHING ----- ----- CONSTRUCTION AREADISTURBED AREA EXISTING ROAD A PROPOSED ROAD1230 EXISTING CONTOURS --- _ DRAINAGE AREA 5�O 1230 PROPOSED CONTOURS PROPOSED FENCE ----- + 28.5 PV PROPOSED SPOT ELEVATION CENTERLINE CONCRETE PAVING I /\ /- \I— / I II \�/ /I -- �\- / — — /\1 — / I SITE BOUNDARY D DRAINAGE FLOW —E/T—ELECTRIC TELEPHONE LIGHT PAVEMENT 600 5CONSTRUCTION ENTRANCE GRAVEL AREA CONSTRUCTION ROAD STABILIZATION METER/ TRANSFORMER FIXED SOLAR PANELS5�0 DD GUY WIRE ARRAY TRACKING SOLAR PANELS SILT FENCE EXISTING UTILITY POLE DELINEATED WETLANDS INLET PROTECTION EXISTING LIGHT POLES 100 YR FLOODPLAIN 58e' CULVERT INLET PROTECTION PROPOSED UTILITY POLE --------- TOP OF STREAM BANK f TEMPORARY DIVERSION DIKE STORM SYSTEM PERENNIAL STREAM -50' MINIMUM CLASS 1 BUFFER TEMPORARY FILL DIVERSION PROPOSED DITCH NO -BUILD SETBACK -CLASS 1-20'/CLASS 2-10' RIGHT OF WAY DIVERSION EXISTING PROPERTY LINE =ma ---- INTERMITTENT STREAM -30' CLASS 2 BUFFER / — SEDIMENT TRAP SETBACK LINE PROPOSED BOUNDARY BUFFER OUTLET PROTECTION EASEMENT LINE PROPOSED ADJACENT NEIGHBOR BUFFER ssn -_______- DISTURBED AREA TEMPORARY CONTRUCTION STAGINGROCK CHECK DAMSPROPOSED PAD TEMPORARY CONCRETE WASHOUT s�o TOPSOILING TEMPORARY SEEDING PROPOSED RACK PATH CLEAN WATER DIVERSION DIKE PERMANENT SEEDING PROPOSED SERVICE AISLE SILT -LADEN WATER DIVERSION DIKE SODDING TIME OF CONCENTRATION SEDIMENT BASIN BAFFLE DITCH LINE \I ---------------------------- 5'7aD DD rr r /SEDIMI�NT BASIN' 8 SEE SEDIMENT BASIN TABLE SEDIMENT BASIN 9.-----------------� SHEET5.11 FOR BASIN DETAILS. INSTALL SILT FENCE 5' TO 10 OFF/ SEE SEDIMENT BASIN TABLE ON -------_—_-77------- - � --- SHEET 5.11 FOR BASIN DETAILS. 580 -- THE TOE OF THE EMBANKMENT ANd TIE INTO THE EMBANKMENT ON INSTALL SILT FENCE 5 TO 10 OFF D DD / EITHER SIDE OF THE SPILLWAY SO THE TOOF THE EMBANKMENT AND THAT WATER FLOW DOES NOT DIVERT/ TIE INTO THE EMBANKMENT ON AROUND THE BASIN. EITHER SIDE OF THE SPILLWAYSO THAT WATER FLOW DOES NOT DIVERT \ AROUND THE BASIN. r rp2 3 / Ar a24' Di DITCH SHALL BE 1 DEEP TPOKPILE ------------------(MIN), V SHAPED, AND PPRQXIMA LOCATION -----------HAVE 4:1 SIDE SLOPES. — — — — ------------- I 0' F140M ESC N. S LONGITUDINAL SLOPE OF AT 559 DD rR JREAMI LEAST 1%. DETAIL—SH.5.10- SB8 Qs/a// /I dsa 0.8' ss2 \ I I I I I I\ \ / / / W=29' d5o=0.7' I ` \ \ X550 _ La=26' \ \� \ I I I 5 \ \ 1 /r_, // // La=2o' I\— / —\ / \� / / I D i 1 / e/ I \ \ I / / � \ \ \ —� \ 560 \ \ r \ I \ \ \ I I I felI IIIL I S�DIMENT BA$ N \7. SB7 �* / SEE SEDIMENT/ BASIN TABLE\ OWN\ / / I SHEET 5.11 FOR BASIN 'QEJTAILS�. \ / INSTALL SILT FENCE 5' TO \10 OFF 1 \ / A 1 THE TOE OF THE EMBANKMEII�ITI AVD TIE INTO THE EMBAN4 M NT QN\ 1 \ /M /' I EITHER SIDE OF THE SPILLAI� 0 / d5o=0.7' \ I THAT WATER FI/OW DOES NOT IDLE T I W=20' 1 \ /AROUND Prw- IBFI,SI I / La=118' I 1 II, / / I I 1 5�0 I -- // /I YOPSOIL STOCKPILE - 50 /� /��� //APPR XIMAT)E LOCATION MiN.0' MOM ESC MEASURES -.,OR TReAM I I I _ IL T' / ---------------- 41f Y\ Ir----------\---------------r----------I-- I� / / PRO POS SEDIMENT BASRN� DRAINAGE EASEMENT - APPROX. 40'W X 70'L 1 1 I)S ICKPIL�k, OXI E\ LOCATIO \ I /l I/ // 57 / R .I 0j OM ES U ES /I rr� I ° /-4--/- ------------ �_ `\ \ / I / ( / 1 /! — l — U1 �� N OD I B/M 564 — \ \ 560 570---' /_�\ \ `__---_ _� \\ _ �'v I / I I I / I \ /I SEDIMENT BASIN 10. La=2o' \ _ __ — _ SEE SEDIMENT BASIN TABLE ON �W- — — \ \` \ — — — 1 \ / / GRAPHIC SCAL I I I I / / / / ` ) i SHEET 5.11 FOR BASIN DETAILS. INSTALL SILT FENCE 5 TO 10 OFF 1\ \\ \� 100' 0 W0' 200' I 4/ — THE TOE OF THE EMBANKMENT AND TIE INTO THE EMBANKMENT ON `\ \ \ 1 \ SCALE: 1=100' EITHER SIDE OF THE SPILLWAY SO ray`\ \ \ \ I I \ / `\ — / / I / / / / / 1 1 / / / THAT WATER FLOW DOES NOT DIVERT // I — — / ' \ / / I I /l I 1 l // ( ► / I/ AROUND THE BASIN. Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ Date: 4-25-17 . ,, Scale: AS NOTED 5,*5 of 23 Sheets d%• d ti QvO�P Designed by: EHB :W cwi)'t 0 :Z •.v� o Drawn by: RIJ U Checked by: EHB Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ Drawing No. . ,, , 5,*5 of 23 Sheets d%• d ti QvO�P J 00 :W cwi)'t 0 :Z •.v� o .d U '11/11111f111141\\\\♦ Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ Job No. 2377 Drawing No. Z 5,*5 of 23 Sheets O U O N ( Z o O WQ N Q N W m = Q T1_ W UO > M Q� J O F -WN a J — LLI W N m Q O N 0 � U V) W Job No. 2377 Drawing No. 5,*5 of 23 Sheets Job No. 2377 i) II -7\ \ -' SEDIMENT BASIN 5. 57 / i/ SEE SEDIMENT BASIN TABLE ON - �- � 15o=0.7'- SHEET 5.11 FOR BASIN DETAILS. \ \\ \ \ \\ \ W=23' ' / / // i / ( �, �� \ INSTALL SILT FENCE 5' TO 10 OFF _a=20' THE TOE OF THE EMBANKMENT AND\� - TIE INTO THE EMBANKMENT ON :#,\ \ �' - - — i i'� ���/ - \ �` / / T EITHER SIDE OF THE SPILLWAY SO THAT WATER FLOW DOES NOT DIVERT DD\, 50 AROUND // /j j/'ice/�� -��� \ \ I / ��\ \ / ��// /_` AROUND THE BASIN. - La=25' •. // /// // / — `550 / / \ \ \�\ / \\ \ / \ \ \ \ \ \ \ / DD �� \\ \ \ \ / / A8 La= 10' jp / // \ I \ \ / / \ \ \\ I \ \ J r� SEDIMENT BASIN. - SEE SEDIMENT BASIN TABLE ON [ ( 1 \ I I I \ 1 \ 1 DD - - _ - - - \ , - / / SHEET 5.11 FOR BASIN DETAILS. _ ' - \ , _ / / / INSTALL SILT FENCE 5 TO 10 OFF \ /� /\\ d5f,-o.7'\ THE TOE OF THE `EMBANKMENT AND \ / / \ \ I I 1 W-24' ` 1 I I 1 \ 1 �� - \ - - _ - _ _ _D - / TIE INTO THE EMBANKMENT ON 544 — I EITHER SIDE OF THE SPILLWAY S0 I - - - / / I I I I I I / / \ THAT WATER FLOW DOES NOT DIVERT T \\ �\ I I I ( 1540 5� I \\ 1\ \ \\ \\ _ \ / ---- 54 �— / / / 2 /A 0 ND THE BASIN \ / I I I l� 5 A I/ 1 I I �------------------------ ----— — — _ —,—--- �—L/ / / 50 _B6 / ---- _----- T-- - _ /' �_ J9 \ \\ � I I I D \TOPSOIL ST�CKI'ILE I I I \ / ) / 1 \ / - _ \ \ \ -5 \ _ \ \ ` \ \ 1 TOP rray I I I _ _ I I \�� \ I (! ///I I \1 A � WATS�U�ea�>��_— \ APPROXIMATE LOATI N I / / ' I �--__ \ � \ \ � �I/- — / __\�\ \ /\ M�N . 50- SARs----- \ MIN. 50' SROM SC M UR,ES/ / \ \ \ �\ I I / I 1 / _ � � � \ I � I�E>� _ _ � \ / I OR S REAM \ // SEDIMENT / / / Q 1 \ \ \ \ III / / _� __ \ \ \ \ \ 1 /////i i'/ _ � _ � \•'. \ \ \ \ 1 // L/ �EDPM/ /' B I 6. /� / / , / / / SEE ENT BASIN T LE SHEET 5.11 FOR BASIN DETAILS. INSTALL SILT FENCE 5' T 10II r I I II \\ /// - - \\1 \/// / / / _ HE TOE OF THE EMBAN MENT AND / I I / / �_- � \---- �\ / TIE INTO THE EMBA NT ON I \\ \\ I I I I SEDIM NT BASIN 3. / 15o=0.7'— W=23' La=20' D D \I \ INow � -�-�--�T-HQ��{ATER FLOW DOES NOT DIVERT � / / � \ I \ / / \ � I \ / / / ! I SEE SEDIMENT BASIN TABLE ON -T- t� �R SIDE OF THE SPILLWAY SO / / / / I I \ \\ \ ^ � ( I I I I I � / / /__ S EEfi_ 5.1 1 FOR ASIN DETAILS. r-- - / / --- \ y - \------ �- / /---/- ! / / / / / / / I I 1 / ! I \ --- ---------------------- --- -t-1--- �- - --- Er -- ,---------t- - ,LFT r / AROUND BASIN. / ' / / / I / /--------- \ �`__ _ J____r I 7 I S ALLT SILT FENCE 5 TO `10 OFF r / / / \ I I-------- /--------- -- --I ---�-� I J / 1 'Z f /-------- — - / --- / / ! I I / / / / ( I D 1 / \ � T r-- /-- TOE OF-TRE-EMBA�1RNiENT-A�I6-t--%- / / / I / I t/ III / \ \ / ! --_-----------�/ I /7// / / I 1� / / / / / I TIE INTO THE EMBANKMENT ON / / ' / / \ ' / I I ' o ( I 1 I 1 / / / I \Arr8 / / ! I EITHER SIDE OF THE SPILLWAY SOS I \ 1 \ ✓ / // / I / / TNiAT WATER FLOW DOES NOT DIVERT/ / / / ! AROUND/ THE BASIN ''Array _ -- _ _ \ \ I I \/ l \— \ \ _ I 1 \ ! / �/ / I I I / / 1 /'/ 5$0 I I IDD / I/ D 1 ' /----� / I /- / 1 I - ---- - \ -------I--7--�-------_-,� -, ------------\------\ ------ GRAPHIC' 1'�'A \ 100' / / 100' 570 200' \ I I I I SCALE: I "-100 / / / / / / / / / , / / _ — — — _ \ \ \ \ / " \ 1 I I13 y- 576 *ay 1,/ /jr--Al A/0% \ r/ /n A k I i ra v —see \\ --- ----- 1_-�-------1----- �--------- - T-- -T---�---(---- � - / / / / \ 1 \ \ \ \ \ 1 / I �` DD \ —A — \ \——i i / / / �— / /---r-- 1- �7— l ----- 1—!-t— 1 1 —� —---/ —1 —---L-----= ----- / I / ----——-------- 5.0 Arra\ ! I I ► \ \ 5�0 / DD CD I \ rr 1 rra - \ rr I I r7 Date: 4-25-17 •'N, Scale: AS NOTED LEGEND d%• d ti �vO�P Designed by: EHB :W 41, SLOPES > 3:1 Mu MULCHING EXISTING UG FIBER OPTICS LINE U Checked by: EHB CONSTRUCTION AREA --------- EXISTING ROAD H > o DISTURBED AREA N � � — 1230 EXISTING CONTOURS o PROPOSED ROAD WN �Q � Q DRAINAGE AREA Q — 1230 PROPOSED CONTOURS CENTER LINE ter— PROPOSED FENCE M Q + 28.5 PV PROPOSED SPOT ELEVATION 0 F -WN SITE BOUNDARY CONCRETE PAVING Q J — LLJ W N m � LIGHT PAVEMENT Q o DRAINAGE FLOW D —E/T— ELECTRIC/TELEPHONE ® GRAVEL AREA cE CONSTRUCTION ENTRANCE 0 METER/ TRANSFORMER ARRAY FIXED SOLAR PANELS � cRs CONSTRUCTION ROAD STABILIZATION C GUY WIRE ARRAY TRACKING SOLAR PANELS N sF SILT FENCE EXISTING UTILITY POLE DELINEATED WETLANDS iP INLET PROTECTION t EXISTING LIGHT POLES 100 YR FLOODPLAIN ciP CULVERT INLET PROTECTION J PROPOSED UTILITY POLE --------- TOP OF STREAM BANK TEMPORARY DIVERSION DIKE p� STORM SYSTEM — — — — — PERENNIAL STREAM -50' MINIMUM CLASS 1 BUFFER TEMPORARY FILL DIVERSION PROPOSED DITCH — — — — — NO—BUILD SETBACK—CLASS 1-20'/CLASS 2-10' \ \ \ \ \ \ RwD RIGHT OF WAY DIVERSION — — EXISTING PROPERTY LINE INTERMITTENT STREAM -30' CLASS 2 BUFFER SEDIMENT TRAP — — — SETBACK LINE ®®— — ® PROPOSED BOUNDARY BUFFER OUTLET PROTECTION — — EASEMENT LINE PROPOSED ADJACENT NEIGHBOR BUFFER ROCK CHECK DAMS --------- DISTURBED AREA TEMPORARY CONTRUCTION STAGING To TOPSOILING PROPOSED PAD TEMPORARY CONCRETE WASHOUT Z -- / rs TEMPORARY SEEDING PROPOSED RACK PATH ® CLEAN WATER DIVERSION DIKE — \/ // i �� �� Ps PERMANENT SEEDING PROPOSED SERVICE AISLE ® SILT—LADEN WATER DIVERSION DIKE / // �' / ��� / —► —► TIME OF CONCENTRATION SEDIMENT BASIN BAFFLE SODDING DITCH LINE -7\ \ -' SEDIMENT BASIN 5. 57 / i/ SEE SEDIMENT BASIN TABLE ON - �- � 15o=0.7'- SHEET 5.11 FOR BASIN DETAILS. \ \\ \ \ \\ \ W=23' ' / / // i / ( �, �� \ INSTALL SILT FENCE 5' TO 10 OFF _a=20' THE TOE OF THE EMBANKMENT AND\� - TIE INTO THE EMBANKMENT ON :#,\ \ �' - - — i i'� ���/ - \ �` / / T EITHER SIDE OF THE SPILLWAY SO THAT WATER FLOW DOES NOT DIVERT DD\, 50 AROUND // /j j/'ice/�� -��� \ \ I / ��\ \ / ��// /_` AROUND THE BASIN. - La=25' •. // /// // / — `550 / / \ \ \�\ / \\ \ / \ \ \ \ \ \ \ / DD �� \\ \ \ \ / / A8 La= 10' jp / // \ I \ \ / / \ \ \\ I \ \ J r� SEDIMENT BASIN. - SEE SEDIMENT BASIN TABLE ON [ ( 1 \ I I I \ 1 \ 1 DD - - _ - - - \ , - / / SHEET 5.11 FOR BASIN DETAILS. _ ' - \ , _ / / / INSTALL SILT FENCE 5 TO 10 OFF \ /� /\\ d5f,-o.7'\ THE TOE OF THE `EMBANKMENT AND \ / / \ \ I I 1 W-24' ` 1 I I 1 \ 1 �� - \ - - _ - _ _ _D - / TIE INTO THE EMBANKMENT ON 544 — I EITHER SIDE OF THE SPILLWAY S0 I - - - / / I I I I I I / / \ THAT WATER FLOW DOES NOT DIVERT T \\ �\ I I I ( 1540 5� I \\ 1\ \ \\ \\ _ \ / ---- 54 �— / / / 2 /A 0 ND THE BASIN \ / I I I l� 5 A I/ 1 I I �------------------------ ----— — — _ —,—--- �—L/ / / 50 _B6 / ---- _----- T-- - _ /' �_ J9 \ \\ � I I I D \TOPSOIL ST�CKI'ILE I I I \ / ) / 1 \ / - _ \ \ \ -5 \ _ \ \ ` \ \ 1 TOP rray I I I _ _ I I \�� \ I (! ///I I \1 A � WATS�U�ea�>��_— \ APPROXIMATE LOATI N I / / ' I �--__ \ � \ \ � �I/- — / __\�\ \ /\ M�N . 50- SARs----- \ MIN. 50' SROM SC M UR,ES/ / \ \ \ �\ I I / I 1 / _ � � � \ I � I�E>� _ _ � \ / I OR S REAM \ // SEDIMENT / / / Q 1 \ \ \ \ III / / _� __ \ \ \ \ \ 1 /////i i'/ _ � _ � \•'. \ \ \ \ 1 // L/ �EDPM/ /' B I 6. /� / / , / / / SEE ENT BASIN T LE SHEET 5.11 FOR BASIN DETAILS. INSTALL SILT FENCE 5' T 10II r I I II \\ /// - - \\1 \/// / / / _ HE TOE OF THE EMBAN MENT AND / I I / / �_- � \---- �\ / TIE INTO THE EMBA NT ON I \\ \\ I I I I SEDIM NT BASIN 3. / 15o=0.7'— W=23' La=20' D D \I \ INow � -�-�--�T-HQ��{ATER FLOW DOES NOT DIVERT � / / � \ I \ / / \ � I \ / / / ! I SEE SEDIMENT BASIN TABLE ON -T- t� �R SIDE OF THE SPILLWAY SO / / / / I I \ \\ \ ^ � ( I I I I I � / / /__ S EEfi_ 5.1 1 FOR ASIN DETAILS. r-- - / / --- \ y - \------ �- / /---/- ! / / / / / / / I I 1 / ! I \ --- ---------------------- --- -t-1--- �- - --- Er -- ,---------t- - ,LFT r / AROUND BASIN. / ' / / / I / /--------- \ �`__ _ J____r I 7 I S ALLT SILT FENCE 5 TO `10 OFF r / / / \ I I-------- /--------- -- --I ---�-� I J / 1 'Z f /-------- — - / --- / / ! I I / / / / ( I D 1 / \ � T r-- /-- TOE OF-TRE-EMBA�1RNiENT-A�I6-t--%- / / / I / I t/ III / \ \ / ! --_-----------�/ I /7// / / I 1� / / / / / I TIE INTO THE EMBANKMENT ON / / ' / / \ ' / I I ' o ( I 1 I 1 / / / I \Arr8 / / ! I EITHER SIDE OF THE SPILLWAY SOS I \ 1 \ ✓ / // / I / / TNiAT WATER FLOW DOES NOT DIVERT/ / / / ! AROUND/ THE BASIN ''Array _ -- _ _ \ \ I I \/ l \— \ \ _ I 1 \ ! / �/ / I I I / / 1 /'/ 5$0 I I IDD / I/ D 1 ' /----� / I /- / 1 I - ---- - \ -------I--7--�-------_-,� -, ------------\------\ ------ GRAPHIC' 1'�'A \ 100' / / 100' 570 200' \ I I I I SCALE: I "-100 / / / / / / / / / , / / _ — — — _ \ \ \ \ / " \ 1 I I13 y- 576 *ay 1,/ /jr--Al A/0% \ r/ /n A k I i ra v —see \\ --- ----- 1_-�-------1----- �--------- - T-- -T---�---(---- � - / / / / \ 1 \ \ \ \ \ 1 / I �` DD \ —A — \ \——i i / / / �— / /---r-- 1- �7— l ----- 1—!-t— 1 1 —� —---/ —1 —---L-----= ----- / I / ----——-------- 5.0 Arra\ ! I I ► \ \ 5�0 / DD CD I \ rr 1 rra - \ rr I I r7 Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ Date: 4-25-17 •'N, Scale: AS NOTED 5,o6 of 23 Sheets d%• d ti �vO�P Designed by: EHB :W Ld C?: Z •.v� C:> Drawn by: RIJ U Checked by: EHB Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ Drawing No. •'N, , 5,o6 of 23 Sheets d%• d ti �vO�P J 00 :W Ld C?: Z •.v� C:> .d U Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ Job No. 2377 Drawing No. Z 5,o6 of 23 Sheets O U H > o N � � Z o WN �Q � N W m� Q M Q 0 F -WN Q J — LLJ W N m Q o 0f N � U N W Job No. 2377 Drawing No. 5,o6 of 23 Sheets Job No. 2377 1 \ --------- ------------- -------1 ------------------------------------- TOPSQIE- -STOCKPILE A -AP-P-RO-XIMATE LOCATION r �a MIN. 50' FROM ESC MEASURE OF_ STREAM / -� \--\---------------------------------------------------------. ----�-� - - y-------- ------ ------ --' \ \ \ 570 \ \\Arr\,aY-25 I I --- 7-- --- --�-- ------ --- ------ - - - - - - - - - - - - - - - ---- / 4 / GRAPHIC SCALE 100' 0 100' 200' I I SCALE: 1 "=100' CONRtUC710N AREA /4 Drawing No. Date: 4-25-17 LEGEND , SLOPES > 3:1 rnu MULCHING EXISTING UG FIBER OPTICS LINE cn 0: 2 z CONSTRUCTION AREA Designed by: EHB D --------- EXISTING ROAD Drawn by: RIJ '11/11111f111141\\\\♦ DISTURBED AREA Checked by: EHB 1230 EXISTING CONTOURS N c0 ROAD Z O QPROPOSED DRAINAGE AREA WN m> 1230 PROPOSED CONTOURS N W af CENTER LINE �� PROPOSED FENCE + 28.5 PV PROPOSED SPOT ELEVATION M SITE BOUNDARY 0 CONCRETE PAVING J O HW Q LIGHT PAVEMENT - DRAINAGE FLOW —E/T—ELECTRIC/TELEPHONE Q O N ® GRAVEL AREA cE CONSTRUCTION ENTRANCE ❑E METER/ TRANSFORMER ARRAY FIXED SOLAR PANELS cRs CONSTRUCTION ROAD STABILIZATION C GUY WIRE ARRAY TRACKING SOLAR PANELS sF O SILT FENCE N EXISTING UTILITY POLE DELINEATED WETLANDS iP INLET PROTECTION EXISTING LIGHT POLES 100 YR FLOODPLAIN ciP CULVERT INLET PROTECTION "C� PROPOSED UTILITY POLE --------- TOP OF STREAM BANK DD TEMPORARY DIVERSION DIKE STORM SYSTEM - - - - - PERENNIAL STREAM -50' MINIMUM CLASS 1 BUFFER FD TEMPORARY FILL DIVERSION PROPOSED DITCH - - - - - NO -BUILD SETBACK -CLASS 1-20'/CLASS 2-10' E0 RIGHT OF WAY DIVERSION — - — EXISTING PROPERTY LINE --------- INTERMITTENT STREAM -30' CLASS 2 BUFFER sT SEDIMENT TRAP - - - SETBACK LINE - - - - - PROPOSED BOUNDARY BUFFER oP OUTLET PROTECTION — - EASEMENT LINE — PROPOSED ADJACENT NEIGHBOR BUFFER co ROCK CHECK DAMS --------- DISTURBED AREA Boom TEMPORARY CONTRUCTION STAGING To TOPSOILING PROPOSED PAD TEMPORARY CONCRETE WASHOUT Ts TEMPORARY SEEDING PROPOSED RACK PATH ® CLEAN WATER DIVERSION DIKE PROPOSED SERVICE AISLE ® SILT -LADEN WATER DIVERSION DIKE Ps PERMANENT SEEDING -► -► TIME OF CONCENTRATION SEDIMENT BASIN BAFFLE so SODDING DITCH LINE 1 \ --------- ------------- -------1 ------------------------------------- TOPSQIE- -STOCKPILE A -AP-P-RO-XIMATE LOCATION r �a MIN. 50' FROM ESC MEASURE OF_ STREAM / -� \--\---------------------------------------------------------. ----�-� - - y-------- ------ ------ --' \ \ \ 570 \ \\Arr\,aY-25 I I --- 7-- --- --�-- ------ --- ------ - - - - - - - - - - - - - - - ---- / 4 / GRAPHIC SCALE 100' 0 100' 200' I I SCALE: 1 "=100' CONRtUC710N AREA /4 Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ Z Drawing No. Date: 4-25-17 . N, , d d Scale: AS NOTED - J 4�' Z:flp� :w cn 0: 2 z J Designed by: EHB D Drawn by: RIJ '11/11111f111141\\\\♦ Checked by: EHB O Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ Z Drawing No. . N, , d d ti Q)00 'd - J 4�' Z:flp� :w cn 0: 2 z J D '11/11111f111141\\\\♦ Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ Z Drawing No. 5.7 of 23 Sheets O H U J D O N c0 Z O WN m> N W af N m� Q w > M Q� J O HW Q � N J - LLI W N m Q O N � U N Li Job No. 2377 Drawing No. 5.7 of 23 Sheets Job No. 2377 ' - SLOPES > 3:1 LEGENDMu MULCHING EXISTING UG FIBER OPTICS LINE - - - - IN, /�--------- EXISTING ROAD CONSTRUCTION AREA 1230 EXISTING CONTOURS DISTURBED AREA PROPOSED ROAD DRAINAGE AREA - - - PROPOSED FENCE 1230 PROPOSED CONTOURS CENTER LINE 0 CONCRETE PAVING \ / + 28.5 PV PROPOSED SPOT ELEVATION SITE BOUNDARY LIGHT PAVEMENT DRAINAGE FLOW —E/T— ELECTRIC/TELEPHONE GRAVEL AREA CONSTRUCTION ENTRANCE METER/ TRANSFORMER A® J I \ \I I '/ / / / / / cRs CONSTRUCTION ROAD STABILIZATION C GUY WIRE ARRAY � LS FIXED SOLAR PANELS TRACKING SOLAR / I // // \ SILT FENCE 0 EXISTING UTILITY POLE DELINEATED WETLANDS INLET PROTECTION EXISTING LIGHT POLES 100 YR FLOODPLAIN CULVERT INLET PROTECTION jC� PROPOSED UTILITY POLE --------- TOP OF STREAM BANK TEMPORARY DIVERSION DIKE STORM SYSTEM = = = = = PERENNIAL STREAM -50' MINIMUM CLASS 1 BUFFER TEMPORARY FILL DIVERSIONo0000o PROPOSED DITCH NO -BUILD SETBACK -CLASS 1-20'/CLASS 2-10' RIGHT OF WAY DIVERSION — - EXISTING PROPERTY LINE INTERMITTENT STREAM -30' CLASS 2 BUFFER �\ �i0 I I \ \ �� I \ \5�0\\\\ \ \ \ 1 I - - - ----� \ sr SEDIMENT TRAP SETBACK LINE PROPOSED BOUNDARY BUFFER OUTLET PROTECTION - - - EASEMENT LINE PROPOSED ADJACENT NEIGHBOR BUFFER --------- \ ROCK CHECK DAMS DISTURBED AREA TEMPORARY CONTRUCTION STAGING DD I I so / / / / / / / / I I I \ _ To TOPSOILING PROPOSED PAD TEMPORARY CONCRETE WASHOUT / / / ,/ TEMPORARY SEEDINGPROPOSED RACK PATH ® CLEAN WATER DIVERSION DIKE J / / / / / / \ \ _ J - - _ _ _ = PROPOSED SERVICE AISLE ® SILT -LADEN WATER DIVERSION DIKE PERMANENT SEEDING y ` - _ - _ TIME OF CONCENTRATION SEDIMENT BASIN BAFFLE � � - - � � - � so SODDING DITCH LINE 610 r r I /l 596 / ice_--- / / / // / �/ / / SEDIMENT BASIN 1. SEE SEDIMENT BASIN TABLE ON SHEET I 5.11 FOR BASIN DETAILS. / �INSTALL SILT FENCE 5, TO 10 OFF / THE TOE OF THE EMBANKMENT AND TIE INTO THE EMBANKMENT ON EITHER SIDE OF THE SPILLWAY SO ` _ - THAT WATER FLOW DOES NOT DIVERT - -- AROUND THE BASIN. ,1 60/ / / / / �� �- / — — —_ _-- -/2 U% / 606 / / / / — / I \ I I / — — J La =19' // OIL�ST02•KPILE �\ -- / OkMATE LOC TTN -�\\\\\\\\\\MIN. FROM E C NFEA5URES\-- _9Q 0 r5 x-'57-9 -------------------�-- r=...r. ---- ---1 ------------- ------ ------------ -----®= �"' \ / . \ \ \ \ \ \ \ \� \ \ \ \ 530 Arrcl -------- \ , r rq -TaPSOtt STQCK151LE /• ` / / / J / I I Z 1 PPROXIMATE LOCATION �� • 1, I / �/ / / MI.PV. 50/ FROM ESC MEASURES fl / Ila\ 500 DD -Nor��i 570, � \� \ \ - / // 2 SEDIMENT BASIN 2. �l �\\ \� 'SEE SEDIMENT BASIN TABLE ON SB2 SHEET 5.11 FOR BASIN DETAILS. -'_ - - INSTALL SILT FENCE 5' TO 10 OFF THE TOE OF THE EMBANKMENT AND -_ _ -TIE INTO THE EMBANKMENT ON / ✓ ��\�-�/ �� / / \\ \ _� \� �� 1\ W=13'.5 103' � _ _ EITHER SIDE OF THE SPILLWAY SO THAT WATER FLOW DOES NOT DIVERT La=11 \ C AROUND THE BASIN. GRAPHIC SCALE /l // \ \ �\ - - - \ / ��♦ �/ \/ / / ' I \\` \ 100' 0 100' 200' - - SCALE. 1"=100' - - - - /, \\DID \ - - fill illi � �„�„ „ ,,, ��� •� I ) I \ Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ Z Date: 4-25-17 O • of 23 Sheets d%• d ti QvO�P Scale: AS NOTED U � Z •.v0 o �Z: Q ` .d [Des-ign:e:d:by: EHB XV Drawn by: RIJ N � �o Z Checked by: EHB Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ Z Drawing No. O • of 23 Sheets d%• d ti QvO�P J � U � Z •.v0 o �Z: Q ` .d XV Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ Z Drawing No. O • of 23 Sheets U D 0 N � �o Z WN 0Q N W T1- m= Q W UU > d' QJ J 0 F -WN a J - LLI W N m Q O N � U (10 W Job No. 2377 Drawing No. • of 23 Sheets Job No. 2377 2 2377 - McBride Place Energy, LLC Erosion and Sediment Control Narrative Project Description The purpose of this project is the development of a 75 MW (AC) Solar Farm located on 652± acres in Cabarrus County, North Carolina near the intersection of US Route 601 and Mt. Pleasant Road South. Construction will include installation of nearly 2,660 ground -mounted solar racks, a solar PV breaker panel connected to a Union Power substation on Mt. Pleasant Road, approximately 2.1 miles north of its intersection with Route 601. A total of 484.7± acres will be disturbed during construction. Existing Site Conditions The site is undeveloped, cleared land that is bisected in the southern quarter by Bost Creek. It is relatively flat with rolling knolls. Elevations range from 490' in the southeast to 590' in the northwest (separated by a distance of 1.2 miles). There is a wetland area on the site - 2.87± acres. The Bost Creek 100 -year flood plain encompasses approximately 8.28± acres. Adjacent Property The property is bounded primarily by CR (Countryside Residential) zoning. To the east are six Agricultural parcels. See the list of Adjacent P 1 Properties in the Site Plans. Offsite Area An off-site borrow and waste required for this project must come from a site with an approved erosion Y q P 1 Pp control Ian a site regulated under the Mining Act of 1971 or a landfill regulated b the Division of Solid p, 9 9 9 Y Waste Management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated b the Division of Solid Waste Management or per Division of Solid P Y 9 Y 9 Waste Management or Division of Water Resources rules and regulations. [15A NCAC 4B .01101 i'Z1711[ The primary soil in the project area is mapped as Misenheimer channery silt loam (nearly 2/3 of the site) on 04% slopes. The Misenheimer series consists of shallow, moderately well drained, and somewhat poorly drained, moderately rapidly permeable soils that formed in residuum weathered from fine-grained metavolcanic rock. During wet seasons these soils have perched water tables. Secondary soil is mapped as Badin channery silt loam (approximately 15% of the site) on 5-15% slopes. The Badin series consists of moderately deep, well drained, moderately permeable soils that formed in residuum weathered from fine-grained metasedimentary and metavolcanic rocks of the Carolina Slate Belt. 1 1 P a g e 2377 - McBride Place Energy, LLC Another secondary soil is mapped as Kirksey silt loam (10% of the site) on 1-6% slopes. The Kirksey series consists of deep, moderately well drained, moderately slowly permeable soils that formed in material mostly weathered from Carolina slate of the Piedmont Uplands. The remaining four soil types range from 0.7 to 5.6% of the site on slopes ranging 0-15%. 78% of the soil types also are classified with channery soils. Channery soil is, by volume, more than 15 percent thin, flat fragments of sandstone, shale, slate, limestone, or schist as much as 6 inches along the longest axis. A single piece is called a channer. The presence of channery soil increases the permeability and thus reduces the runoff characteristics. See Soil Map in Appendix Critical Erosion Areas Critical erosion areas include but are not limited to slopes exceeding 3:1 in grade. There are three areas exceeding 3:1 within construction areas as shown on the plans (Sheet 5.0). Erosion and Sediment Control Measures Unless otherwise indicated, all vegetative and structural erosion and sediment control practices shall be constructed and maintained accordingto existing minimum standards and specifications of North Carolina g Department of Environment and Natural Resources Erosion and Sediment Control Regulations, latest edition. Structural Practices 1. Construction Entrance Temporary construction entrances shall be installed as shown on the Ian in five locations. Construction P Y P entrance must contain at least 2 -3 -inch stone and be maintained in a condition that willrevent tracking or P 9 direct flow of mud onto streets. Periodic to dressin with stone will be necessary. Install water bars ditch topdressing Y diversions or other suitable measures so that stormwater does not leave the limits of disturbance through the construction entrances, as needed. [G.S. 113A-57(3), 15A NCAC 4B .0105] 21Page 2377 - McBride Place Energy, LLC 2377 - McBride Place Energy, LLC 4. Temporary Sediment Trap A temporary sediment trap shall be constructed as shown on the plans. It shall be constructed such that all site runoff shall concentrate in the sediment trap before leaving the site. 12"min. of NCDOT #5 5 CroS$-5¢Ciion or #ST washed store -"'"----- -- -- 1 5'm . L ? 1 � _ 3600 cu ft acre %r � '� lrcftF:� 'S I S YI T �- -• 1 1 5 Alter fabric Daigt settled ZY• Ovet�ll�6'�for w�. Plan View .e a Emer �=tisoQ`passbc bv6enloom. d- -------- ______rv5�-________d10 fill ---2'to 3.5 s ♦ Q qqlItt rc, bround fubrw'c n. TEMPORARY SEDIMENT TRAP NTS Temporary Sediment Trap Construction 1. Clear, grub, and strip the area under the embankment of all vegetation and root mat. Remove all surface soil containing high amounts of organic matter, and stockpile or dispose of it properly. Haul all objectionable material to the designated disposal area. 2. Ensure that fill material for the embankment is free of roots, woody vegetation, organic matter, and other objectionable material. Place the fill in lifts not to exceed 9 inches, and machine compact it. Over fill the embankment 6 inches to allow for settlement. 3. Construct the outlet section in the embankment. Protect the connection between the riprap and the soil from piping by using filter fabric or a keyway cutoff trench between the riprap structure and soil. • Place the filter fabric between the riprap and the soil. Extend the fabric across the spillway foundation and sides to the top of the dam; or • Excavate a keyway trench along the center line of the spillway foundation extending up the sides to the height of the dam. The trench should be at least 2 feet deep and 2 feet wide with 1:1 side slopes. 4. Clear the pond area below the elevation of the crest of the spillway to facilitate sediment cleanout. 5. All cut and fill slopes should be 2:1 or flatter. 6. Ensure that the stone (drainage) section of the embankment has a minimum bottom width of 3 feet and maximum side slopes of 1:1 that extend to the bottom of the spillway section. 7. Construct the minimum finished stone spillway bottom width, as shown on the plans, with 2:1 side slopes extendingto the to of the over filled embankment. Kee the thickness of the sides of the spillway outlet P P P Y structure at a minimum of 21 inches. The weir must be level and constructed to grade to assure design capacity. 6l Page 8. Material used in the stone section should be a well -graded mixture of stone w"AtlEafafMinches (class B erosion control stone is recommended) and a maximum stone size of 14 inches. The stone may be machine placed and the smaller stones worked into the voids of the larger stones. The stone should be hard, angular, and highly weather -resistant. 9. Discharge inlet water into the basin in a manner to prevent erosion. Use temporary slope drains or diversions with outlet protection to divert sediment- laden water to the upper end of the pool area to improve basin trap efficiency (References: Runoff Control Measures and Outlet Protection). 10. Ensure that the stone spillway outlet section extends downstream past the toe of the embankment until stable conditions are reached and outlet velocity is acceptable for the receiving stream. Keep the edges of the stone outlet section flush with the surrounding ground, and shape the center to confine the outflow stream (References: Outlet Protection). 11. Direct emergency bypass to natural, stable areas. Locate bypass outlets so that flow will not damage the embankment. 12. Stabilize the embankment and all disturbed areas above the sediment pool and downstream from the trap immediately after construction (References: Surface Stabilization). 13. Show the distance from the top of the spillway to the sediment cleanout level (1/2 the design depth) on the plans and mark it in the field. 14. Install porous baffles as specified in Practice 6.65, Porous Baffles 15. Sediment basins shall be stabilized immediately after installation. Maintenance Inspect temporary sediment traps at least weekly and after each significant (% inch or greater) rainfall event and repair immediately. Remove sediment, and restore the trap to its original dimensions when the sediment has accumulated to one-half the design depth of the trap. Place the sediment that is removed in the designated disposal area, and replace the part of the gravel facing that is impaired by sediment. Check the structure for damage from erosion or piping. Periodically check the depth of the spillway to ensure it is a minimum of 1.5 feet below the low point of the embankment. Immediately fill any settlement of the embankment to slightly above design grade. Any riprap displaced from the spillway must be replaced immediately. After all sediment -producing areas have been permanently stabilized, remove the structure and all unstable sediment. Smooth the area to blend with the adjoining areas, and stabilize properly 71 Page 2377 - McBride Place Energy, LLC EXISINO PAVEMENT GROUND 50 MIN. FN LL WIDTH!E OF 2 3- COARSE - INGRESS AND ACCRECATE o EGRESS AREA 1 MIN. STONE CONSTRUCTION ENTRANCE o n� Entrance Construction 1. Clear the entrance and exit area of all vegetation, roots, and other objectionable material and properly rade it. 1 P P Y9 2. Place the gravel to the specific grade and dimensions shown on the plans, and smooth it. 3. Provide drainage to carry water to a sediment trap or other suitable outlet. 4. Use geotextile fabrics because they improve stability of the foundation in locations subject to seepage or high water table. Maintenance Maintain the ravel ad in a condition to prevent mud or sediment from leaving the construction site. This 9 P P 9 may require periodic topdressing with 2 -inch stone. After each rainfall, inspect any structure used to trap sediment and clean It out as necessary. Immediate) remove all objectionable materials spilled, washed or tracked onto public roadways. Y Y J P , , 2. Construction Road & Service Path Stabilization The temporary stabilization of access roads, construction staging areas, and other on-site vehicle transportation routes shall be implemented with stone immediately after grading. SERVICE PATH & STAGING AREA SOIL SECTION NTS 2--3' TOPSOIL W/ 1-/3- DIA. STONES WORKED IN h PUNTED W/GRASS B� OF 1'/3. OIA ROCK WORKED INTO SITS-GRMIE 3 Page 2377 - McBride Place Energy, LLC 5. Temporary Sediment Basin A temporary barrier or dam with a controlled storm water release structure formed by constructing an embankment of compacted soil across a drainageway shall be constructed as shown on the plans. PLASTC SLG PE DRAINPIPE [PRACTICE STA NDA RD 6.32) GR GEGTEXTILE LINING STEEL FOSTS(QI MIN PERMANENT - RD.ERSTRICTIIRE SKIMMER ]SQE VAR.] /E E NNMEM / STONE ENE [a l� olss rorz IE f Mf NG fNCYSPILI W } / / .� Vtt Eo LMS 0 R METAL PoSf COIR FIBER BAFFLES ' [PRACTICESTANDARD 6.65] 1 Nf NRG PLAN VIEW TGPGF EM6INKMEM R6f RSTRLCTURf TRASH PACK- F i rv. Hill -01S 7 -ENTERO ENCYSPILLWA4 to sof s �. p SKIMMfR- nx E 1 hN k Hca n � � � o 66 RFfL �- P IPE CLAS 6slGNf Ni❑ [4'X4'X1'MIN.] AMIFI-ION EM SECTIONALVIEW t CIUFGFF AMI -SEEP STA E ILIZE D. L TRENCH -LLAq 7 Df f P G LfTLfT 1.1 NOTES 1. SEED AND PLACE MATTING FGR ERO SIGN CONTROL ON INTERIO RAND EXTERIOR SIDESLOPES. 2. INSTALLA MIN IMUM OF 3 N IR FIBER BAFFLES.111 ACCORDANCE WITH PRACTICE STANDARD 6.65. 3. NSTALLSKIMMER.AND CO UPLING TO RISER ST R UCRU RE O R DIRECTLY INTO EMBANKMENT 1 FT. FROM BOTTOM O F BASIN. 4. THE ARM PIPE SHALL HAVE A MINIMUM LENGTH 0 F 6 FT. BETWEEN THESRIMMER AN COUPUNG, NOT TO SCALE 2377 - McBride Place Energy, LLC Construction Road Stabilization Construction 1. Clear roadbed and parking areas of all vegetation, roots, and other objectionable material. 2. Ensure that road construction follows the natural contours of the terrain, if it is possible. 3. Locate staging and concrete washout areas on naturally flat areas, if they are available. Keep grades sufficient for drainage, but generally not more than 2 to 3%. 4. Provide surface drainage, and divert excess runoff to stable areas by using water bars or turnouts (References: Runoff Control Measures, North Carolina E&SC Manual, 6.20). 5. Keep cuts and fills at 2:1 or flatter for safety and stability and to facilitate establishment of vegetation and maintenance. 6. Spread a 6 -inch course of "ABC" crushed stone evenly over the full width of the road and smooth to avoid depressions. 7. Where seepage areas or seasonally wet areas must be crossed, install subsurface drains or geotextile fabric cloth before placing the crushed stone (Practice 6.81, Subsurface Drain). 8. Vegetate all roadside ditches, cuts, fills, and other disturbed areas or otherwise appropriately stabilize as soon as grading is complete (References: Surface Stabilization, Practice 6.10). 9. Provide appropriate sediment control measures to prevent off-site sedimentation. Maintenance Inspect construction roads and staging areas periodically for condition of surface. Top -dress with new gravel, as needed. Check road ditches and other seeded areas for erosion and sedimentation after runoff - producing rains. Maintain all vegetation in a healthy, vigorous condition. Sediment -producing areas should be treated immediately. 3. Silt Fence A temporary sediment barrier constructed of posts, filter fabric and in some cases a wire support fence, placed across or at the toe of a slope or in a minor drainage way to intercept and detain sediment and decrease flow velocities from pp drainage areas of limited size; applicable where sheet and rill erosion or small , concentrated flows may be a problem. Contractor to install silt fence where shown on the site plans or where deemed necessary to avoid sediment runoff. CO -CION I'll'DOESTr'l EHCH / s wTLawL SPECIncnnw+s NG MTM1 O TRENCH. no - E1PEc1ED rvS I COrv51I DFE Al n 91 EL5 MSTS sAR SMIMSI io IMSRaL �M .mroa ETR f cl .TE _TENING THE SILT FENCE IMOM (SHEET FLOW PROTECTIONS ,11" s�i�n °" �rv`H�µ"s 4 Page 2377 - McBride Place Energy, LLC slopes of the trench no steeper than 1:1. Compaction requirements are the same as those for the embankment. Keep the trench dry during backfilling and compaction operations. 3. Embankment- Take fill material from thea roved areas shown on the plans. It should be clean mineral soil Pp p , free of roots wood vegetation, rocks and other objectionable material. Scarify areas on which fill is to be Y 9 , 1 Y placed before placing fill. The fill material must contain sufficient moisture so it can be formed by hand into a ball without crumbling. If water can be squeezed out of the ball, it is too wet for proper compaction. Place fill material in 6 to 8 inch continuous layers over the entire length of the fill area and compact it. Compaction may Y 9 p P Y be obtained by routing the construction hauling equipment over the fill so that the entire surface of each layer is traversed by at least one wheel or tread track of heavy equipment, or a compactor may be used. Construct the embankment to an elevation 10 percent higher than the design height to allow for settling. 4. Conduit spillways- Securely attach the riser to the barrel or barrel stub to make a watertight structural connection. Secure all connections between barrel sections by approved watertight assemblies. Place the barrel and riser on a firm smooth foundation of impervious soil. Do not use pervious material such as sand P P , ravel or crushed stone as backfill around the pipe or anti -see collars. Place the fill material around the 9 PP P pipe spillway in 4 -inch layers, and compact it under and around the pipe to at least the same density as the adjacent embankment. Care must be taken not to raise the pipe from firm contact with its foundation when compacting under the pipe haunches. Place a minimum depth of 2 feet of compacted backfill over the pipe spillway before crossing it with construction equipment. Anchor the riser in place by concrete or other satisfactory means to prevent flotation. In no case should the pipe conduit be installed by cutting a trench through the dam after the embankment is complete. 5. Emergency spillway- Install the emergency spillway in undisturbed soil. The achievement of planned elevations, grade, design width, and entrance and exit channel slopes are critical to the successful operation of the emergency spillway. Construction 6. Inlets- Discharge water into the basin in a manner to prevent erosion. Use diversions with outlet protection 1. Site preparations- Clear, rub and strip topsoil from areas under the embankment to remove trees to divert sediment -laden water to the upper end of the pool area to improve basin trap efficiency (References: P P g P P Runoff Control Measures and Outlet Protection). vegetation, roots, and other objectionable material. Delay clearing the pool area until the dam is complete and then remove brush, trees, and other objectionable materials to facilitate sediment cleanout. Stockpile all 7. Erosion control- Construct the structure so that the disturbed area is minimized. Divert surface water away from bare areas. Complete the embankment before the area is cleared. Stabilize the emergency topsoil or soil containing organic matter for use on the outer shell of the embankment to facilitate vegetative Y P g y spillway embankment and all other disturbed areas above the crest of the principal spillway immediately establishment. Place temporary sediment control measures below the basin as needed. after construction (References: Surface Stabilization). 8. 2. Cut-off trench- Excavate a cut-off trench alongthe center line of the earth fill embankment. Cut the 9. Install porous baffles as specified in NCDEQ Erosion and Sediment Control Planning p P O 9 and Design Manual Chapter 6 Practice 6.65.1 Porous Baffles. trench to stable soil material, but in no case make it less than 2 feet deep. The cut-off trench must extend g p , into both abutments to at least the elevation of the riser crest. Make the minimum bottom width wide enough to permit operation of excavation and compaction equipment, but in no case less than 2 feet. Make side 10. Safety- Sediment basins may attract children and can be dangerous. Avoid steep side slopes, and fence and mark basins with warning signs if trespassing is likely. Follow all state and local requirements. 81Page 9l Page 2377 - McBride Place Energy, LLC Silt Fence Construction 1. Construct the sediment barrier of standard strength or extra strength synthetic filter fabrics. 2. Ensure that the height of the sediment fence does not exceed 24 inches above the ground surface. (Higher fences may impound volumes of water sufficient to cause failure of the structure.) 3. Construct the filter fabric from a continuous roll cut to the length of the barrier to avoid joints. When joints are necessary, securely fasten the filter cloth only at a support post with 4 feet minimum overlap to the next post. 4. Support standard strength filter fabric by wire mesh fastened securely to the upslope side of the posts. Extend the wire mesh support to the bottom of the trench. Fasten the wire reinforcement, then fabric on the upslope side of the fence post. Wire or plastic zip ties should have 50 -pound tensile strength. 5. When a wire mesh support fence is used, space posts a maximum of 8 feet apart. Support posts should be driven securely into the ground a minimum of 24 inches. 6. Extra strength filter fabric with 6 feet post spacing does not require wire mesh support fence. Securely fasten the filter fabric directly to the posts. Wire or plastic zip ties should have minimum 50 -pound tensile strength. 7. Excavate a trench approximately 4 inches wide and 8 inches deep along the proposed line of posts and upslope from the barrier. (See detail) 8. Place 12 inches of the fabric along the bottom and side of the trench. 9. Backfill the trench with soil placed over the filter fabric and compact. Thorough compaction of the backfill is critical to silt fence performance. 10. Do not attach filter fabric to existing trees. Maintenance Inspect sediment fences at least once a week and after each rainfall. Make any required repairs immediately. Should the fabric of a sediment fence collapse, tear, decompose, or become ineffective, replace it promptly. Remove sediment deposits as necessary to provide adequate storage volume for the next rain and to reduce pressure on the fence. Take care to avoid undermining the fence during cleanout. Remove all fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been properly stabilized. 5 Page 2377 - McBride Place Energy, LLC Maintenance Inspect temporary sediment basins at least weekly and after each significant (1/2 inch or greater) rainfall event and repair immediately. Remove sediment and restore the basin to its original dimensions when it accumulates to one-half the design depth. Place removed sediment in an area with sediment controls. Check the embankment, spillways, and outlet for erosion damage, and inspect the embankment for piping and settlement. Make all necessary repairs immediately. Remove all trash and other debris from the riser and pool area. 6. Temporary & Permanent Seeding Temporary seeding shall be applied to disturbed areas that will not be brought to final grade for a period of more than 14 days, in accordance with North Carolina E&SC Manual, Chapter 6.10.1. Permanent seeding is used to control runoff and erosion on disturbed areas by establishing perennial vegetative cover with seed after all construction activity is complete. 9 Y P Seeding Installation Complete grading before preparing seedbeds, and install all necessary erosion control practices such as, dikes, waterways, and basins. Minimize steep slopes because they make seedbed preparation difficult and increase the erosion hazard. If soils become compacted during grading, loosen them to a depth of 6-8 inches using a ripper, harrow, or chisel plow. Seedbed Preparation Good seedbed preparation is essential to successful plant establishment. A good seedbed is well - pulverized, loose, and uniform. Where hydro -seeding methods are used, the surface may be left with a more irregular surface of large clods and stones. Liminq Apply lime according to soil test recommendations. If the pH(acidity) of the soil is not known, an application of ground agricultural limestone at the rate of 1 to 1 1/2 tons/acre on coarse-textured soils and 2-3 tons/acre on fine- textured soils is usually sufficient. Apply limestone uniformly and incorporate into the top 4-6 inches of soil. Soils with a pH of 6 or higher need not be limed. Fertilizer Base application rates on soil tests. When these are not possible, apply a 10-10-10 grade fertilizer at 700- 1,000 Ib/acre. Both fertilizer and lime should be incorporated into the top 4-6 inches of soil. If a hydraulic seeder is used, do not mix seed and fertilizer more than 30 minutes before application. Surface rou henin a 9 If recent tillage operations have resulted in a loose surface, additional roughening may not be required, except to break up large clods. If rainfall causes the surface to become sealed or crusted, loosen it just prior to seeding by disking, raking, harrowing, or other suitable methods. Groove or furrow slopes steeper than 3:1 on the contour before seeding (Practice 6.03, Surface Roughening). Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ Drawing No. Date: 4-25-17 • AX, 1 Scale: AS NOTED �..1..� •l.Jl J 00 Designed by: EHB L0 ~ Drawn by: RIJ Checked by: EHB ''/�//j11f 111141\\\\♦ Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ Drawing No. • AX, 1 �W �..1..� •l.Jl J 00 _ C?:CD L0 ~ O Q ''/�//j11f 111141\\\\♦ Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ Job No. 2377 Drawing No. U �..1..� L0 ~ O Q (,� c0 C) w � z o> Q W �QN Z m= a W U� > Z < J J= O LLJ H LJ N J - Ij J W CV m o O N � O W m U Job No. 2377 Drawing No. 5.9 of 23 Sheets Job No. 2377 LLQ A 2377 - McBride Place Energy, LLC Plant Selection Select an appropriate species or species mixture from Table 6.10a for seeding in late winter and early spring, Table 6.10b for summer, and Table 6.10c for fall. In the Mountains, December and January seedlings have poor chances of success. When it is necessary to plant at these times, use recommendations for fall and a securely tacked mulch. Seedina Evenly apply seed using a cyclone seeder (broadcast), drill, culti-packer seeder, or hydro -seeder. Use seeding rates given in Tables 6.10a -6.10c. Broadcast seeding and hydro -seeding are appropriate for steep slopes where equipment cannot be driven. Hand broadcasting is not recommended because of the difficulty in achieving a uniform distribution. Small grains should be planted no more than 1 inch deep, and grasses and legumes no more than 1/2 inch. Broadcast seed must be covered by raking or chain dragging, and then lightly firmed with a roller or culti- packer. Hydro -seeded mixtures should include a wood fiber (cellulose) mulch. Mulching The use of an appropriate mulch will help ensure establishment under normal conditions, and is essential to seeding success under harsh site conditions (Practice 6.14, Mulching). Harsh site conditions include: • seeding in fall for winter cover (wood fiber mulches are not considered adequate for this use), • slopes steeper than 3:1, • excessively hot or dry weather, • adverse soils (shallow, rocky, or high in clay or sand), and • areas receiving concentrated flow. If the area to be mulched is subject to concentrated waterflow, as in channels, anchor mulch with netting (Practice 6.14, Mulching). 11IPage 2377 - McBride Place Energy, LLC Construction Schedule 1. Obtain site plan approval and other applicable permits. 2. Hold a pre -construction conference at least one week prior to any construction activity. 3. Construction Area #1 a. Flag the work limits, including the perimeter buffer area and no -build area along Bost Creek for protection of trees and creek. b. All perimeter Erosion/Sediment Control measures in all areas, such as sediment fencing, diversions, and sediment basins shall be installed before any clearing, grubbing, or topsoil stripping takes place. Temporary diversion ditches designed to direct clean water entering the site to an area off-site must be stabilized immediately after installation with vegetation and matting. Due to the nature of this project and the required number and size of temporary sediment basins and associated control measures, it is necessary to install erosion control measures within the prescribed perimeter Buffer Area and in areas where Solar Arrays will ultimately be installed. Once the need for the temporary measures ceases, the Buffer Area shall be re-established and the grade beneath Solar Arrays created and stabilized. c. Obtain permission from County/DEQ ESC Inspector to proceed. d. Install temporary gravel Construction Entrance/Exit. e. Complete site clearing and grubbing. f. Construct Construction Staging Area and Concrete Washout Area as shown on Sheet 5.11, details "Service Aisle, Rack Path & and Construction Staging Area Soil Section" and Concrete Washout. g. Grade Construction Area #1 portion of the site as shown on the Site Plan, Sheets 5.0, 5.1, & 5.2. Bare areas should be vegetated or mulched, if grading ceases for more than two weeks. h. Construct Service Roads and Service Paths as shown on Sheet 5.0, 5.1 & 5.2 and Sheet 5.11, detail "Service Aisle, Rack Path & and Construction Staging Area Soil Section." i. Install solar array inverter pads per solar manufacturer's directions at locations shown on Sheets 5.1 & 5.2. j. Install solar array anchors/support beams per manufacturer's instructions in areas not impacted by sediment basins. Anchors and beams for solar arrays located within temporary sediment basins shall be installed after removal of temporary erosion control measures and full site stabilization. Installation of anchors and beams causes no risk of soil erosion or creation of sediment. k. Install cabling from array pads to a location, to be determined, near the Union Power pad. I. Inspect all erosion and sediment controls weekly and after all rainfall events. Needed repairs are to be completed immediately. m. After obtaining approval from the County/DEQ ESC Inspector, remove temporary sediment control measures, and stabilize the entire Construction Area #1. n. Install remaining solar array anchors/support beams in areas previously occupied by temporary sediment control measures. o. Establish permanent vegetation. p. Install solar arrays onto supports and test. q. Estimated time before final stabilization - 7 months 4. Construction Areas #2 - #4 161 Page 2377 - McBride Place Energy, LLC 2377 - McBride Place Energy, LLC Maintenance Reseed and mulch areas where seedling emergence is poor, or where erosion occurs, as soon as possible. Do not mow. Protect from traffic as much as possible. table 6.10a temporary seeding Recommendations for late winter and early spring Al A seeding mixture spWics Rate (Ib/acre) Rye (grain) 120 Annual lespedeza (Kobe in Piedmont and Coastal Plain, 50 in Mountains) Omit annual lespedeza when duration of temporary cover is not to extend beyond June. seeding dates Mountains -Above 2500 feet: Feb. 15 - May 15 Below 2500 feet: Feb. 1- May 1 Piedmont -Jan. 1 - May 1 Coastal Plain -Dec. 1 - Apr. 15 soil amendments Follow recommendations of soil tests or apply 2,000 Ib/acre ground agricultural limestone and 750 Ib/acre 10-10-10 fertilizer. mulch Apply 4,000 Ib/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. 12IPage 2377 - McBride Place Energy, LLC table 6.10b temporary seeding Recommendations for summer Repeat steps 3.a. - 3.q. for Areas #2 - #4. 5. Any off-site borrow and waste required for this project must come from a site with an approved erosion control plan, a site regulated under the mining act of 1971, or a landfill regulated by the division of solid waste management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules and regulations. [15a NCAC 4b .0110] 6. Pursuant to the NPDES permit that went into effect August 3, 2011, ground stabilization must occur within 7 days on perimeter areas and slopes greater than 3:1, and ground stabilization must occur within 14 days on other areas. These requirements supersede any less stringent stabilization requirement on the plans and apply for any section of the project for any period of inactivity or project completion. [G.S. 143-215.1] Slopes greater than 3:1 have been identified on Sheet 5.0. 7. Construction Entrances must contain at least 2 -3 -inch stone and be maintained in a condition that will prevent tracking or direct flow of mud onto streets. Periodic top dressing with stone will be necessary. Install water bars, ditch diversions or other suitable measures so that stormwater does not leave the limits of disturbance through the construction entrances, as needed. [G.S. 113a-57(3), 15a NCAC 4b .0105] Maintenance In general, all erosion and sediment control measures shall be checked daily and after each significant rainfall. The following items shall be checked, in particular: 1. The seeded area shall be checked regularly to ensure that a good stand is maintained. Areas shall be fertilized and reseeded as needed. 2. The gravel Construction Entrance shall be maintained in a condition which will prevent tracking or flow of mud onto public rights-of-way. Periodic top dressing with additional stone or the washing and reworking of existing stone shall be required when the stone is covered or has been pushed into the soil and shall be returned to its original minimum depth of 6". 3. The Silt Fence barrier, if used, shall be checked regularly (no less than weekly) for undermining or deterioration of the fabric. Sediment shall be removed when the level of sediment deposition becomes 6" deep at the fence. 4. Self -Inspection requirements: As a minimum, the inspections shall be performed after each of the following phases of a plan: 1. Installation of perimeter erosion and sediment control measures. 2. Installation of sediment traps/basins. 3. Clearing and grubbing of existing ground cover. 4. Completion of any phase of grading that requires provision of stabilization. 5. Installation of measures during any phase of the project. 6. Completion of construction or development. 7. Installation of stormwater retention measures. 8. Quarterly until the establishment of permanent ground cover is fully established. 171Page table 6.10c temporary seeding Recommendations for fall seeding mixture s106 Rate (Ib/acre) German millet 40 In the Piedmont and Mountains, a small -stemmed Sudangrass may be substituted at a rate of 50 Ib/acre. seeding dates Mountains -May 15 - Aug. 15 Piedmont -May 1 -Aug. 15 Coastal Plain -Apr. 15 - Aug. 15 soil amendments Follow recommendations of soil tests or apply 2,000 Ib/acre ground agricultural limestone and 750 Ib/acre 10-10-10 fertilizer. mulch Apply 4,000 Ib/acre straw. Anchor straw by tacking with asphalt, netting or a mulch anchorin tool. A disk with blades set near) straight can be 9 Y 9 used as a mulch anchoring tool. maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. 13IPage 2377 - McBride Place Energy, LLC Soil Map-Cabarrus County, North Combos Y1 ' MpS5 e' 1,9,913)hp,lffi l,M (05'x11"J9ffi. R M� A1001 mm LG I"n7 pdaVm', N2b Macim -d-- ­ EdS:vLs: VIM Zoe 1TV NGE84 �iNatural Resources Web Soil Survey Conservation Service National Cooperative Soil Sulvey 1/5/2017 Page 1 of S 18IPage 2377 - McBride Place Energy, LLC seeding mixture opwics Rate (Ib/acre) Rye (grain) 120 seeding dates Mountains -Aug. 15 - Dec. 15 Coastal Plain and Piedmont -Aug. 15 - Dec. 30 soil amendments Follow soil tests or apply 2,000 Ib/acre ground agricultural limestone and 1,000 Ib/acre 10-10-10 fertilizer. mulch Apply 4,000 Ib/acre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. maintenance Repair and refertilize damaged areas immediately. Topdress with 50 Ib/acre of nitrogen in March. If it is necessary to extent temporary cover beyond June 15, overseed with 50 Ib/acre Kobe (Piedmont and Coasta Plain) or Korean (Mountains) lespedeza in late February or early March. Si Ma Civalrva Cwnty, Nath C.ou.a (McePode Fere I.L. solar Farm) MAPLEGEND Map Unit Symbol Map Unit Name Acres In AOI Percent of AOI BaB Bodin channery silt loam. 2 to 79.5 12.3% 8 percent slopes ea , nfl ,� m, ® e,rsmy5pa to soil rn.vwavmna _. aa., spVelsswoua wmerr apeam,.ndGmal, ® Oe.�A1 ci percent slopes, frequently Mm R.as o GI,,..to..... „e,MaRIMm.,, � Ga..lpa 0.1% „ Ga+elM Spa a. .am o Lam 3.8% ala da A e.mu KkB Kirksey silt loam, 1 to 6 Mvsha mamp 12.7% Aenv Pn oYapY � Mm.a MSA Misenheimer channery silt 0 59.1% loam, 0 to 4 percent slopes cp.,....lw.e. TaB Tarsus sill loam. 2 to 8 percent } saanespap 6.4% slopes srvz,Yy EodM Spa p a.,aha. W Water I, ardeaa, 0.2% Totals for Area of Interest $ s.a. 4.1 100.0% 14IPage 2377 - McBride Place Energy, LLC 7. Other practices shall be provided if determined by the Engineer or NC -DEQ Administrator. Management Strategies 1. Perimeter sediment trapping measures to be installed prior to any excavation on site. 2. Construction Entrance and Construction Road Stabilization shall be installed as a first measure following installation of sediment trapping measures. 3. Construction shall be conducted so that existing cover will not be disturbed more than necessary. 4. Construction shall be sequenced so that grading operations can begin and end as quickly as possible 5. Permanent seeding and other stabilization shall follow immediately after grading.in accordance with 7 or 14 day ground stabilization requirements. 6. The job superintendent shall be responsible for the installation and maintenance of all erosion and sediment control practices. 7. After achieving adequate stabilization to the satisfaction of the E&SC Administrator, the temporary E&S controls shall be removed. Permanent Stabilization All areas disturbed by construction and not otherwise stabilized, shall be stabilized within 7 days on perimeter areas and slopes greater than 3:1, and ground stabilization must occur within 14 days on other areas. These requirements supersede any less stringent stabilization requirement on the plans and apply for any section of the project for any period of inactivity or project completion [G.S. 143-215.1] When it is clear that plants have not germinated on an area or have died, these areas must be reseeded immediately to prevent erosion damage. In all seeding operations, seed, fertilizer, and lime shall be applied prior to mulching. Erosion control blankets shall be installed over fill slopes which have been brought to final grade and have been seeded to protect the slopes from rill and gully erosion and to allow seed to germinate properly. Mulch (straw or fiber) shall be used on relatively flat areas. In all seeding operations, seed, fertilizer, and lime shall be applied prior to mulching. Storm Water Management/Water Quality There are no permanent storm water management practices proposed for this site, and there are no water quality measures proposed. The proposed impervious area is 0.3%. 2377 - McBride Place Energy, LLC MAP INFORMATION The spn all 24 000. rely p0 Ne bar scaa m -1, map sheet fiv ioi smrcerol Map: Moil ResourcesCmservatipns URL. hhpsal :-bsurvey.nres.ueda qa, Co«tlmeteurvey b,e.. Web Me .1(FPsc:3GST1 Maps ROm the Web sal surrey ere based m Ina wee Mercet« ehieh perves dshape but and shbut 6stpds rires sc ntl area. APr rllce that preserresarea. suM as the rs equal-area cmic prgedlm. shmld be used ifmpre accurate celculehrns adlslanam or area are required This pradud Is gen n- from the UsDhNRCs cehieed Late esa the version dele(s) listed below. Sc ep..rh Cr«Ina V« surveyry1. D.I.Uel. slon,5.5 19, 2016 'Imapunilserel�beled(assperoellaysl lamaD%rales 1:5p000 or larger. Datels)aedal images were phao Ors d, -11.2011-reb 13.2011 eryddespleyed mdti- maps Az elI- sane -.1zhiflog dr p dlrbwOd M1e%maybe Led, 191Page 15IPage 2377 - McBride Place Energy, LLC Soil Map-Cabarrus County, North Carolina Map Unit Legend Cabarrus County, North Carolina (NCO25) Map Unit Symbol Map Unit Name Acres In AOI Percent of AOI BaB Bodin channery silt loam. 2 to 79.5 12.3% 8 percent slopes J 00 •l.Jl Q (-):co Boo, Bedin channery silt loam, 8 to 191 30% 15 percent slopes Drawn by: RIJ ChA Chewaclasandyloam,0to2 168 2.6% percent slopes, frequently w W z 0>_ nodded W N GOC Gddston very channery silt 0.9 0.1% loam, 4 to 15 percent slopes Hell Herndon silt loam, 2 to 8 24.4 3.8% percent slopes H LLJ N KkB Kirksey silt loam, 1 to 6 82.0 12.7% percent slopes W N m 0 O MSA Misenheimer channery silt 382.8 59.1% loam, 0 to 4 percent slopes TaB Tarsus sill loam. 2 to 8 percent 41.5 6.4% slopes W Water 1.2 0.2% Totals for Area of Interest 646.2 100.0% USDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey Page 3 of 3 201 Page Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ Date: 4-25-17 • , 1 Qv,OZ� Scale: AS NOTED ti ' d '[n J 00 •l.Jl Q (-):co Designed by: EHB lO Q Drawn by: RIJ Checked by: EHB '11/11111f111141\\\\♦ Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ • , 1 Qv,OZ� ti ' d '[n J 00 •l.Jl Q (-):co w�} _ 0: _ lO Q O '11/11111f111141\\\\♦ Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ Drawing No. 5,e10 of 23 Sheets Job No. 2377 U \W / J J lO Q O CO 0.) O Q Z w W z 0>_ W N Z m Q w U�> CL Q J J O H LLJ N J to W N m 0 O W O U Drawing No. 5,e10 of 23 Sheets Job No. 2377 TYPICAL TREATMENT - (SOIL S TABILIZA TION BLANKET) INS TALLA TION CRITERIA 12"MAX. 4:1 OR FLATTER 6"MAX. STEEPER THAN 4:1 LAP JOINT 2" MIN. (JUTE MESH ONLY I I I 111 I I I i ANCHOR SLOT I I I I '::"EDGE AND END JOINTS ii i I TO BE SNUGLY ABUTTED (JUTE MESH WILL HAVE 5' MAX. 4:1 OR FLATTER I STAPLED LAP JOINT IN JUNCTION SLOT 3' MAX. STEEPER THAN 4:1 1 1 1 1 1 LIEU OF EDGE JOINT) CHECK SLOT I I TERMINAL FOLD I 1 Iii i1 TAMP FIRMLY I I I I I = AOR SLOT *CHECK SLOT I I I I ,-,u1I I I I I W6 -T 12" VAR' ►ice PLAN VIEW STAPLING DIAGRAM �-1 " TO 2" * CHECK SLOTS AT MIN. TAMP FIRMLY 50' C -C INTERVALS; CHECK SLOT NOT REQ'D. WITH ALL 6" TO IN. 2„ "COMBINATION" BLANKETS 6" 0 12" STAPLE FORMED FROM NO. 11 STEEL WIRE. 8" STAPLE MIN. LENGTH FOR SANDY SOIL. 6" STAPLE MIN. LENGTH FOR OTHER SOIL. NOTES JUNCTION SLOT TEAL FOLD APPROXIMATELY 200 STAPLES I� 12„ TAMP FIRMLY f•- --►( TAMP FIRMLY REQUIRED PER 100 SQ. YDS. OF MATERIAL ROLL.. T 6" TO 12"96 2 ANCHOR SLOTS, JUNCTION i SLOTS & CHECK SLOTS TO BE BURIED 6" TO 12". EXCAVATED SOIL COMPACTED SOIL 4' WIDE x 12" DEEP 4' WIDE x 12" HIGH FLOW DIVERSIONS NOT PLACED IN SOLAR ARRAYS OR SERVICE PATHS NTS COMPACTED SOIL 10' WIDE x 6" HIGH EXCAVATED SOIL 10' WIDE x 6" DEEP FLOW DIVERSIONS PLACED IN SOLAR ARRAYS OR SERVICE PATHS NTS Drape baffle material overwire strand and secure with plastic ties at pasts and on wire every 12" 9 Gauge Min. High ---11r Tension Wire Strand Shall Be Secured To Post To Support Baffle Material Baffle Material . Z co 50' MIN. EXISTING PAVEMENT II -III -III -III -III -III -III -III EXISTING GROUND L Z :2 III III o o *MUST EXTEND FULL WIDTH OF 2-3" COARSE INGRESS AND AGGREGATE EGRESS AREA 10' MIN. z STONE CONSTRUCTION ENTRANCE NTS COMPACT SUB -GRADE TO 95% PROCTOR DENSITY LBASE AGGREGATE, 8" OF CRUSH & RUN AGGREGATE FINISHED ENTRANCE GRAVEL SECTION NTS 2"-3" TOPSOIL W/ 1"/3" DIA. STONES WORKED IN `& PLANTED W/GRASS 6" OF 1"/3" DIA. ROCK WORKED INTO SUB -GRADE - THREE LIFTS -j THE SURFACE OF THE ACCESS ROADS SHALL BE DESIGNED AND MAINTAINED TO SUPPORT THE 0 IMPOSED LOADS OF FIRE APPARATUS WEIGHING UP TO 75,000 POUNDS. THE ACCESS ROADS SHALL BE SURFACED SO AS TO PROVIDE ALL-WEATHER DRIVING CAPABILITIES TO MEET 503.2.3 AND APPENDIX D102.1 OF THE NC FIRE CODE. USE TEMPORARY LOGGING MATS IN CONSTRUCTION STAGING AREA DURING SITE CONSTRUCTION. SERVICE AISLE, RACK PATH & CONSTRUCTION STAGING AREA Extend 9 gauge wire to basin side or install T -post to anchor baffle to side of basin and secure to vertical post 4'Max.� *If the temporary sediment basin will be converted to a permanent stormwater basin of greater depth, the baffle height should be based on the pool depth during use as a temporary sediment basin. Note: Install three (3) coir fiber baffles in basins at drainage outlets with a spacing of 1/4 the basin length. Two (2) coir fiber baffles can be installed in the basins less than 20 fL in length with a spacing of 1/3 the basin length. SEDIMENT BASIN TABLE 11 Gauge Landscaping Staple Baffle Material 44, I 1 steel Post 2'-0"Depth JJ Baffle Material should be secured to the bottom and sides of basin using 12" landscape staples SOIL SECTION NTS EARTHEN DAM NOTES: 1) CUT OFF TRENCH FOR ENTIRE LENGTH OF DAM AT CENTERLINE TO BE EXCAVATED 4' WIDE AND 4' DEEP INTO IMPERVIOUS MATERIAL. SIDE SLOPES TO BE 1:1, AND COMPACTED. 2) DAM COMPACTION TO BE 95% OF MAXIMUM DRY DENSITY. iD M I I -III FILTER CLOTH -II = NCDOT CLASS B (DOWNSTREAM VIEW) COARSE AGGREGATE FLOW 2:1 2:1 R 0 CK CHECK DAM NTS 10' PARABOLIC UPSTREAM TOE OF DAM PERMANENT FLOWLENGTHXTOP OF BASIN DAM LENGTH(LxW) CURVE LBS/ACRE SPECIES LBS/ACRE EDGE OF SHOULDER 50-100 KENTUCKY 31 FESCUE 4 OR OPTICAL FLOW LINE 60-100 RED TOP GRASS 0 MAINLINE 50 ROADWAY 5. 30' MIN. 160-250 1�24'� R25' (TYP.) SEEDING & MULCHING TABLE %-8% CHANGE ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH TEMPORARY OR F SLOPE PERMANENT SEEDING WITHIN 7 DAYS FOLLOWING FINISH GRADING. SEEDING SHALL BE DONE ACCORDING TO STANDARDS & SPECIFICATIONS OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL HANDBOOK. SEEDING MIXTURE SHALL BE AS INDICATED BELOW. 15"CMP - SHALL BE INSTALLED IN DITCHLINE 30' AT ENTRANCES #1, #3, #4, &#5 Q TEMPORARY UPSTREAM TOE OF DAM PERMANENT FLOWLENGTHXTOP OF BASIN DAM LENGTH(LxW) SPECIES LBS/ACRE SPECIES LBS/ACRE ANNUAL RYEGRASS & CEREAL RYE 50-100 KENTUCKY 31 FESCUE 128 ANNUAL RYE GRASS 60-100 RED TOP GRASS 2 GERMAN MILLET 50 SEASONAL NURSE CROP* 20 TOTAL 160-250 TOTAL 150 MAINLINE ROADWAY ENTRANCE MUST BE GRADED AS TO ALLOW THE SURFACE WATER TO DRAIN TO BOTH SIDES OF THE ENTRANCE. 15" CMP PIPES SHALL BE INSTALLED AT ENTRANCES #1, #3, #4, & #5. 4"-5" RIP RAP SHALL BE USED ON THE INLET AND OUTLET ENDS OF THE PIPES TO PREVENT EROSION. THE FINAL STONE SURFACE SHALL BE INSTALLED TO PREVENT ANY LOOSE STONE MIGRATING INTO THE ROADWAY. CONSTRUCTION S M qx - EXCAVATE 4" X 4" TRENCH UPSLOPE OF STAKELINE. - ATTACH FENCE MATERIAL AND EXTEND INTO AND ALONG BOTTOM OF TRENCH. - BACKFILL AND COMPACT EXCAVATED SOIL. . I I -7- FLOW II III I I- ' 111,;,111=''" SIL T FENCE (SHEET FL 0 W PROTECTION, NTS Al SECTION A -A 28' R TYP. FILTER CLOTH KEY IN 6"-9" RECOMMENDED FOR ENTIRE PERIMETER 20' 70.' CHANNEL 0 LINING q.'1 �r��, � 1=_I =1 11=20' MINIMUMI I =1 I I=1 1(- UNOBSTRUCTEDI1=111=1''- '' =III=11' PATH (TYP.) DITCH SECTION DEAD-END FIRE APPARATUS NTS SERVICE AISLE WZT URNAR 0 UND NTS o 0 La ziN cV 0% COARSE AGGREGATE � b rvm RIGHT-OF- WAY DIVERSION NTS ALUMINUM SIGNS ("DANGER -HIGH VOLTAGE" AND "DANGER -NO TRESPASSING"), EACH MEASURING 14X10" IN SIZE, SHALL BE PLACED ON PERMANENT 6' CHAIN LINK SECURITY FENCING, ALTERNATING EVERY 100' AROUND THE PERIMETER OF THE PROJECT. FINISHED ENTRANCE DETAIL SILT FENCE MATERIAL SPECIFICATIONSNTS SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY WEIGHT OF POLYOLEFINS OR POLYESTER, WHICH IS CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS IN ASTMD 6461. SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM OF 6 MONTHS OF EXPECTED USABLE CONSTRUCTION LIFE AT A TEMPERATURE RANGE OF OTO 120 DEGREES FAHRENHEIT. ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.33 LB/LINEAR FT STEEL WITH A MINIMUM LENGTH OF 5 FEET. STEEL POSTS SHALL BE BURIED/DRIVEN TO A DEPTH OF 18" AND HAVE PROJECTIONS TO FACILITATE FASTENING THE FABRIC. - FOR REINFORCEMENT OF STANDARD STRENGTH FILTER FABRIC, USE WIRE FENCE WITH A MINIMUM 14 GAUGE AND A MAXIMUM MESH SPACING OF 6 INCHES. [G.S. 116A-57(3)] NTS MAINTAIN AT LEAST 2.5' OF ANTI -VORTEX COVER OVER CULVERT TRASH RACK EACH SEDIMENT BASIN SHALL HAVE 3 POROUS BAFFLES 6" HDPE DRAIN PIPE 6' MIN �\ RISER II CULVERT 8`1 TOP OF DAM INSTALL 1' FROM BOTTOM FLOW OF BASIN ANTI -FLOATATION CONCRETE BASE/ANCHOR TEMPORARY SEDIMENT BASINS NOTE: N. T. S. SEDIMENT BASINS TO REMAIN IN PLACE UNTIL SITE IS COMPLETED AND STABILIZED. AFTER APPROVAL FROM E&SC ADMINISTRATOR(S) SEDIMENT BASINS SHALL BE REMOVED AND GRADING CAN COMMENCE IN REGIONS PREVIOUSLY HINDERED BY BASIN LOCATION. NO TRESPASSING 10" �14"� HIGH VOLTAGE BASIN # TOP OF DAM UPSTREAM TOE OF DAM CLEANOUT ELEVATION FLOWLENGTHXTOP OF BASIN DAM LENGTH(LxW) EMERGENCY SPILLWAY CREST EMERGENCY SPILLWAYCREST WIDTH/LENGTH EMERGENCY SPILLWAYSLOPE PRINCIPAL SPILLWAY CREST SKIMMER ORIFICE SKIMMER BARREL ANTI -SEEP COLLAR (SIZE) BARREL INV IN/OUT RISER/BARREL d50 ANTI- FLOATATION ANCHOR SIZE DISTURBEDAREA REQUIRED STORAGE VOL ACTUAL STORAGE VOL (RISER) 2 -YR. ELEV. 10 -YR. ELEV. 1 558.0 ft 551.0' 553.4' 150'x230' 556.8' 30.0720.0' 1 % 555.8' 2.7" 6" 4.25'x4.25' 552.07551.4' 24"/15" 0.8' 471' 17.6 AC 31,680 cult 27,800 cuft 555.29' 555.97' 0 2 548.0 ft 539.0' 542.5' 220'x160' 547.0' 30.0'/20.0' 1 % 546.0' 2.8" 6" 4.25'x4.25' 540.07539.4' 24"115" 0.5 471' 19.8 AC 35,640 cuft 46,700 cuft 544.88' 545.47' 3 548.0 ft 539.0' 542.3' 230'x155' 546.6' 30.0720.0' 1 % 545.5' 3.0" 6" 6'x6' 540.07539.1' 77736" 0.7' 9'/1.5' 21.5 AC 38,700 cuft 45,800 cuft 546.57' 547.11' 4 543.7 ft 535.0' 537.8' 200'x250' 542.0' 30.0'20.0' 1 % 540.5' 3.0" 6" 6'x6' 536.07535.3' 7211/36" 0.7' 9'11.5' 29.3 AC 52,740 cuft 55,200 cuft 542.08' 542.72' 5 551.6 ft 545.0' 547.3' 110'x90' 550.5' 20.0'20.0' 1 % 549.5' 1.5" 6" 5'x5' 546.07545.5' 48"/24" 0.5' 6/1.5' 7.0 AC 12,600 cuft 13,500 cuft 550.18' 550.60' 6 542.6 ft 533.0' 536.0' 240'x285' 540.7' 20.0720.0' 1 % 539.0' 4.0" 6" 6'x6' 534.07533.3' 7211/36" 0.7 971.5' 43.2 AC 77,760 cuft 93,900 cuft 540.51' 541.56' 7 554.4 ft 547.0' 548.9' 225015' 552.7' 25.0'20.0' 1 % 550.9' 3.0" 6" 5'x5' 548.07547.2' 72"124" 0.7' 9111.5' 15.5 AC 27,900 cuft 28,100 cuft 552.66' 553.40' 8 558.6 ft 549.0' 551.8' 270'x205' 556.7' 40.0720.0' 1 % 554.7' 4.0" 6" 6'x6' 550.07549.3' 7211/36" 0.8' 971.5' 50.0 AC 52,740 cuft 100,700 cuft 556.53' 557.52' 9 571.5 ft 563.0' 566.0' 275'x155' 570.5' 25.0720.0' 1 % 569.0' 2.5" 6" 5'x5' 564.07563.4' 48"124" 0.7' 611.5' 15.4 AC 27,720 cuft 43,300 cuft 569.88' 570.52' 10 564.3 ft 557.0' 559.4' 195'x230' 562.8' 25.0720.0' 1 % 561.8' 2.5" 6" 5'x5' 558.07557.0' 481124" 0.7' 6/1.5' 17.4 AC 31,320 cuft 33,200 cuft 562.66' 563.26' 11 521.8 ft 511.0' 513.5' 190'x230' 520.0' 30.0720.0' 1 % 516.0' 2.5" 6" 5'x5' 512.07510.3' 72"/24" 0.8' 9'/1.5' 30.0 AC 54,000 cuft 13,800 cuft 519.74' 520.75' 12 519.0 ft 507.0' 509.9' 320'x230' 516.0' 30.0720.0' 1 % 512.7' 3.0" 6" 5'x5' 508.07504.9' 72"24" 0.8' 9'/1.5' 43.4 AC 52,740 cuft 59,100 cuft 515.99' 517.00' 13 534.0 ft 523.0' 527.0' 90'x120' 532.0' 20.0720.0' 1 % 531.0' 3.5" 6" 4'x4' 526.07525.5' 24"112" 0.8' 471' 29.9 AC 53,820 cuft 36,200 cuft 531.42' 532.16' 14 547.5 ft 543.0' 544.1' 160'x190' 546.3' 20.0720.0' 1 % 545.3' 4.0" 6" 4'x4' 544.07543.7' 36712" 0.5' 471.5' 7.1 AC 12,780 cuft 20,900 cult 545.97' 546.25' 15 549.0 ft 542.0' 544.5' 190'x110' 547.0' 20.0720.0' 1 % 546.0' 3.7" 6" 4'x4' 544.07543.7' 36712" 0.5' 4'/1.5' 7.2 AC 12,960 cuft 10,900 cuft 547.01' 547.35' 16 545.0 ft 539.0' 541.0' 200'x115' 544.0' 20.0720.0' 1 % 543.0' 2.5" 6" 3.67'x3.67' 540.07539.5' 2411/8" 0.5' 471' 16.1 AC 52,740 cult 11,400 cuft 543.27' 543.70' 17 543.5 ft 539.0' 539.0' 55'x75' 542.0' 20.0720.0' 1 % -- 1.5" 6" 3.5'x3.5' 540.07539.6' -46" 0.5' -- 6.5 AC 11,700 cuft 4,600 cuft 541.91' 542.12' 18 545.5 ft 541.0' 541.0' 155'x125' 543.5' 20.0'20.0' 1 % -- 1.5" 6" 3.5'x3.5' 542.07541.6' -/6" 0.5' -- 4.3 AC 7,740 tuft 7,600 cuft 542.58' 542.74' 19 514.0 ft 505.0' 507.5' 180'x280' 512.3' 20.0'20.0' 1 % 510.0' 4.0" 6" 3.67'x3.67' 506.07505.4' 2411/8" 0.6' 4'/1' 39.0 AC 70,200 cuft 26,700 cuft 510.01' 510.44' 20 522.0 ft 517.0' 518.8' 70'x205' 5215 20.0720.0' 1 % 5205 2.0" 6" 3.67'x3.67' 517.07514.0' 1811/8" 0.8' 471' 15.8 AC 52,740 cuft 10,200 cuft 520.68' 521.02'10. 2, *USE SEASONAL NURSE CROP AS INDICATED BELOW ❑ SEPT. 1st - FEB. 15th ANNUAL RYE & CEREAL RYE ❑ MAR. - MAY 15th ANNUAL RYE ❑ FEB. 16th - APR. 30th ANNUAL RYEGRASS ❑ MAY 16th - AUG. 15th FOXTAIL MILLET ❑ MAY 1st -AUG. 31st GERMAN MILLET ❑ AUG. 16th - OCT. ANNUAL RYE ❑ NOV. - FEB. WINTER RYE ORGANIC MULCH MATERIALS AND APPLICATION RATES VESCH TABLE 3.35-A RATES MULCHES PER ACRE PER 1000 SF NOTES: 1j - 2 TONS70 - 90 lbs. FREE FROM WEEDS AND COARSE MATTER. MUST BE ANCHORED. STRAW OR HAY (MIN. 2 TONS FOR SPREAD WITH MULCH BLOWER OR BY HAND WINTER COVER) FIBER MULCH MINIMUM 35 lbs. DO NOT USE AS MULCH FOR WINTER COVER OR DURING HOT, DRY 1500 lbs. PERIODS.* APPLY AS SLURRY CORN STALKS 4 - 6 tons 185 - 275 lbs. CUT OR SHREDDED IN 4-6" LENGTHS. AIR DRIED. DO NOT USE IN FINE TURF AREAS. APPLY WITH MULCH BLOWER OR BY HAND. FREE OF COARSE MATTER, AIR-DRIED. TREAT WITH 12 lbs. WOOD CHIPS 4 - 6 tons 185 - 275 lbs. NITROGEN PER TON. DO NOT USE IN FINE TURF AREAS. APPLY WITH MULCH BLOWER, CHIP HANDLER, OR BY HAND. BARK CHIPS OR50 - 70 C.Y. 1 - 2 cy. FREE OF COARSE MATTER. AIR-DRIED. DO NOT USE IN FINE TURF .. ,, SHREDDED BARK AREAS. APPLY WITH MULCH BLOWER, CHIP HANDLER, OR BY HAND * WHEN FIBER MULCH IS THE ONLY AVAILABLE MULCH DURING PERIODS WHEN STRAW SHOULD BE USED, APPLY AT A MINIMUM RATE OF 2000 lbs./ac. OR 45 lbs./1000 sq. ft. WATER ENTRY UNIT WITH TRASH SCREEN GENERAL NOTES: 1. PROPER DESIGN MUST BE COMPLETED TO MINIMIZE PIPING AROUND DISCHARGE PIPE. 2. PROPER ORIFICE OPENING MUST BE SELECTED TO ENSURE POND DRAINS IN CORRECT AMOUNT OF TIME. MODIFICATIONS MAY BE REQUIRED IF FIELD CONDITIONS WARRANT A CHANGE. 3. EMBANKMENT MUST BE COMPACTED TO DESIGN SPECIFICATIONS. 4. EMERGENCY SPILLWAY MUST BE CORRECTLY SIZED AND EROSION PROTECTION ORIFICE OPENING INSIDE THE INSTALLED. ORIZONTAL TUBE WITH A 5. EROSION PROTECTION MUST BE INSTALLED ALONG THE EMBANKMENT AND AT THE CONSTANT HYDRAULIC HEAD DISCHARGE END OF THE PIPE. 6. INSPECT SYSTEM REGULARLY TO ENSURE IT IS FUNCTIONING IN A CORRECT MANNER. 7. EIGHT SIZES OF SKIMMERS ARE AVAILABLE, REFER TO THE FLOW SHEET, CUT SHEET, AND INSTRUCTIONS ON WEB SITE FOR EACH SIZE. SCHEDULE 40 PVC PIPE (BARREL OR ARM) ARTHEN EMBANKMENT MAXIMUM HEIGHT OF FLOAT WHEN NO MERGENCY SPILLWAY OTHER STORM WATER DISCHARGE OPENINGS EXIST _,__--FLEXIBLE HOSE (MAJOR STORM EVENT) _ INVERT OF LOWEST STORM PVC VENT _=1 1=1 GRATE WATER DISCHARGE OPENING PIPE (MINOR STORM EVENT) LOAT FLEXIBLE HOSE MUST BE Q WATERH E FASTENED TO /F PIPE I I I STORMOPEN;SE OPENING TY NG �llj1��l�I H LEXIBLE HOSE L = 1.4 X DEPTH I- TO THE OVERFLOW I MINIMUM LENGTH APPLIES :NTRY UNIT I SCHEDULE 40 PVC PIPE III (BARREL OR ARM) END VIEW SIDE VIEW MAINTAIN DEPRESSION TO = 1 -= (NO SCALE) MINIMIZE CHANCE OF SKIMMER BECOMING STUCK DRAWN BY T. R. EVANS 10/10 FAIRCLOTH SKIMMER° DISCHARGE SYSTEM WITH OUTLET J. W. FSON INC. WWW.FAIRCLOIRCLOTHSKI M MER.COM STRUCTURE TELEPHONE: (919) 732-1244 FAX: (919) 732-126666 EMAIL: WARRENOFAIRCLOTHSKIMMER. COM STAPLESSTRAW BALE BINDER WIRE (2 PER BALE) U 10 mil PLASTIC LINING J Scale: AS NOTED PLYWOOD NATIVE MATERIAL 48"X24" Designed by: EHB ��0 44;.. PAINTED WHITE O 1(OPTIONAL) - 0 1 WOOD OR METAL STAKES (2 PER VARIES 10 mil PL SECTION B -B NOT TO SCALE WASHOUT T 36" "imil=z IIIEIIILIllr 36" BLACK LETTERS 6" HEIGHT - LAG SCREWS WOOD POST 3.5"X3.5"X3' 1 CONCRETE WASHOUT SIGN DETAIL (OR EQUIVALENT) 8 1.12" DIA STEEL WIRE STAPLE YLHN -..,..VV BALE DETAIL NOT TO SCALE (TYP) TYPE "ABOVE GRADE" WITH STRAW BALES NOTES 1. ACTUAL LAYOUT TO BE DETERMINED IN THE FIELD. 2. A CONCRETE WASHOUT SIGN SHALL BE INSTALLED WITHIN 30' OF THE TEMPORARY CONCRETE WASHOUT FACILITY. 3. MATERIALS USED TO CONSTRUCT TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE REMOVED FROM THE SITE OF THE WORK AND DISPOSED OF OR RECYCLED. 4. HOLES, DEPRESSIONS OR OTHER GROUND DISTURBANCE CAUSED BY THE REMOVAL OF THE TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE BACKFILLED, REPAIRED, AND STABILIZED TO PREVENT EROSION. REFERENCE: CITY OF RALEIGH PUBLIC WORKS DEPARTMENT SW -20.25 -CONCRETE WASHOUT 10/22/2012. LATH AND FLAGGING ON 3 sir" SANDBAG -\ 10 mil PLASTIC LINING Affllll=1' SECTION A -A 3'NOT TO SCALE �II�IIiLIIP BERM 10 mil PLASTIC LINING WOOD FRAME SECURELY FASTENED AROUND SECTION B -B ENTIRE PERIMETER NOT TO SCALE WITH TWO STAKES 10'MINIMUM VARIES 10 mil PLASTIC LININ... SANDBAG PLAN NOT TO SCALE .RM �E "BELOW GRADE" TWO -STACKED 2X12 ROUGH WOOD FRAME STAKE (TYP) ABOVE GROUND" WITH WOOD PLANKS F-� I E O � o ) DO Ih U N o s` N o . Q) v c ii, ssy• � � a ,�, 0 > 3 I� U) U 0) 0 Im LIJ w� M O CD ®® co It V)o LC) L v O = LJ LJ z 0 o_ IN IN Date: 4-25-17 U J_ J Scale: AS NOTED ti �UvO�P .cn J 00 Z: flp 4%0 :W Designed by: EHB ��0 44;.. O Drawn by: RIJ 0 '11/11111f111141\\\\♦ Checked by: EHB W N Z F-� I E O � o ) DO Ih U N o s` N o . Q) v c ii, ssy• � � a ,�, 0 > 3 I� U) U 0) 0 Im LIJ w� M O CD ®® co It V)o LC) L v O = LJ LJ z 0 o_ IN IN Drawing No. U J_ J d%• d ti �UvO�P .cn J 00 Z: flp 4%0 :W LLl 0 0: _ ��0 44;.. O 0 '11/11111f111141\\\\♦ Revision Dates 1 -10 -17 -PER NCDOT 2-15-17 PER NCDEQ -21 -17-PER COUN N Drawing No. U J_ J Q Ln ~ O O 0 O W N Z �Q N W U w > W Q _j_ O � w ( 0 J - Z W N Im 0 O QN � U Job No. 2377 Drawing No. 5,o 1 1 of 23 Sheets Job No. 2377 BASIN # 2 LEGEND CURVE NUMBER/ RUNOFF COEFFICIENT CONSTRUCTION AREA 1230 EXISTING CONTOURS F12301 PROPOSED CONTOURS + 28.5 PV PROPOSED SPOT ELEVATION 72 DRAINAGE FLOW cE CONSTRUCTION ENTRANCE cRs CONSTRUCTION ROAD STABILIZATION sF SILT FENCE IP INLET PROTECTION cIP CULVERT INLET PROTECTION DD TEMPORARY DIVERSION DIKE FD TEMPORARY FILL DIVERSION RwD RIGHT OF WAY DIVERSION sT SEDIMENT TRAP oP OUTLET PROTECTION c� ROCK CHECK DAMS To TOPSOILING Ts TEMPORARY SEEDING Ps PERMANENT SEEDING so SODDING Mu MULCHING BASIN # DRAINAGE AREA TIME OF CONCENTRATION (MIN) CURVE NUMBER/ RUNOFF COEFFICIENT 1 17.6 ac 6.6 72 2 19.8 ac 9.0 72 3 21.5 ac 8.7 90 4 29.3 ac 10.6 90 5 7.0 ac 5.0 90 6 43.2 ac 12.0 90 7 15.5 ac 9.5 90 8 50 ac 9.9 90 9 15.4 ac 8.2 90 10 17.4 ac 9.8 90 11 30.0 ac 14.6 90 12 43.4 ac 13.3 90 13 29.9 ac 15.0 0.4 14 30.9 ac 10.6 0.4 15 33.9 ac 8.0 0.4 16 16.1 ac 5.0 0.4 17 6.5 ac 5.0 0.4 18 4.3 ac 5.0 0.4 19 39.0 ac 5.0 0.4 20 15.8 ac 6.0 0.6 I v S o� / DA S62 \ 19.8 AC A, r / Rr SB DA SB3 I 21.5 AC �// I j4/ DA SB5 7.0 AC DISTURBED AREA ✓ / �/ ) (�� T1I r Q DRAINAGE AREA / / SEl CENTER LINE SITE BOUNDARY -E/T- ELECTRIC/TELEPHONE / -�- -�- / I ( \ , _. DA S134 r / ��DA -A SB6 1 METER/ TRANSFORMER / 29.3 AC �. ❑E \ \ / � / I � - � � / � � 1 �� I // 43.2 AC � / \ C GUY WIRE �7 EXISTING UTILITY POLE EXISTING LIGHT POLES 1 I o \ /f PROPOSED UTILITY POLE STORM SYSTEM PROPOSED DITCH - - EXISTING PROPERTY LINE - - - SETBACK LINE EASEMENT LINE --------- DISTURBED AREA l L J DA SB10 DA SB8 PROPOSED PAD DA SB7 50.0 AC j J c _- 17.4 AC PROPOSED RACK PATH 15.5 AC i DA S139` / PROPOSED SERVICE AISLE \ 8 I \ SB9 15.4 AC --------- EXISTING ROAD PROPOSED ROAD �-� PROPOSED FENCE \ 0 CONCRETE PAVING HEAVY PAVEMENT \ \ \ D LIGHT PAVEMENT 1 I ) ® GRAVEL AREA f ARRAY FIXED SOLAR PANELS \ / / \J / l i r 30.9 AC �) \ DA SB15 / ARRAY TRACKING SOLAR PANELS \ / / / 33.9 AC j /f DELINEATED WETLANDS l i ' _211 f 100 YR FLOODPLAIN --------- TOP OF STREAM BANK PERENNIAL STREAM -50' MINIMUM CLASS 1 BUFFER - - - - - NO -BUILD SETBACK -CLASS 1-20'/CLASS 2-10' / /� I // ( // ` /SB14 /SB15 I i --------- INTERMITTENT STREAM -30' CLASS 2 BUFFER J _ PROPOSED BOUNDARY BUFFER I ` i f (� DA SB16 PROPOSED ADJACENT NEIGHBOR BUFFER TEMPORARY CONTRUCTION STAGING TEMPORARY CONCRETE WASHOUT TIME OF CONCENTRATION \ Il ° 1 DIVERSION DIKE // DA SB17 B11 6 DITCH LINE / / 6.5 1 1 / ° SEDIMENT BASIN BAFFLE - ii �� / DA SB13 EXISTING UG FIBER OPTICS LINE / /�i�;;) I� 29.8 AC \ ° / sB'i1 / B13 / -SB18 DA SB18 4.3 AC 30' CLA 2 STREAM BUFFER 1 SS UILD ZON ADJACENT NEIGHBOR 100' I \ \ LANDSCAPING BUFFER i/, - \ \ EASEMENT \ \J \ r DA SB/ / 39.0 AC //� / / DA SB 11 I / / 30.0 AC DA B 12 43.4 AC I _ TEMPOR�STRUCTION STAGING \ / DA SB 2 X180' (TYP. OF 5) .SEE SH. 5.11 15.8 AC0 820 J' GRAPHIC SCALE EMPO RY NCRE?rE WASHOU \ \ 0'X30 (TYP. F,5) SEE SH. 1 500' 0 500' 1000' CLASS BUFFED 46 Nh-ZONE- / SCALE: 1 "=500' l� Map Unit Symbol Map Unit Name BaB Badin channery silt loam, 2 to 8 percent slopes BaD Badin channery silt loam, 8 to Scale: AS NOTED 15 percent slopes Ld Snewacla sany loam, 0 to 2 ChA percent slopes, frequently Designed by: EHB flooded GoC Goldston very channery silt loam, 4 to 15 percent slopes HeB Herndon silt loam, 2 to 8 percent slopes KkB Kirksey silt loam, 1 t 6 epercent Checked by: EHB slopes WA Misenheimer channery silt loam, 0 to 4 percent slopes TaB Tarrus silt loam, 2 to 8 percent slopes W Water / / / I I I I I l I II I \ / I / / / c \ / I / / / r 30' CLASS 2 STREAM BUFFER 10' CLASS 2 NO -BUILD ZONE I TaB �( I / Ba I \ BaD / \ 1 \ ski \\ A l ` KkB HeB INN \ -- -� eB KkB a15- "j, m / / / / / / / / / BaB /�. KkB Il BaB r / Ba MsA \ I II / ADJACENT NEIGHBOR 100' LANDSCAPING BUFFER EASEMENT / CLASS 1 STREAM BUFFER AND NO -BUILD ZONE I \ I I .: i / / / / 0 I E o . a a --i CN M U CN _1 c c o, a w L L LL > 3 rn o I m ILL]M �_ 0 m o LC) L v O = w I Zw O Date: 4-25-17 V) d%• dco ti QvO�P Scale: AS NOTED Ld .d Designed by: EHB O Drawn by: RIJ Checked by: EHB CL 0 I E o . a a --i CN M U CN _1 c c o, a w L L LL > 3 rn o I m ILL]M �_ 0 m o LC) L v O = w I Zw O Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ -21-17 PER COUN V) d%• dco ti QvO�P J 00 Ld .d O Revision Dates 1-26-17 PER NCDEQ 2-15-17 PER NCDEQ -21-17 PER COUN GRAPHIC SCALE / 500' 0 500' 1000' I / ° L SCALE: 1 "=500' Drawing No. 6 of 23 Sheets Job No. 2377 V) z O CL U U o N > O LLI O 0 O \� J W z oQ N \ O W \ mea \ (%) W U > \ N 2 ,J Q \ Q _j F -w 0 \ W J - LTJ (V m Q ID O W O m CV C' U Q � z Q 0 GRAPHIC SCALE / 500' 0 500' 1000' I / ° L SCALE: 1 "=500' Drawing No. 6 of 23 Sheets Job No. 2377 LANDSCAPING NOTES: LARGE SHRUBS �6 / v 15 PER 50' UNLESS 01p, ^-40' 1. TREES WITHIN LANDSCAPE BUFFERS MAY BE PRUNED AS \ v v v OTHERWISE NOTED / .q i NECESSARY TO AVOID OVERHEAD UTILITY LINES OR PREVENT V v . IN TABLE THIS\ »« SHADING OF THE SOLAR ARRAYS. v VV PAGE- \ / f / ✓ ° v 75% EVERGREEN /�'�2. ORNAMENTAL SMALL MATURING TREES \ v v v .� SINGLE ROW - FOUR (4) TREES PER 50' \1\00' FIFE 100' BUFFER AREA TWENTY-FIVE PERCENT MUST BE EVERGREEN \ I L v °=<v MIN. 1 4" CALIPER AT 6" ABOVE GROUND AT TIME OF \ - - o Array 1 L ° o / » ; PLANTING \ ✓ v v v v 100BUFFER ®q'* �� MYRICA CERIFERA (WAX MYRTLE) v v v , ' \ v v v :," i�� ILEX DECIDUA (POSSUMHAW) ., Q \ ° YARD A Array 2.;a. oa 3. SHRUBS \ v o ° o ��:.� ' �2 TRIPLE ROW - 15 SHRUBS PER 50' \ o ° o �`� 'x�'�..` / p SEVENTY-FIVE PERCENT MUST BE EVERGREEN vSMALL ORNAMENTAL TREES MIN. 2 TALL WHEN PLANTED - 5-6 FEET AT FOUR \ / ° vv Array 3 V7 v �`� *»*� i FOUR PER 50' YEARS YARD B1 \ ° *;F i UNLESS OTHERWISE JUNIPERUS CHINENSIS HETZI (HETZI JUNIPER) V Arr 4o �`�� NOTED IN TABLE ABOVE HAMAMELIS VERNALIS (VERNAL WITCH HAZEL) ° Array 5 �i 25% EVERGREEN V v , 4. TREES & SHRUBS SHALL BE PLANTED FOLLOWING REMOVAL v v v 100' BUFFER ° OF TEMPORARY EROSION AND SEDIMENT CONTROL YARD B 2V VV / MEASURES. �� NTRANCE #5 / v v \ d \°� v �` v v YARD C / 5. PESTICIDES AND CHEMICALS SHALL NOT BE USED TO _ =� v v / MAINTAIN THE GRASS OR WEEDS ON THE SITE. ENTRANCE #4 ---- Array 6 J ° ® DYA R D H 1 � i O v v L Array 7 v av ° Array 9 , � v Array 8 YARD D J/ Array 10 Array 11 Array 121 \ IArray 13 Array 14 Array 15 Array 16 Array 17 Array 18 Array 19 I 60 / Landscape Buffer Yard Requirements Yard Existing Length (Ft) Required Width (Ft) Required Trees (8 understory per 100 ft) Required Shrubs (30 per 100 ft) Proposed Plantings Existing Growth A 482 100 39 145 39trees/145 shrubs PROPOSED RACK PATH B1 862 100 69 259 69trees/259 shrubs four to five inches every two to three weeks from spring B2 808 100 65 242 33trees/121shrubs CONCRETE PAVING B3 962 100 77 289 19trees/95 shrubs ARRAY C 1406 100 113 422 56trees/211 shrubs NO -BUILD SETBACK -CLASS 1-20'/CLASS 2-10' D 658 100 53 197 25 trees/100shrubs "Old Field" herbiciding instructions below, and take a full 4 E 5990 100 479 1797 479trees/1797shrubs October 20 (see specifics in Step 2). F1 1803 100 144 541 144trees/541 shrubs a) Mow and rake or burn the existing vegetation to the F2 488 100 39 146 20trees/146 shrubs and time lines outlined in Option B, "Existing Crop Fields." 4 G 491 100 39 147 39trees/147 shrubs Note: Year-long cultivation is Not Recommended on steep, H1 31361 100 251 941 251 trees/941 shrubs season every two to three weeks and plant into a prepared H2 1 7845 100 628 2354 419trees/1568shrubs spring, mid -summer, early fall). * Required tree and shrub counts are reduced by the retention of existing vegetation. Existing tree/shrub count was estimated by visual observation and review of aerial photos of the Site. 1 I 1y No Mow Lawn 1 I / NURSERY�1 1 I PHASE III \ Si- Seeding Instructions 1 I 1 Array 20 Array 21 Array 22 I 1 1 1 IArray 23 Array 24 Array 25 i -ENTRANCE #3 YARD EA Array 26 Array 27 100' BUFFER \ XISTING UNDERGROUND FIBER OPTICS LINE -TO BE FIELD -LOCATED YARD H2 Array 28 / / r `a / Array 29 REAKEr R Array 31 Array 30 STATION& SUB -STATION NT E #2 100' BUFFER \ Array 32 Q \\ Array 33 1 / w / Array 34 �� J ,1 I II Array 35 Array 36 I e ADJACENT NEIGHBOR 100' \ I ' i�;% it LANDSCAPING BUFFER Array 37 Array 38 I Array 42 K �\ Array 39 1 - ° Arra � 1 ` � YARD G y 43 \`- I Array 40 Array 44 Array 4 - 11 Array 41 / 6 ���' v v Array 45 / V� ' v vA Array 47 / \ 'G v \ Array 48 Array 49 Array 50 s 7 v (fixed) OST CREEK / 7 \ / c 7v \ �+ 7v IIVV_ vvvvvvvV1_v 7 v ! b vs v V V_V / � � 1 30' BUFFER/NO-BUILD � - -_. �T"V-v -vy v v'V� \ \\) �( / R3 0 V ( / d BCLAS� 1 STREAM BUF6_ D ILD ZONE �NTRANOE PROPOSED 24' GATE (TYPICAL -FIVE LOCATIONS) YARD F1 YARD F2 GRAPHIC SCALE 500' 0 500' 1000' SCALE: 1 "=500' Everything you need to know to get the best results with your No Mow Lawn. IMPORTANTPRELIMINARIES Prairie Nursery's No Mow Lawn Seed Mix is a special blend of six different fine fescue varieties. Fescues have some of the deepest roots of all the turf grasses, making them more drought tolerant than bluegrass and other lawn grasses. Fescues also require much less nitrogen fertilizer than other turf grasses, making No Mow more ecological than other mixes. We generally recommend that you NOT apply nitrogen fertilizer to your No Mow Lawn. Site Conditions No Mow thrives in most soil types and light conditions, including moderate shade. However, it is not recommended for planting in wet soils, heavy clay soils with little or no topsoil, and in deep shade. No Mow requires good drainage and will not tolerate standing water for more than a day or two at a time. When to Plant The best time to plant No Mow Lawn Seed Mix is between August 20 and October 20. Fall seeding is strongly recommended, ideally when daytime highs drop below 80 degrees. The fescue grasses germinate during the cool, often damp fall months. Most weeds germinate in spring, so fall plantings typically have far fewer weeds than spring seedings. If fall planting is not an option, the best time to plant in spring is between March 15 and May 15. Seeding between June 1 and August 15 is not recommended, except in cool climates that do not experience hot summers. Fescue grasses do not generally germinate well in the heat of summer, and drought is always STEP 2: FINAL SEED BED PREPARATION Just prior to planting, the soil should be prepared according to the type of planting method used. This is also a good time to improve the fertility y and water -holding capacity of sandy soils, and the porosity of clay soils by tilling weed -free organic matter into the soil (i.e. compost, peat moss, mushroom compost, etc.). Broadcast Seeding or Drop Seeding and Mechanical Seeding With a Brillion Seeder Applying seed from push -type broadcast and drop seeders requires a smooth, tilled and finely graded surface for firm seed -to -soil contact. The seed is simply raked lightly into the tilled soil, and rolled to firm it. No -Till or Slit Seeders No -till drills and slit -seeders require a smooth, level soil surface completely free of weeds. Tilling is not necessary, unless the area is rough and requires re -grading and smoothing. No - till seeding and slit -seeding have the advantage of bringing up very few weed seeds from the soil below. Excess dead vegetation should be cut and removed, or burned prior to using slit -seeders to prevent fouling and clogging of the seeding mechanisms. STEP 3: PLANTING WHEN TO PLANT Fall (August 20 to October 20). Fall is the best time to plant. Cool temperatures and gentle rains promote germination of the cool season fescue grasses. Weed germination is lower in fall than in spring. Fall -seeded lawns typically have far fewer weeds than spring -seeded lawns. Spring (March 15 to May 15). Spring planting is a good second option. Spring seedings often require watering more frequently, summer drought can be a threat, and weeds will typically be more competitive. Seeding No Mow between May 16th and August 19th is not recommended. PLANTING METHODS METHOD 1: Broadcast Seeding or Drop -Seeding a) Requires a tilled seed bed free of rocks or clumps greater than one inch diameter. b) Fill broadcast spreader or drop seeder. Some seeders list the seeding rates for fescue grasses. If no listing is provided, experiment with setting the opening, so that the seed is distributed at the recommended rate of five pounds per 1,000 square feet. c) Cover the seed with one eighth to one fourth inch of soil. Use a rake, or drag the planted area with seeding drag, or piece of chain link fence. a concern during this time. Watering No Mow for the first two months after seeding is strongly recommended for best germination and growth. Planting Steep Slopes and Erosion Prone Sites When planting steep slopes or other erosion -prone sites, we recommend using No Mow with Annual Rye nurse crop. The annual rye germinates rapidly and provides quick cover to help stabilize slopes. When planting erosion -prone sites in fall, the best dates for seeding are between August 20 and September 20. This provides time for the annual rye and fescue to grow and hold the soil before the onset of winter. On steep slopes, the application of biodegradeable erosion -control blankets is recommended. No Mow with Annual Rye is recommended only in USDA Hardiness Zones 2-4. In warmer zones (5 +) the annual rye does not always die over winter, and can compete with the No Mow. IMPORTANT - Prepare Your Site Thoroughly! For a successful planting your site will need to be well prepared in advance. To prepare your site for planting, all existing vegetation must be killed or removed. Existing lawn grass, weeds and otherlants will compete h p p e �nnt the No Mow seeds for nutrients, moisture, and sunlight. All perennial weeds must be eliminated prior to seeding. Perennial weeds such as quackgrass, bromegrass, thistles, creeping goldenrods and other aggressive plants will present a long-term problem if not controlled prior to seeding your No Mow turf. Annual weeds which are present in the soil as seeds can require your attention in early going (establishment stage), but should not pose a long-term threat. Iof4 d) Firm the seed into the soil by rolling with a roller, cultipacker, or similar implement. e) Mulch the planting with a light covering of straw such as oats, winter wheat or marsh hay. Approximately 50% of the soil should be visible through the straw. The mulch helps control erosion on gentle slopes, and retains moisture in sandy and clay soils. f) If working on steep slopes, it is recommended that the area be covered with an erosion -control blanket immediately after seeding. The grass will come up through the erosion blanket, and the soil will be protected from washing away during heavy rains. METHOD 2: Mechanical Planting with Tractor -Drawn Mechanical Seeders and "Slit -Seeders" On areas greater than a 10,000 square feet, it is often more efficient to plant your No Mow seed using a mechanical seeder, such as a "Brillion" or "Land Pride" turf seeder. The Brillion seeder has heavy cast iron packing wheels that provide firm seed to soil contact. The ground must be freshly tilled when using a Brillion seeder. Land Pride turf seeders are similar to the Brillion seeders, with more aggressive soil preparation mechanisms. Brillion and Land Pride turf seeders are often available at equipment rental and farm rental establishments. "Slit seeders" refer to various makes and models of seeders that plant the seed in rows by opening small slits in the soil at the time of seeding. "Ryan" walk -behind slit seeders are commonly available at many rental centers. When using a slit seeder, make sure not to set the slit seeder too deep, no more than 1/8 inch deep or less. Method 3: "No -Till Broadcast Seeding" For Fall Only This method involves planting the seed into exposed, untilled soil following a sod -cutting, smothering, or herbicide treatment. The seed is broadcast onto the surface of the soil in late summer or early fall, without tilling or raking the seed into the soil. The mineral soil must be exposed for this method to work properly. Do not use this method to seed into an untilled dead sod. The dead sod will prevent good seed -to -soil contact. Dead sod also wicks moisture up out of the soil, drying out the surface soil in the germination zone. Dead sod can be aggressively dethatched to expose mineral soil, the thatch then removed and the seed applied, either by broadcast seeding or using a Slit Seeder. Areas that are seeded using this method must be watered regularly every morning for the first three weeks to encourage germination. This NoTillBroadcast Seeding method is an excellent choice for steep slopes and erodible sites, since the soil is never exposed by tilling. The dead roots of the grasses or weeds that were killed by smothering or herbiciding will usually hold the soil over the summer during the site preparation process, as well as after the No Mow seed is planted. The No Mow with Annual 3of4 LEGEND METHOD B: Existing Crop Fields (Corn, soybeans, or small grains) SITE BOUNDARY — - EXISTING PROPERTY LINE - - - SETBACK LINE - - - EASEMENT LINE year or two, consider testing the soil for herbicide residue. DISTURBED AREA Atrazine is commonly applied to cornfields, and can kill PROPOSED PAD germinating seedlings of fescue grasses if present in sufficient PROPOSED RACK PATH --�-�-�� PROPOSED PERIMETER FENCE 1. CULTIVATING OPTION PROPOSED SERVICE AISLE --------- EXISTING ROAD four to five inches every two to three weeks from spring EXISTING UG FIBER OPTICS LINE through fall. This should kill all the weeds on the site. PROPOSED ROAD �1 PROPOSED FENCE Q . CONCRETE PAVING ® HEAVY PAVEMENT O LIGHT PAVEMENT ® GRAVEL AREA ARRAY FIXED SOLAR PANELS ARRAY TRACKING SOLAR PANELS - - - - - PERENNIAL STREAM -50' MINIMUM CLASS 1 BUFFER - - - - - NO -BUILD SETBACK -CLASS 1-20'/CLASS 2-10' ------- INTERMITTENT STREAM -30' CLASS 2 BUFFER PROPOSED BOUNDARY BUFFER PROPOSED ADJACENT NEIGHBOR BUFFER PROPOSED LANDSCAPING ■■■■■■■■■ PROPOSED SUPPLEMENTAL LANDSCAPING TEMPORARY CONTRUCTION STAGING TEMPORARY CONCRETE WASHOUT o"o ovo` EXISTING BUFFER www.prairienursery.com 800-476-9453 1 Mon. - Fri., Barn to 5pm CST cs@prairienursery.com PO Box 306, Westfield, WI 53964 4of4 R EQUIVALENT AS APPROVED BY OWNER.I METHOD B: Existing Crop Fields (Corn, soybeans, or small grains) These guidelines are based on our experience. Before planting, check the field history of herbicide If you have any questions, please call or email application. If herbicides with long-term residual activity in us with your concerns. We will do our very best the soil (such as Atrazine) have been applied within the past to ensure the success of your No Mow Lawn. year or two, consider testing the soil for herbicide residue. 0 `Zt C7' : _ Z Atrazine is commonly applied to cornfields, and can kill 800-476-9453 germinating seedlings of fescue grasses if present in sufficient Mon.— Fri., 8am to Spm CST concentrations. Email: cs@prairienursery.com 1. CULTIVATING OPTION 114111\\`\_\♦ a) If perennial weeds are present, cultivate at a depth of w w �"t W C Q cV four to five inches every two to three weeks from spring Checked by: EHB through fall. This should kill all the weeds on the site. STEP 1: SITE PREPARATION METH• b) Plant in fall between August 20 and October 20 for best W U 2 results. Since a variety of site conditions will be encountered when Note: Year-long cultivation is Not Recommended on steep, planting an area, it is difficult to write a standard "recipe" erosion -prone sites. for site preparation and planting procedures. Select from the following site preparation Methods and Options to match your 2. HERBICIDING OPTION particular situation: a) Spring: Spray once in mid to late spring, wait 10 days and L., 1 N m plant into a prepared seedbed, between March 15 and May 15. METHOD A: Existing Lawns b) Fall: Spray once after the crop is removed when weedy 1. SMOTHERING OPTION vegetation is still actively growing. Wait 10 days and plant a) Cover the site with either black plastic, old carpet, into a prepared bed between August 20 and October 20. plywood or a thick layer of leaves or newspapers. Note: If perennial weeds are present in the field, refer to b) Leave in place for a full growing season. "Old Field" herbiciding instructions below, and take a full U year to prepare the site to remove problem weeds prior to c) Remove the "smother cover" in fall or the following spring. seeding in fall. d) Plant into a prepared bed in fall, between August 20 and October 20 (see specifics in Step 2). METHOD C: Old Fields 2. SOD CUTTING OPTION (Abandoned agricultural fields that have grown up to weeds) a) Remove the top two to three inches of grass and soil using 1. CULTIVATING OPTION a sod -cutter. a) Mow and rake or burn the existing vegetation to the b) Till lightly and plant into a prepared bed. ground in late fall or early spring. c) If deep-rooted perennial weeds are present, sod -cutting b) Cultivate to a depth of four to five inches every two to will not remove them. Follow the preparation procedures three weeks from spring through late summer. and time lines outlined in Option B, "Existing Crop Fields." c) Before planting, make sure all the existing weeds have 3. CULTIVATING OPTION been killed. a) Cultivate two to three times at one week intervals to kill d) Plant in fall between August 20 and October 20. the lawn. Note: Year-long cultivation is Not Recommended on steep, b) Till the soil prior to seeding to break up remaining thatch erosion -prone sites. and create a smooth seedbed. 2. HERBICIDING OPTION c) If perennial weeds are present, cultivate all growing a) Mow and rake, or burn the existing vegetation to the season every two to three weeks and plant into a prepared ground in late fall or early spring. bed, free of clumps of dead sod and thatch. b) Apply a Glyphosate herbicide (Roundup) three times at six 4. HERBICIDING OPTION to eight week intervals during the growing season ( mid - a) Apply a Glyphosate herbicide when the lawn is actively spring, mid -summer, early fall). growing (in fall or spring). c) When all vegetation is dead, till the soil and plant into a b) Till the sod under when the grass has turned brown, and prepared bed between August 20 and October 20. break up the thatch to create a smooth seedbed. Plant in fall between August 20 and October 20, or in spring between March 15 and May 15. 2 of 4 Rye should only be used for seeding steep slopes that require especially important if planting on dry soils, or in late spring rapid stabilization. The annual rye will germinate quickly and when temperatures are higher. Once established, the grass help hold the soil while the fescue germinates and develops. If a should be watered during dry periods. Occasional thorough seeded slope is to be protected with a straw or excelsior erosion soakings are better than frequent, light sprinklings. Deep blanket, there is no need to use No Mow with Annual Rye. soakings encourages deep root growth, and makes your turf This seeding method is recommended for fall seeding ONLY. more drought resistant. Spring seedings are subject to higher temperatures and greater Fertilizing and Weed Control chance of drought than fall seedings. However, success can be Fertilizing is not recommended for No Mow fescue turf, and attained using this method with early spring seedings in March should be applied sparingly, if at all. If you must, fertilize and April, with daily morning watering throughout the spring in early spring or late summer. Use a slow-release, balanced to maintain soil moisture. fertilizer with equal portions nitrogen, phosphorus, and METHOD 4: Hydro -Seeding potassium. Do not use high levels of nitrogen fertilizer on your The fine fescue grasses in the No Mow Lawn Mix can be No Mow turf. This is far worse than no fertilizer at all. successfully seeded using a hydro -seeder if desired. There are If desired, your No Mow Lawn can be treated with the weed two basic methods of hydroseeding: control and lawn care products that are labeled for use on a) Mix the seed with water only, and "shoot" the mixture fine fescue grasses. Always follow the directions when using onto a prepared seedbed of loose, weed -free soil. herbicides and other lawn care products. These chemicals and Hydromulch can then be applied separately in a second fertilizers should be used sparingly, of at all. pass after the seed has been applied mixed with water Mowing only. The recommended seeding rate of 5 pounds per 1000 square feet (220 pounds per acre) can be used when using It is not recommended that you mow your No Mow Lawn this two step method. closer than 3.5 inches. Close mowing will eventually damage b) Mix the seed with water and hydromulch, and "shoot' the roots and weaken the turf. Fescue grasses often produce this mixture onto the prepared seedbed in a single seed heads up to two feet tall in early to mid-June. To maintain pass. Due to the fact that much of the grass seed will be a more manicured appearance, mow at our inches when the suspended in the hydromulch and is not in close contact seed heads appear. This is usually the only mowing that will be with the soil, a certain percentage of seedlings will not required, unless a more manicured look is desired. become successfully established. The seeding rate using If you require a more "cropped lawn" look, occasional mowing this method should be increased to seven to eight pounds will be necessary, but far less frequently than with other lawn per 1000 sq.ft. (300-350 lbs. per acre) to account for this mixtures. Mow once a month at a height of 3.5 inches, starting phenomenon. in spring and continuing throughout the growing season. Never remove more than the top one third of the leafy growth. Do STEP 4: •ST PLANTING MAINTENANCEnot mow your No Mow turf to a short height late in the season, after it has been allowed to grow to its full natural height. This Although No Mow plantings are low maintenance compared will scalp the lawn, severely harming the grass and creating an to other lawns, a some management is required to ensure unsightly appearance. successful establishment and growth. Your No Mow Lawn will form a soft, four to six inch tall flowing carpet of grass. In fall, leaves should be raked and removed to Watering prevent them from smothering the lawn. An option to raking Watering is essential during the first one to two months, is to mow with a mulching mower after all the leaves have increasing germination rates and seedling survival. Seeds dropped. This shreds the leaves and encourages decomposition should be watered every other morning for 15 to 30 minutes over winter. The nutrients from the mulched leaves are all the during the first four to six weeks after planting. This is fertilizer your No Mow Lawn should need! www.prairienursery.com 800-476-9453 1 Mon. - Fri., Barn to 5pm CST cs@prairienursery.com PO Box 306, Westfield, WI 53964 4of4 R EQUIVALENT AS APPROVED BY OWNER.I 0 I E O -.4- o + 00 M U CV o s✓ CV � •L if) 3 loEaaaol ll1 U � rn o m aM 0Gi 0 m ®® O 0 o LC)•L v O = w z Ld 0 a_ 3-14-17 Date: 4-25-17 —20-17—PER COUN —19-17 d%• d Scale: AS NOTED 00 J " 1.1.5 0 `Zt C7' : _ Z Designed by: EHB O Drawn by: RIJ 114111\\`\_\♦ Z CL w w �"t W C Q cV Checked by: EHB m Q 0 I E O -.4- o + 00 M U CV o s✓ CV � •L if) 3 loEaaaol ll1 U � rn o m aM 0Gi 0 m ®® O 0 o LC)•L v O = w z Ld 0 a_ Revision Dates 3-14-17 Drawing No. —20-17—PER COUN —19-17 d%• d ti QvO�P 00 J " 1.1.5 0 `Zt C7' : _ Z O '''✓!!lilt 114111\\`\_\♦ Revision Dates 3-14-17 Drawing No. —20-17—PER COUN —19-17 PER COUN —21-17 PER COUN Job No. 2377 Drawing No. J O �� rr�� O `J (.0 a) 1-0 Z CL w w �"t W C Q cV Q m Q V W U 2 U � c� Z Q Q = J W O Q J (1) J L., 1 N m 0 O O U Job No. 2377 Drawing No. 7,oO of 23 Sheets Job No. 2377 / l I I YARD H2 17 17 ------------ i° p 7, I p s� r( i ! i *z VV CLASS 1 STREAM BUFFER AND NO -BUILD ZONE 0 I." �4% ♦\ it 1 u CENT NEIGHBOR 100- LANDSCAPING BUFFER EASEMENT J �l ♦� aft X \ p \ _ _ -mown -mmu / 17 V 17 71117 17 30' BUFFER/NO—BUILD I E� /7 Q _V _V ° ° p— V —'f— V �/ft _�_ 17 LEGEND __\\ / __\_\ \\ p SITE BOUNDARY l \ , / \�- _\ ` \ p — - EXISTING PROPERTY LINE _ \ - \ - - - SETBACK LINE \ ' A \\ EASEMENT LINE PROPOSED 24 GATES \ --------- DISTURBED AREA \ PROPOSED PAD (TYPICAL—FIVE LOCATIONS) PROPOSED RACK PATH PROPOSED SERVICE AISLE --------- EXISTING ROAD EXISTING UG FIBER OPTICS LINE / PROPOSED ROAD \ 11 PROPOSED FENCE \ / 0 CONCRETE PAVING HEAVY PAVEMENT \ 0 LIGHT PAVEMENT ® GRAVEL AREA ARRAY FIXED SOLAR PANELS ARRAY TRACKING SOLAR PANELS PERENNIAL STREAM -50' MINIMUM CLASS 1 BUFFER NO -BUILD SETBACK -CLASS 1-20'/CLASS 2-10' \ / INTERMITTENT STREAM -30' CLASS 2 BUFFER \ / — PROPOSED LANDSCAPING \ / PROPOSED SUPPLEMENTAL LANDSCAPING / TEMPORARY CONTRUCTION STAGING \ TEMPORARY CONCRETE WASHOUT \ E7=v`= EXISTING BUFFER \ / PROPOSED ADJACENT NEIGHBOR BUFFER 17 \ S\ \ \ p / / 4 o GRAPHIC Soo LE 200' 400' \ \ / SCALE: 1 "=200' Date: 4-25-17 \ 17 \ S\ \ \ p / / 4 o GRAPHIC Soo LE 200' 400' \ \ / SCALE: 1 "=200' Revision Dates -10-17 PER COUN -21-17 PER COUN Date: 4-25-17 • of 23 Sheets d%• d Scale: AS NOTED J 00 -"w Ld't0_z .,� Designed by: EHB Drawn by: RIJ O Checked by: EHB CD W rn Revision Dates -10-17 PER COUN -21-17 PER COUN Drawing No. • of 23 Sheets d%• d ti QvO�P J 00 -"w Ld't0_z .,� a z: '11/11111f111141\\\\♦ Revision Dates -10-17 PER COUN -21-17 PER COUN Job No. 2377 Drawing No. • of 23 Sheets J O CD W rn [if T--- O C� W z o a Z N w m3 CL Q W U > U N Q O 0 J N Z Qf w Nm <0 O J O N U Job No. 2377 Drawing No. • of 23 Sheets Job No. 2377 YARD H2 II /All -C17 0 II Drawing No. Date: 4-25-17 7,o2 of 23 Sheets Scale: AS NOTED I I I I I I I I I I I I I I I /All -C17 0 II 100' BUFFER STREAM BUFFER NO -BUILD ZONE NO uV &CLASS 1 STREAM BUFFER AND NO -BUILD ZONE OST CREEK � 14 r % 'air ' f ' . <• I O •d .• • .• e• .• I A • • Y �I i \ I i � ! Q I � 1 W 1 / LEGEND SITE BOUNDARY I �I — - EXISTING PROPERTY LINE - - - SETBACK LINE — - EASEMENT LINE --------- DISTURBED AREA I 4 PROPOSED PAD PROPOSED RACK PATH �' \ PROPOSED SERVICE AISLE --------- EXISTING ROAD I I \ EXISTING UG FIBER OPTICS LINE PROPOSED ROAD I �I ------- PROPOSED FENCE Q CONCRETE PAVING NEIGHBOR 100' HEAVY PAVEMENT 3CAPING BUFFER LIGHT PAVEMENT EASEMENT GRAVEL AREA I �' ARRAY FIXED SOLAR PANELS ARRAY TRACKING SOLAR PANELS I - - - - - PERENNIAL STREAM -50' MINIMUM CLASS 1 BUFFER I - - NO -BUILD SETBACK -CLASS 1-20'/CLASS 2-10' I ----- INTERMITTENT STREAM -30' CLASS 2 BUFFER I I — PROPOSED LANDSCAPING I ■1111101■ PROPOSED SUPPLEMENTAL LANDSCAPING HEM TEMPORARY CONTRUCTION STAGING I I TEMPORARY CONCRETE WASHOUT I I [o"o ovo` EXISTING BUFFER Q2 PROPOSED ADJACENT NEIGHBOR BUFFER I I I I e I I I I0 I I I � e I �I I 4 4 / / / / GRAPHIC SCALE 200' 0 200' 400'Ar SCALE: 1 "=200'Ar 4� o / / / 40 4� J / NTRANCE #2 YARD F1 YARD F2 Drawing No. Date: 4-25-17 7,o2 of 23 Sheets Scale: AS NOTED Designed by: EHB Drawn by: RIJ Checked by: EHB 30' CLASS 2 'moi 10 CLASS 2 100' BUFFER STREAM BUFFER NO -BUILD ZONE NO uV &CLASS 1 STREAM BUFFER AND NO -BUILD ZONE OST CREEK � 14 r % 'air ' f ' . <• I O •d .• • .• e• .• I A • • Y �I i \ I i � ! Q I � 1 W 1 / LEGEND SITE BOUNDARY I �I — - EXISTING PROPERTY LINE - - - SETBACK LINE — - EASEMENT LINE --------- DISTURBED AREA I 4 PROPOSED PAD PROPOSED RACK PATH �' \ PROPOSED SERVICE AISLE --------- EXISTING ROAD I I \ EXISTING UG FIBER OPTICS LINE PROPOSED ROAD I �I ------- PROPOSED FENCE Q CONCRETE PAVING NEIGHBOR 100' HEAVY PAVEMENT 3CAPING BUFFER LIGHT PAVEMENT EASEMENT GRAVEL AREA I �' ARRAY FIXED SOLAR PANELS ARRAY TRACKING SOLAR PANELS I - - - - - PERENNIAL STREAM -50' MINIMUM CLASS 1 BUFFER I - - NO -BUILD SETBACK -CLASS 1-20'/CLASS 2-10' I ----- INTERMITTENT STREAM -30' CLASS 2 BUFFER I I — PROPOSED LANDSCAPING I ■1111101■ PROPOSED SUPPLEMENTAL LANDSCAPING HEM TEMPORARY CONTRUCTION STAGING I I TEMPORARY CONCRETE WASHOUT I I [o"o ovo` EXISTING BUFFER Q2 PROPOSED ADJACENT NEIGHBOR BUFFER I I I I e I I I I0 I I I � e I �I I 4 4 / / / / GRAPHIC SCALE 200' 0 200' 400'Ar SCALE: 1 "=200'Ar 4� o / / / 40 4� J / NTRANCE #2 YARD F1 YARD F2 a 0 I E o�o a 00 M U L N 'C a w 1n 3 In U 0)C, cn I m W 17 C 0V) lot m LnL v O = ww Z O N``` `` \ Revision Dates \ 1 —10-17 PER COUN \ \ 2 —21-17 PER COUN \ \ N o W LLJN z �Q N Z W m� Q W U� > Q Q J N Zw Nm Q 0 O J O N U Drawing No. Date: 4-25-17 7,o2 of 23 Sheets Scale: AS NOTED Designed by: EHB Drawn by: RIJ Checked by: EHB a 0 I E o�o a 00 M U L N 'C a w 1n 3 In U 0)C, cn I m W 17 C 0V) lot m LnL v O = ww Z O N``` `` \ Revision Dates \ 1 —10-17 PER COUN \ \ 2 —21-17 PER COUN \ \ N o W LLJN z �Q N Z W m� Q W U� > Q Q J N Zw Nm Q 0 O J O N U Job No. 2377 Drawing No. 7,o2 of 23 Sheets Job No. 2377 o � I YARD B3 0 0 / 7 0 / / / o / / / / / 0 / / / / / / _IL1 / ii 7 ' / / / I ' II I ' I I I ' I YARD H1 1 I 1 1 / / / / / / / / / Now 1 � / 1 � / \ YARD H2 / / / 1 / 100' BUFFER PHASE II PHASE IF— YARD IWA 100' REAKER E 0 STATION LEGEND GRAPHIC SCALE 200' 0 200' 400' SCALE: 1 "=200' & SUB -STATION YARD F1 YARD F2 SITE BOUNDARY — - EXISTING PROPERTY LINE - - - SETBACK LINE d%• d EASEMENT LINE --------- DISTURBED AREA cf? 0: _ PROPOSED PAD Designed by: EHB PROPOSED RACK PATH > o PROPOSED SERVICE AISLE BUFFER EXISTING ROAD w ro- EXISTING UG FIBER OPTICS LINE PROPOSED ROAD Checked by: EHB PROPOSED FENCE 0 CONCRETE PAVING 0 HEAVY PAVEMENT 0 LIGHT PAVEMENT ® GRAVEL AREA /ARRAY FIXED SOLAR PANELS ARRAY TRACKING SOLAR PANELS - - - - - PERENNIAL STREAM -50' MINIMUM CLASS 1 BUFFER - - - - - NO -BUILD SETBACK -CLASS 1-20'/CLASS 2-10' Z INTERMITTENT STREAM -30' CLASS 2 BUFFER PROPOSED LANDSCAPING ■■■■■■■■■ PROPOSED SUPPLEMENTAL LANDSCAPING TEMPORARY CONTRUCTION STAGING TEMPORARY CONCRETE WASHOUT �ovovvl EXISTING BUFFER PROPOSED ADJACENT NEIGHBOR BUFFER GRAPHIC SCALE 200' 0 200' 400' SCALE: 1 "=200' & SUB -STATION YARD F1 YARD F2 r-� 0 "0 0 I E o -.4- o a M U N a L N L ac a w L LL > 3 I� Lon U 0) 0 we M® �_ 0 m LC) •L v O w w Z 0 Date: 4-25-17 U J d%• d Scale: AS NOTED J 00 4�' Z:flp� :W cf? 0: _ LO Designed by: EHB > o Drawn by: RIJ Checked by: EHB W W N z o Q r-� 0 "0 0 I E o -.4- o a M U N a L N L ac a w L LL > 3 I� Lon U 0) 0 we M® �_ 0 m LC) •L v O w w Z 0 Revision Dates —10-17 PER COUN Drawing No. U J d%• d ti QvO�P J 00 4�' Z:flp� :W cf? 0: _ LO > o '11/11111f111141\\\\♦ Revision Dates —10-17 PER COUN Job No. 2377 Drawing No. U J J LO > o C� W W N z o Q Z N W m� CL Q W U� > Q N J H W 0 p JN Z W N m J 0 O — O N U Job No. 2377 Drawing No. 7,*3 of 23 Sheets Job No. 2377