HomeMy WebLinkAbout20141169 Ver 6_In-field mod_20170502Environmenral
Quality
ROY COOPF•,R
r,�„er„o,�
M[CHAEL S. REGAN
Secrefmy
S. JAY Z[MMERMAN
u�����m,�
North Carolina Division of Water Resources
Transportation Permitting Unit
In-Field Minor 401 Water Quality Certification, Buffer Certification and Isolated Water Permit
Modification
Project Name/ TIP Project No.: Mavsville Bv-pass / R-2514D
DOT Division: 2 County: Jones
DOT Staff: -��`� J���✓1
ACE Staff: � Grrl .�Ct�4'1 S
a
Modification Sketch:
Date: Mav 2, 2017
DWR Project No. / Permit Type: 20141169 v.6
DWR Staff: Garcv Ward
DWR Regional Office: Washinqton
on Goshen Branch northwest of Pollocksville.
See the plan sheets provided with the modifcation application dated 2/15/17 and additional information provided 4/7/17.
This in-field modification is required for the following reason(s):
"Nothiiiy Compares - -
S�:de nl Nortli C arolina I PmirnnineneJ t)u:ihn
1617 �lad tien ica Cem.�i i RWcieh. Nuiih Carulin� 27oV9-1617
�
In-Field Modification
Page 2 out of 3
❑ The information contained in the application or presented in support thereof is incorrect in the
following manner:
Conditions under which the original certifcation was issued have changed in the following manner:
A diversion channel is needed to aid in the installation of a culvert at Site 3 of R-2514D.
This in-field modification is valid only if issued by an authorized agent of the Division of Water Resources,
Transportation Permitting Unit �
This in-field modification authorizes the NCDOT to
To construct a diversion channel as needed for the installation of a culvert on Goshen Branch at
Site 3 of R-2514D in Jones County. The project shall be constructed as described in the Modification
Description and Sketch on Page 1 of this document dated April 28, 2017 to improve/construct the section
of work trestle that extends over the Trent R. at Site 4. The approved design is that described in the
Modification Description and Modification Sketch on Page 1 of this document dated 2/14/17. Any further
changes to the original Water Quality Certification dated March 2, 2015 may require a formal written
modification request.
The description of the proposed action provides adequate assurance that the proposed action in the
Neuse River Basin in conjunction with the proposed development will not result in a violation of applicable
Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that
this activity will not violate the applicable portions of Section 301, 302, 303, 306, 307 of PL 92-500 and PL
95-217 if conducted in accordance with the application and conditions hereinafter set forth. Should your
project change, you are required to notify the DWR and submit a new application. If the property is sold,
the new owner must be given a copy of this Certification and approval letter, and is thereby responsible
for complying with all conditions. For this approval to remain valid, you are required to comply with all the
conditions listed below. In addition, you should obtain all other federal, state, or local permits before
proceeding with your project including (but not limited to) Sediment and Erosion control, Coastal
Stormwater, Non-discharge and Water Supply watershed regulations. This Modification Approval shall
expire on the same day as the expiration date of the corresponding Corps of Engineers Permit.
Conditions(s) of Modification Approval:
1. As-built drawings of the proposed action shall be submitted to the NC DWR Transportation
Permitting Unit within 30 days of completion of the action.
2. All the authorized action activities and conditions of the certification associated with the original
Water Quality Certification dated March 2, 2015 and all other corresponding modification still
apply except where superseded by this certification.
3. Additional Conditions:
In- Field Modification
page 3 of 3
Failure to construct the proposed action as described in the Modification Description and Sketch on
Page 1 of this document andlor violations of any condition herein set forth may result in revocation of this
modification approval and may result in criminal and/or civil penalties. This modification approval shall
become null and void unless the above conditions are made conditions of the Federal 404 andlor Coastal
Area Management Act Permit. If the Corps of Engineers requires a formal written modification to the 404
permit for the proposed action, the NC DWR must require a formal written modification to the 401 WQC,
and therefore, this in-field modification is invalid. If additional (wetland, stream, buffer) impacts for this
project (now or in the future) exceed (one acre, 150 linear feet, or one-third of an acre1150 linear feet,
respectively), or if mitigation is required above and beyond the current mitigation requirement for this
project, this in-field modification is invalid and a formal written modification is required.
This in-field modification is effective upon the date the last party signs this document. This in-field
modification is made upon mutual agreement between DOT and DWR as indicated by the signatures
below and is, therefore, not subject to appeal by either party. Appeals by third parties must be made
within sixty (60) days of notification pursuant to the contested case provisions of the Administrative
Procedure Act, NC Gen. Stat. §1506-23 et sea.
DWR Staff Signature: ��4_ TA �� Y
Date: 5�2�� 7 .
DOT Staff
Date: S v v
��_ Staff Signatur : � {� � ��^ `� S
Date: � �Z �
'—An authorized agent of the Transportation Permitting Unif is defined as DWR staff that are DOT-funded and
review and issue 401 Water Quality Certificalion for DOT projects. These staff include Central Office and Regional
Office personnel.