Loading...
HomeMy WebLinkAbout20170424 Ver 1_Approval Letter_20170421s t: ���..:�. Environntenlal QUQ�It y ROY COOPCR Gurernur MICHAEL S. REGAN .Srcrarurr S. JAY 'LIMMERMAN n;��e� mr April 21, 2017 New Hanover County NCDW R Project No. 20170424 (Bridge No. 19 on) SR I 100 TIP No. [3-5236 f ederal Aid Pr�ject No. BRZ-I100(29) APPROVAL of d01 WATER QUALfTY CERTIFICATION witli ADDITIONAL CONDITIONS Mr. Philip S. Harris, I[I, P.E., CPM Na[ural Environment Seclion Head Project Development and Enviroumen�al Analysis North Carolina Deparlment of Transporta[ion 1598 Mail Service Center Raleigh, Noith Carolina, 27699-1598 Dear Mr. Harris: You have our approval, in accordance with the conditions listed below, for tlie following impacts for the putpose of replacing bridge No. 19 over Lord's Creek on SR 1 100 in New Hanover County: S�ream Impacts in the Cape Fear River 6asin Permanent �ill Temporary �ill Permanenl fill Temporary �ill Total Sh•eam in Intermittent in Intermittenf in Perennial in Perennial Site Impact Stream Qincar Stream (lincar Slream Stream P[ ft linear ft linear ft pinear Pt) 16�r10 to 20+00 12 12 I.T I6+10 to 20+50 R 30 30 TOTAL 0 0 42 0 42 Total Sh-cam Impact for Projec[: �!2 linear feef. Wetland Impacls in the Cape Fear River B�sin 'Ibtal Welland Impact fm• Projeet: 0.18 acres. -'�Noihltly Cnln��ar[•ti .. .. SCitc ol Nonh Cnrolinz I Cnvironmrntal Qualily Ifil7 A7ail Sen'irt Center I k����'�eh. Nonh C.nrolinn 27C99-1617 i `s.�c� e,�` klv°.cv _ , , �:zc ., � . ,,.,{. , _,_ . . Open Water Impacts in the Cape Fear River Basin Permanent Fill in Temporary Fill in Total Fill in Open Site ^---.,,-`--- '--. .,___.,,_.__.. .,.,.. .v...o.�ia..� ) to 20+00 LT 0.011 0.01 )to 20+50 RT 0.020 0.02 TOTAL 0.03 0.00 �_ 0.03 Total Open Water Impact for Project:0.03 acres. The project shall be constructed in accordance with your application dated received April 7, 2017. After reviewing your application, we have decided that these impacts are covered by General Water Quality Certification Number 4093. This certification corresponds to the Nationwide Permit 23 issued by the Corps of Engineers. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with [he accompanying 404 permit. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the NCD WR and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in l5A NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you must adhere to the conditions listed in the attached certification and any additional conditions listed below. Condition(s) of Certification: Project Specific Conditions l. As a condition of this 401 Water Quality Certification, the bridge demolition and construction must be accomplished in strict compliance with the most recent version of NCDOT's Best Management Practices for Conshuction and Maintenance Activities. [15A NCAC 02H .0507(d)(2) and 15A NCAC 02H .0506(b)(5)] 2. Bridge deck drains shall not discharge directly into the stream. Stormwater shall be directed across the bridge and pre-treated through site-appropriate means (grassed swales, pre-formed scour holes, vegetated buffers, etc J before entering the stream. To meet the requirements of NCDOT's NPDES permit NCS0000250, please refer to the most recent version of the North Carolina Department ofTransportation Stormwater Best Management Practices Toolbox manual for approved measures. [ 15A NCAC 02H 0507(d)(2) and 15A NCAC 02H .0506(b)(5)] 3. A turbidity curtain will be installed in the stream if driving or drilling activities occur within the stream channel, on the stream bank, or within 5 feet of the top of bank. This condition can be waived with prior approval from the NCDWR. [15A NCAC 02H .0506(b)(3) 4. Adherence to The Cuidelines for Avaidinglmpacts to the West lndian Manatee: Precautronary Measures for Construction Activrtres rn North Caralina Waters will be required throughout construction General Conditions Unless otherwise approved in this certification, placement of culverts and other structures in open waters and streams shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other shuctures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and downstream of the above structures. The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by NCDWR. lf this condition is unable to be met due to bedrock or other limiting feamres encountered during construction, please contact NCDWR for guidance on how to proceed and to determine whether or not a permit modification will be required. [ISA NCAC 02H.0506(b)(2)] 6. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. [15A NCAC 02B.0200] 7. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. [15A NCAC 02H.0506(b)(2)] 8. The dimension, pattern and profile of the stream above and below the crossing shall no[ be modi5ed. Disturbed floodplains and streams shall be restored to namral geomorphic conditions. [15A NCAC 02H.0506(b)(2)] 9. The use of rip-rap above the Normal High Water Mark shal] be minimized. Any rip-rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage. [ISA NCAC 02H.0506(b)(2)] 10. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approvaL [ 15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)� ] 1. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most wrrent version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. [ 15A NCAC 02H.0506(b)(3) and (c)(3)] 12. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. [15A NCAC 02H.0506(b)(3)] 13. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream wa[ers from fuels, lubricants, hydraulic fluids, or other toxic materials. [15A NCAC 02H.0506(b)(3)] 14. No rock, sand or other ma[erials shall be dredged from the stream channel except where authorized by this ceRificatioa [15A NCAC 02H.0506(b)(3)] l5. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. [15A NCAC 02H.0506(b)(3)] 16. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water qualiry standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. If the NCDW R determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal ]aw is being violated, or that further conditions are necessary to assure compliance, the NCDWR may reevaluate and modify this certification. [15A NCAC 02B.0200] 17. Al] fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise authorized by this certification. [15A NCAC 02H.0506(b)(2)] 18. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the Wa[er Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on-site project manager. [ISA NCAC 02H .0507(c) and i5A NCAC 02H .0506 (b)(2) and (�)(2)7 19. The outside buffer, we[land or water boundary located within the construction corridor approved by this authorization shall be clearly marked by highty visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. [15A NCAC 02H.0501 and .0502] 20. The issuance of [his certification does not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and sedimentation control requirements, etc. 21. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours ofdiscovery. [15A NCAC 02B.0506(b)(2)] 22. Upon completion of the project (including any impacts at associated borrow or waste sites), the NCDOT Division Engineer shall complete and rewrn the enclosed "Certification of Completion Form" to notify the NCDWR when all work included in the 401 Certification has been completed. [15A NCAC 02H.0502(�] 23. Native riparian vegetation must be reestablished in the riparian areas within the construction limits ofthe project by the end of the growing season following completion of construction. 15A NCAC 02B.023 I(a)(6)] 24. There shall be no excavation from, or waste disposal into, jurisdictiona] wetlands or waters associated with this permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road constmction activities.[15A NCAC 02H.0506(b)(3) and (c)(3)] 25. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards [15A NCAC 02H.0506(b)(3) and (c)(3]): a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in [he most recent version of the North Carolrna Sediment and Erosron Contro! Manual. The devices shall be maintained on all wnstruction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in aceordance with the most recent version of the Nor�h Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 26. Where placement of sediment and erosion control devices in wetlands and/or waters is unavoidablein the Hand Clearing areas, they shall be removed and the natural grade restored upon completion of the project. [15A NCAC 02H.0506(b)(3) and (c)(3)] If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administra[ive Hearings within sixty (60) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:OOam and S:OOpm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed-provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Cen[er Raleigh, NC 27699-6714 Telephone: (919) 431-3000, Facsimile: (919) 431-3100 A copy of the petition must also be served on DEQ as follows: Mr. Sam M.Hayes, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-6701 This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you have any questions, please contact Joanne Steenhuis at (910) 796-7306 or joannesteenhuis@ncdenr.gov. Sincerely, � S. ay Zimmerm n, Director Division of Water Resources Electronic copy only disffibution: Brad Shaver, US Army Corps oFEngineers, Wilmington Field Office Mason Herndon, Division 3 Environmental Officer Colin Mellor, NC Department of Transportation Chris Rivenbark, NC Department of Transportation Jason Dilday, NC Department of Transportation Gary Jordan, US Fish and WildliFe Service Travis Wilson, NC Wildlife Resources Commission Cathy Brittingham, NC Division of Coastal Management Joanne Steenhuis, NC Division of Water Resources Wilmington Regional Office File Copy Environrnental QUQ�!(y NCDWR Project No.: 2017-0424 Applicant: NC-DOT County: Ne�v Hanover ROY COOPGR Goro,�nor MICHAEL S. REGAN S'errrmrr S. JAY ZIMMERMAN Dlrecrnr Projec[ Name: Replace�uen[ ol' I3rid�e Nu. 19 over Lord's Creek on SR I I00 (River Road) Date of Issuance of 40l Water Quality Certification: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certifica[ion or applicable F3utTcr Rules, and any subsequenL modifcations, the applican[ is required to re[tu'n this certifica�e to the 401 Transpurtation Pennittine Unit, North Carolina Division of Water Resources, 1G17 MTiI Service Cen[er, Ralcieh, NC, 27699-1617. �I'his Form may be returned to NCDWR by ihe applicanl, Ihc applicanYs �uthorized agent, or the projecl engineer. I[ is nol necessary to send cerCificates front all oftl�ese. ApplicnnPs Cerlificntion �� , hereby state that, ro the best of my abilities, due care and diligence was used in the oUservation of the consVuction such that the consVuction was observed to be built within subst�ntial compliance and infent of the 401 Water Quali[y Ccrtificalion and Buffer Rules, the approved plans and specifications, and other suppo�tii�, materials. Signatw'e: Date: Age�iPs Cer�ificntion � , hereby state thTt, lo the besl of my abilities, due care and diligence was useA in thc observation of the conslluction such lhat the construclion was observed [o be built witliin substan[ial compliance and inten� of the 401 Water Qualiry Certifica[ion �nd Buffer Rules, the a�proveA pl�ns and specifications, and other supporting meterials. Signahire: F_ngineer's Cerlificnlinn Plrtial Fin�l �, , as a duly registered Professionel Engineer in thc State of North Carolina, hnvin� been au[horized ro observe (periodically, weekly, fu.11 [ime) Ihe conslruc�ion of the projec[ for the Permittee hereby state th�t, to the best of nry abili�ies, duc care and diligence was used in the observation ofthe construction such lhat [he construction was obseived to be built wilhin substantial compliance and in[enl of the A01 Wa[er Qu�lity Certitication and l3uffer Rules, die approved plans and specifications, and o[her supporting materials. Signature Dnte Registration No. :� Nni hlriq C:nmparc� State ofNarth Carnlina I Cnviroinncntzl QUalily If.l7 A1ail Scrvicr Q�nler I Rnleieh. North Camlina 2 7699-1 61 7