HomeMy WebLinkAbout20150955 Ver 1_DCM Permit_20170320Carpenter,Kristi
From:
Sent:
To:
Cc:
Subject:
Attachments:
Hello,
Brittingham, Cathy
Monday, March 20, 2017 2:23 PM
Herndon, T. Mason
Rivenbark, Chris; Shaver, Brad ; Steenhuis, Joanne; Lane, Stephen
RE: Pender B-4829 CAMA LOR Request
B-4929, 60-16, LOR March 2017.pdf
Please find attached a Letter of Refinement for CAMA Major Permit No. 60-16
approving NCDOT's proposal to add two floating docks adjacent to the work
trestle at bridge bents 14 and 15, and a 7' wide x 26' long gangway from the work
trestle to each of the floating docks.
A paper copy will be sent to NCDOT in Castle Hayne.
Please let me or Stephen Lane know if you have any questions or concerns.
Sincerely,
Cathy Brittingham
Cathy Brittingham, Transportation Project Coordinator
N.C. Division of Coastal Management
(919) 707-9149 phone
cathv.brittingham(a�ncdenr. gov
Mailin� Address:
c/o DWR Wetlands Unit
1617 Mail Service Center
Raleigh, NC 27699-1617
Physical Address:
512 North Salisbury Street
Archdale Building
12`h Floor, Room 1204G
Raleigh, NC 27604
Please visit www.nccoastalmanaqement.net to subscribe to Coastal Management's quarterly
newsletter, the CAMAgram.
E-mail correspondence to and from this address may be subject to the North Carolina Public
Records Law and may be disclosed to third parties
From: Herndon, T. Mason
Sent: Friday, March 03, 2017 11:13 AM
To: Lane, Stephen <stephen.lane@ncdenr.gov>
Cc: Rivenbark, Chris <crivenbark@ncdot.gov>; Brittingham, Cathy
<cathy.brittingham@ncdenr.gov>; Shaver, Brad <Brad.E.Shaver@usace.army.mil>;
Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov>
Subject: Pender B-4829 CAMA LOR Request
Stephen,
Please see the attached Letter of Refinement request for B-4929. Per our field visit and
discussion with the contractor on March 1, they would like to install floating docks at
Bent's 14 & 15 to moor a rescue boat near the navigation channel. Modification of the
USCG, 404 and 401 permits is not required. Please be advised that the contractor will
need to install the four pipe piles for the floating dock prior to the April 15Y moratorium
so your prompt processing of this request would be appreciated.
If you have questions or need additional information please do not hesitate to contact
me.
Thanks!
Mason Herndon
Environmental Program Supervisor
Division 3
NCDOT- Division of Highways
910-341-2036 office
910-604-0050 mobile
tmherndon@ncdot.gov
5501 Barbados Blvd
Castle Hayne, NC 28429
_ *�f �� �,-
-__�j �„ ;,= �;
=#ir ; _
, ti . �1 >
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third
parties.
�
� -
Coastal Management
ENVIRONMENTML QUALITY
March Z0, 21717
Mr. Mason Hea�rpdon
Division 3 Environmental Program Supervisor
N.C. Dept. oi Transport�tian
5501 Barbados Boulevard
Castle Hayne, �iC 28429-5647
ROY C40PER
Gaver-nor
MICHA�L S. REGAN
Setretory
BRAXT�N C, DAV�S
Director
RE: Refineznent of CAMA Majar Development Permit No. fd-16 {TIP No. B-4929), TopsaiI Sound and
AIVi�W, ReplaGement of Bridge No. 16 on NC-SO/NC-210, Pender Co�nty.
Dear Mr. Herndon:
This letter is in response to a request from the N.C. Department afTranspertatian (NCDOT) dated March 3,
2017, w�ich included two workplan drawings dated March 3, 2017. In the request, I�iCDOT proposes to add
two floating do�ks adjacent ta the work tr�stle at bridge bents 14 and �S. The two flaating tiocks would be 4'
wide x 40' laz�g each, and would be secured in place by twa pipe piles �ach. Acidi�ionaliy, a 7' wide x 26' lang
gangway would lead down from the work trestle to eacY� af the floating docks. The attached workp�an drawings
indicate thai the docks would be placed in areas with water depths o� 6' ar greater at low tide.
Please be advised that through this Letter of Refinement the N.C. I�ivision of Coastal N�anagement {DCM)
conveys it� determination that th� proposed revisions are cans�stent with the existing State's rules and
regulations and are in keeping with the �ri�inal purpose and intent of CAMA Major Permit No. 60-1 C. This
Ietter shall be attached to the original CAMA Major Fermit No. 60-16, which was issued on May 27, 2016, as
w�e11 as the amended permit issu�d on June 2, 2016, and the Minor Modification issued on December 19, 2016,
and copies nf alI documents shall be readily available on sit� when a DCM representative. inspects the project
for compliance. All conditions and stipulat�ons of the active permit remain in force unless altered herein. �his
approval does not eliminate the need to obtain any additianal pezmits, appravals, or authorizations that may be
required.
Please contact Stephen Lane at {252) 808-2808 ext. 2�8 if you have any questions or concerns.
cc:
Sincerely,
�.,�,,� �,�,.� _
Daug Huggett
Major Permits Coordinator
Chris 12ivenbark. NCDaT
Brad Shaver, USACE
Joanne Ste�nhuis, DWR
Stephen Lane, DCM
Cathy $rittingham, DCM
State of North Caro["rna f Enviranmental Qualaty � Coastal Management
Moeehcad City OFfice I 4a0 Commerce Avenuc I h9orehead City. NC 28557
252 808 28Q8