From: Brian Oschwald <boschwald@thewootencompany.com>
Sent: Monday, April 03, 2017 5:19 PM
To: Norton, April R
Subject: RE: Additional Information Request - Town of Wilson's Mills
Attachments: Buffer SOA USDA Sewer System Improvements 040317.pdf, Neu -Con SOA USDA
Sewer System Improvements 040317.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
April,
We completed the field determinations today. We should be receiving written confirmation of stream locations towards
the end of the week from Gary Kreiser. There is one place on the plans that we will be getting additional topo survey
and relocating a sewer line. I'll get you updated construction drawing and updated Buffer/Stream impacts as soon as
they are ready.
Second, I have attached a letter from Cara Conder, with RES, stating that Buffer and Wetland Mitigation is available
through their bank.
Brian J.P. Oschwald, PE
Project Engineer
The Wooten Company
120 North Boylan Avenue
Raleigh, NC 27603
919.828.0531
Fax 919.834.3589
www.thewootencomoanv.com
Iff1w
THE WOOTEN COMPANY
From: Norton, April R [mailto:april.norton@ncdenr.gov]
Sent: Tuesday, March 21, 2017 8:23 AM
To: Brian Oschwald
Subject: RE: Additional Information Request - Town of Wilson's Mills
Brian,
The plan is acceptable.
Thanks,
April
From: Brian Oschwald [mailto:boschwald@thewootencompany.com
Sent: Monday, March 20, 2017 5:05 PM
1
To: Norton, April R <april.norton@ncdenr.gov>
Subject: RE: Additional Information Request -Town of Wilson's Mills
April,
I have addressed all of the comments in this letter and how we discussed last week. I have made a request to Stephanie
Goss for field determinations to be made. I'd like to submit all of my revisions back to you. That way you can be
reviewing while we wait on the field determinations. If there are any additional revisions from your review, I can make
them prior to the field determinations. I am confident the field determinations will result in no additional changes, but
we can address those if needed. We are getting close to being ready to advertise/bid this project, so I'd like to take
advantage of all review time we can. Please advise if this plan is acceptable to you.
Thanks,
Brian Oschwald, PE
Project Engineer
The Wooten Company
120 North Boylan Avenue
Raleigh, NC 27603
919.828.0531
Fax 919.834.3589
www.thewootencompany.com
W V
THE WOOTEN COMPANY
From: Norton, April R[mailto:april.nortonCa)ncdenr.Qov]
Sent: Tuesday, March 14, 2017 2:49 PM
To: Brian Oschwald
Subject: FW: Additional Information Request - Town of Wilson's Mills
From: Norton, April R
Sent: Wednesday, February 22, 2017 3:32 PM
To: 'Brian Oschwald'<boschwald@thewootencompanv.com>
Cc: Homewood, Sue <sue.homewood@ncdenr.gov>; 'John.T.Thomas.JR@usace.army.mil,
<John.T.Thomas.JR@usace.army.mil>
Subject: Additional Information Request - Town of Wilson's Mills
Brian,
Thank you for addressing my questions regarding your 401 Water Quality Certification. Below you will find additional or
revised questions/comments which I would like a response to via email.
- Appendix 3, Buffer Impact Exhibits, C-1.05 — You noted that this is a non -perpendicular crossing. The Table of
Uses states, "Impacts other than perpendicular crossings in Zone 2 only is allowable and impacts other than
perpendicular crossings in Zone 1 are allowable with mitigation." Please review this area again and submit map
revisions and/or PCN buffer impact table and/or mitigation calculation revisions, as appropriate.
After reviewing Appendix 3, Buffer Impacts Exhibit, C-4.02, it appears as though all impacts are located in Zone
2. As mentioned previously, the Table of Uses states, "Impacts other than perpendicular crossings in Zone 2 only
is allowable and impacts other than perpendicular crossings in Zone 1 are allowable with mitigation." It was
noted during our conversation that the impacts in question are non -perpendicular. Please comment on mitigation
requirements, as it appears as though mitigation is not necessary within this impact area. This may require map
revision and/or PCN buffer impact table and/or mitigation calculation revisions.
- It was noted during our conversation that 0.216 acres of permanent wetland impacts will occur, 0.522 acres of
temporary wetland impacts will occur, resulting in a total of 0.738 acres of wetland impacts. This amount includes
the 20' and 30'permanent utility easements. As mentioned, General Certification 3884, Condition 17 allows for
only a 15' permanent easement. Any exception from this condition requires a specific request and justification by
the applicant (via email) for review by DWR.
- After reviewing the Soil Survey Map and USGS Map, it appears as though there may be additional stream
impacts within the surrounding area of the proposed project site. A complete review of the project cannot be
conducted until a site visit has been conducted by the Raleigh Regional Office, and all stream impacts have been
verified. I will contact the Regional Office to provide them with an update on this project. Please complete and
submit the Stream Determination form for the Raleigh Regional Office, located here.
- Lastly, after the above comments have been addressed and resolved, an official letter from Resource
Environmental Solutions is required with the buffer mitigation credits.
I am required to develop a formal additional information request letter which will also be mailed to the applicant. In the
letter, I can include all items addressed above, or give you a week to address some of the issues.
Please let me know if you have any questions or concerns.
Thanks,
April
April R. Norton
Environmental Specialist
Division of Water Resources
North Carolina Department of Environmental Quality
336-776-9692 office
336-354-2284 mobile
april.nortongncdenr. gov
Winston-Salem Regional Office
450 W. Hanes Mill Road, Suite 300
Winston-Salem, NC 27105
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.