Loading...
HomeMy WebLinkAbout20071818 Ver 1_Other Agency Comments_20080122 es~'t'° STATE OF NORTH CAROLINA I?EPARTIV~NT OF T~:ANSPORTATION MICHAEL F. EASLEY GOVERNQR January 22, 2008 Mr. Barry Jacobs Orange County Board of Commissioners 200 South Cameron Street Hillsborough, NC 27278 LYNDO TIPPETT SECRETARY Re: T1P Project B-4218- bridge No. 108 over New Hope Creek on SR 1730 (Turkey Farm Road).. Dear Mr. Jacobs: The -planning for this bridge replacement project began in 2002 when Start of Study letters were sent to federal, state, .and local officials requesting input concerning the. project. The local contact on this project was Sohn Link (Orange County Manager). During the information gathering process, several state and federal agencies provided comments. In addition, two area residents contacted us for further information concerning the proposed project and in September of 2005 a newsletter was sent to the residents in the immediate area of the project. A third area resident contacted our office following the distribution of the newsletter. NCDOT Project Development staff has also been in contact with county planning staff on several occasions during the development of the project. During the design phase several different span arrangements were considered with the final design being. a two span box beam structure. After receipt of your letter of December 18, 2007 NCDOT has re-evaluated the project and has chosen to modify the existing twa span box beam design to a three span cored slab design. This design change will allow the location of the interior bents to be shifted outside of the water channel onto the dry bank area that, in turn, will eliminate the need for the rock causeway. In addition, in an effort to protect mussel species believed to exist in or near the project area, NCDOT has specified that "Design Standards in Sensitive Watersheds" be used for this project. These design standards offer the highest level of erosion control measures NCDOT implements on a project. alAluNO ADDR~ss: NG bEPARTMENT OF TRANSPORTATION PROJECT DEYELOWIEMT ~i ENYIR1NiMENtALANALYSISGRANCH BRKX3E PROJECT DEVELOPMENT UNTT 1 S51=t4IJltt SEtMACE CENTER RALEIGH NC 27889-1551 TELE7HONE: 919-715-1500 FAX: 919-715-t501 WEBSITE: WWW.NCDOT.ORG LOCATION: PARKER LINCOLN $LDG 2728 CAPITAL &.VD -SUITE 168 RALEIGH NC 27804 At this time we feel that an appropriate amount of public exposure has lien both put forth and received. The current schedule for this project has a let date of July 15, 2008 designated. Thank. you. for making us aware of your concerns for this project. We hope that this recent design change will accommodate the. intent of the New Hope Corridor Open Space Master Plan. Please feel free to contact me if I can be of further assistance. Sincerely, ~V I ~ ~ ~ t William T. Goodwin, fir. PE Bridge Project Development Unit Head Project Development and Environmental Analysis CC; Gregory J. Thorpe, PhD., Project Developmgnt & Environmental Analysis Jay Bennett, PE, Roadway Design Greg Perfett, PE, Structure Design Robert Healy, New Hope Corridor Advisory Committee ,: r~ .~: ., ,r ...; i ;~ a ... , .: ~S3.tc,:: ;n~JF, =,.