HomeMy WebLinkAbout20040954 Ver 1_Complete File_20040727NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Michael F. Easley, Governor William G. Ross, Jr., Secretary
Alan W. Klimek, P.E., Director
July 27, 2004
DWQ Project # 04-0954
Wake County
St. Lawrence Homes Rhein Interests of Raleigh
7200 Falls of the Neuse Rd. 4 ? IS-SUED 7 Corporate Center Ct.
Suite 300 Greensboro, NC 27408
Raleigh, NC 27615
Subject Property: Brightleaf Sewer Outfall C/o St. Lawrence Homes
Lick Creek[03-04-01, 27-11-(0.5), WS-IV, NSW (nutrient sensitive)]
Approval of 401 Water Quality Certification and Authorization Certificate per the Neuse
River Buffer Protection Rules (15A NCAC 213.0233) with Additional Conditions
Dear Mr. Sirs & Madam:
You have our approval, in accordance with the attached conditions and those listed below, to
place fill within or otherwise impact 1.01 acres of wetlands, 212 feet of streams and 61,173.1
square feet (fl) of protected riparian buffers (Zone 1=17,732.8 square feet, Zone 2=43,440.3
square feet) for the purpose of a sewer outfall at the subject property, as described within your
application dated June 11, 2004 and received by the N.C. Division of Water Quality (DWQ) on
June 14, 2004 and the additional information submitted July 26, 2004. After reviewing your
application, we have decided that the impacts are covered by General Water Quality Certification
Number 3374 (GC3374). The Certification allows you to use Nationwide Permit 12 when issued
by the US Army Corps of Engineers (USACE). This letter shall also act as your approved
Authorization Certificate for impacts to the protected riparian buffers per 15A NCAC 2B .0233.
In addition, you should obtain or otherwise comply with any other required federal, state or local
permits before you go ahead with your project including (but not limited to) Erosion and
Sediment Control, Non-discharge, and Water Supply, Watershed regulations. Also, this
approval to proceed with your proposed impacts or to conduct impacts to waters as
depicted in your application shall expire upon, expiration of the 404 or CAMA Permit.
This approval is for the purpose and design that you described in your application. If you change
your project, you must notify us and you may be required to send us a new application. If the
property is sold, the new owner must be given a copy of this Certification and approval letter and
is thereby responsible for complying with all conditions. If total fills for this project (now or in
the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may
be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the
conditions listed in the attached certification and any additional conditions listed below.
401 Wetlands Certification Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650 .. ?TOne
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 jr Carolina
Phone: 919-733.1786/ FAX 919.733-6893 / Internet: htto://h2o.enr.state.nc.us/ncwetlands aturullu
v.
St. Lawrence Homes
Page 2 of 4
7/27/04
The Additional Conditions of the Certification are:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and
general conditions of this Certification (or Isolated Wetland Permit) are met. No other
impacts are approved including incidental impacts:
Amount Approved Plan Location or Reference
nits
Stream 212 (feet) Wetlands Impacts 1, 2, 3, 4, 5, 9
and 14
404/CAMA Wetlands 1.01 (acres) Wetlands Impacts 6, 7, 8, 9, 10,
11, 12, 13, 15, 16, 17 and 18
Buffers 61,173.1 (square Neuse Buffer Impacts 1, 2, 3A, 3B,
$.) 4, 5, 67, 8A, 8B, 9, 10A, 10B, 11,
12, 13A, 13B, 14A, 14B, 15, 16,
17, 18, 19, 20, 21; 22, 23, 24, 25,
26;27, 28, 29, 30, 31, 32A, 32B,
33,34A, 34B and 35
2. Erosion & Sediment Control Practices
Erosion and sediment control practices must be in full `compliance with all specifications
governing the proper design, installation and operation and maintenance of such Best
Management Practices in order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed,
installed, operated, and maintained in accordance with the most recent version of the
North Carolina Sediment and Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion
control measures must be such that they equal, or exceed, the requirements specified
in the most recent version of the North Carolina Sediment and Erosion Control
Manual. The devices shall be maintained on all construction sites, borrow sites, and
waste pile (spoil) projects, including contractor-owned or leased borrow pits
associated with the project.
3. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas
beyond the footprint of the impacts depicted in the Pre-Construction Notification. All
construction activities, including the design, installation, operation, and maintenance of
sediment and erosion control Best Management Practices, shall be performed so that no
violations of state water quality standards, statutes, or rules occur.
r
St. Lawrence Homes
Page 3 of 4
7/27/04
4. No Sediment & Erosion Control Measures w/n Wetlands or Waters
Sediment and erosion control measures shall not be placed in wetlands or waters to the
maximum extent practicable. If placement of sediment and erosion control devices in
wetlands and waters is unavoidable, they shall be removed and the natural grade restored
within six months of the date that the Division of Land Resources has released the
project.
5. No Impacts to Zone 1
No impacts shall occur to Zone 1 of the protected riparian buffers (except for uses and
activities designated as "exempt" within 15A NCAC 02B .0233), unless otherwise
approved by the DWQ.
6. Water Quality Certification(s)
The proposed project must comply with all of the conditions of General Water Quality
Certification(s) (GC) 3374.
7. Certificate of Completion
Upon completion of all work approved within the 46,1 Water Quality Certification or
applicable Buffer Rules, and any subsequent modifications, the applicant is required to
return the attached certificate of completion to the 401%Wetlands Unit, North Carolina
Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650.
Violations of any condition herein set forth may result in revocation of this Certification and may
result in criminal and/or civil penalties. The authorization to proceed with your proposed
impacts or to conduct impacts to waters as depicted in your application and as authorized by this
Certification, shall expire upon expiration of the 404 or CAMA Permit.
If you do not accept any of the conditions of this Certification (associated with the approved
wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60
days of the date that you receive this letter. To ask for a hearing, send a written petition, which
conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative
Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its
conditions are final and binding unless you ask for a hearing.
Any disputes over determinations regarding this Authorization Certificate (associated with the
approved buffer impacts) shall be referred in writing to the Director for a decision. The
Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean
Water Act and the Neuse riparian buffer protection rule as described within 15A NCAC 2B
.0233. If you have any questions, please telephone John Dorney at 919-733-9646 or Debbie
Edwards at 919-733-9302.
St. Lawrence Homes
Page 4 of 4
7/27/04
Sincerely,
Alan W. Klimek, P.E.
AWK/dae
Enclosures: GC 3374
Certificate of Completion
cc:
Todd Preuninger-S&EC
USACE Raleigh Regulatory Field Office
DWQ Raleigh Regional Office
DLR Raleigh Regional Office
File Copy
Central Files
Filename:
t
040954BrghtleafSewerOutfall(Wake)401+buffer
WETLANDS i 401 GROUP
Regional Office may be included as appropriate. Photographs may alsJ(te jn6hgo at the
applicant's discretion.
WATER QUALITY SECTION
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify. )?
Yes ® No ? If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Impact Site Zone* Impact Multiplier Required
Number (square feet) Mitigation
Please, refer to 1 17,732.8 SF 3 NA
Buffer Map for 2 43,440.3 SF 1.5 NA
I
di
id
l
n
v
ua
Impact Total 61,173.1 SF NA
Locations (1.40 acres)
* Zone I extends out 30 feet perpendicular trom near bank of channel; Gone 2 extends an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or.0260.
NA
XI. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
N/A
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
Sanitary Sewer System.
WETLANDS /X101 GROi. p
JUL 2 6 2004
Page 8 of 9 WATER QUALITY SECTION
NCDENR-DWQ
Attn: Mr. John Dorney
2321 Crabtree Blvd
Parkview Building
Raleigh, NC 27604
Environmental Consultants, PA
Road - Raleigh, North Carolina 27614 - Phone: (919) 846-5900 - Fax: (919) 846-9467
IF!!-
Army Corps of Engineers
US
Attn: Mr. Todd Tugwell
6508 Falls of Neuse Rd., Ste. 120
Raleigh, NC I%SUNDS 1401 GROUP
JUN 14 2004
RE: Nationwide Permit 12.401 Compliance, & NC-DWQ Buffer Comp QUALITY SECTION
Brightleaf at the Park - Sanitary Sewer
Durham, Durham County, North Carolina
(Latitude/Longitude:) 035° 57' 7.67" N 078° 48' 49.29"W
S&EC Project #: 5566.W0 & 8118.W1
Dear Mr. Dorney and Mr. Tugwell:
On behalf of the Rhein Interests and St. Lawrence Homes (owners), we hereby request
authorization from the US Army Corps of Engineers (USACE) to use Nationwide Permit 12 for
the subject project to cover temporary impacts to wetlands and jurisdictional waters (i.e., streams,
ponds) for the purpose installing a sanitary sewer. The proposed easement is located north of
Highway 70, approximately 2000 feet northeast of the intersection of Highway 70 and Sherron
Road (SR 1811). Figure 1 shows the location of the alignment on a USGS topographic
quadrangle.
Construction of the proposed sewer line will proceed in accordance with all general conditions
that apply to Nationwide Permit 12, as well as all of the conditions of the 401 Certification
associated with NWP 12. Parallel buffer impacts to Zone 2 are unavoidable due to topographic
constraints and existing utility location, therefore we are requesting buffer compliance from the
NC-DWQ. A Pre-construction Notification Application (PCN) is attached, as well as an agent
authorization form.
The proposed easement (and surrounding properties) was delineated b S&EC nor to finalizing '-?
the construction plans and the USACE agreed with our delineation (AID# 200420413 & AID# r=
200420594). Mr. Steve Mitchell of NC-DWQ has also conducted a site visit to verify our buffer -
determinations. A copy of his letter is attached (DWQ Cert. # 00-1455).
This project consists of the installation of a sanitary sewer line to service the proposed residential
development. The sewer alignment crosses the creeks at a nearly perpendicular angle in order to
minimize impacts. Placement of the sewer line will temporarily impact a cumulative total of 212
linear feet (Impacts 1-5, 9, & 14) of stream channel and 1.01 acres (Impacts 6-13, 15-18) of
wetlands. Please, refer to attached Wetlands Impact Exhibit for individual impact locations and
amounts.
Charlotte Office:
236 LePhillip Court, Suite C
Concord, NC 28025
Phone: (704) 720-9405
Fax: (704) 720-9406
Greensboro Office:
3817-E Lawndale Drive
Greensboro, NC 27455
Phone: (336) 540-8234
Fax: (336) 540-8235
Hickory Office:
622 Coon Mountain Lane
Taylorsville, NC 28681
Phone (828) 635-5820
Fax: (828) 635-5820
May 11, 2004
S&EC Project #: 5566.W0 & 8118.W1
Page 2 of 2
Due to topographic constraints, parallel impacts to Zone 2 of the Riparian Buffer could not be
avoided (see attached justification). Please, refer to attached Neuse Buffer Exhibit for individual
impact locations and areas. The USACE's current policy requires applicants to avoid and
minimize wetland and stream channel impacts to the maximum extent practicable and may
require further compensatory mitigation to offset unavoidable losses forested wetlands due to
utility line installation. The applicant requested a detailed delineation of wetlands present along
the proposed corridor prior to construction in order to avoid wetland impacts wherever possible.
The wetlands and jurisdictional waters (i.e., streams, ponds) will be restored to original contours
following completion of the project and the banks will be reseeded following current guidelines.
Because the applicant will minimize impacts to stream channels by utilizing perpendicular
crossings, and because the proposed impacts are temporary, S&EC does not believe
compensatory mitigation should be required by the USACE for this project. However, if
mitigation is required the applicant proposes payment to the WRP. A request has been sent to
their office concurrent with this application.
Sincerely,
Todd Preuninger
Biologist/Project Manager
Attachments:
Pre-Construction (PCN) Notification Form
Site Location Map - USGS Quad (Figure 1)
Site Location Map - Soil Survey (Figure 2)
Wetlands Impact Exhibit (12 sheets)
Neuse Buffer Exhibit (9 sheets)
NC-DWQ Buffer Letter
Agent Authorization Form
i
Office Use Only: C Fonn Version May 2002
494-
USACE Action ID No. DWQ NP
O `?
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
1. Processing
1. Check all of the approval(s) requested for this project:
N Section 404 Permit N Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
N 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested:
NWP 12
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete
section VIII and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
II. Applicant Information
1. Owner/Applicant Information
Name: St. Lawrence Homes/ Rhein Interests of Raleigh
Mailing Address: 7200 Falls of the Neuse Rd./ 7 Corporate Center Ct.
Suite 300/ Greensboro N.C. 27408
Raleigh N.C.27615/
Telephone Number: 919-676-8980/336-288-9355 Fax Number: Rhein: 336-282-4980
E-mail Address:
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: Todd Preuninger
Company Affiliation: Soil & Environmental Consultants, PA
Mailing Address: 11010 Raven Ridge Road
Raleigh NC 27614
Telephone Number: (919)846-5900 Fax Number: (919)846-9467
E-mail Address: Preuninger(a-)SandEC.com
Page 1 of 9
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Brightleaf Sewer Outfall
2. T.I.P. Project Number or State Project Number (NCDOT Only): NA
3. Property Identification Number (Tax PIN): 0850-02-75-7790, 0850-02-85-9943, 0850-04-
83-2103, 0850-0340-5942, 0850-04-61-1440, 0850-04-72-0429, 0850-03-21-4274, 0850-03-
30-3502 0850-03-32-3444 0850-03-42-7587 0759-01-19-9198 0850-03-01-7009 0850-03-
02-9321
4. Location
County: Durham Nearest Town: Durham
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers, landmarks, etc.): The subject site is located north of
Highway 70, approximately 2000 feet northeast of the intersection of Highway 70 and Sherron Road (SR 1811).
5. Site coordinates, if available (UTM or Lat/Long):035° 57' 7.67"N 078° 48'49.29"W
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Property size (acres):N/A
7. Nearest body of water (stream/river/sound/ocean/lake):
Lick Creek
8. River Basin: Neuse
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.)
Page 2 of 9
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: The site is currently wooded. Land use in the vicinity of the
project consists of residential and agricultural land.
10. Describe the overall project in detail, including the type of equipment to be used: The
proiect consists of the installation of a sanitary sewer outfall. Typical equipment associated
with utility installation will be utilized.
11. Explain the purpose of the proposed work: The purpose of the alignment is to provide
utilities to two proposed subdivisions and adjacent properties.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
The proposed easement (and surrounding properties) was delineated by S&EC prior to finalizing
the construction plans and the USACE agreed with our delineation (AID# 200420413 & AID#
200420594). Mr. Steve Mitchell of NC-DWO has also conducted a site visit to verify our buffer
determinations. A copy of his letter is attached (DWQ Cert. # 00-1455). In addition, Mr. Todd
Tugwell and Mike Horan visited the site to make importance and perennial determinations.
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
Impacts associated with the proposed subdivision will be submitted under separate cover.
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
Page 3 of 9
Provide a written description of the proposed impacts: Temporary impacts to 212
Linear feet of stream channel and 1.01 acres of wetlands for installing s_anitm sewer line to
service two residential developments. Buffer Impacts in zone 1 & 2 are necessary for sewer
line easements and creek crossings. See attached Wetlands Impact Exhibit.
2. Individually list wetland impacts below:
Wetland Impact Area of Located within Distance to
Site Number Type of Impact* Impact 100-year Floodplain** Nearest Stream Type of Wetland***
(indicate on ma) (acres) (yes/no) (linear feet)
6(NWP 12) Temporary/ 0.27 yes 100 Bottomland
Excavation
7(NWP 12) Temporary/ 0.12 yes 40 Bottomland
Excavation
8(NWP 12) Temporary/ 0.23 yes 40 Bottomland
Excavation
9(NWP 12) Temporary/ 0.07 yes 20 Bottomland
Excavation
10(NWP 12) Temporary/ 0.06 yes 150 Bottomland
Excavation
II(NWP 12) Temporary/ 0.06 yes 125 Bottomland
Excavation
12(NWP 12) Temporary/ 0.06 yes 300 Bottomland
Excavation
13(NWP 12) Temporary/ 0.002 yes 150 Bottomland
Excavation
15(NWP 12) Temporary/ 0.03 yes 100 Bottomland
Excavation
16(NWP 12) Temporary/ 0.04 yes 125 Bottomland
Excavation
17(NWP 12) Temporary/ 0.03 yes 150 Bottomland
Excavation
18WWP 12) Temporary/ 0.03 yes 200 Bottomland
Excavation
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at htto://www.fema.gov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only).
List the total acreage (estimated) of all existing wetlands on the property: 21.9 Acres
Total area of wetland impact proposed: 1.01 Acres
3. Individually list all intermittent and perennial stream impacts below:
Stream Impact Length of Average Width Perennial or
Site Number Type of Impact* Impact Stream Name** of Stream Intermittent?
(indicate on ma) (linear feet) Before Impact (please specify)
1 Temporary/
30 UT Tributary to Lick
10'
Intermittent
Excavation Creek
2 Temporary/
11.2 UT Tri butary to Lick
4'
Intermittent
Excavation Creek
Page 4 of 9
3 Temporary/
42 UT Tributary to Lick
3'
Intermittent
Excavation Creek
4 Temporary/
37'4 UT Tributary to Lick
10'
Intermittent
Excavation Creek
5 Temporary/ 30 Lick Creek 15 Perennial
Excavation
9 Temporary/ 31.5 Lick Creek 12'
Excavation Perennial
14 Temporary/ 30 UT Tributary to Lick 3' Intermittent
Excavation Creek
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.usgs.gov. Several intemet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com,
www.maoauest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 212 LF
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.) below:
Open Water Impact Area of Name of Waterbody Type of Waterbody
Site Number Type of Impact* Impact (if applicable) (lake, pond, estuary, sound,
(indicate on map) (acres) bay, ocean, etc.)
NA NA NA NA NA
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
5. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): NA
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.): NA
Size of watershed draining to pond: NA Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
Page 5 of 9
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
The applicant requested a wetland delineation for the entire project site in order to avoid and
minimize impacts. The USACE's current policy requires applicants to avoid and minimize
wetland and stream channel impacts to the maximum extent practicable and may require further
compensatory mitigation to offset unavoidable losses forested wetlands due to utility line
installation. The applicant requested a detailed delineation of wetlands present along the
proposed corridor prior to construction in order to avoid wetland impacts wherever possible. The
wetlands and jurisdictional waters (i.e., streams, ponds) will be restored to original contours
following completion of the project and the banks will be reseeded following current guidelines.
Because the applicant will minimize impacts to stream channels by utilizing perpendicular
crossings, and because the proposed impacts are temporary, S&EC does not believe
compensatory mitigation should be required by the USACE for this project. However, if
mitigation is required the applicant proposes payment to the EEP. A request has been sent to
their office concurrent with this application.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed. .
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/ncwetlands/stnngide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
Page 6 of 9
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
Because the applicant has avoided and minimized stream channel impacts by crossing
stream channels in a perpendicular fashion, and because the proposed impacts are temporary
and small, S&EC believes that compensatory mitigation should not be required. However, if
mitigation is required the applicant proposes payment to the EEP.
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at
(919) 733-5208 to determine availability and to request written approval of mitigation prior
to submittal of a PCN. For additional information regarding the application process for the
NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of
the NCWRP is proposed, please check the appropriate box on page three and provide the
following information:
Amount of stream mitigation requested (linear feet): NA
Amount of buffer mitigation requested (square feet): NA
Amount of Riparian wetland mitigation requested (acres): NA
Amount of Non-riparian wetland mitigation requested (acres): NA
Amount of Coastal wetland mitigation requested (acres): NA
IX. Environmental Documentation (required by DWQ)
Does the project involve an expenditure of public (federal/state) funds or the use of public
(federal/state) land?
Yes ? No
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a. NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No ?
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Page 7 of 9
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233
(Meuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify, )?
Yes ® No ? If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Impact Site Zone* Impact Multiplier Required
Number (square feet) Mitigation
Please, refer to 1 13872 SF 3 NA
Buffer Map for 2 47301.1 SF 1.5 NA
I
di
id
l
n
v
ua
Impact Total 611173.1 SF NA
Locations (1.40 acres)
* Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or .0260.
NA
XI. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
N/A
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
Sanitary Sewer System.
Page 8 of 9
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application?
Yes ? No
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
N/A
Applicant/Agent's Signature
(Agent's signature is valid only if an authorization letter from the
vy
Date
is provided.)
Page 9 of 9
todd
From: Jay Nivens Dayn@y-wh.com]
Sent: Thursday, April 01, 2004 11:26 AM
To: todd
Subject: RE: Brightleaf Wetlands Exhibit Transmittal
Todd,
I have revised the sewer trunk and the exhibits for the Wetland Package (wetland impact &
neuse buffer impact) and will be sending them to your attention today. Please let me know
if you have any questions or concerns.
I have moved the sewer out of the Neuse buffers as far as possible
the wetland impacts. I am sure you know how bad the topography is
emits us to where we can run this sewer trunk due to the vertical
Thanks for you help,
Jay Nivens
Yarbrough-Williams & Houle, Inc.
704-556-1990 x117
-----Original Message-----
From: todd [mailto:preuninger@sandec.com]
Sent: Monday, March 15, 2004 11:11 AM
To: 'Jay Nivens'
Subject: RE: Brightleaf Wetlands Exhibit Transmittal
ze
s
Yes, you are correct - zone 1 (inner 30 feet) and zone 2 outer 20 feet. Parallel impacts
are allowed to either zone, WITH JUSTIFICATION. Zone 1 requires mitigation at roughly
$3/sq. ft.
Let me know if you have any additional questions.
todd
-----Original Message-----
From: Jay Nivens [mailto:jayn@y-wh.com]
Sent: Monday, March 15, 2004 10:52 AM
To: todd
Subject: RE: Brightleaf Wetlands Exhibit Transmittal
Todd,
we are looking at
the creek. My understanding is there is 2 zones in the Neuse buffer for the state. One
is a 30' buffer(zone 1) that we need to stay out of and a 20' buffer(zone 2) where we can
have impacts. As you know we are limited with the topo in this basin(steep sides to the
creek) that will constrict our corridor for the sewer trunk line. Let me know if this is
the correct interpretation of the Neuse rule. We will try and get your maps back to you
as soon as possible.
Thanks,
Jay Nivens
Yarbrough-Williams & Houle, Inc.
704-556-1990 x117
-----original Message-----
From: todd [mailto:preuninger@sandec.com]
Sent: Monday, March 15, 2004 10:38 AM
To: 'Jay Nivens'
Subject: RE: Brightleaf Wetlands Exhibit Transmittal
1
05/16/2003 16:08 336-288-3993 RICHARD WESTMORELAND PAGE 02/02
Environmental Consultants, PA
Road • Raleigh, North Cuolins 27614 • Phone: (919) 846-5900 • Fax: (919) 846-9467
vrww.SandEC.c-cmt
Address: COLD 6;?2" -p . Q .C- . T.'14JDb
Phone: '29ko - 'LiR- Qua `ra
Project Name/Dewription:
Date: 5? - K- -
The Department of the Army •
U.S. Army Corps of En&eers, Mm#ngto-n District
P.Q. Box 1890
WflrxtingtQa, NC 284M
Attn: -Tor-w-
Field Office: zaps...
Re: Wetlands Related Consulting and Permitting
To Whom It May Concern:
I, the curmta. o er, hereby designate and authorize Soil & Envixoxi mental Consultants, PA, to
act in my behalf as my agent in the processing of pem- t applications, to furnish upon request
supplemental information in support of applications, etc. from this day forward. The day of
Ibis notification supersedes any previous correspondence concerning the agent for this project.
NOTICE: This authorization, for liability and professional couxtesy re"ons, is valid only for
government officials to enter the property when accompanied by S&EC staff. You should can S&EC
to armge a site meeting prior to visiting the site.
?-"SL 1?TS R? r'?-btQlEt U..4
t:tztu-tnsir, i.R?? -u? ?,•? 1>_P
1'rint???pe?ypp„Ownex's Name crarertY Owner's Signature
cc: Mr. John Dorney cc: Mr. Todd Preurdnger
NCDENR - DWQ Soil & Environmental Consultants, PA
2321 Crabtree Boulevard
Raleigh, NC 27604
urr.r
t?flflOttE OfSCG: SZCE@I1?t2LRSL11fk&? Ifickm Office!
236 LePhMp Court, Suite C 3817-E Lawndale Drive 622 Coon Mountain lAne
Concord, NC 28025 Greensboro, NC 27458 Taylorsviiln, NC 28681
Phone: (704) 720-y405 Phone: (336) 540-8234 Phonc (826) 635.5820
F2x: (704) 720-9406 Pax: (336) 5448235 Fax: (828) 635-5820
Name. 'ZlketVA 'VZEE?' 5`21S
Soil & Environmental. Consultants, Pty.
11010 Raven Ridge Road - Raleigh, North Carolina 27614 • Phone: (919) 846-5900 a Fax: (919) 846-9467
www.S,indFC.com
AGENT AUTHORIZA'T'ION FORM
All Blanks To Be Filled In B The Current Landowner
Name: ?L- ?fj-c,? G'E /Y S
Address: 7200 t??k t?s OF-e- s st c t t 3GO j C d ?>6 / .r-
Pbone: 21'7 ^ 6 76 9-l 9.0
Project Name/ Description:
Date: /(iv r/ - 1? a o 0 3
The Department of the Army
U.S. Army Corps of Engineers, Wilmington District Post4r Fax Nxe 7671
P.O. Box 1890
Wilmington, NC 28402 TO
CoZWt.
Attn: phom#
Field Office: Fax e
r-O
Re: Wetlands Related Consulting and Permitting
To Whom It May Concern:
I, the current propga owner, hereby designate and authorize Soil & Environmental Consultants, PA to
act in my behalf as my agent in the processing of permit applications, to furnish upon request
supplemental information in support of applications, etc. from this day forward. The, day of
.?ciad? ? ?e , aoo3
This notification supersedes any previous correspondence concerning the agent for this project.
NOTICE: This authorization, for liability and professional courtesy reasons, is valid only for
government officials to enter the property when accompanied by S&EC staff. You should call S&EC
to mange a site meeting prior to visiting the site.
Go%?-?-t c`foLd ST-. r-A-;ts
Print Property Owner's Name
cc: Mr. John Dorney
NCDENR - DWQ
2321 Crabtree Boulevard
Raleigh, NC 27604
=- ' /yrv(" ?
Property wner's Signa e
cc: Mr. Todd Preuninger
Soil & Environmental Cor sultants, PA
Charlotte Office: G1CegOshor4 Off ee: 9r
.
236 LePhillip Court, Suite C 3817-L Lawndalc Drive 622 (bon Mountain Lane
Concord, NC 28025 GmcxLsboro, NC 27455 Taylorsville. NC 28681
Phono: (704) 720.9405 Phone: (336) 540.8234 Phone (828) 635-5820
Fax: (704) 720-9406 Fax: (336) 540-8235 Fax: (828) 635-5820
t ?era? 'mot / `_ + t ? c
-`? ' I t\ wsc ?Jw G ?sr r?,_r _
Cc 1 tr,_ ./r.WsE 1 ' S f .:w. •?'' .. ? A.. r - \ ' \''Rx? ?<.. S
J 30
4 "t r Y W s ?.d d b1 C
k.
Chi x j e A,P ° tr i? ?r i ti - N F. / ' 27 rY c
y rr t ( wSC k. VrsB r 26 28 YJ.'K
1
,'? 4 ?._'.F ?•r
ws 1\ s s r
CrB 25
al. i ,?'h ,SII ,}` ?? ?? +•a ,?`f t _ Ej ,?+z 31 ?'.
wse?? w5cst 23 ?V .
usB' 1? } 21 /
C16 rev ' ?/ YYb
t Y , . -? ? Gr'R r ? f ??
24
y tl '?11 ?` t t ? X22 d?4 tt t'?G4?? r ??
d 71
i 14er ,f?: t k?.. \r` ??L s.{ .?'x .±? 19 ?$ J; n•\? - c 3.' r ,;rt? t
r ` 1' '{ /u4t 36 )j r n
E 1
CrB"rr '3 "? 15 F.,- ICzr ` 38 N> i Y
/ t k
7 ? t
Sheets : 27,28,32,33
Project M Scale:
00-5566 1" =1320'
Project Date: Figure 2 -Soil Survey Soil & Environmental Consultants, Inc.
Mgr.: P. J. 7117100 Priest, Craven, & Associates
Sherron Rd. 11010 Raven Ridge Rd.- Raleigh, NC 27614
Durham, Durham County, NC (919) 846-5900 • (919) 846-9467
Web Page: www.SandEC.com
O?CF W AT F/?'QG
r
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Colleen H. Sullins, Deputy Director
Division of Water Quality
March 18, 2004
Todd Preuninger
S&EC,Inc.
11010 Raven Ridge Road
Raleigh, N.C. 27614
SSGGW0 M R 2 20,04
Subject: Neuse River Basin Riparian Buffer Rules
NBR 04-094
S&EC Project No. 5566
Village Creek Tract
Formerly Sherron Road Tract
DWQ Certification #00-1455
Durham County
Dear Mr. Preuninger:
I have reviewed the information submitted for the project referenced by the Raleigh Regional Office as
NBR 04-094. An evaluation of the stream features on the property represented on the Durham County
Soils and the USGS East Durham topographic quadrangle map was performed.
The Division of Water Quality (DWQ) has determined that there are numerous surface water features
indicated on the maps that are present on the ground as a streams and therefore subject to buffer
protection under the Neuse River Basin: Nutrient Sensitive Waters Management Strategy; Protection and
Maintenance of Existing Riparian Areas, Administrative Code 15A:20B.0233. Features 2, 3, 7, 8, 11, 12,
16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 27, 29, 30, 37, 38, 39, and 40 were determined to be subject within
the tract. Features 1, 4, 5, 6, 9, 10, 13, 14, 15, 26, 28, 31, 32, 33, 34, 35, and 36 are not subject. Please
review the attached delineation map for a correlation of the stream features and their locations within the
property. This onsite determination shall expire five (5) years from the date of this letter.
Landowners or affected parties that dispute a determination that a water body exists and that it is subject
to the buffer rule may request a determination by the Director. Such a request shall be referred to the
Director in writing c/o John Dorney, DWQ Wetlands/401 Unit, 2321 Crabtree Blvd., Raleigh, N.C.
27604. Individuals that dispute a determination that "exempts" a surface water from the rule may ask for
an adjudicatory hearing. Action must be taken within 60 days of the date of receipt of this letter.
Applicants are hereby notified that the 60-day statutory appeal time does not start until the affected party
(including downstream and adjacent landowners) is notified of the decision. DWQ recommends that the
applicant conduct this notification in order to. be certain that third party appeals are made in a timely
manner.
To ask for a hearing, send a written petition that conforms to Chapter 150B of the North Carolina General
Statutes to the Office of Administrative Hearings, Post Office Box 27447, Raleigh, N.C. 27611-74.47.
The determination is final and binding unless a request is presented within the 60 days.
This letter addresses only those issues involving the riparian area. For information relative to
Raleigh Regional Office 1628 Mail Service Center
Water Quality Section Raleigh, NC 27699-1628
O
A A
NCD'C®R
phone (919) 571-4700 Customer Service
facsimile (919) 571-4718 1-877-623-6748
other impacts, 401/404, or wetland issues, please contact Mr. John Dorney at 919-733-1786. Thank you
for your attention to this matter and if this Office can be of any other assistance or if you have additional
questions, please do not hesitate to contact me at 919-571-4700.
Sincerely,
Steve Mitchell
Environmental Scientist
Cc: RRO/John Dorney/Land Quality
h:\buflet.for\buf04\villagck.094
BRI GHTLKAF AT THE PARK
WETLANDS IMPACT EXHIBIT
SCALE: 1 "=1200' DATE: 4-13-04
Wetland Impacts
--Impact
Location I
1
2 -.Type- j Aree e.t.
_.
CH
-CH- Linear Ft.
Ch one
_30
11.2
-- 42
_
4 . _ __ _CH 37,4
30
6 JW _ X1888.9
JW 5,272.5
?
JW _
--1_0200.2
__ 9
- JW B CH
-- -2031..3 _31.5
10 JW 261:7
11 JW
? 2 924.5
__ 12
JW
CH
-?
54.2
._-- _
---.-.__......
30
15 _ JW 1408.5
.-16 --
18-
.-JW __
JW _
_039.5
-1f333.3
1475.1
SEE
DETAIL #1
SEE
DETAIL
SEE
PAIL #4
4
k
YARBROUGH - WILLIAMS & HOULE, INC.
Planning Surveying • Engineering
730 91n4er 0A Court Chektt• NC 19213
704.356.1990 7041511.0505(f.')
0?P
SEE
RTAIL dill
SEE'.
SEE ,. n.
SEE
?' ?x° ;:,.: DETAIL6 SEE
DETAIL
;,n,. 1, °:::::., tn, • -io ¢. SEWER
- •r?.i,? - •?'? -• Vii,,,. TRUNK
>..
SEE .:?
!i\\\ uliiill ?`• lmli•, '?>%ii - ,.+,',?.' . ao \a%'??``,,?? ?\'?:'`??\::
SEWER ? ? • ?• •::,,.:-;:. y . ,. r!? ,...•? •.. . •..:
a;` ?;:._:?•<-''. DETAIL 415
TRUNK
,r?;r :,,try,; r<::::'tr? ? x ? .'it;°•?
Til .?l..:a ', !,r!}} `7"., :r nr?`• ?. i?tii4;? ^J:;.';. ?j•i _.?1 ?
. . ..... ..... .. \ ........
.?.......
\....
?. . . . . .. . JURISDICTIONAL \
\ . . : . .. :: . WETLANDS
UNDISTURBED
........ ..'.'.
\ . \ PROPOSED
\,. SEWER TRUNK & /
30' SEWER R/W i
J CK
'IMPACT ,#1 / v
30 1.. F.
JURISDICTIONAL CHANNEL
i ?I I
zf/
BRIGHTLEAF AT THE PARK
I
W-" TLANDS IMPACT DETAIL #1
SCALE: 1 "=50' DATE: 4-13-04
I J YARBROUGH - WILLIAMS & H OULE, INC.
Planning • Surveying • Engineering
/ 790 Tlndsor Oak court Chulott, NC 20279
ttu.ooo.twu 1w.0oo,v6*?4x)
CHANNEL
i
/ I UNDISTURBED - ?-
_ \\ IMPACT #3 PROPOSED -
42 L.F. ` ?• \.. SFWFR TRUNK &
\ JURISDICTIONAL CHANNEL 30' SEWER R/W
/ SURVEYED
1'OP OF BAN
k
BRI GHTLEAF AT THE PARK
-? '? - WETLANDS IMPACT DETAIL #3
i SCALE: 1"=50' DATE: 4-13-04
\ \ / YARBROUGH - WILLIAMS & H OULE, , INC.
-? Planning • Surveying • Engineering
790 ftdaor Oak Court Charlotte NC 2¢279
?? 104.0"Jo 0 701.566.0900((-)
\ l
JURISDICTIONAL /
PROPOSED "• / / / /
SEWER TRUNK & UNDISTURBED \
30' SEWER R/W
77
? I
IMPACT #4
37.4 L.F. JURISDICTIONAL
CHANNEL
IMPACT ##5
.. 30.0 L.F. JURISDICTIONAL
CHANNEL
??,S1dRVEYBANK
???--- = - BRI GHTLEAF AT THE PARK
WETLANDS IMPACT DE'T'AIL #4
SCALE: 1 "=50' DATE: 4-13-04
YARBROUGH - WILLIAMS & H OuI.E, INC.
Planning • Surveying • Engineering
730 rtna,or Oak court cnarlott., HC 2ozt9
. 'tu+.noo.iwu •tw,ooo.u+wii(tu)
....... . .
....... ?. '.. y'
WETLANDS IMPACT #7 \' ' '
- - - \ \ 5,272.5 S.F. (0.12 A.C.) ... .. I I
_ JURISDICTIONAL WETLANDS i'
\ DISTURBED
_? - - JURISDICTIONAL
- - WETLANDS
UNDISTURBED
''';;;;::;:
. . . . . . . . . . . .;.;.;.;..:? - - _ \
_ _ \
-•` ........ .'.'.".'.'.'.'..
\
'_•c? -? \ \ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . --
,r
. . . . . . . . . . . . . . . . . . . . . . . . . .rq4 . . . . . . . . . . .
. . .. bF 0qNK . . . . . . . . . . . . . .
- 1 . . . . . . . . . . . . . .
PROPOSED
/ SEWER TRUNK &
WETLANDS IMPACT #6 30' SEWER R/W
11,888.9 S.F. (0.27 A.C.)
JURISDICTIONAL WETLANDS
DISTURBED
I II I ?\ l) /%? - \
BRIGHTLEAF AT THE PARK
WETLANDS IMPACT DETAIL #5
SCALE: 1"=100' DATE: 4-13-04
I I I l ?l ?I /
YARBROUGH - WIUJAMS & H OULE, INC.
Planning Surveying • Engineering
790 Vbdsor Oak Court CLu.o.U*.uouoNC 28273
J / / rua.ooaAm ?w.oo(r.Y}
WETLANDS IMPACT #10
I \? \ - - - 2,612.7 S.F. (0.06 A.C.) / g
- - WETLANDS IMPACT #9 JURISDICTIONAL WETLANDS
3,037.3 S.F. (0.07 A.C.) DISTURBED -?
& 31.5 L.F. JURISDICTIONAL &
?? ?? \ . • . • CHANNEL WETLANDS DISTURBED i
......... ::
JURISDICTIONAL .?. . . ..
WETLANDS ! ...... \? -_ ....... .
UNDISTURBED .'.'.'.'.:?i: I'.' ?•
I / J.... '.'.'.'.'... :..... . ' . '.... .
I DF. 6•
+ I I I . .SURVEYED TOP. OF BANK. ...... Ay k: .-. 1?1
............. .......:.. / \ -
. . . . . . . . . . .? . J / SEWER TRUNK & \ : : :
. . . . . . . . . . . . . . .. . • e 30' SEWER R/W - JURISDICTIONAL
WETLANDS
/ . . . ... ... UNDISTURBED
Y
. . . . . . . .. . . . . .
J
...
. . . . .I r . . . . . . . ,.
I.;.:.:. / WETLANDS IMPACTS
10,206.2 S.F. (0.23 A.C.)
.. . :?,...?.. • ... . ..I...... ' JURISDICTIONAL WETLANDS BRIGHTLEAF AT THE PARK
DISTURBED WETLANDS IMPACT DETAIL6
-7
SCALE: 1"=100' DATE: 4-13-04
.
. . . ....'.'. SEE WETLAND
DETAIL #2 / YARBROUGH - wILLIAMS & HOIJLE, INC.
FOR IMPACTS Planning • Surveying • Engineering
I i
1 730 VWdsor Oak Court Chnrtottu KC ZM3
. / / / / 704.666.Le60 70{.66E.0606(tu)
.. ......
WETLANDS IMPACT #11 • •
2,924.5 S.F. (0.06 A.C.) ?-
JURISDICTIONAL WETLANDS ?- '
DISTURBED _
PROPOSED ?-
/ SEWER TRUNK &
/ 30' SEWER R/W /
/ JURISDICTIONAL
WETLANDS \
UNDISTURBED
BRIGHTLEAF AT THE PARK
/ ?pCP?\°N app \ WETLANDS IMPACT DETAIL #7
SCALE: 1 "=50' DATE: 4 -13 - 04
YARBROUGH - WILLIAMS & H OULE, INC.
Pinning • Surveying • Engineering
% 7907W.tltl6 99Oak 0 Court CWlo?tbaN `l?2W3
--_-'\
.............
. . . . . . . . . . . . . . . . . . . .. JURISDICTIONAL
. . . . . . . . . . . . . . . . . . . . . ... .. .. . . . WETLANDS
''''''''''''''
. . . . . . . . . . . . . . . UNDISTURBED 0
'''`'
. . . . . . . . \ PROPOSED
SEWER TRONK Ac
30 SEWER R/W
................................................
::: . . .... . . . . . . . . . . . . . .
. . ....
j
..... /
: ........................... ' / 1 <
••• .•••••.•••••••••••. WETLANDS IMPACT #13 hQ
. . . . . . . - - 1083 SF (000*2 AC)
JURISDICTIONAL
WETLANDS DISTURBED "cz-
WETLANDS IMPACT #12 ?J
2,654.2 S.F. (0.06 A.C.)
JURISDICTIONAL WETLANDS •••••..•.••.••••••••.
DISTURBED
BRIGHTLEAF AT THE PARK
WETLANDS IMPACT DETAILS
SCALE, 1 -50 DATE: 4-13-04
YARBROUGH - WILLIAMS & H OULE, INC.
Planning • Surveying • Engineering
7 -- 730 ftdior 06k Court Chulotts NC 28271
im.0dd.1000 mBBd omaqu)
? CHANNEL
UNDISTURBED
PROPOSED
SEWER TRUNK &
30' SEWER R/W
IMPACT #14
/
30.8 L..F.CHANNEL
- ??
.............. ? ?,fs1?FtVEYED Top F BANK
::
i
BRIGHTLEAF AT THE PARK
WETLANDS IMPACT DETAIL #9
SCALE: 1 "=50' DATE: 4-13-04
YARBROUGH - WILLIAms & H OULE, INC.
Planning • Surveying • Engineering
790 VMftr CA Court Charlotls HC 28M
YW.OOe.tYw 'rW.000.0900(lu}
r _ . ; ; ; ; ; . / WETLANDS IMPACT #16
i 2,039.5 S. F. (0.04 A.C.)
ETLANDS
JURISDIC
I
/ STURBED
DI
/ JURISDIC TIONAL • . • .
WETLA NDS .... .. . . .. .. .
UNDISTURBED --
...:.
/ ........... :...
" '
. .. ....... ....
'
/ PROPOSED
SEWER TRUNK &
30' SEWER R/W
JURISDICTIONAL
/ WETLANDS
UNDISTURBED
{ Op
..•.'.•.•..•.•.•.•.'.•.'.•.•...
•.'. ?
E?Ep ?_
. •
_ . . . Uw
.
......... .. ...
. ......... .
..
..... -
::.
.
. .
I
\1
:....::...'..
.
.
............
.
/
/
WETLANDS IMPACT #15
1,468.5 S.F. (0.03 A.C.)
JURISDICTIONAL WETLANDS
DISTURBED
BRIGHTLEAF AT THE PARK
WETLANDS IMPACT DETAIL #10
04
13
4
'
"
-
-
DATE:
=50
SCALE: 1
\ \ YARBROUGH - WILLIAMS & H OULE, INC.
Panning • Surveying • Engineering
CUrtotto NC 28273
r Oak Court
790 ll
d
.
c
ao
. .. . .
-- JURISDICTIONAL
_ i WETLANDS
?• Z , '
/ UNDISTURBED ' :::::::::::':':..............
/ ......................
JURISDICTIONAL
\'. / .. . . ..'.'.' WETLANDS .'.'.'.'
I• UNDISTURBED
( :':: ::::::::::::::::.:::::.:.: :::::. ...............
WETLANDS IMPACT #18 ..... ................. .......... ......
1,475.1 S.F. JURISDICTIONALOWETLANDS '..... .. ...... ... .::: :::::
DISTURBED I ......... / / I /J?
I - ........ I .r..j.• ..•-?..•...-.• BRIGHTLEAF AT THE PARK
. . / WETLANDS IMPACT DETAIL X11
• E T L AANDS IMPACT #17
' / ' •.'.' ' ' '? • ? ? /
WETLANDS .
1,333.3 S.F. (0.03 A.C.) / SCALE: 1"=100' DATE: 4-13-04
_• . JURISDICTIONAL WETLANDS
I DISTURBED YARBROUGH - WILLIAMS & HOULE, INC.
( .. Planning • Surveying • Engineering
? 730 ra odoa via Court ra ano oaoo(r..} M
B-RfGHTL-F-,AF AT THE PA-RK
Neuse Buffer imeads Neuse Buffer Im pacts
I ImoaC, Impact
Location Type Area s.f. Location TyDe I Area s.f.
1 I NB•Z2 2.097.2 17 NB-Z2 957.0
2 NS-Z2 1192.6 18 NB-Z2 1 530.7
3a NB-Z1 2,091.2 19 NB-Z2 424.1
3b NB-Z2 2.529.5 20 NB-Z2 3.077.9
4 NB-Z2 1,931.1 21 NB-72 379.4
5 NB-Z2 4,415.7 22 N9-Z2 144.3
6 N3-Z2 702.4 23 NB-72 841.2
7 NB-Z2 1,967,5 24 NB-Z2 316.4
8a NB-Zi 1,876.9 25 NB-Z2 732.1
8b NB-Z2 1,906.6 26 NB-Z2 1,623.4
9 NB-Z2 786.5 27 NB•Z2 805.6
10a NB-Zt 1,990.6 28 NB-Z2 229.9
10b NB-Z2 1.930.2 29 NB-Z2 638.5
11 NB - ZZ 2.015.8 30 NB-Zt 1.893.7
12 NB-22 1.190.6 31 NB-Z2 I 623.9
13a NB-Z2 1,908.1 32a NB - Zt 1,853.0
13b NB-L7 2,958.2 325 NB-12 1,235.2
14a NB-Z2 1,340.7 33 NB-Z2 269.2
14b NB-Z2 2,046.5 34a NB-Z1 1,208.4
15 NB-Z2 1.812.3 34b NB•Z2 1,803.5
16 I NB-Z2 1,211.4 35 1 NB•Z2 I 1,681.9
Sub Total' 39,903.8 Sub Total 21.269.3
Total 61,173.1
?g
?O
---
' SEiYER ?:;; StI M?t\ SEE
i!, • DETAIL 43 TRUNK
.,p
55==y11t ?? I ,
SEE
' x SEE SEE DETAIL #4
DETAIL 4
DETAIL. rr3 r;J1f'' " a
+ yr ! ' , . ,
\l SEE
k ? DETAIL n 3 ' ? ?
? awl •I \ .•. '
SEE ?, z ?? . \, \I I
'. DETAIL SEE
DETAIL 71
YABBPPOUGH - `VII Lms & HOui.'',, INC.
k_v.V Planning San-ying - Engineering
Fli no r=d-r Dnk eaci CherbNa WC znz,9
705.`x`6.1950 704.456.0505(1-)
SEE
DETAIL #6
IVE USE B UFFER . EXH_ !Bf'rP
SCALE: 1 900' DATE: 4-15-04
e?ne NeirteP -
I
I
rl1.
1.
SEE
t? n> 7
r
-- SEE
-
DETAIL ?6
<lr - .
SEE
d ?: = =
sf DETAIL #6
s\,
nCAILjf ` ?? ?`