Loading...
HomeMy WebLinkAbout20170834 Ver 1_Division 7 - Start of Study Notification Corps Response_20170328 Wanucha, Dave From:Bailey, David E CIV USARMY CESAW (US) <David.E.Bailey2@usace.army.mil> Sent:Tuesday, March 28, 2017 10:48 AM To:Mayhew, Aileen S Cc:Wanucha, Dave; Powers, Tim; Thomson, Nicole J; Parker, Jerry A Subject:RE: Division 7 - Start of Study Notification Ms. Mayhew, Thank you for your request for comments regarding the following Division 7 projects: B-4958, Replace Bridge No. 106 on SR 2128 (Bunch Road) over Reedy Fork Creek; Guilford Co. B-5715, Replace Bridge No. 17 on SR 2351 (Witty Road) over Haw River; Rockingham Co. I visited both of these projects on 2/22/2017 and confirmed the presence and boundaries of wetlands and streams as flagged and mapped by Ecosystem Planning & Restoration, LLC. Please be aware that impacts associated with the discharge of dredged or fill material into jurisdictional waters of the United States are subject to our regulatory authority pursuant to Section 404 of the Clean Water Act. Any discharge of dredged or fill material into waters of the United States including wetlands would require Department of the Army (DA) permit authorization. The type of DA authorization required will be determined by the location, type, and extent of jurisdictional area impacted by the project, and by the project design and construction limits. Until additional data is furnished that details the extent of the construction limits of the proposed projects we are unable to verify that the projects will not have jurisdictional impacts, or to provide specific comments concerning DA permit requirements or a recommendation of avoidance and minimization measures and/or alternatives. However, the Corps is in favor of replacing these bridge structures in place with bridges; such project constraints typically decrease impacts to waters of the US to the greatest extent practicable. Bridge-to-bridge replacement projects with off-site detours are typically authorized via Nationwide Permit 3 for maintenance and/or Nationwide Permit 13 for bank stabilization. Should you have any further questions related to DA permits for this project, please contact me at 919-554-4884, extension 30. Sincerely, Dave Bailey --- David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. -----Original Message----- From: Mayhew, Aileen S \[mailto:Aileen.Mayhew@mottmac.com\] Sent: Tuesday, March 21, 2017 3:14 PM 1 To: Bailey, David E CIV USARMY CESAW (US) <David.E.Bailey2@usace.army.mil>; 'gary_jordan@fws.gov' <gary_jordan@fws.gov>; 'travis.wilson@ncwildlife.org' <travis.wilson@ncwildlife.org>; 'brian.strong@ncparks.gov' <brian.strong@ncparks.gov>; 'vanderwiele.cynthia@epa.gov' <vanderwiele.cynthia@epa.gov>; dave.wanucha@ncdenr.gov Cc: Wicker, Henry M Jr CIV USARMY CESAW (US) <Henry.M.Wicker.JR@usace.army.mil>; felix.davila@dot.gov; Powers, Tim <tpowers@ncdot.gov>; Jordan, Tim <Tim.Jordan@mottmac.com>; Jackson, Rebecca F <rebecca.jackson@mottmac.com> Subject: \[EXTERNAL\] Division 7 - Start of Study Notification Dear Agency Representative: SUBJECT: Notification of start of activities for NCDOT State Transportation Improvement Program bridge replacement projects to be let in 2017 and 2018. The NCDOT has begun the planning, environmental, and engineering studies for the bridge replacement projects listed in the attached spreadsheet. It is anticipated that the projects will include replacement of the existing bridge with a bridge. The NCDOT would appreciate any information you might have that would be helpful in evaluating potential environmental impacts of the projects. A vicinity map for each bridge replacement project is attached. Please note that there will be no formal interagency meeting for these projects. It is desirable that your agency respond by April 13, 2017 concerning any beneficial or adverse impacts of the proposed projects. If you would like additional time to provide comments, please let me know. If you have any questions concerning these projects, please contact Tim Powers, Division Bridge Program Manager, at (336) 487- 0000 or tpowers@ncdot.gov <mailto:tpowers@ncdot.gov> or me at (919) 552-2253 or aileen.mayhew@mottmac.com <mailto:aileen.mayhew@mottmac.com> . Please include the Project Number(s) in all correspondence and comments. I am also putting hard copies of this information in the mail today. Thank you, Aileen Aileen S. Mayhew, PE Project Manager / NEPA T +1 (919) 552 2253 F +1 (919) 552 2254 aileen.mayhew@mottmac.com <mailto:aileen.mayhew@mottmac.com> 2 Mott MacDonald 7621 Purfoy Road Suite 115 Fuquay-Varina NC 27526 United States of America Website | Twitter <Blockedhttps://twitter.com/mottmacdonald> | LinkedIn <Blockedhttps://www.linkedin.com/company/7253> | Facebook <Blockedhttps://www.facebook.com/mottmacdonaldgroup> | YouTube <Blockedhttps://www.youtube.com/user/mottmacdonaldgroup> 3