Loading...
HomeMy WebLinkAbout20081216 Ver 1_Site Plan_20080815a Ar Win5t9t+~Safem fi~i:C~:~il ice ~r~ S f r.3 _ . ~j ~;~c :4i,f~r ~ ~n,nt r ~1f~1~71G11~d7U~ ~~1~t~llJ1~lLJ~ll1LU.YA~ 1~~ lLl1Gd~~~ 1. VERIFY THAT EROSION CONTROL PERMIT HAS BEEN OBTAINED BY OWNER 2. SCHEDULE PRE-CONSTRUCTION CONFERENCE TO INCLUDE NC DIVISION OF LAND QUALITY. 3. INSTALL TEMPORARY CONSTRUCTION ENTRANCE. 4. INSTALL TEMPORARY AND PERMANENT STREAM CROSSINGS AND ASSOCIATED SEDIMENT FENCE, DIVERSIONS, AND OUTLET PROTECTION PRIOR TO CROSSING STREAM. 5. CLEAR AREAS ALONG CONSTRUCTION LIMITS AT PROPERTY PERIMETER FOR INSTALLATION OF OFF-SITE TRAPEZOIDAL DIVERSION DITCHES AND INSTALL SEDIMENT FENCE, DITCHES, AND STONE CHECK DAMS TO DIVERT OFF-SITE DRAINAGE. PROVIDE OUND COVER FOR ALL DISTURBED AREAS. ~ TEMPORARY GR 6. CLEAR AREAS FOR SEDIMENT POOL INSTALLATION AND INSTALL SEDIMENT POOL, BAFFLES AND SKIMMERS AS DETAILED ON PLANS. PROVIDE TEMPORARY GROUND COVER FOR ALL DISTURBED AREAS INCLUDING DIVERSIONS. 7. CLEAR AREAS FOR INTERIOR DVERSION DITCHES AND INSTALL DIVERSION DITCHES TO DIVERT SEDIMENT (ADEN RUNOFF TO SEDIMENT POOLS. PROVIDE TEMPORARY GROUND COVER FOR ALL DISTURBED AREAS INCLUDING DIVERSIONS.. 8. PRIOR TO MASS CLEARING OR GRUBBING, VERIFY ALL EROSION MEASURES ARE INSTALLED PROPERLY. THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION-CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL WITHIN 21 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PROVISIONS FOR PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION MUST BE e sR ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR - - ~-`v DAYS (WHICHEVER IS SNORTER} FOLLOWING COMPLETIONS OF CONSTRUCTION OR DEVELOPMENT. 3 L _ 9. MAINTAIN ALL TEMPORARY EROSION CONTROL MEASURES UNTIL PERMANENT MEASURES ARE k ~ ~ t g#,~ 6 ESTABLISHED, THEN REMOVE TEMPORARY MEASURES. nt~`~' ~ ~ ' ~ ~~a 10. WARRANTY REQUIREMENTS FOR THIS PROJECT ALSO EXTEND TO THE PERMANENT ER0510N CONTROL MEASURES. 000p0111111if/j1 0000`{O/IIIIq~11 0*°` DES~G IIIIIi a°~0 CaR I /II/i C ~ a,k~i 4f`,~'~ 5 BEFORE YOU DIG ! ~y N Q~,,...•« • ~ • CALL 1-800-632-4949 ; ~Af~ ; c ; ~~s{"' N.C. ONE-CALL CENTER n i i ' ~ z zaos r ; i s . vJ e . • I ~r b i 4 ~ ITS THE LAW . r. . ~ ~ s 'a~N~,. ~ • 11 S ~ S0 II~s M4.n.N ~ 00 II/I y 00'0 I/Il sn _,t`~ 0,0! IIIh 7( ~`,4 IIICf W. r 000 - s't w ~ Lt 1. EXISTING SITE PLAN Y. ty - :R 8 . ~ ~ y 1 ~ r r! ~i SITS 3. PERIMETER EROSION CONTROL INSTALLATION PLAN 4. GRADING & EROSION CONTROL PLAN ~ - ~ r~ 5. EROSION CONTROL DETAILS ~ t X ';r t ,p g'^~ ~Id~ t~~Ei ~l" ~~f > r_ t . '~A k ,r ti , Yt' 'pry _z., . , W D 1 y~X ~ .~X .T ~3 ~ a . r ~ ~~C~~~ N0 'SCALE i P:\01010-55\Dwgs\Detoils\Cover,dwg 1:1 '~~~,~NN~ gylrl Ro er D. Yates WETLANDS /JURISDICTIONAL WATERS ~ ~ ~ s; 9 1320-234 V ~ ~ ~ The site was originally assessed for wetlands and jusrisdictional waters by 'Wetland & Natural Resource rn : 3~~ r Consultants, Inc., Newton, N.C. The wetland and juridictional water areas were flagged, located by field ~',r'~°b ~yw~ i survey, and mapped for further review. Site & Utility Design Services met'' with Mr. John Thomas, US °'•,,~0 ~wy,•`• Army Corps of Engineers, on the site on July 1, 2008. Mr. Thomas inspected the northern areas of the '•~~„~n~ ~ site for wetlands and jurisdictional waters. The Intermittent and Perennial 'Stream locations, as well as the wetland area "1 W" were confirmed on the ground using features and flag numbers from the survey. N 02'31'14" E Existing _ _ 87 , 109.89' ~ Mr. Thomas identified wetland area "1 W" and the temporary stream crossing "1-TS" as subject to wetland . - _ Axle_ _ p ; ~ ~ 0 1 E Milton F. & Roger D. Yates area disturbance calculations. The existing stream crossing from a former logging operation is also - _ ~ r 1124-23 subject to wetland area disturbance calculations. All other stream crossings, temporary and permanent, ~ ,,r' are subject to length of disturbed perennial stream calculations according to Mr. Thomas. W J ~ -V.,.._ `'"`-~.,~.~.~~.ti,~,,,a ~ / ? j ` - --r-- - _ _ N 02'19 55" E 7 ~ ~ r c,, i ~ ~n.n~" W_.-- ~~..r ~a.. ~ ~ ~ _ 027,161 - i - ' ;f ~ 1 EIP ~ ~a6 0 ' T~ - ~ - ~ - _ / jai / / rn ~ ~ ~ ~ ~ ~ ~ ' J 1 I 1 { ~ ° 859 859 ~ ~ ~ v Q R1 ~ I C ~ .w.--- / G ~ i h.. ° ~ J INTERMITI INTERMITTENT / ~ / ~ ~ ~ V~ ~ ~ ~ ~ ~ v. STREAM ~ ! ~ ~ \ ~ ' , r ~ ,r w. ~ ~ ,`r. i ~ r i ~ -M-~. ~ _w-- r---...__ ~ ~T,S, ~ W BEGIN PERENIAL ~IN PERENIAL \ k ~ ~ ~ ~ ~ ~ ! f i ~ STREAM i ~ _vA .a _ _ _ ~ r_ ~ ~ ~ ; ~ ~ FLAG 416 STREAM ~ i / ~1 O FLAG ~ 416,E ~ f ~ l ~ ~ ~ ~ ~ ~ f i' TEMPORARY ~ ~ ~ N ( PT. ~ 646 ~ INTERMITTENT STREAM ~ ~ t. ht ti ~ , , ~ ~ SURVEY PT. ~ 646 1 ~ Pole ~ Q ~ ~ CHANNEL CROSSING. 1 ~ 850 r'F i ti N ~ ~ ~ 12-FOOT MAXIMUM \ ~ r J N ~:~WIDTH. ~ ~ s, sod ~ ~ ~ d. 7 ~ ~ "'jam _ ~ r° r' Y ~ ~ _ ~ \ \ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ NQ~ } ~ 1 ) ~ X ~ ~U ~ ~ I ~ : ~ ` ~ ~ \ ~ ~ ~ o m I-- to 'a. n ~ / r ~ 1 ~ ~ ~ k ~ ~ ~ a z M [yt I ~ 't . b ~ ~ ~ ~ ~ ~ \ ~ tease ~ a~i ~ ~0 y`` c, f ~ f r ~ 15 STREAM BUFFER r~ ~ r 'FER ~ ~ ~ 1 ~ 1 ~ ~ 1 Frap 'n V ~ ~ I °a _ _ _ r _ ~ DO NOT DISTURB ~B~,~' r 1~ V ~ ugnt ~ ~ m \ i ~ ~ Pole W ~ ~ ~ C0 Od ~ ~ .r ~ ~ ~ ; ~ ~ ~ ~ ~ ~ a ~ 1~ ~ ~ 6" CPP ~ Q ~ 7 I ; l \ ~ \ ~ ~ 849.0 F.. ~ i . ~ ~ ~ ~ , ~ ~ \ RIP=RAP a ~ ~ , _ - 1~ ` ~ ~ i ~ ~ \ APRON (TYP.) ~t f ( ~ ~ \ 6" GPP BURIED / ~ m A \ ~ \ ~ \ \ transformer ~t-' \ \ \ 1 ~ tight BL-WP, LLC & Others ~ \ ~ ~ ale 1932-3142 PB ~ << ~ ~ ~ ~ _ _ EI _ ~ 15' STREAM BUFFER ~ ~ I ~ \ , DO NOT DISTURB ~ ~ ~ r ti 1 65.0 LF 72 CMP W r t / ~ \ _ ~ 1 - ti ~-E' \ \ , . 20.. ~RF,q ~ HEADWALL AT INLET ~ ~ , j:- ~ ~ \ ~ ~R AND FES AT OU LET ~ , . a , ; / ~ , ~ , ~ , l ~ \ \ ~ ~ \t \ ~ std a etZer w • ° . • INSTALL PIPE INVERT ; ~ / , " • • ~ ` . ~ °r~-~•~~,-~ ~-,rY,n ~ ~ , • . . O ~ \ ~ ~ I ~ ~ ` ~ ~ \ \A~\ ~ dolt ~ . ~ ~ ; ~ ~ \ _ ws Ran ~ ~ w'~.I.O BELOW EXISTING _ . ~ i ~ ~ . ~ B 626 ~ STREAM CHANNEL. ~ ` - % ~ . ¦ , ~ .-w ~ w,. ,.M.s \ "CPP ~ / 1 ~ ~ ~ ~ \ OUTLET BURIED ~ r~ I ~ ~ ~ 55.2 LF 60 CMP W/ z; \ d y.. ~ ~ I ~ 1 j i HEADWALL AT INLET t ` ~ ~ o ~ d ~ • ~ .M..-' r ~ L. ~ W 50.7 LF fi6 CMP W/~ • f - 82 1 ~ \ ~v~ ~ r~. _ , ~ ~ - _ . ° HEADWALL AT INLET . ° / 1 s ~ ~ f ~ y V ° ~ ! ~ ~ AN D FES AT OUTLET. v ~ ~ ~ ~ , _ ~ °;-AND FES AT OUTLET...~~,~.~.r~~~.,~..~\,,.,~ ' ~ ~ / ~ ~ I INSTALL PIPE INVERT ~ - -STB M ~ BUFF'^' • • M" ' ~ INSTALL PIPE INVERT l! ~ 4~ ~ ~ ` ~ w ~ ~ `t ~ ~ I.0' BELOW EXISTING ~t~ ~ ` -0,Power \1 f ~ " " . , -~„h.N I.0 BELOW EXISTING _ ~ ,f ~ EXISTING - ~ ~ ° ~t ~ \ ~ ~ j STREAM CHANNEL. ' ~ - ~ L~L Q „ `tiL~.~ , ~ ~..rt.. _ _ STREAM CHANNEL. N ' I ~ _ , WETLAND ° ° " - etzeP ~ ~;~~:,,.w;i~`' • / AREA ~ ~ ~ \o~' \ ~ti\ ~ \ ~ ~ g" DIP Water ~ Ron ~ ,i r ~ ~ ` ~ . \ / ~ P deaf Rd. Existing~~ ~ ~Urrows ~ ~ `1 ~ ~ . E r ~ . & ..626 ~ ~ ~ ° ~ \ ~'L. ~ M' . ( a,` ~ a.`y ~ \ ~i - ~ f { I d yes r' °r 1-'~0 ~n ~ ~ ~ T MPORARY STREAM' v.. r" 150 ~ 3 , E - 1g 6 ~ ' • ~ ~ CHANNEL CROSSING. ~ / ~ ~ ~ ~ ~ ^ ' N ai5 Qo°'2„ w ~ _ p~ ~'o?~e~+'" Z IY F- ~ Q C' _ _ ~ ~ ~ • ~ 0 12-FOOT MAXIMUM ~ % - - _ i ~ \ ~ ' ,r ' 3 ~ ,,,,6, EI 15" CPP J ~ a ~ E" ~ - ~ ~ A~ ~ WIDTH. f - r 1w b ~ r . 830 i - i, ~ ~ / / EXISTING =i,~.~ / ~ , I ~ z ~ ~ W a = Z ~ ' ~ WETLAND ~ a _ / / ~ ~ i ~ ~ d' UJ IMPACT ~ f ~ ~ ~ , BEdlN ~ ~ ~ ~ l r ~ AREA ~ o l ~ N ~ ~ ~ ~ \ ~ ` / ~ .J ~ ~ Bernard E. & Ellen E. Caruso ~ ~ ~ ~ ~ ~ N to e ~ \ ? ~ r' ~ _ EXISTING 18" CPP & .r ~ ~ ~ ~ 1892-2283 (n r ~ Q Z a . J ` + / r \ 1 , TEMPORARY STREAM ~m o ® J ~ y ~ N ~ PB 76-19 Z $~o r- ~ - ° CROSSING (PREVIOUS,, ~ ~ ; ~ ~ d' Q LOGGING OPERATION). ~ ~ ~ REMOVE PIPE AND \ ~``t~~ ~ \ ~ C~ ~ ~ ° ~r ~ ~ . REVEGETATE CHANNEL' Q ? v ~ ~ ' - ROAD SUBGRADE ~ ~ , , ~ W Q O. J I ~ ~ l / S . ti: ~x . . r ~ ~ _ `SIDES AFTER ENTRANCE \ X ~ LL O 0. ~ ~ ~ r ~ kF ( ~ f, N , . ~ , ~ - ~ PLACEMENT,, ~ ~ W ./"w \ \ ~ ~ l~ ~ ~ ~ / iii u ~ ~ ~ ~ I ~ Y \ ~ ~ ~ ry-y`(°('Y'~r' r r..Y"`r'l~'YYYY^ ~ . / N 73'5404 W ~ 1 r I 'A ' f '~~_`1 ~ ` I ry.~y~1^+ ~ r`^~'vti^r°v•~^, r-~~°v~,~r-,n r^« y-vy~~,-., r' / / ~ 5.21' - - _ ~ • 1 ~ ~ r ~ -v~-z,-,~.}„~ EIP ' ~ ~ 57' i~' W 206.05' \ . \ ` ~ - _ ~ " ~^"y~,r~-~,~-vn ~ ~ ~ _M 4~ ° ~ . ~ PRO~CT NUMBER ~~,-~,,~,-,t~~,Fw-~ ;-~,,~,~-.~,r~~-,.,~~~,~, ~ ~ ~ , 08-WESTPOINT-0 ' ~ ~ \ ~ E EIP - - "~`•r~~ r ~ 'EIP • . \ \ ~ - _ ^rry, 1 ~ r ~ ~ f I ~ . • i 1 ~tC 03'03'38" E - - _ - _ r ~ I ~ ~ A ~ ~ ~ ' V ~2 A2' ~ EIP „ - - % _ ~ 1 ~ ~ w D 1'42 27 W 221.08 N 74 56_16 W S 0144'43" IN • \ ~ \ l ~ \ ~ 1 0 19,28' 61.86' ~ l \ / ~ ~ " _ EIP & 0858" W ~ - - _ ° ~ DESIGNED 8Y 209.83 v~e•-~v ti ysy,.y,~"y~ JWW ~ Stone EIP ` - ~ Yd2;5 N - - ~ 6' 209.78' - IP ~ DRAWN BY N 73'34'17" W \ \ \ ,.y~ Q ' ' - - _ D 21.12' ,r'~,'~'`-, ~ ~ ~ - ' , JWW/MRS ~ 0 i ~ 2p'•2s' ~ ~ ~ ti \ , i m 0 ~ + o i a ~ o e CHECKED ®Y I ~ I W o ~ ~ Ste hen H. & Pamela Sue Ho ua o ~ i l P P ' JWW ~e/a Sue Hopkins i a ~ ~ ~ ~ EIP r ~ ' 1246-1670 1670 ~ ' ~ scA~E ~ ~ Howard Thomas & Juu/a Stutts ~ 1247-1263 ~ 1263 Stephen H. & Pamela Sue Hopkins ~ AS NOTED Thomas Miller ~ ~ 50 0 50 100 150 1657-1072 1246-1670 ~ 1613-477 V ~ ~ ~ _ PB 10-93 , ~ ~ DATE Christine P. Coviness JULY 2008 Scale; I" = 50' 1993-1458 1 OF 10 08-WESTPOINT-01\DWGS\08-WESTPOINT-01 PRELIM SITE,dw 1:1 1, THE CONTRACTOR SHALL TAKE ALL REASONABLE PRECAUTIONS TO AVOID THE SILTING OF STREAMS, LAKES OR 2. EFFECTIVE EROSION CONTROL MEASURES SHALL BE INITIATED PRIOR TO THE COMMENCEMENT OF CLEARING, GR 4MS, LAKES OR OTHER WATER COURSES DUE TO THE CONSTRUCTION OF THIS PROJECT. )F CLEARING, GRADING, EXCAVATION, OR OTHER OPERATIONS THAT WILL DISTURB THE REMAININGTREE LINE - NATURAL PROTECTION. THE CONTRACTOR SHALL MAINTAIN A MIN. 15' NATURAL BUFFER ALONG EACH SIDE OF STRI ~H SIDE OF STREAM(S). e~'~~` p~au~,~~~yr 3. THE EROSION CONTROL DETAILS SHOWN HEREIN ARE FOR THE CONTRACTOR'S REFERENCE, THE DETERMINATIOI iE DETERMINATION OF WHICH DETAIL IS APPLICABLE AS THE WORK PROGRESSES SHALL BE EXISTING FENCES ,e••w~C`-f.• `~..~~~~Lr s AS SHOWN ON THE PLANS OR MADE BY THE ENGINEER, 4. ALL DITCHES SHALL BE STABILIZED AS SOON AS IS PRACTICABLE TO MINIMIZE EROSION. EXCELSIOR MATTING S' .SIOR MATTING SHALL BE PLACED IN DITCHES AND OTHER AREAS TNAT EXHIBIT MULCH ~ ~ 4~ ,t' r. ` DISPLACEMENT FROM VELOCITY SCOUR, i•• ~ DRAINAGE COURSE ~4 ~ , C OFFSITE DRAINAGE TRRAPEZOIDAL 5. THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINE DEVICES OR STRUCTURES, IN ANY EVENT, SLOPES LEFT EXPOSED WILL WITHIN 21 CALENDAR DAYS OF COMPLETIi CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION-CONTROL ~ ~ • • ; V ; ; YS OF COMPLETION OF ANY PHASE OF GRADING BE PLANTED OR OTHERWISE PROVIDED : ~ fR 3 I 5 DIVERSION DITCH / BERM (TYP.) WITH TEMPORARY OR PERMANENT GROUND COVER> DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. STRAIN EROSION. ;y.,r:.,.. ,T~ L~ S ~ kl a I 6. PROVISIONS FOR PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPLISHED FOI ;COMPLISHED FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR EXISTING GROUND CONTOUR •rr,I~~~ .~~(~G~`~~• N ~ DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETIONS OF CONSTRUCTION OR DEVELOPMENT. C . 7. THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL DEVICES IN A GOOD, WORKING STATE OF REPAIR UN E OF REPAIR UNTIL THEIR USE IS NO LONGER WARRANTED, AT THAT TIME, THE EROSION 778 PROPOSED GRADE CONTOUR r,~~~~~heo ~ C . ~ CONTROL DEVICES SHALL BE REMOVED AND DISPOSED OF SO AS TO CAUSE NO STREAM SILTATION. N. LIMITS OF 8. WHERE CULVERT PIPES ARE T4 BE INSTALLED UNDER ROADWAY, THE CONTRACTOR SHALL INSTALL THE CULVER ALL THE CULVERTS AS RAPIDLY AS IS PRACTICAL, BACK FILL IMMEDIATELY AND RIP RAP lON SHALL BE PROVIDED AT ANY CULVERT THAT IT PASSES UNDER OR OVER IF THE c ~ CULVERT (C) i DISTURBANCE THE UPSTREAM AND DOWNSTREAM SIDES OF THE STREAM CHANNEL. PERMANENT OUTLET PROTECTION SHALL BE F CULVERT AREA IS DISTURBED, _ - Existing r , 9. ALL DISTURBED DITCHES OVER 3% AND THOSE THAT EXHIBIT SCOUR WILL BE LINED WITH HIGH VELOCITY EXCEL OSDD Axle - ,.-~0 ,r ~ f j / ~ I I „ i VELOCITY EXCELSIOR MATTING AND PERMANENT SEEDING UNLESS OTHERWISE NOTED. SEE - • • - • • - • • - • • - CONSTRUCTION/CLEARING LIMITS - .-y~ r r~0 ' ~ SHT, 5 DETA L N . 'd •.-z,,,~, y-..--_ _ f / J f g ! i I 10, SEE EROSION CONTROL DETAIL SHEET FOR TEMPORARY SEDIMENT TRAP SIZING AND CULVERT OUTLET STABILIZ OUTLET STABILIZATION, W~ ®I~~®~ I~®~~ - - CENTER LINE N y rte` r ..4t,. j 0 , t ~ ~ ~ OSDD --•~,=r ! I ~ - - -R- - - PROPERTY LINE (I~ o ~-~_`..c~ '7"- f - -7--~_ _ ~ EIP ~ Q ~ ~ to "ti, _ , r r ` f ~ t r J U "C7 _ _ r 1 o d „ 1 ~ ~ ,l _ • ~ ~ , ^ - ~ -r--TDD TEMPORARY DIVERSION DITCH (TDD} ~ _ 0 1 1 -~--0SDD-¦- O~FSITE RUNOFF DIVERSION DITCH (OSDD) A + ~ L. ~ ~ a ~ ~ it I ~ \ ,,y k~ ~ q ~ ~ ~ ' r ¦ ¦ SEDIMENT FENCE ~ ~ ~ m ~ ~ ~ ~ ~ CONSTRUCTION ENTRANCE/EXIT, ! . ~.w ! .-1.... 0 I ~ ~ ~ •'c,~-~~~,. RIP-RAP CHANNEL i ~ v f~~` ~ • q~ q ~,~`;~~"Yx; `~s,=~~~ ~x`~~ ~k EXCELSIOR MATTING Y~I ~ Ica-. ~ ~ ! 1 ~ ~ . q a / ~ l ~ ~ q I ~i , - 4' Elf C7 ~ / / I k, 1 o f ~0 TEMPORARY SEDIMENT TRAP TST ~ ~ r w~ U ,1 ti ~ A ! ~ Lrght Q w . ? ~ $ 'dom.,,, / Y 4 p~v f ~ / ~ ~ \ ~ Pole ~ ~ Q ~ Z / i t ~ ~ °'s~o~ ROCK DAM ~ ~ ~ ~ ~ / ' ! ' LIMITS OF DISTURBANCE ~ ~ ! ~ 4 ~ h ~ ~ / ;/MIN. 15' BUFFER SHALL ; ~ ~ ~ ~ U ~ r~BE MAINTAINED ALONG BOTH ~ ~ R p- X M q ~ ~ , ; ~ I RAP APRON OUTLET PROTECTION (RRA) ~ O = ~ ~ ~ , f ~ ~ LIMITS OF DISTURBANCE l ~ ~ ~•~1 SIDES OF STREAM (TYP.) ~ i m f- ~ ` _ f ~ ~ MIN. 15' BUFFER SHALL U tf) ,.M. _.e.. / t , ~ .L o `J~' ~ Ll ~ t \ q ~ R~ CULVERT INLET PROTECTION CIP ~ O ~ y, ~ y r BE MAINTAINED ALONG BOTH BOTH ,~o.~ / ~,I 1 ~ ~ ! ~t ! ~ ( ) ~ a Z M _ ` \ ~ ! ~'f - - ~ ~ SIDES OF STREAM (TYP.) ~ ~ ~ ~ q ~ ~ Grease STANDARD DOT ROCK ILT S ~ ~ ~I~ RO K CHECK q q ~ . crap ' S CREEN, O . 4 p ~ r I, ~ ~ ~ y0 ~ ,y .y ,r~ s a ~ ; ; .y ~ ~ ~ ~o DAM (TYPICAL) ti, ~ ~ • STONE CHECK DAM ~ ~ ~ 150 t'<SEPARATION 1 c~9ht W ~ m ~ - ALL ~`OSDDs ~ ! ! ~ . coo SECTION NUMBER OR DETAIL LETTER = v i ~ O~ q ~ ! ~ ABC SHEET NUMBER (WHERE SECTION/DETAIL ~ ~ ~ W ! ,,f / / s. _ ` / ~ ~ ~ ! ! , 123 ' APPEARS DR WHERE SECTION/DETAIL ~ W Q ~ _ ,u.. . , _ ~ o ' e / ~ ~ o • ~ J ' l S~l TST - ~ ~ ~ ` ' ~ WAS TAKEN FROM) ti ~ 1 AC¦ \ j ~ ~ o,`,,\ coo GRADING AND EROSION w w o ~ -ti ~ f,. 3g^ TDD-- ~ ~ - / .1~ 4oa ~ SPOIL ~ ,R CONTROL LEGEND } ~ I ' / i ~ ~ cAd\ \ \ transformer ~ r,~ ~ ~ ~ O•' poet o • / ~ 1 ~ AREA , ~ ~ OFFSITE DRAINAGE TRAPEZOIDAL C ~ I b rST. ~ ~ 'r ~ ,,~-rp0 ~ ~ ~ \ \ \ DIVERSION DITCH j BERM (TYP.) 5 ° ~ ¦ ¦ T r ~ ~ ~ ~ ~ \ \ to ~ - - - EI _ to _ mom, ' ~ y l''' ~ ~~,r ~ ~ ~ I ~ / ~ ~ A z ..~,v v ~ _ 1~ a LIMITS OF r, ~ ~ ~ ~ ~ \ ~ ti RIP-RAP APRON OUTLET F ~ I- ~ ~ • rD0 1 ~ 1 ~ _ ' ~ DISTURBANCE ~ % z ~ ~ ` 1 _ I f ~ ~ ° TDD= ~ ~ . ~,A ~ W t' J . . ~ ~ ~ ! `r ~ ~ ..r- r,. r ~ ~ ! `~\'e~ PROTECTION (TYP. FOR 3) 5 ° o l ~ `---n~ ~~I ~ ~ ~ ~ 'r'te 'e \,`°~°~`i 'f/\\\ N U f \ \ ro - - - ~ - ~ ~ ~ _W ....ice L_ LIMITS OF DISTURBANCE ~ ~ ' ~ , v r, INV. ' t _ ~ ~ EIP , r, ~ _ e ~ J, MIN. 15 BUFFER SHALL TST 7 ` ~ f - ~ ~ :i . - y~ ` ~ tf~ ~ ~;f ~ l l ~ ~~y' ~ ~ \ 1 ~ I TEMPORARY CONSTRUCTION A d ~ ~ ~ ~ o ~ , ti _ 823.59 _ I INV. ~ ~ ~ ~ ~ ~ I\ ~.r- ~ ~j' 1 ~ ~ e~ + ENTRANCE (TYPICAL} 5 ~ 820 r~ 1 ~ ~ . ~ ~ r, BE MAINTAINED ALONG BOTH , , ~~~~.r~ ~ ~ 823.96 ~ ~ ~ t. J , / y ~ INV. 'INV. SIDES OF STREAM TYP. ~ - / \ ~ ~ ( ) TDD _ I . ~ ~ 1 ~ ~ . 817.55 . ~ - ~ ; ~ . ~.,~,ti..~, rn ~ ' 65.0 `..818.02 yr / f 0,'I?~ v , 72 ~ ~ \ ~ LIMITS OF DISTURBANCE ~ ~ ~ I ~ IMITS OF ~ -o-Pa~e r ~ Q Q I- rs ~ o.72q w ~ T ~ ~ - ~ MIN. 15' BUFFER SHALL ~ 1, - ^ _ DISTURBANCE~~ qi l~~ ~ _ _ - ~ Z \BE MAINTAINED ALONG BOTH t i q ~ • ` - _ _ ~ Z J ~ o. \ TDD ¦ ¦ ° ¦ ,f ~tiSIDES OF STREAM (TYP.) ~ ' • ~ ~ _ u ptP ~ W G ` ~ ~,i yi~•,,~~ .~;~~1 ~ ~ of R~. Existing 6 _ W ~ ~ Y ..W V ' .-i;°•.. \ V ,r SOD ~ ~ . rn o, ' ~ C3 ~ 1¦ Ac¦ ° ~ ~ ~ Oak _ Ex,'st - ~ . ~ INV. ~ - - - - r. ~ ~ 4 Tpp:: . ~ ~ 832.09 ` _ - y d r~ ~ ~ ~ .r ' 0~'2 ~ L _ ~ - ` ~ •59,0 i f ~ i Q ~ ~ W 4 830 ~ .v , "fi ~ j ~ ' 1, 1 Q, s 7 ~ o ~ i g _ _ _ _ ~ ~ µ ~ ~ l i E TEMPO~iARY DIVERSION ~ - w.. ~ ~ ~ INV. /I l i ~"~"-LIMITS OF = z (VERSION ` ~ ' 832.40 \ DISTURBANCE ~ W ~ ~ N O 1 f " A ,.r "w ~ ~ ~ ~,1 ~ ~ ~ , 5 DIT fi ~ BERM (TYP.) \ 1 v ; , ~ _ A TEMPORARY . ' ~ Z ~ ~ i / O ® 1 6 WATERCOURSE DIVERSION ~ _ r © } , ~o ....Tar, ~ ~i , v I" ~ ® ~ ~ 12 ~VJIDE TEMP RARY STREAM M , _ - ~ , G \ ~ , r ~ ` ~ ,,Q ~ L PERMANENT STREAM kd ~ ~ ry.~ \ ~ ~ o C OSSING FOR BUFFER BERM. 5 /g i ~ \ \ ~ I STALLATI01~1. 2-24 C,BP' ~ 5 CROSSING DETAIL r" ,r~,.. ~ ~ _ ~ - ~ ~ "v" TDD.. ' ~ Z Z ~ ~ ~ v ~'A ~ _ INSTALLE PARALLEL ,f - - - ~ FK SEDIMENT POOL W ~ ~ _ \ ~ O W Z ? _ N ~ r \ ,J r ~ w ~ \ " ~ / • S IM 'F`ENCE B ~ ED ~N ~ ` ,.5'w BAFFLES ~TY,PICAL-) ~ ~ ` ~w, ~ o, \ ~ G~ _ ® a a ~ \ 4 ~ 1 i r IP , A \ ,f ~ TYPICAL 5 \ ~ ~ ! 7a ~ v 7~ \ ~ -r w _TST-10 ~ o ~ \ \ LI TS OF ~ r r \ \ 1 I ANC ~ ' T l r - ~ ti , DIST,U ~ • 0 uQt j ~ ~ ~ \ ~ ~ ~r i Fr , ' ~ O ~ A ~ ~'T~EMPORARY _ . A~ ~ ~ ~ ~ ~ Z fF ~ ~ ¦ ¦ ATERCOU DIVERSION' 6 _ ~ • ` ~~o W A TEMPORARY ~ O ~ ~ ~ ~ ~ -moo \ 1 ~ ~ _ _ _ _ , , . s 1 ~ \ \ 6 WATERCOURSE DIVERSION ~P ~ t / / ~ ~ P ya \ ~ . ~ ~ EIP ~ ` ; a ~ - ! _ .1 i ~3 \ \ 1 1 OSDD r ~ _ `~R RMANE T STREAM L - f ~ ~ ' `EIP "'mod \ . ~i . ' ~ ti ~ ~ EIS OSDD r . ~ L PERMANENT STREAM ~ J I ~ ~ / ~ ~ ~ ' r ~ ~ ~ ~ ' ~ ~ ~ ~ e . %f I:,r ~ CROSSING`~DETAIL 5'' _ ~ ~ PROJECT NUMBER ~ ~ ~ , 08-WESTPOINT-0 ~ ~ I ~ A ~ 4., ~ 9 ~ . EIP ~ OSDD 5 CROSSING DETAIL - = \ / ~ ~ ~ ~ ~ " OSDD „ ~ DESIGNED BY \ \ ` ,5 EIP & ` e + Stone EIP ~ OSDD ~ ~IP JWW ~ ' EIP ~ - \ ~ ~ OSDD + i 0 _ .w. ~ DRAWN 8Y ~ \ ~ i C OFFSITE DRAINAGE TRRAPEZOIDAL ~ ' G ROCK CHEC~• ~ ~ ' ~ ~ r ' Or 1'~ITE - ~ + + JWW/MR5 + Q \ ~ 5 DIVERSION DITCH / BERM (TYP,) 5 DAM (TYPICAL) , \ MAINTAIN MIN. 0.5% SLOPE a AINAGE AREA ~ OFFSIE I ~E J E~D BY ~ ~ , ~ ~ r 150 t SEPARATIONS ' \ \ ~ ~ -ALL OSDDs ~ , EIP ~ ~ PERIMETER DRAINAGE AREA ~ S~~~E ~ ~ Q 150 ~ r 50 0 50 100 ~ ` V 0 DIVERSION G ROCK CHECK TO PERIMETER ~ AS NOTED 5 DAM (TYPICAL) ~ ~ ~ 11d ZR 1 d Z R9 ~w 150'f SEPARATIONS 11~V~QC~f1Al on~E / ~ ® ® ® VeAe VeV ?'p%' ALL OSDDs we v e.e ev®we® JULY 2008 Scale: 1 = 50 r D.A. 0.90 Ac. 3 OF 10 08-WESTPOINT-01 QWGS\08-WESTPOINT-01 PRELIM SITE.dW 1:1 1. THE CONTRACTOR SHALL TAKE ALL REASONABLE PRECAUTIONS TO AVOID THE SILTING OF STREAMS, LAKES C 'REAMS, LAKES OR OTHER WATER COURSES DUE TO THE CONSTRUCTION OF THIS PROJECT. REMAININGTREE LINE 2. EFFECTIVE EROSION CONTROL MEASURES SHALL BE INITIATED PRIOR TO THE COMMENCEMENT OF CLEARING, NATURAL PROTECTION. THE CONTRACTOR SHALL MAINTAIN A MIN. 15' NATURAL BUFFER ALONG EACH SIDE OF ~ T OF CLEARING, GRADING, EXCAVATION, OR OTHER OPERATIONS THAT WILL DISTURB THE q°° EACH SIDE OF STREAM(S). ',i,~t~ °°°e°~ 3. THE EROSION CONTROL DETAILS SHOWN HEREIN ARE FOR THE CONTRACTOR'S REFERENCE. THE DETERMINA' THE DETERMINATION OF WHICH DETAIL IS APPLICABLE AS THE WORK PROGRESSES SHALL BE EXISTING FENCES ,e~.w®f •o~~ .H~s~.°~. AS SHOWN ON THE PLANS OR MADE BY THE ENGINEER. - 4. ALL DITCHES SHALL BE STABILIZED AS SOON AS IS PRACTICABLE TO MINIMIZE EROSION. EXCELSIOR MATTING CELSIOR MATTING SHALL BE PLACED IN DITCHES AND OTHER AREAS THAT EXHIBIT MULCH • • ~ ;~~~r ~s ~ 0 BLOCK 8e GRAVEL DISPLACEMENT FROM VELOCITY SCOUR. i•• _ i DRAINAGE COURSE C OFFSITE DRAINAGE TRAPEZOIDAL 5 INLET PROTECTION 5. THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RE`fA 4T CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION-CONTROL ~ V s ~ $ ~ ` 5 DIVERSION DITCH BERM TYP. DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL WITHIN 21 CALENDAR DAYS OF COMPL I / ~ ~ WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSI( DAYS OF COMPLETION OF ANY PHASE OF GRADING BE PLANTED OR OTHERWISE PROVIDED RESTRAIN EROSION. ~4~~ EXISTING GROUND CONTOUR ~'sr ~ ,.~'~yws' , I 6. PROVISIONS FOR PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPLISHED ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR °°~dQ ti''~~ ~ ~ysA•~ ~ D 6' TALL BERM & TRRAPEZOIDAL DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETIONS OF CONSTRUCTION OR DEVELOPMENT. ATE OF REPAIR UNTIL THEIR USE IS NO LONGER WARRANTED. AT THAT TIME, THE EROSION PROPOSED GRADE CONTOUR °°ffh/°~'~ ° ~ LIMITS OF 7. THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL DEVICES IN A GOOD, WORKING STATE OF REPAIR 5 DIVERSION (TYP.) CONTROL DEVICES SHALL BE REMOVED AND DISPOSED OF SO AS TO CAUSE NO STREAM SILTATION. TION. I DISTURBANCE 8. WHERE CULVERT PIPES ARE TO BE INSTALLED UNDER ROADWAY, THE CONTRACTOR SHALL INSTALL THE CULti I (TYP.) THE UPSTREAM AND DOWNSTREAM SIDES OF THE STREAM CHANNEL. PERMANENT OUTLET PROTECTION SHALL BE JSTALL THE CULVERTS AS RAPIDLY AS IS PRACTICAL, BACK FILL IMMEDIATELY AND RIP RAP ~ _ _ _ _ _ _ _ = CULVERT C ECTION SHALL BE PROVIDED AT ANY CULVERT THAT IT PASSES UNDER OR OVER IF THE ( ) _ 87 Existing - CULVERT AREA IS DISTURBED. ` Axle "y ( 9. ALL DISTURBED DITCHES OVER 3% AND THOSE THAT EXHIBIT SCOUR WILL BE LINED WITH HIGH VELOCITY E)e OSDD _ ~ ~ ~ 0 f ~ SHT. 5 DETAIL "N°. IIGH VELOCITY EXCELSIOR MATTING AND PERMANENT SEEDING UNLESS OTHERWISE NOTED. SEE _ _ . _ . • _ , • _ . _ _ CONSTRUCTION/CLEARING LIMITS ~ f 1 ~ 10. SEE EROSION CON ROL DET IL SHEEN FOR TEMPORARY SEDIMENT TRAP SIZING AND CULVERT OUTLET STABI RT OUTLET STABILIZATION. ' F" ~ TEMPORARY STREAM M - - CENTER LINE ~ ROBBING DETAIL 5 _ _ ~5 w o o • , ~ 1 i ~ OSDD - ~ EIP 1 -R- PROPERTY LINE (R) o W ~ ~ ° _ _ ~ ~ ~ - 850 ~ . _ _ OSDD-I'` "r / ~ ~ ~ ` -~•--TDD TEMPORARY DIVERSION DITCH (TDD) o z a / ~ a 4 f S r .t' J s l ~ ~S'~ i ~ ~ ~ ~ ~ a f',%~ ~ ~ I E ~ SD OFFSITE RUNOFF DIVERSION DITCH (OSDD) ~ ~ ~'If M- ~ ~ ~ 1 ~ ~ - ~ N FENCE ~ ~ V l .......u.. \ mar/ ~l{ ~ : / ' ~ F C' t~ t ~ i °~r ~ ~ ~ ` ~ r CONSTRUCTION ENTRANCE/EXIT ~ \ I .~e.V~~:~:,~.; RIP RAP CHANNEL j~~( ~ 4 # ~ EXCELSIOR MATTING Z n as m . / J . ~ rn _ A _ I ~ t ~ , ~ i~ ~ I G ~ ~ _w EIEO _ I ~ ~ _ f` i ' is /a s r / ~ ~ ~ ~ ~ ( ~ TEMPORARY SEDIMENT TRAP (TST) ~ O ° _ M.. i~- ~ ~ I ~ O ' 4 ~ ~ 0 ~ ~ ~ ~ N ~ ~ O ~,~0-~•--~ ~ I~ a~ ~ ~ N r r V 0 ~ ~ a ~ ~ ~ ~ Light - R l ti A... S R V 1tA~ W ~ _ r , ~ ~ r~~ ~ ~ ~ L ~ ROCK DAM J N 1 1 o, ~ O ~ ISTURR~ANCE ~ ~ ~ ~ r S r ~ ti o~ ` BLOCK AND GRAVEL INLET PROTECTION ~ W N U ~ ~ ~ ~ 01 ~ x ~ M( l \ o. S r ~ pI~ r r I I~ , , f• - r f / ~ h ~ i/ ~ ~ ~ 1 I ~ ~ RIP-RAP APRON OUTLET PROTECTION (RRA) m ~ r~ ,a , f ~ ~ ~ I ' ~ s~:~ p D tD ~ r ~ a a . ~ >t ~ s c ~ ~ ~ I _ ~ ~ ~ - _ ' ' ' A DISTURBS ~ / + ~ ` ~ ~ ~ ~ ~ rease ~ CULVERT INLET PROTECTION (GIP} ~ U ~ ~ of t ~ ~ ~ ~ Trap fY N O D ~ f ~ I \ ~ ~ o ~ \ ~ ~ 1 i Ci ht 1 STANpARD ROCK CHECK DAM ~ O j •F" t \ ( ~ Pole ~ ~ m ~m ~ 7 a ~ h - ~ w ~ / / f' 1 1~ t, c/o SECTION NUMBER OR DETAIL LETTER ~ ~A = ~ i 840 ~ , , \ 1 r i ' ~ SPOIL AREA ACCESS ~ 1, ~ ABC SHEET NUMBER (WHERE SECTION/DETAIL y,/ 4 / 1 ~ ~ ~ 123 APPEARS OR WHERE SECTION/DETAIL Q 0 - ' moo. w ~ ` , "r _ . ~ ~ ' ~ 1 ~ WAS TAKE / \ N FROM) ~ Q J ° ~ 1 CURB INLET ~ \ J w ~ ~ ~m. ~ ~ ~ ' TBC=829.0 ~i 4 , GUTTER 828.68 '+I 1 .1 N Q' H -•i ~ ~ i l~ W p ~ ~ .i w w INV.=823.85 ~ ~ \ ~ i I I _ ~ ~ ~ ~ GRADING AND EROSION ° ~ ~ CONTROL LEGEND ~ ~ ~ ~a ~ ~ _ o ~ ~ N a ' ~ v \ r I i 1 ~ ~ ~ ~ ~ Q\ ~ y ~ ~ Transformer ~ / ~ ~ ~ ~ ~ p i ~ \ ~ lr"gbt ~ ro ~ ~ 0 830 ~ ~ \ ~ I I ~ I l f Y ~ j ~ 0 ~ ~ ' \ ~ °ie OFFSITE DRAINAGE TRAPEZOIDAL C ~ ~ I ~ ~ B d• ~`p. I f ~ ~ /?;'-rDD` ~ ~ ~ ~ 1 DIVERSION DITCH / BERM (TYP.) 5 ° ~ ~ l 18 FES~ Q I ~ y ,'Q ; ~ ; • ~ ~ ~ Q INV. 823.0 ~ ~ ~ r' Q ,..0 ~ ~ ~ \ ~ RIP-RAP APRON OUTLET F - ~ / ~ ~ i ~ ~ ~ ~ ~~~~V~ PROTECTION {TYP. FOR 3) 5 ~ ~ ° w•. - ~ T ~ M f 66 CMP rr ,.w ,,,1 ,.w f' V~~ ~ ~ ~ _ _ ~ SEE SH . 3' I / r,.-- / ~ ~ ~ _ , ti, . LIMITS OF • ~ R . - ~ EIP ~ ~ • . ' ~ DISTURBANCE ' ~ f TST° ~ ~ ~ ~ _ , - a..- ~ • • ~ ~ ~ ~ ~ ; _ _ r ~ \ 1 i~, TEMPORARY CONSTRUCTION A aW. l ~ 1 r ~.-''820 .l ~ 72 CMP ~ ~ ,r" ~ ~ ~ ~ ~ ~ ~ o \ 1 ~ 1 \ 1 ENTRANCE (TYPICAL) 5 ~ f` w.. ~ ~ L E 1 ~ 0 ~ H SEE SHT. 3 ~ ~ • ~ - - / ~ > LIMITS OF ~ ~ 1 ~ 1 - f' •1 . ~ ' , TDD ~w ~ . ~..RRP-- ~ ~ . • 0~ 830 ~ ~ i • • ~ ~ , DISTURBANCE (TYP.) ~ ~ I ! ~ ~ ~ ~ ~ ~ Power r MAINTAIN MIN, 15' o ~ psi _ _ _ ~ ~ ~ _ ~ BUFFER EACH SIDE 6O CMP 1 ~ ~ LIMITS OF Pole Z a SEE BHT. 3 E DISTURBANCE EI - _ _ ~ ~ Z OF STREAMS (TYP.) ~ ~ i ~ ~ ~ ~ . , ~ - _ ~ ~ ~ 1 ~ --~f . i ~ lnt. Sta 9f .26 I TDD ~ ~ ~ - ti. ~ \ ~ r _ .l ' J " D1P Water 0' W ~ ~ \ \ ~ ~ pak Leaf Rd. Exishn9 6_ _ - J ~ N 1, m ~ x ~ ~ eLL ~ } `S ~ Nay a `(SAS ~ ~ N r• ' \ \ mom- wER FOR r , \ ~ ~ r~ CEM IN TYP.) ~m , \ ~ ~ EIP - IMITS OF ~ Q ~ ~ ~ ~ ~ TDD ~ - DISTURBANCE ~ ~ m ~ M JJ i ' \ \ ~ ~ l ~ ~ ~ o ~ ~ ~ ~ ~ r ~ .~i 1 i I ~ ROLLED SLOPE MATTING H Zr ~ ~ Z ~ ~ ~ , . w ~ ~ A " ~ ~ k~ i DETAIL (TYPICAL) 5 Q ~ ' '~O _ _ _ TDO ~ ~ ~ ` USE TEMPORARY P J ® ~ i r} ~ r ~ ~ ~ ~ / ! r ~ ri 0 aanst ~ .~~~a..~ ~ ~ ~ ~ ' \ r TERCOURSE DIVERSION 5 W °f~'B TDD ~ ~ ~ TO REMOVE EXISTING ~ ~ ..~7~3~ SF ~ ~Ca 14, 3 ~ SF ~ ~ v~ v ~ • CULVERT ~ RIP-RAP, p~ Z • POOZ µ 086 SF ~ ~ Y PICNIC REMOVE ONERSION SYSTEM 0 v = ~ ~ CLUBHOUSE ~ P USE TEMPORARY ~ ~ ~ ~ •1 ~ ~ t rt ~ _ ~ ONLY AFTER NEW TRENCH IS (!f G. ~ ~ ~ ~ • ~ ~ ~ I r 'SEDIMENT FENCE B 5 WATERCOURSE DIVERSION \ IP , ~ • ~ ~ ~ ~ ~ . ~ ~ STABILIZED WITH EXCELCIOR ~ FOR ~ ! ~ ~ \ I ~ TYPICAL 5 ~ ~ ~ T MATTING. \ ~ ~ f 3 84 1 LI TS OF ~ r 8 f L PERMANENT STREAM ~ { ' -A,, \ ~ T ~ ~ `"ti 0 \ ~ ~ \ 0 5 CROSSING DETAIL ~ ~ ; ~ ~ 1 ~ ~ ~ A,,~ - ~ 2:1 FILL ° \ ~ \ Z ' ~ ~ ~ ~.o :~o ~ / P f \ n EIP ` ~ ` - L _ ~ ~ , 1 ~ I o r 7--~- ~3~ EI,OSDD ` I ! 1 ~ 1 , F EIP • , . . ~ ~ ~ OSDD ,e PROJECT NUMBER ~ 08-WESTPOINT-0 I1 F \ \ ~ / ' \ M„ EIP OSDD EIP & OSDD M ~ DESIGNED BY ~ \ ~ ~ _ - i Stone EIP ~ OSD OSDD~~,a~ JWW ~ EIP ' =-s~ _ - _ ~ K SEDIMENT POOL W I ~ ~ ~ ~ ' ° DRAWN BY \ 1 ~ 5 BAFFLES (TYPICAL) i' I JWW/MRS r ` ` ~ ~ r ~ ti•.'ti ~ r r \ ~ ~ P USE TEMPORARY , Q ' r 5 WATERCOURSE DVERSION a C OFFSITE DRAINAGE 1 I TE DRAINAGE TRAPEZOIDAL CHECKED 8Y . ~ \ \ ~ 5 DIVERSION DITCH / 310N DITCH / BERM (TYP.) ~ USE TEMPORARY P ~ Juyylr r ~ r r ~ \ ~ EIP L FOR PERMANENT STREAM r , I WATERCOURSE DIVERSION 5 I M TEMPORARY STREAM ~ ~ D 6 TALL BERM & 1 ~ ~ 0 5 CROSSING INSTALLATION LL BERM & TRRAPEZOIDAL ~ 5 CROSSING FOR ~ r 50 0 50 100 5 ~ 5 DIVERSION DITCH / V Q 310N DITCH / BERM (TYP.) FOR PERMANENT STREAM L ~ AS NOTED BUFFER BERM ~ r ~ r ROCK CHECK CROSSING INSTALLATION 5 °A~ INSTALL IIUN migifflifflim DAM (TYPICAL) 5 JULY 2008 Scale: 7 = 50 150'± SEPARATIONS - r ALL OSDDs 4 of 10 08-WESTPOINT-01\DWGS 08-WESTPOINT-01 PRELIM SITE,dw 1:1 3'-0„ 2' MIN. 1'-6" 2'-O" STEEL LEVEL WIDE 2' MIN. 1.5' MIN. ~®,r~ ~u~~ir~yheei SUPPORT POST COMPACTED SOIL CROWN BASE LEVEL WITH HOG WIRE FROM DITCH COMPACTED SOIL CROWN 12" THICK LAYER OF o er IN CHANNELS, ROLL OUT STRIPS OF MATING PARALLEL TO s 0 H s r• v~ ~ Ste, x BACKING (TYP.} EXCAVATION FINISH FROM DITCH 57 WASHED STONE ~ rr ~ THE DIRECTION OF FLOW AND OVER THE PROTECTIVE MULCH ~ p r Jam,/ ?yy ~ (PLACE ON BERM GRADE EXCAVATION Q Z COMPACTED FILL LOWER SIDE _ (PLACE ON BERM „ DITCt, : q ! J 1'' , - OF DITCH) , , , LOWER SIDE 1 -6 1'-6" ~.OW ~ DAM MATTING NORTH ~ V to 3 ~ r HEIGHT AMERICAN GREEN ' ~ a , , OF DITCH) MODEL C-125 ' ~ ~ 2:1 SLOPE `i. ~ / r , y~Q~ ; ~ ~ OR EQUAL ',•r~,~ ~ , ~y~a~? ~'r, ~ ~ „ OR FLATTER ~ r, i?'. , r ` ~ ~ 2:1 SLOPE ~ ~ r~}' GEOTEXTILE 8 MIN. r,~ •~1,f ; , OR FLATTER ~i~~~-., i< ~ f ,~fir } if ACTION A-A CLASS "B" RIP-RAP eererHqu,'`ti 0' e~~ ~ ~ FlLL BERM WITH 6" d50 FILTER ~ ~ - I I ~ 4 0 s~, ~ RIP-RAP IN AREAS WHERE FABRIC ~ „ , , ~~t 114 ~r,~t ~%~~%1~~~ EQUIPMENT MUST CROSS =I3 DNERSION o „ pp FENCE FABRIC N T • I AIN MIN. 0.5% LONGITUDINAL SLOPE IN DITCH. THE 6 THICK MIN. OF ~ ' IN. 0 E. MA NT NOTE: MAINTAIN MIN. 0.5% SLOPE IN DITCH. THE DNERTE TCH. THE DNERTED RUNOFF I TO~PK F A r „ , DNERTED RUNOFF SHOULD BE RELEASED THROUGH A STABILIZED SHOULD BE RELEASED THROUGH A STABILIZED OUTLET, S 2-3 COARSE STONE ,~°'1. OUTLET, SLOPE DRAIN, OR SEDIMENT TRAPPING MEASURE. OR SEDIMENT TRAPPING MEASURE. BILIZED OUTLET, SLOPE DRAIN, PLACED OVER NOTES: GEOTEXTILE FILTER FABRIC OFFSITE DRAINAGE DIVERSION DITCH c TEMPORARY DIVERSION DITCH ~J ~ i A STABILIZED PAD OF CRUSHED STONE SHALL BE LOCATED WHERE TRAFFlC WILL 6' NO SCALE - ~N DITCH E w ( I BE ENTERING OR LEAVING A CONSTRUCTION SITE TO OR FROM A PUBLIC STREET. FENCE Q•~. NO SCALE 8 i B INSTALL STAPLES STAPLES ACCORDING TO ~ IF THIS LOCATION IS SUBJECT TO SEEPAGE OR HIGH WATER TABLE STABILIZE MAX, FOU DATION WITH GEOTEXTILI: FABRIC. FABRIC ~ NORTH AMERICAN GREEN STAPLE PATTERN ?MANUFACTURER'S EQUAL N H BUFFER B SEDIMENT 2 THIS ENTRANCE SHALL BE MAINTAINED IN A CONDmON WHICH WILL PREVENT STEEL _ pIANTING - FENCE La La STAPLE. TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING SUPPORT POST r ~'P) PAVEMEM. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE WITH NOG WIRE BACKING PICAL ~ AS CONDmONS DEMAND ANO REPAIR AND/OR CLE4NOUT OF ANY MEASURES ~ ) ~ USED TO TRAP SEDIMENT. RESIDUAL SOIL - COMPACTED FOR TOP WIDTH BANKOF y 18" OVERLAP (TYP) . 8 MI ~f,4%1~;~ 3 ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC STREETS ~ FULL WIDTH, DEPTH TEMP. PERM. C r. Y BASE OF DITCH ( ~'`~j~ MUST BE REMOVED IMMEDIATELY. . ` AND HEIGHT OF BERM DNERSfON DITCH - ? V ~ ~ ~ Y Y ? ? Y ~ ° , 4 WHEN NECESSARY, WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ` ,`y` TOP OF ~ TOP OF , ~~i~',;~~, W'::.~:;:: FlI ENTERING A PUBLIC STREET. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ~i r ~ ~ ~ ~ W - FlLTER FABRIC SANK BANK )N A-A JOIN STRIPS BY ANCHORING ON AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN ' • ~ r~~~~ " ° , ~ .y."• 2 MAx. 2 (MAX. E ~,0 SECTION A A APPROVED SEDIMENT BASIN. ~/~~~j~r ~J ;,~i ~ ° ~p , UP GRP9 ~ AND OVERLAPPING AS SHOWN ,,r~jy~'~~ ~C ~ ~ 16 SST. RIP-RAP FLUSH WITH ~ l1NiSH ~ .~,r,. END OF STORM PPE 4" x 8" r ~ BURY ~ FLARED END SECTION CE EXIT ~ ANCHOR MATTING IN ~`~C,,~. 8" TRENCH (TYP) ~ d. TEMPORARY GRAVEL. CONSTRUCTION ENTRAN A TRENC 1 MIN. TRENCH O ~1 1hMIN. NO SCALE - NOTES: SEPARATION _ O SEPARATIO E GRADE ~ EXCELSIOR MATTING H ~ 1. SUPPORT POST: 1.33 POUND/LINEAR FEET STEEL WITH HOG A A BASE OF DITCH NO SCALE - ~ ~ N _ WIRE 64CKING. O BOTTOM v ~ 4 DAM HEIGHT SECTION B-8 3.0' MAX. - 1.5' MIN. ~ ~ Z 2. FENCE FABRIC; EXTRA STRENGTH SYNTHETIC FILTER FABRIC WIDTH REMOVE ALL FLOODPLAIN TYPE ~ OR PERVIOUS SHEET OF POLYPROPYLENE, NYLON, POLYESTER VARIES SANDS & ALLWIAL SOIL TO (SEE NOTE BELOW) ~ ~ J N OR POLYETHYLENE YARN MEETING SPECIFlCATIONS AS SHOWN THIS DIRECTION VIRGIN RESIDUAL SOIL BASE FOR O E ~ ~ IN TABLE 6.628 OF N,C, EROSION ANO SEDIMENT CONTROL FULL WIDTH & LENGTH OF BERM ~ ~ ~5 a PLANNING AND DESIGN MANUAL. NOTE: MAXIMUM HEIGHT OF DAM SHALL BE NO MORE THAN ~ ~ ~ ONE FOOT ABOVE NORMAL FLOW LEVEL. WIDTH OF ~ N d OF DAM SHALL BE NO LESS THAN WIDTH OF DITCH. ~ V ~ 3. IF FENCE FABRIC JOINTS ARE NECESSARY, SECURELY FASTEN ' ~ THE FABRIC ONLY AT A SUPPORT POST WITH OVERLAP TO THE o CLASS "B" RIP-RAP NEXT PosT. 6 TALL BERM & TRAPEZOIDAL DIVERSION D ROCK CHECK DAM G ~ °m ~ co 100' 4. ANCHOR BOTTOM OF FENCE FABRIC IN TRENCH WITH BACKFILL NO SCALE - P.1AN NO SCALE e O ~ ~ OF COMPACTED SOIL OR GRAVEL. ~ CANOPY TREES azM 60% RED MAPLE VARIETY DIMENSIONS STONE WEIGHT RANGES (Ibs} ~ 40% WIL10W OAK SEDIMENT FENGE B 'IRON _ do (m) ado (ftf w (ft) t (inj La (it) d50 (rn) La (ft) d50 (rn) MIN. -MAX. 75~ RAN6E CONSTRUCTION: ~ NO SCALE UNDERSTORY TREES _ RRA ALL 60 15 *VARIES 9 10 4 10 4 15 - 50 20 - 60 ~ ~ 1. SET UP BY-PASS PUMP AND - ~ 50% CAROLINA CHERRY-LAUREL 40% AMERICAN HOLLY i / - - ~ FLOW s DISCHARGE TEMPORARY PIPING. PLACE OUTLET OF W 10% CREPE MYRTLE NOTE; d50 =MEDIAN ST~JE DIAMETER ~ HOSE TEMPORARY PIPE TO MINIMIZE EROSION 'A = AT THE DISCHARGE SITE OR PROVIDE Y~ ~ SHRUBS ~ VARIES FROM WIDTH OF FES DOWN TO CHANNEL WIDTH OVER LENGTH TH OVER LENGTH OF APRON ENERGY / TEMPORARY ENERGY DISSIPATION MEASURES. Q ` ~ ~ 40% JAPANESE BARBERRY HEIGHT AT ROADWAY 40% HELLERI HOLLY SUB-GRADE ELEV. 5' MAX, BANK HEIGHT STREAM CHANNEL RIP® APRON OUTLET PROTEC DISSIPATION \ FlRMIY ANCHOR PUMP AND PIPING. r IMPERVIOUS 2. CONSTRUCT OUTLET PROTECTION IF NEEDED. 20% NANDINA DOMESTICA ~ PROTECTION F DIKE ~ 3. CONSTRUCT IMPERVIOUS DIKE UPSTREAM OF ~ o NO'(E; FlLL SLOPE ~ `~1 NO SCALE (PIPE OUTLET TO FLAT AREA) v ~d .1 64~ BUFFER ZONES WHERE EXISTING VEGETATION IS TO REMAIN WILL BE TEMPORARY CLASS A , ~ ~ ~ y ~~4 ,y FLAT AREA) - ~F ~ SUCTION 0~ WORK AREA TO IMPOUND WATER FOR BYPASS ~0~, ~ ; ' / HOSE PUMP INTAKE. USE A FLOATING INTAKE FOR ASESSED FOR PLANTING YARD TYPE C EQUNALENCY AND STONE STABILIZATION h ~ ~ ~ ~ It I~ f, ~~nf ~ , SURFACE FLOW ~ ~ PUMPS WHERE POSSIBLE. ' , f°~ 4. CONSTRUCT AN IMPERVIOUS DIKE DOWNSTREAM p P RFORMED AS NECESSARY TO OR HEADWALL AS STREAM CHANNEL ` l,~, ~ ~I ik y~~'" DNERSION SUPPLEMENTAL PLANTING WILL BE E ~a ACHIEVE COMPLIANCE, INDICATED IN PLAN Y~~y~ a~ t - I r '`wr f' ,9,°.q IF NECESSARY, TO ISOLATE WORK AREA. s „ ~ ~ ~ v ~~~a v ~ 1, ~ suRFACE Flow ~ ' ~ ~ wIRE scRESN ~ ' ~r<<<<~"~`"I"~=j • ~ • • ~ i • 5. CHECK OPERATION OF PUMP AND PIPING SYSTEM. a ~ _ ~ ~ ~ ,,'i r,,', rr',~ ~ ; ~ ~ ` ' 6. UPON COMPLETION OF CONSTRUCTION, REMOVE ~ ~ WIRE SCREEN OVER IMPERVIOUS DIKE TYPICAL TYPE C BUFFER PLANTING z ~;~r~ W ~ ' ~ DNERSION TO 4 ~~J ~ TEMPORARY ' ' + ~ a • !t ~ » ALL BLOCK OPE ALL BLOCK OPENINGS ~ ~ ~ TEMPORARY PIPES), BYPASS. PUMP, AND m ~ ~ : TST (TYP.) yt ~ ~ f' - ° SEDIMENT POOL 2 NO SCALE - ~ CLASS A STONE i~ ~,'r y y ~ d~yyl'vv'v6 S' I!1 f y66 4~.9 ~o,g,d."~ a:, ~ ~ I BANKOF ~ PROJEC'T` MAINTENANCE: ~P~ 1} ~ ~ GRAVEL FILTER tr1 II ~~y~ ~ ~ ~ - 1j 2.1 SLOPE ~ IMPERVIOUS 1. ROUTINELY INSPECT BYPASS PUMP AND TEMPORARY o ~ Cp ~ PIPING TO ENSURE PROPER OPERATION. ~ I s ~ ~ ~y~~ . " i ~ ~ A STONE ~ ~ ~ CLASS ~ ~ ~ y ~ ~ . T d•P`~ ~ CMP OR RCP .s' ~ STONE APPROACH SECTION ~ ~ ~ - ~ DEWATERING DEVICE ~ I DIKE 2. INSPECT IMPERVIOUS DIKE FOR LEAKS AND REPAIR p ~ II ~ ~ 1 ` !j W ~ CULERTS SIZED 5:1 MAX. SLOPE ON ROAD ~ a ; WORK ~ ANY DAMAGE. ~ 10'x15' WITH ~ ~ ~ ~ AREA 3. INSPECT DISCHARGE POINT FOR EROSION. TO PASS 2-YEAR ~ ~ ~ ' • 1^ ~ RIP-RAP OVER :~~1` ~;~-;~r:yN~~y ~ STORM , r,/,,v~i ~ >f DROP INLET 2:1 SLOPES _ - / y - - ~ 4. ENSURE FLOW IS ADEQUATE THROUGH PIPE. Z ~ "L`.. I 5. INSPECT AND MAINTAIN DEWATERING DEVICE TO VENT CMP OR RCP ~ ~ FILTER FABRIC SURFACE FLOW , j~` , ~ ° CULERT SIZED ; STONE APPROACH SECTION „ :i~. WITH GRATE NOTE: PLAN ENSURE CLEAN DISCHARGE. 0 ~ ' BE SURE TO ANCHOR Z TO PASS 25-YEAR ~ 10;1 MAX. SLOPE ON ROAD DIVERSION SEDIMENT 2 MIN. p~~ FLOAT DEWATERING ALL PUMPS SECURELY w TYPICAL PROBLEMS ENCOUNTERED: H ~ ' ~ STORM. INVERTS 1' T END ~ BELOW STREAMBED RIP-RAP OVER ORIGINAL TEMPORARY OU LET + FlLTER FABRIC SURFACE FLOW STREAMBANK ACCESS MIN. SUCTION' 1. PUMP FAILURE d o CONNECTED TO PIPE THROUGH ~+i 1~~ ; , ELEV. PER PLAN. DNERSION DEWATERING g° x 16" CONCREI POLYETHEYLENE HOSE 2. EROSION AT OUTLET. _ U x 16" CONCRETE BLOCK DISCHARGE M FABRIC ON FACE 3. LEAKS IN PIPING AND IMPROPER CONNECTION ~ DAM OR RISER STRUCTURE e i ~ ~ , (TYP. PER SIDE) FROM PUMP (BMIL. THICK) TO PUMP, p' ` CLASS A STONE ~ WATER j \ SURFACE FLOW LEVEL HEIGHT AT ROADWAY DIVERSION TO IF REQUIRED O ~ ENERGY H I ~ SUB-GRADE ELEV. TST TYP. ~ - , v. DISSIPATION W U w - - ~ Z ,v ~ INLET SCREEN DOOR ORIGINAL FILTER FABRIC w - ~ " ' / SURFACE FLOW STREAM~NK „ ORIFICE INSIDE DNERSION a lL BARREL PIPE OR ARM CLASS TRIP-RAP CLASS A STONE NOT INCLUDED WITH SKIMMER NOTE: INLET SCREEN {d50) MEDAN STONE DIA. = 6" W ""-FLOW APPLIED BY USER SCH 40 PIPE VARIES ON LARGER SKIMMERS {dMAX) MAX. STONE DIA. 1.5 x d50 = 9" „ " {t} STONE THICKNESS 1.5 x dMAX = 13.5" .f. SEDIMENT TRAP TO USE 1-i/2 SKIMMER WITH 1-1/2 ~ IMPERVIOUS DIKE HEAD, USING 1-1/2" ORIFICE TYPICAL FOR ALL TST's . ~ POLYETHEYLENE CLASS GRIP-RAP PROPOSED TEMPORARY IMPERVIOUS DIKE: SKIMMERS TO BE FAIRCLOTH SKIMMERS OR EOUAL AS 6" Dm RIP-RAP FILTER FABRIC NOTE: CONTRACTOR TO RETURN STREAM BANK TO ORIGINAL GRADE ~ APPROVED BY ENGINEER. PLACED AROUND AND STABILIZE ALL DISTURBED AREAS USING CLASS GRIP-RAP, ~ FABRIC ON FACE IF REQUIRED CULVERTS (2) SANDBAGS (6MIL. THICK) L PIPE TO SPRINGLINE STREAMBED IMMEDIATELY FOLLOWING LOCAL CONSTRUCTION COMPLEI10N. ~ y IF REQUIRED 1"' TYPICAL SKIMMER INSTALLATION DETAIL J y W 4, ~ y, y ~ a. y a. y~ v w SECTION W~ y SCALE NONE - CMP OR RCP SI G „ APPLICABLE TO ALL TRAPS TEMPORARY STREAM CROS N M CLFAN 3/4-1/2 GRAVEL, 2;1 . CULERT SIZED ~2" GRAVEL, 2:, SLOPE TEMPORARY WATERCOURSE DIVERSION P Z J TO PASS 25-YEAR NO SCALE - T PROTECTION 6 NO SCALE - ~ ~ Q sTORM. INVERTS 1' BLOCK AND GRAVEL INLET PROTEC' BELOW STREAMBEO NO SCALE ~ ~ ~ ELEV. PER PLAN. PERMANENT STREAM CROSSING L ~ Z ~ No sCALE - Seeding Mixture Species. Rate (Ibs/acre) aa~ J Tall Fescue ..................................80 o ~ BAFFLE (TYP) Sericea Lespedeza ..........................20 INLET OUTLET INLET FLOW Kobe Lespedeza ..............................10 EARTHEN or o a ~c EMBANKMENT Seeding Notes ~z~ (1) After Aug. 15, Use Unscarified Sericea Seed. ~Q ~ earance Is ~ ~ (2) Where Periodic Mowing Is Planned Or A Neat Appearance Is Desired, Omit Sericea And Increase Kobe Lespedeza To 401b acre. '0 401b/acre. J n ~ / SUPPORT POST, 3 To Extend S rin Seedin Dates Into June, Add 15 Ib acre HL 5 Ib/acre Hulled 0 24 INTO O P 9 9 / SUPPORT ROPE TO STAKE TO 5' CREST INLET zoNE Bermuda rass. However, after Mid-a nl, It Is Preferable To Seed BOTTOM OR SIDE. WIDTH 9 P ale To Seed Temporary Seeding Schedule For Fall. ~ ~ WIRE TO PREVENT SUPPORT WIRE 35% OF SURFACE AREA Temporary Cover. Z SAGGING OVERFLOW OUTLET FIRST CHAMBER Nurse Plants Seeding Mixture Species. Rate (Ibs/acre) ~ Q Z CLASS I RIPRAP 25% OF SURFACE AREA Between Ma 1 And Au 15 Add 10 Ib acre German Millet Or 1 E Y 9 ~ / 1 Millet Or 15 ~ m „ - ~ SECOND CHAMBER Ib acre Sunda rass. Prior To Ma 1 Or After Aug. 15 Add 40 Ib/ 6 Dm RIP RAP / 9 Y i Add 40 Ib/acre Rye (Grain) .................................120 ~ _ APRON 5'x10' SKIMMER OUTLET ZONE 25% IF SURFACE AREA R e Grain . ( ) Y ( ) COIR MESH OR SIMILAR, STAPLED OR AT SKIMMER OUTLET J 15% OF SURFACE AREA Seeding Dates TRENCHED INTO BOTTOM OR SIDE 3 Seeding Dates ~ Best Possible Fall: Aug. 25 -Sept. 15 Aug. 20 -Oct. 25 ssible Mountains Aug. 15 -Dec. 15 W act. 25 Coastal Plain And Piedmont Aug. 15 -Dec. 30 SEDIMEM TRAP SCHEDULE DRAINAGE DISTURBED 010 REQ.'D REO.'D SIDE WEIR DESIGN DESIGN DESIGN DESIGN DESIGN TOP DESIGN SKIMMER DESIGN Late Winter: Feb. 15 -Mar. 21 Feb. 1 -Apr. 15 pr. 15 Soil Amendments TRAP N0. AREA AREA CFS) TRAP VOL. SURFACE SLOPES LENGTH SURFACE SURFACE BASE BASE OF BERM VOLUME SIZE (IN.) ORIFICE Fall Is The Best For Tall Fescue And Late Winter For Lespedeza. Lespedeza. Follow Soil Tests Or Apply 2000 Ib/acre Ground Agricultural Limestone PROJECT NUMBER (AC•} (AC.) ( (CU, fT.) AREA (SQ. FT.) FT/FT (FT.} ELEV. AREA (SF) ELEV. AREA (SF) ELEV. (CF) DIA. (IN.) Overseeding Of Kobe Lespedeza Over Fall Seeded Tall Fescue Is V Fescue Is very 08-WESTPOINT-0 And 1000 Ib/acre 10-10-10 Fertilizer. TST-1 2.93 2.93 6.02 5274,0 2107.4 1 10 816.5 2252.9 813.8 1752.0 820.0 5506.7 820,0 1.5 Effective. DESIGNED BY TST-2 0.32 0.32 0,66 576.0 230.2 1 8 819.5 450.0 817.5 286.0 821.0 736.0 821,0 1.0 Soil Amendments apply 4000 MuICh JWW TST-3 1.63 1.63 3.35 2934.0 1172.4 1 8 823.0 1200.0 820.0 792.0 824.5 2988.0 824,5 1.5 Apply Lime And Fertilizer According To Soil tests Or Apply 4000 cre 10-10-10 Apply 4000 Ib/acre Straw. Anchor Straw By Tacking With Asphalt TST-4 1,77 1.77 3.64 3186.0 1273.1 1 10 819.5 1789.0 817.5 1431A 821.0 3220.0 821.0 1.5 Ib/acre Graund Agricultural Limestone And 1000 Ib/acre 10-10-1 Netting Or A Mulch Anchoring Tool. A Disc With Blades Set Nearly BY TST-5 1.10 1.10 2.26 198x.0 791.2 1 8 824.5 845.1 821.0 347.0 826.0 2086.1 826.0 1.5 Fertilizer. Straight Can Be Used As A Mulch Anchoring Tool. JWW/MRS TST-6 1,82 1.82 3.74 3276.0 1309.0 1 8 824.5 1333.1 821.5 920.5 826.0 3380.4 826.0 1.5 MUICh .55 4860.0 1942.0 1 10 827.0 1989.1 824.0 1418.0 830.0 5110.6 830,0 1.5 Apply 4000 Ib/acre Straw. Anchor Straw By Tacking With Asphalt JVith Asphalt TsT-7 2.70 2ao 5 43.6 .5 59 .1 0.0 305.1 1 Netting Or A Mulch Anchoring Tool. A Dlsc With Blades Set Nearly TST-8 1.20 1.20 2.47 2160.0 863.1 1 8 828,5 9 825 3 83 2 830,0 .5 Stral ht Can Be Used As A Mulch Anchoring ToOI. s Set Nearly Maintenance diECKED BY TST-9 0.54 0.54 1.11 972.0 388.4 1 8 826.5 573.0 824.0 358.0 828.0 1,163.8 828.0 1.0 g Repair And Refertilize Damaged Area's Immediately. Topdress With 50 JWW Maintenance TST-10 1.02 1.02 2.10 1836,0 733.6 1 10 835.5 s24.o 832.5 57s.a 837.0 2250.0 837.0 1.5 Refertilize In The Second Year Unless Growth Is Fully Adequate. M~ Ib/acre Of Nitrogen In March. If It Is Necessary To Extend Temporary Adequate. May Cover Beyond June 15, Overseed With 50 Ib/acre Kobe (Piedmont And AS NOTED TST-11 1.20 1.20 2.47 2160.0 863.1 1 8 827.5 1191.0 825.3 902.9 837.0 2355.7 837.0 1.5 Be Mowed Once Or Twice A Year,But Mowing Is Not Necessary, Re Jecessary, Reseed, Coastal Plain) Or Korean (Mountains) Lespedeza In Late February Or TST-12 0,96 0.96 1.97 1728.0 690.5 1 8 830,5 924 -827.5 576.0 837.0 2250.0 837.0 1.5 Fertilize, And Mulch Damaged Area's Immediately. ~rrr_~~ z an n ~n F d~ 3an n 27A9.0 1 12 840.5 2822.0 839.5 2593.8 842.0 2707.9 N/A N/A Early March. DATE No SKIMMER REQUIRED oN.S.-,3 Permanent Seeding Gentle Slopes Slopes, JULY ZODS SEDIMENT POOL W/POROUS BAFFLESn Average Soil, Low Maintenence NO SCALE - nence Temporary Fall Seeding 5 OF 10 08-WESTPOiNT-01.OwO 1:1