HomeMy WebLinkAbout20080748 Ver 1_Approval Letter_20080812Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
August 12, 2008
DWQ Project # 08-0748
Wake County
Mr. Mike Nepywoda
Mill Associates, LP
P.O. Box 691551
Orlando, FL 32869-1551
Subject Property: Creekside Village
Ut to Swift Creek [030402, 27-43-(8), C, NSW
Authorization Certificate per the Neuse River Buffer Protection Rules (15A NCAC 2B .0233) with
Additional Conditions
Dear Mr. Nepywoda:
You are authorized to place fill within or otherwise impact 984 square feet (ft) of Zone 1 protected
riparian buffers and 640 square feet (ft) of Zone 2 protected riparian buffers, per 15A NCAC 213 .0233,
as described in your application dated April 28, 2008, and received by the Division of Water Quality
(DWQ) on April 28, 2008, with additional information received on July 7, 2008, to construct the
proposed residential development at the site. In addition, you should obtain or otherwise comply with
any other required federal, state or local permits before you go ahead with your project including (but not
limited to) Erosion and Sediment Control, and Non-discharge regulations.
This approval is for the purpose and design that you described in your application. If you change your
project, you must notify us and you may be required to send us a new application. If the property is sold,
the new owner must be given a copy of this Authorization and approval letter and is thereby responsible
for complying with all conditions. This approval requires you to follow the conditions listed in the
attached certification and any additional conditions listed below.
The Additional Conditions of the Authorization are:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are
approved including incidental impacts:
Type of Impact Amount Approved Units Plan Location or Reference
Buffers Zone 1 984 (square ft.) PCN page 7 of 8
Buffers Zone 2 640 (square ft.) PCN page 7 of 8
2. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur buffer areas beyond the footprint of the
impacts depicted in the Pre-Construction Notification. All construction activities, including the
design, installation, operation, and maintenance of sediment and erosion control Best Management
None aro ma
401 Oversight/Express Review Permitting Unit atuCallr?
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http://h2o.enr state.nc.us/ncwetlands
An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper
Mill Associates, LP
Page 2 of 3
August 12, 2008
Practices, shall be performed so that no violations of state water quality standards, statutes, or rules
occur.
3. Erosion and sediment control practices must be in full compliance with all specifications governing
the proper design, installation and operation and maintenance of such Best Management Practices in
order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Sediment and Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control
measures must be such that they equal, or exceed, the requirements specified in the most
recent version of the North Carolina Sediment and Erosion Control Manual. The devices
shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects,
including contractor-owned or leased borrow pits associated with the project.
c. Sufficient materials required for stabilization and/or repair of erosion control measures and
stormwater routing and treatment shall be on site at all times.
4. Sediment and Erosion Control Measures
Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum
extent practicable. If placement of sediment and erosion control devices in wetlands and waters is
unavoidable, they shall be removed and the natural grade restored within six months of the date that
the Division of Land Resources has released the project;
5. Protective Fencing
The outside buffer, wetland or water boundary and along the construction corridor within these
boundaries approved under this authorization shall be clearly marked with orange warning fencing
(or similar high visibility material) for the areas that have been approved to infringe within the
buffer, wetland or water prior to any land disturbing activities;
6. Diffuse Flow
All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at
non-erosive velocities through the protected stream buffers such that it will not re-concentrate
before discharging into a stream as identified within 15A NCAC 2B .0233 (5). If this is not
possible, it may be necessary to provide stormwater facilities that are considered to remove
nitrogen. This may require additional approval from this Office.
7. Certificate of Completion
Upon completion of all work approved within the Buffer Authorization, and any subsequent
modifications, the applicant is required to return the attached certificate of completion to the 401
Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail
Service Center, Raleigh, NC, 27699-1650.
Violations of any condition herein set forth may result in revocation of this Authorization and may result
in criminal and/or civil penalties.
Mill Associates, LP
Page 3 of 3
August 12, 2008
If you do not accept any of the conditions of this Authorization, you may ask for an adjudicatory hearing.
You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written
petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of
Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This Authorization and
its conditions are final and binding unless you ask for a hearing.
Any disputes over determinations regarding this Authorization (associated with the approved buffer
impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to
review as provided in Articles 3 and 4 of G.S. 150B.
This letter completes the review of the Division of Water Quality under the Neuse riparian buffer
protection rule as described within 15A NCAC 2B .0233. If you have any questions, please telephone
Cyndi Karoly or Ian McMillan at 919-733-1786.
Srt-- ly,
een H. Sullins
Col
CHS/ jm
Enclosures: Certificate of Completion
cc: USACE Raleigh Regulatory Field Office
Lauren Witherspoon, DWQ Raleigh Regional Office
DLR Raleigh Regional Office
File Copy
Central Files
Nicole Thomson, S&EC, P.A., 11010 Raven Ridge Road, Raleigh, NC 27614
Filename: 080748CreeksideV illage(W ake)NBR