Loading...
HomeMy WebLinkAbout20080737 All Versions_Maps_20080425 (14) Set SIXW STATE OF NORTH CAROLINA See Sneer f•B For Conre~imdSyntlata .C U-2519E 1 `W'`M DIVISION OF HIGHWAYS 44" Wm PAOLM TS 34817.1,2 HF-DPR-0100 001 P.E. SWIN 34817,2a NHF-1009 RW and UTIL W Z *f 34817.3.11 NHF-DPR-0100 CONST ~n A N ALL DIMENSIONS IN -,/PT 51-rfsoooo CUMBERLAND COUNTY THEµDT METERS MLUMErERS FWT BRAX wN1rMY UNLESS OTHERWISE SHOWN LAKE f AAE L~E LOCATION: FAYETTEVILLE OUTER LOOP BEGIN ECf E; FROM WEST OF NC 24 TO EAST OF a . Ln4 " D ~ NC 24 (BRAGG BOULEVARD) ~ ~a0'0°° TYPE OF WORK: GRADING, DRAINA , STRUCTURES, CULVERTS, C,1 ff 0 PAVING, TRAFFIC SIGNAL , & SIGNING '~1 $ D" FAYE r7LLE--- a,,,,, ~ turf n°7;4 VICINITY TIAI~ -OOL2- POT 4Masn OEM w4m T i ~ s ~ x o ti r~ -L- EB POT 41.13,201 •COLr POT 4M61171 KM Kau -L- b rol 4.6LS23 -L T 39+40.000 BEGIN TIP PROJECT U-2519E { K -L- POT 39+40.000 END TIP PROJECT U 2519DA END CONSTRUCTION i -L- P 9+ 7.00 -L- POC 49+80.000 END TIP PROJECT U-2519E -L- POC 49+80.000 BEGIN TIP PROJECT X40028 ri Y -L- Ell POT MSr.TM -1144w POT r.SL2a LMD Blom •"PBo- POT 41.10. -T2• POC 24.60" -L- •LTS 44.04R13 lp• • TS N. 4.Y KOM w c Q~ BEGIN CONSTRUCTION -L- POT 39 + 22.673 r N PRELIMINARY PLANS w NOT VR MR OOlIIBVC N V THIS IS A CONTROLLED ACCESS PROJECT WITH ACCESS LIMITED TO INTERCHANGES. GRAPHIC SCALES PROJECT LENGTH FUNS PREPARED BY. xsDRAUUCS J~uGn+>~R A~OF NOR7 A OLX! Fll1RENGB & 1fITPCh~iSON1N~' STATE CONSULTING ~vaJ1vSJTR4 4W W==UZ 4 4 l° LENGTH ROADWAY TIP PROJECT U-2519E 0.920 KM. NO W. RAZrJUH LENGTH STRUCTURES TIP PROJECT U-2519E 0.047 KM. PREPARED FOR THE MORTH CARXINA DEPARrMERT OF TRANSPORTATION PLANS TOTAL LENGTH TIP PROJECT U-2519E 0.967 KM. 2W 62A=M uamx47MM ~ q ~p ra RIGHT OP WAY DAZE, DENNIS 1. MORY. P.E. 2V" JUNE 26.2006 MWAC7 M MOOR ROADWAY DESIGN r °r nor r O PROFILE (HORIZONTAL) ZX=G DAIR- HENRY W. BARE a NOV 18.2008 ragpcr no= AMEX= {ai6~ NOTE: EB LANE BRIDGE STATIONING USED TO DETERMINE b V PROFILE (VERTICAL) LENGTH OF STRUCTURES CATHY S. HOUSER. P.E. NCDOT CONTACT. PJWJ= :Nozom ra ra UIGNAZL=- "T.178 IDnHWAr l""N" lY "GDOER STATE OF CAROLINA FY M BMED!Y, PItOJ.REFERENCE N0. SNNO. NORTH a F1Aoamn INS R~ u-2&925~9E I-B AW ,A DIVISION OF HIGHWAYS *S.U.E = SUBSURFACE UTILITY ENGINEER CONVENTIONAL SYMBOLS BUILDINGS & 0771ER CULTURE CE2D ROADS & RELATED ITEMS Edge of Pavement MINOR Recorded Water Line Buildings Curb Head & End Wall c-o-N c-H w-~ Designated Water Line S.U.E.* Foundations ] Prop. Slope Stakes Cut Pipe Culvert - - - Sanitary Sewer -n Area Outline Prop. Slope Stakes Fill F Footbridge------------------------------------- - - - - - - - Recorded Sanitary Sewer Force Main SS-FSS- Gate r Prop. Woven Wire Fence --g -e Drainage Boxes 11 CB Designated Sanitary Sewer Force Main(S.U.E Fes-FSS _ Gas Pump Mentor UoG Tank Cap o Prop. Chain Link Fence -E3 -E Paved Ditch Gutter - - - - Recorded Gas Line - Church Prop. Barbed Wire Fence 0- Designated Gas Una (S.U.E.*) School Prop. Wheelchair Ramp c UTILITIES ® Storm Sewer---------------------------------- -S-S- Park ~ - ~ Exist. Guardrail • - - - Exist. Pole Recorded Power Line Cemetery ~ J Prop. Guardrail Exist. Power Pole + Designated Power Una (S.U.E.*) _ _ _ _ _ . Dam Equality Symbol Prop. Power Pole b Sign-------------------------------------------- S4 Recorded Telephone Cable -T-T- S Pavement Removal PropExist.. Telephone Telephone Pole Pole _ ® Designated Telephone Cable (S.U.E.) _ _T- _T_ _ mall Well ------Mine---------------------------------------------------------------------- ° -0- x RIGHT OF WAY Recorded UG Telephone Conduit -TC-TC S Exist. Joint Use Pole -4- Designated lYG Telephone Conduit (S.U.E.*) ng --Tc--TC-- Swimming Pool Baseline Control Point ? Prop. Joint Use Pole -6- Unknown Utility (S.U.E.*) -7BTL-- 9NTL- Existin Right ofWa Marker TOPOGRAPHY g Y Telephone Pedestal p Recorded Television Cable -TV-TV- Loose Surface Exist. Rig o Way Line wMlarker $ Cable TV Pedestal © Designated Television Cable (S.U.E.*) Hard Surface Prop. Right of Way Una with Proposed Hydrant .0 Recorded Fiber Optics Cable -FO-rO- Change in Road Surface - RMI marker Iron Pin & Cap) - At Satellite Dish 2) Designated Fiber Optics Cable (S.U.E,*) - -FO--FO- Right of Way Line with Proposed - Curb Prop. Exist. Water Valve ® Exist. Water Meter 0 Right of Way Symbol Riw (Concrete or Granite) Rw Marker - Sewer Clean Out 0 USG Test Hole (S.U.E.*) Guard Post oCP Exist. Control of Access Line a Power Manhole © Abandoned According to USG Record ATTNR - Paved Walk . - - - - - - Prop. Control of Access Line Telephone Booth m End of Information _ Lol Bridge Exist. Easement Una - - E- - _ Water Manhole p BOUNDARIES & PROPERTIES ~ Prop. Temp. Construction Easement Line Box Culvert or Tunnel P. P. E Light Pole a State Line Ferry - - - - - - - - - Prop. Temp. Drainage Easement Line -,EE - H-Frame Pole County Line - Culvert rop. Perm. Drainage Easement Line -POE- Power Una Tower ® Township Line Footbridge _ HYDROLOGY Pole With Base p City Una Troll, Footpath - - Gas Valve Stream or Body of Water 0 Reservation Line Gas Meter------------------------------------- Light House Flow Arrow Property Line DisaPPearln9 Stream__________________________ Telephone Manhole 0 ProPafiF Line Symbol R VEGETATION Single Tree _ Q SPring Power Transformer 0 Exist. Iron Pin o Swamp Marsh k Sanitary Sewer Manhole ® EP Single Shrub - - - - - - - - - - - - - - - o Property Comer Hedge Shoreline - - - - - - Storm Sewer Manhole 0 Property Monument Falls, Rapids + Tank, Water, Gas, Oil Woods Line Q Property Number i23 Orchard - - - - - - f~4f~4Qs~ Prop Lateral, Tail, Head Ditches Water Tank With Legs Parcel Number O _ Vineyard NNEYAAD I ~ Traffic Signal Junction Box RAILROADS ?s Fence Line -x-x-x- STRUCTURES ww & ISBw Fiber Optic Splice Box p Existing Wetland Boundaries m - -*LB- - 4i MAJOR Standard Gouge T ~ Bridge, Tunnel, or Box Culvert C cone-I Proposed Wetland Boundaries _ -NEB- RR Signal Milepost ti a ® i o Utility Power Line Connects to Traffic wzpw,u E Bridge Ong Wall, Head Wall Existing Endangered Animal Boundaries______ EAB- _ Switch \ Signal Lines Cut Into the Povement___________ ED lx and End Wall JCONC ww/ l Existing Endangered Plant Boundaries _ s~ V1 C - - - redsel 2125147 91 KAN$ PREPARED tY.. PROJECT REFERENCE N0. SHEET NO. PAVEMENT SCHEDULE MMW a J 9117f"fMONNC U-2519E 2 00A=TM Yv~ 40W 10WItNAM rACM SLUT TRI It W SHEETNO, RFM DESCRIPTION RALaa$AV A'Nar ROADWAY DESIGN PAVEMENT DESIGN © Prop, Approx.100mm Asphalt Concrete Surface Course, Type S12.5C, at an Average Rate of 120 kg. Per SQ. Meter in each of two layers. ENGINEER ENGINEER NOTES: 1. ALL GVt6NEt44T EDGE SLOPES ARE 1;1 UNLESS OTHERWISE NOTED. CI Prop. ApprmL 80mm Asphalt Concrete Surface Course, Type S9.5C, at an Average Rate of 96 kBPer SQ. Meter In each of two kryam 2. SHOULDER ROLLOVER NOT EXCEED 0.06 (ryM. B, USE 4:1 MAX SLOPES ON INSIDE OF INTptCHANGE ~:I3~STT~]' FTT_ 4. SEE PLANS FOR LOCATION OF ACCELERATION AND rair:aaaeac- O Prop. Apprm. 80mm Asphalt Concrete Surface Course, Type S9.51), at on Average Rate of 96 ko. Per SQ. Meter in each of two layers. 5. SEEE PLLANNSIFOR LOTION OF TURN LANES AND INTERSECTION TURNOUTS. 6. RUMBLE STRIPS SMALL BE PLACED ON BOTH THE ® Prop. Approx BOmm Asphalt Concrete Surface Course, Type 59,58, at on Average Rote of 96 kg, Per SQ Meter in each of two layers. MEDIAN AND OUTSIDE SHOULDERS IN ACCORDANCE WITH STD 665.01. 0 Prop. Appro)L 50mm Asphalt Concrete Surface Course, Type S9.5111, at an Average Rate of 120 kg, Per SQ. Mohr. Prop. Var. Depth Asphalt ConaNrfe Surface Course, Type $9.5, at an Average Rate of 2.40 kg. Per SQ. Meter Per imm Depth, to be placed In layers not to exceed 50mm In depth, OD Prop. Approx. 65mm Asphalt Concrete Intermediate Course, Type I19.OC, at an Average Rah of 159.25 kg. Per SQ. Meter. 0 ryy. 0 Prop. ApprwL 80mm Asphalt Concrete Inhnnodiate Course, Type 119.0C, at an Average Rote of 196 kg. Per SQ. Mohr. Q Prop, Apprax.100mm Asphalt Concrete Intermediate Course, Type 119.0C, at an Average Rah of 245 kg. Per SQ. Mohr. LB O Prop. Apprm.110mn Asphalt Canasta Intermediate Course, Type 119,OC, at an Average Rate of 269.5 kg. Per SQ. Mohr, 2.4 25,0 R O Prop. Var. Depth Asphalt Concrete Irdemledioto Course, Type 119.0, at an Average Rah of 2.45 kg. Per SQ. Mohr Per 1mm Depth, to be placed in layers not Lett than 65mm or greater than 110mm in depth. > OE Prop. Approx. 90mm Asphalt Concrete Base Course, Type B25.OC, at an Average Rah of 220.5 kg. Per SQ. Mohr. 4 O Prop. Approx. 80mm Asphalt Concrete Sage Course, Type B25.OC, at an Average Rafe of 196 ko, Per SQ. Mohr. O Prop. ApproL 110mm Asphalt Concrete Base Course, Type B25,0C, at an Average Rate of 269.5 kg. Per SQ. Meter, DETAIL OF CURB 6 GUTTER END TREATMENT O Prop. Var. Depth Asphalt Concrete Base Course, Type B25.0, at an Average Rate of 2.45 kg. Per SQ, Meter Per imm Depth, to be placed In layers not less than 75mm or greater than 140mm In depth. OJ Prop.200mm Aggregate Base Course J1 Prop, 250mm Aggregate Base Coupe O Prop.150mm Aggregate Bass Course JS Prop.100mm Aggregate Base Course O Prop, Vor. Depth Aggregate Bate Course OP Prime Coat at the Rate of 1.6 L per SQ. Mohr. O 450mm Concrete Curb & Gutter Ri 750mm Concrete Curb & Gutter O 125mm Mono. Conc. Island D D q RS 100mm Concrete Cover at R4 Shoulder Berm Goiter BOrm O Earth Material D (MIN) 0 Existing Pavement 65mm O Var. Depth Asphalt Pavement 75mm (MIN) (MIN) WI - WEDGING DETAIL FOR RESURFACING USE IN CONDUCTION WITH TYPICAL SECTION NOS, 4.8 PAVEMENT EDGE CONSTRUCTION DETAILS SEE TYPICAL SECTIONS FOR PAVEMENT' DESIGN Miff W N?fn 289m FOPS ACC R1 T AC$C R T ACSC T ACSC ! W M T N9C xN ~ T acEC T T W vARIES I OB AEC EXISTING _ _ 3dy GROUND A I A& ASPHALT AND ABC 3(Xlmm ABC BC ACBC ABC U J/ DETAIL FOR SHOULDER BERM GUTTER USE IN CONDUCTION WITH TYPICAL USE IN CONDUCTION WITH TYPJCAL USE IN CONJUCTION WITH TYPICAL USE IN CONJUCTION WITH TYPICAL USE IN CONJUCTA)N WITH TYPICAL USE IN CXINJUCTION WITH TYPICAL SEE PLANS FOR LOCATAN AND DIMENSIONS SECTION NO. 3A SECTION NOS. 5d T, IOM 12. 13A & 14 SECTION NOS. 5A & 8 SECTION NOS. 1A & 3 SECTION NOS. 4.5. B, 8, 9.10, 11.(213. & 14 SECTION NOS. 15,16. & 0 SEE TYPCAL SECTIONS FOR PAVEMENT DESIGN PAVEMENT SCHEDULE PLANS PREPARED KY.- PROJECT REFERENCE N0. SHEET NO. ABLOcvAwmT2wMQ & & "QN~ 11-2519E 7-A 1'D!? TRI DESCRIPTION ITEM DESCRIPTION R DESCRIPTION ITEM DESCRIPTION ITEM DESCRIPTION IT DESCRIPTION R/W SHEET NO. Opp ' airy„ 8rms4% C 100mm S12.5C C5 VAR. DEFTH $9.5 D4 VAR. DEPTH 119.0 J 200mm ABC P PRIME COAT R4 SHOULDER BERM GUTTER tPon7 BOAT NGINEEERR PA E4EhNGI DAR Cl BOmm 59 5C Q 65mm 119.00 E 90mm B25.OC Ji 250mm ABC NOTES: 1. ALL PAVEMENT EDGE SLOPES ARE 1:1 UNLESS R 450mm CURB 6 GUTTER OTHERWISE NOTED. 2. SHOULDER ROLLOVER NOT TO EXCEED 0.06 . p1lT Y C2 BOmm S9.5D D1 BOmm 119.00 El 80mm 825.00 J2 150mm ABC R1 750mm CURB 6 GUTTER T EARTH MATERIAL 3. USE 4:1 MAX SLOPES ON INSIDE OF INTERCHANGE. 4. SEE PLANS FOR LOCATION OF ACCELERATION AND _nu wnria.ome~gv:. C3 60mm 59.58 D2 100mm 119.00 E2 110mm B25.OC J3 100mm ABC R2 25mm MONO. CONC. ISLAN U EXISTING PAVEMENT DECELERATION LANES. 5. SEE PLANS FOR LOCATION OF TURN LANES AND C4 50mm S9.5B D3 110mm 119,DC E3 VAR. DEPTH 825,0 J4 VAR. DEPTH ABC A3 100mm CONCRETE COVER WI VAR DEPTH ASPHALT PAVMT INTERSECTION TURNOUTS. 6. RUMBLE STRIPS SHALL BE PLACED ON BOTH THE MEDIAN AND OUTSIDE SHOULDERS IN ACCORDANCE WITH STD 665.01. Q -c- - 21.0m Rom 42m 3bM LANE 36m LANE 3bM 69m 6.9m 36M 36m LANE 3bm LANE 42M 5.4m IBM 10m ADD 1.0m w/GUARDRAIL 2m IMS m Z4 S LADE DPS rGRADE F3AM OPS ~ cl: POINT 1 vC ExISTiNG ,04 D25 s L1?5 Dq 5 D25 _ 6d ~ MIN. GROUND 1025 D4 41,11' 6 z -5, ---r-, ~4~O J NIN. - - - - - - - 89 Bd f405 TING ExrS GROUND II 455mm )25mm )25mm GRADE TO THI$ UNf TYPICAL SECTION NO. GRATHIS LINE WESTBOUND LANES EASTBOUND LANES -L- 39+40.00 TO -L- 41+15,343 (BRIDGE) -L- 39+40.00 TO -L- 41+13204 (BRIDGE) -L- 41+61923 (BRIDGE)TO -L- 44+04273 LB -L- 41+59784 (BRIDGEITO -L- 44+04273 LB -L- 44+76935 LA TO -1- 49+80,000 -L- 44+76935 LA TO -L- 49+80.000 Q -cou- Q -L- 9Dm 3bm 3bm 3sm M M Lem 3Dm 42M 3.6m LANE 36m LAN 35M 69m ADD LOm ADO IDM w/ GUARDRAIL w/GUARDRAIL 12M Il y cl, 2m : = 36M GRAS DP I FDPS D4 D .025 C X25 x GRR~ 2AM vC 8.4 D8 D25 .106 ,0 Q 3a AL N' . -I, d NIN. EXISTING GRADE TO THIS LINE 455mm GROUND 3d M~. 440mm GRADE TO THIS LINE EXISTING 125M GROUND PARTIAL TYPICAL SECTION NO. IA TYPICAL SECTION NO.2 -L- 46+61977 TO -L- 49+80000 wB fbt!- 35+30.00 TO -CW- 40+75.432 Q -1.012- Q -=2- 9pm 3bm 4m -IBM JQM Mom VARIES FROM ADD IDM W/ GUARDRAIL 9B03m TO 22-02m _ 06m • liy f~ x r~ GRADE GRADE POINT NC T 2.4m VC T RI POINT T J~4 D25 x025 L9 d EGUND VMIES 6J NIN. EXISTING EGROUNDG M 440mm D1 GROUND GRADE TO THIS LINE - Dl J GRADE TO THIS LINE J4 D J 440mm TYPICAL SECTION NO.3 PARTIAL TYPICAL SECTION NO. 3A -C0L2- 39+40.00 TO -COL2- 41+0B7I (BRIDGE) -CAL2- 40+Z" TO -C L2- 4I+I7B71(BRI") -COL2- 41+64.49 (BRIDGE) TO -COL2- 47+86596 ~ a of PAVEMENT SCHEDULE PLANS WE9AEE° BY- PROJECT REFERENCE NO. SHEET NO. Fl4M7 & MWSOW NC. U -2519E 24 JTApA+S88'f ITEM DESCRIPTION rrEM DESCRIPTION R DESCRIPTION ITEM DESCRIPTION ITEM DESCRIPTION IT DESCRIPTION COMMM7 R/W SHEET NO. 4M =7=8V &VQ, b'71J7T 49d TRI Adze Ac s my ROADWAY DESIGN PAVEMENT DESIGN C 100mm 512.50 C5 VAR. DEPTH S9.5 D4 VAR. DEPTH 119.0 1 200mm ABC P PRIME COAT R4 SHOULDER BERM GUTTER ENGINEER ENGINEER NOTES: 1, ALL PAVEMENT EDGE SLOPES ARE 1:1 UNLESS C1 BOmm S95C D 65mm 119.OC E 90mm B25,0C J1 250mm ABC R 450mm CURB d GUTTER OTHERWISE NOTED. 2. SHOULDER ROLLOVER NOT TO EXCEED (TYPI. T>„tLtT Y C2 BOmm S9.51) Dl 80mm 119.OC El 80mm B25.OC 12 150mm ABC R1 750mm CURB 6 GUTTER T EARTH MATERIAL 3. USE 4:1 MAX SLOPES ON INSIDE OF INTERCHANGE. 4. SEE PLANS FOR LOCATION OF ACCELERATION AND =xn .coed, C3 BOmm 59.511 D2 100mm 119.00 E2 110mm B25.OC J3 100mm ABC R2 125mm MONO, CONC. ISLAM U EXISTING PAVEMENT DECELERATION LANES. 5. SEE PLANS FOR LOCATION OF TURN LANES AND C4 50mm 59.58 D3 110mm 119.OC E3 VAR. DEPTH 825.0 J4 VAR. DEPTH ABC R3 100mm CONCRETE COVER WI VAR. DEPTH ASPHALT PAVM'T INTERSECTION TURNOUTS. 6. RUMBLE STRIPS SHALL BE PLACED ON BOTH THE MEDIAN AND OUTSIDE SHOULDERS IN ACCORDANCE WITH STD 665.01, -Y2- INC 24 BRAGG BOULEVARD) 45m 45m Dm 3sm VAR) FROM 7 1 I m VAR! FROM 7 T II 4m 5.4m 48m 3DM ADO iDm Om TO 29m EXISTING EXISTING w/OUARDRAL GRADE POINT POI 12m 12m Z, 3Dm T FA°S DP FOPS -V T C1 T T Cl T V GROUNDG 025 025 SdM~. .06 _4 0o25 T_. ____T i MIN EP-Y2- . 69 YIN EXISTING D2 Mom GROUND 34 MPX GRADE TO THIS LINE J1 U E2 E2 U 430mm 290mm 290- GRADE TO THIS LINE GRADE TO THIS UNE RARE TO THIS UNE WESTBOUND LANES TYPICAL SECTION NO.4 EASTBOUND LINES T EXISTING -Y2- T+70000 TO -Y2- 9+49364 A2 GROUND USE ©IN LIEU OF (D ~ 4 FOR NARROW WIDENING -Y2- (NC 24 BRAGG BOULEVARD) FGR" TO THIS LINE 45m 45m Z90mm 9Dm 3.6m -VARIES FROM- VARIES FROM m T m VANS FROM Om 'TO 72m VANE VARIES FROM m T 11 VAR) FROM m 5.4m lzm 30m PARTIAL TYPICAL SECTION NO. 5A ADD Iom On TO 67m EXISTING (.6m TO EXISTING Om TO 72m .24m USE IN CONJUNCTION WITH TYPICAL SECTION NO. 5 w/OUARORAIL VARIES FROM Om 6Dm -Y2- 9+95.362 TO -Y2- 8+09273 EB y T 7 -Y2- 10+38867 TO -Y2- !1+02593 WB VARIES FROM EXISTING VARIES FROM 2i 1 Tp 30m POINT POINT 1,Pjn TO 30m ~ t FDPS FDPS z- 2 T CI R2 O T EXISTING VARIES (SEE GROUND ozs vz5 crass sECrroxs) 3JIL' . 6d EXISTING 60 MIN EP -Y2- GROUND 34 IA GRAflE TO THIS LINE n GRADE TO n U n GRADE IS LINE 430m 430mm THIS UNE 430M VARIES FROM 3pm 36m TO 9393m WESTBOUND LANES TYPICAL SECTION NO, 5 EASTBOUND LANES 3.6m TO 9519m -Y2- 9+49364 TO -Y2- 9+95.382 GRADE USE ©2 IN LIEU OF @ -Y2- 9+95382 TO -Y2- 12+69910 POINT -Y2-14+91544 TO -Y2- 18+8(X551 Ri T EXISTING FOR NARROW WIDENING -SEE PLANS FOR LOCATION OF ISLAND y~IE~ C1 GROUND € -Y2- (NC 24 BRAGG BOULEVARD) n GRADE TO THIS UNE 430mm 45m 4 9Dm JAIR VAR) FRQV VARIES F N 7.7m T m 1 IBM VAR) FROM 7-rvn TO 9Bm VARIES FROM 5.4m IBM 3pm PARTIAL TYPICAL SECTION NO. 511 _Mn ` ADD IDm 491" TO 67m EXIS ING EXISTING TO IObm USE IN CONJUNCTION WITH TYPICAL SECTION NO.5 w/GUARO4AIL -Y2- 15+77588 TO -Y2- 16432D65 EB y 1-Y2- 17+59242 TO -Y2- 18*12/89 WS 12m GARDE 12m !2m GAS 30m C-t DPS DP T T DPS FDPS t T O Cl CI T y EXISTING D2 GROUND p gq? 3Jd~ 425 D25 X25 D25 _ _ _ _ d 5d 6..I YIN. 6J MIN. 6d EXISTING GROUND 3J M ' GRADE TO THIS LINE n ~ E2 ° D2 E2 - n w 430mm GRADE TO THIS LINE 290mm 430mn GRADE TO THIS LINE WESTBOUND LANES TYPICAL SECTION NO.6 EASTBOUND LANES g5 USE ©2 IN LIEU OF(2) -Y2- 12469-W TO -Y2- 14+91544 FOR NARROW WIDENING NCa~~ 10M PAVEMENT SCHEDULE PLANS P rAffO BY. PROJECT REFERENCE NO. SHEET NO. SoU-2519E 2-C ITEM TRI DESCRIPTION ITEM DESCRIPTION ITEM DESCRIPTION ITEM DESCRIPTION ITEM DESCRIPTION IT DESCRIPTION rnMMM7 JTNalavaiiw It 1W SHEET NO. Aam 8LT7>r 811175 Im ROADWAY DESIGN PAVEMENT DESIGN BATdIOXIAmOf C 100mm S12.5C C5 VAR DEPTH 59.5 D4 VAR DEPTH 09.0 J 200mm ABC P PRIME COAT R4 SHOULDER BEAM GUTTER ENGINEER ENGINEER NOTES: 1. ALL PAVEMENT EDGE SLOPES ARE 1:1 UNLESS Cl 80mm 59SC D 65mm 119.OC E 90mm B25.0C A 250mm ABC R 450mm CURB & GUTTER OTHERWISE NOTED. 2. SHOULDER ROLLOVER NOT TO EXCEED 0.06 T1YP1. C2 80mm S9.51) Dl 80mm I19.OC El 80mm B25.OC 12 150mm ABC R1 750mm CURB & GUTTER T EARTH MATERIAL 3. USE 4:1 MAX SLOPES ON INSIDE OF INTERCHANGE. ~1~T~bfCl~ PL~~T 4. SEE PLANS FOR LOCATION OF ACCELERATION ANDae__ xacecnls._ C3 80mm 5958 D2 100mm 119.OC E2 110mm B25,OC J3 100mm ABC R2 25mm MONO. CONC. ISL1N U EXISTING PAVEMENT DECELERATION LANES. 5. SEE PLANS FOR LOCATION OF TURN LANES AND C4 50mm S9.511 D3110mm 119.OC E3 VAR. DEPTH 825.0 J4 VAR. DEPTH ABC R3 100mm CONCRETE COVER WI VAR DEPTH ASPHALT PAVM T INTERSECTION TURNOUTS. 6. RUMBLE STRIPS SHALL BE PLACED ON BOTH THE MEDIAN AND OUTSIDE SHOULDERS IN ACCORDANCE WITH STD 665.01. C -Y2- (NC 24 BRAGIG BOULEVARD) 0.6m 45m 4.5m ohm 30m VARIES FROM N)Bm TO 18.Om VAR( VARIES VARIES VARIES FROM 10.8m TO 14.4m lom VARIES FROM Om TO 85m VARIES FROM 59m TO 122m VARI TO 36m n TO 3bm VAR) FR ! 22m T m VARIES FROM 63m TO IOBm EXISTING Om TQ 49m EXISTING R R V P~ T T G1 T D Cl CI D2 Cl J.Q25 .02-5 A?!L T D2 Ad RAx_\ EXI STING E)NG Rl V Ri GROUND NO GRADE TO THIS LINE 430nim 4JOmm GRADE TO THIS LINE USE ©(N LIEU OF JI GRADE TO THIS LINE I FOR NARROW WIDENING WESTBOUND LANES TYPICAL SECTION N0.7 EASTBOUND LANES -Y2- 18+BOS51 TO -Y2- 23+84,047 -Y2- (NC 24 BRAGG BOULEVARD) VARIES FROM 4 VARIES FROM m TO 100m 45m TO 49m VAR) FROM 10Bm T ll m C Jpm VARIES F I F I I VARIES FROU 4,54m 7 11,07m ARIES FROM 4m IBM 3Am L -RPIaD 755m TO 997m TO 325m EXISTING Om TO 62Em VARIES FROM 3.0m EXISTING 9828m TO 27701m OJxn 12m ! m 3Am FDPS i DPS FOPS x GRADE Po1Nr GRADE EXISTING T Rl P~ Cl T Cl T PO_ V EXISTING GROUND D25 PIOIAT 0 0 D~ GROUND CI vAR/E T D2 EXISTING - - - - - - - - - 6d d MIN 4,V GROUND GRADE TO THIS LANE D D EXISTING E2 U n t0 U n J"wgy GROUND GRAOETOTHIS NE n u 297om 4JOom GRADE TO THIS LINE 290mm 430mm GRADE TO THIS LANE 4lOmm WESTBOUND LANES TYPICAL SECTION NO.8 EASTBOUND LANES 9a„ PARTIAL TYPICAL SECTION NO. IOA -Y2- 23+84041 TO -Y2- 24+60.000 -RPIBO- 41+5721J (BRIDGE) TO -RP18D- 42+X607 USE ®1N UEU OF JI FOR NARROW WIDENING Q -RPLBD- Q -RPIBD- & - CDR-90m Jbm 5.4m IBm 3.Om qpm 3bm 5.4m IBm JL)m ADD IOm ADD !Om wiGUARDRAIL a 5 WIGUARORAIL d I9c 12m IZm Z 12m L. Z Z ~ EDPS l>P EXISTING F 2 EXISTING T t GROUND T CI LADE GROUND GRADE .4m T T PO1M T 3d TV 02 02 ,gq~ I EGAXIQ1tiDG ~B L12 A2 02 OZ 51 ,Q8 D2 02 6d WIN. 6d WIN. 6d MIN. EXISTING- d MIN. p. 1 GRADE TO THIS LINE GROUND n 340 39Omm 3dq 40. GRADE TO THs LINE TYPICAL SECTION NO.9 TYPICAL SECTION NO. 10 -RPIBO- 39+40.07 TO -RP1BO- 41+0713 (BRIDGE) -RPIBD- 41+57213 (BRIDGE) TO -RP/80- 44+03" LB -CDR- 44+43267 LA TO -CDR- 49+51581 REFERENCE No. SHEET NO PAVEMENT SCHEDULE PLANS "~'""E0 PROJECT JFLOBMa & HOM~~SO~N1INQ U4519E 2-D BJWRWSR R DESCRIPTION ITEM DESCRIPTION R DESCRIPTION REM DESCRIPTION REM DESCRIPTION IT DESCRIPTION RM' SHEET NO. aivu emrs q/ TRI C 10pmm S12.5C C5 VAR. DEPTH 59.5 D4 VAR DEPTH 119.0 AM J 200mm ABC P PRIME COAT R4 SHOULDER BERM GUTTE0. f~~ ROADWAY DESIGN PAVEMENT DESIGN Cl BOmm 59.5C D 65mm R9AC E 90mm B25.0C 11 250mm ABC R 450mm CURB `GUTTER NOTES: 1. ALL PAVEMENT EDGE SLOPES ARE 1:1 UNLESS ENGINEER ENGINEER OTHERWISE NOTED. R). C2 BOmm S9.51) Di 80mm 119.0c E1 80mm B25.0C 12 150mm ABC R1 750mm CURB 6 GUTTER T EARTH MATERIAL 2. SHOULDER ROLLOVER NOT TO EXCEED 0.06 3. USE 4:1 MAX SLOPES ON INSIDE OF INTERCHANGET1 ~T Y L ~4f: 4. SEE PLANS FOR LOCATION OF ACCELERATION AND „_wmt.usa rn trogcm~c; . C3 1 80mm S9.511 D2 100mm 119.0C E2 110mm B25.0C J3 100mm ABC R2 25mm MONO. CONC. ISLAND U EXISTING PAVEMENT DECELERATION LANES. 5. SEE PLANS FOR LOCATION OF TURN LANES AND C450mm 59.58 D3 110mm 119.OC E3 VAR. DEPTH 825.0 J4 VAR. DEPTH ABC R3 100mm CONCRETE COVER WI VAL DEPTH ASPHALT PAVM? INTERSECTION TURNOUTS. 6, RUMBLE STRIPS SHALL BE PLACED ON BOTH THE MEDIAN AND OUTSIDE SHOULDERS IN ACCORDANCE WITH STD 665.01. Q -RP2B- 9Dm 3.6m I- 36m VARIES FROM 54m 1Bm 33m ADD 100 485m TO 6m w/GUARDRAIL Q: ~y : W 12m L2m Z ~ F D° EXISTING T CI D1 GRADE GROUND POINT T _0 02 02 A2 k2_1 D8 3JyPT 6d MIN. EXlSTlIIG &I MIN. ! GROUND 3d M GRADE TO THIS LINE T410. TYPICAL SECTION NO. 11 -RP2B- 12+40000 TO -RP2B- 14+92733 E -LP2B- q -RP2B- -SPUR2B- fl -LP2- m m VARIES 90n -25m 36m 3An ADD 1Am w/GUARDRAIL Obm GRADE GRADE GRADE Ltj 12m POINT POINT POINT GRADE R2 T D T EXISTING SLOPE SLOPE SLOPE SLOPE 02 GROUND VARIES - VAR1 VARIES' D2 I 6J MIN. 3`I Wp1I. J GRADE TO THIS LINE GRADE TO THIS LINE 11 J ° GRADE TO THIS LINE ExlST1NG 38Ow 4tOmn 3801m GROUND WIDTH VARIES FROM 25m TO 72m PARTIAL TYPICAL SECTION NO. 12A USE IN CONJUNCTION WITH TYPICAL SECTION 'WIDTH VARIES FROM 4Bm TO Lam TYPICAL SECTION NO. 12 NO.II -RP2B- & NO. 12 -LP2B- FOR MONOLITHIC CONCRETE ISLAND -LP2B-10+60956 TO -LP2B- 13+66450 -RP2B- 14+00.6j3 TO -RP2B- 14+92733 -LP2B- 12+33394 TO -LPZB- 12+88849 -SPUR2B- 10+001100 TO -SPUR2B- 10+86D30 Q -RP2D- 9DM 3EM 36m -VARIES FROM 3.6m 5.4m IBM 3DM ADD IDm 12m TO 36m w/GUARDRAIL EP -RP2D- 12m !2m z LL. DPS A° Of- x EXISTING x T C1 D V BADE T 2-4c GROUND 112 D2 RI T EXISTING ~ yrN. I ~ GROUND EXISTING 6-4 MIN. GROUND GRADE TO THIS LINE 3J J j 3&krun J GRADE TO THIS LINE 380mn TYPICAL SECTION NO. 13 PARTIAL. TYPICAL SECTION NO. 13A -RP2D- 10+87938 TO -RP2D- 14+3739 USE IN CONJUNCTION WITH TYPICAL SECTION NQ 13 -RP2D- 14+1523! TO -RPZD- 14+37.317 fill ~a~~ LT, X PROJECT REFERENCE N0. SHEET No. PAVEMENT SCHEDULE nAr+s PAEFAAEO ar: TRI ITDESCRIPTION I DESCRIPTION R DESCRIPTION ITEM DESCRIPTION ITEM DESCRIPTION IT DESCRIPTION RU-/W SHEET N0, ITEM DESCRIPTION ITEM DESCRIPTION ITEM DESCRIPTION AMWAMMM ASV))„ S= Im NAIilm AV i mf ROADWAY DESIGN PAVEMENT DESIGN C 100mm 512,5C C5 VAR DEPTH 59.5 D4 VAR DEPTH 119.0 J 2DOmm ABC P PRIME COAT a R4 SHOULDER BERM GURER ENGINEER ENGINEER NOTES: 1. ALL PAVEMENT EDGE SLOPES ARE 1:1 UNLESS Cl 80mm 59SC D 65mm 119.OC E 90mm B25,OC 11 250mm ABC R 450mm CURB 8 GUTTER OTHERWISE NOTED. C2 80mm 59 5D Di QOmm 119.0C Ell 80mm B25,OC 12 150mm ABC R1 750mm CURB i GUTTER 2. SHOULDER ROLLOVER NOT TO IXCEED 0.06 T EARTH MATERIAL 9. USE 4:1 MAX SLOPES ON INSIDE OF INTERCHANGE. 1~1tft1M'CI4 R.U-A 4. SEE PLANS FOR LOCATION OF ACCELERATION AND _-!marry topcrnte;_p; C3 80mm 59.58 Q2 100mm 119.0C E2 110mm B25.OC J3 100mm ABC R2 25mm MONO. CONC. ISLAN U EXISTING PAVEMENT DECELERATION LANES. 5. SEE PLANS FOR LOCATION OF TURN LANES AND U SOmm 59.58 D3 110mm 119.DC E3 VAR DEPTH 025.0 J4 VAR DEPTH ABC R9 100mm CONCRETE COVER W1 VAR DEPTH ASPHALT PAYMT INTERSECTION TURNOUTS, 6. RUMBLE STRIPS SHALL BE PLACED ON BOTH THE MEDIAN AND OUTSIDE SHOULDERS IN ACCORDANCE WITH STD 665,01. -LP2D- -RP2D- -SPUR2D- -LP2D- 9Om m 35m 3,0m WAR. 3Am VARIES ADD l,0m w/GUARDRAIL y CK O 120.6m GRADE GRADE GRADE POINT POINT POINT rDPS GRADE T POINT D T EXISTING SLOPE SLOPE D 51DPE SLOPE O? I II 1 A2 GROUND VNtIES VA S VAop' E KARIES JOIN. 3d to, J GRADE TO THIS LINE J EXISTING 3LNnn GRADE TO THIS LINE GROUND •WIDTH VARIES FROM 25M TO 72M PARTIAL TYPICAL SECTION NO. 14A USE IN CONJUNCTION w1TH TYPICAL SECTION WIDTH VARIES FROM 4Dm TO 17m TYPICAL SECTION NO. 14 Na 13 -RP20- & NO. 14 -LP2D- FOR NONOLITHC CONCRETE ISLAND -LPZD- 10+66997 To -LP2D- 13+07546 -RP2D- 13+61-329 TO -RP2D- 14+373N -LP2D- 12+05529 TO -LP2D- 12+46B56 -SPUR20- IQ+OODIO TO -SPUR2D- 0+71591 Q -Y3- SATURN DRIVE Q -Y4- KEITHVILLE DRIVE !Bm VARIES FROL VARIES FR IBm 24m IBm VARIES FROM VARIES FROM IBm 24m an TO 45m : TO 15ai 3-3m TO 4 m 4 V GRADE GRADE T G P POINT T T C4 P POINT T EISTING GXROIIND I A2 A2 I DB 34 GROUND EGROUNDG Ad I A2 ,02 I 4V 3} GXROUt'D GRADE TO THIS LINE q GRADE TO THIS LINE 2OOmm 200M TYPICAL SECTION N0.15 TYPICAL SECTION NO. 16 -Y3- /O+OODw TO -Y3- 12+43755 -Y4- 10+55995 TO -Y4- 12+02396 G -Y5- FOURTH STREET CONN. -T7-6- & -TT7- (TANK TRAILS) IBm VAR) FROjW VARIES F IBM 2,4m 35m 2Am 3m TO 3 3m TO 3 GR GRADE T CS P POI T POINT EXISTING EXISTING GROUND A2 ~ EXISTING 02 GROUND J GROUND 411 EXISTING GROUND A4 GRADE TO THIS LINE L GRADE TO THIS LINE 3 TYPICAL SECTION NO. 18 TYPICAL SECTION x0.17 -TT6- 19+05400 TO -TT6- 22+23755 -Y5- 10+2OD00 TO -Y5- 15+96183 (33m LANES - PAVEMENT RESURFACING ONLY) -TT7- AO+OODOO TO -T77- 14+45DO0 -Y5- 15+961BJ TO -Y5- 24+59786 - NEW CONSTRUCTION -Y6- 10+15,000 TO -Y6- 10+52,000 (35m LANES - PAVEMENT RESURFACING ONLY) Lau 0310W - ADDED RAILROAD BUSTING RIGHT OF WAY, CURRENTLY OWNED BY NCDOT 07/1%08 - PARCEL #1 ADDED PROPOSED PUE 07ANS - PARCELS #1, 7,2A, 3, 4, 5, 6, 7, 9 6 10 ADDED IMISTING PUE - p~~D7 ra F flf Alp ' 61 IQ I/~ / A P 4 1 \ I 1 : r t; -8ri`yi \ \ I I i m IPs~D= \ \ I I /v \\16 / . Y i. loll 1k wcatg \ \ fit f fit h 1':\\ AV, -a w~ / \ .R max? ~ . • ¦ 5 z 40+00 - ~'I \ I 1 w Z r sit ;iz - 1 a / 1 ,h - _ ~p 7 I p - , 42+0 _L_ g \ - --ter _7 ' ~ pppp 98 L 7 I s a t~ ~ \ •~'sa as °~'~a ° /r 1 ? j. Q76 RgC l6Fp~ r ~ ~~~D~ ~ _ eat I ^{i ~~°1®,ngy,i~~ ~ rT YA • aA ~ 91 I A + P Nib e '(0-- 114, g Z ? 13 $ + e I mOTI~~ i`/p $ Q I I~ i 04 a 4 1® i p , g'" IN~r= mv6 ~ , o eon le fit is ' ~ ~ a 6 mi A MATCH UNE 4- 43+70M SEE SHEET 6 P V Jill 5911 I a i ~p~ Ips+roa ps'•"p~ map% ,...a t~ I 46 ' I Ips+ p2 ; ? } ~ I I Y!'7p2 V. *0nnI !NMI, LI . y~ ~ S ~ - ~ ~-r ~.~,4,_ ~ 14 , ? ~ :III Y~•'~f Yr ; ~ ; 1 ' ~ I is a ~;r i I r ~II n 0 ap ' ~I fuw jiq ylr I li I 41 qq qq ul ' 9 O li g it P ~E li l 9 ~ . I I~-' °el ? i! I ii 10;1 ~ I o, ° ik I I aI p ^ S INN i m~ 'um,umn, n:m~u mmn,®mm' xma,m u®d+ ®'xO" i a , w m 'III d I;I +~f3re~~ ~u~ I NIP 1 I ~ ` ~I 1 fxx 1®,xma,0'x0n,®n,mm®" ~1 I © ^ i I 1 I O l m 1 p c ji I I b 1 O=~ ~i y ~ ~ I 1 0 II ~ I 1~ $ ~/a I J~ ~ ~ alb _ ~ I 1 I R- v •y m. „ sq It en - - rZl~are w „f ~1' ~ , ~ ~ ® / m Aq i m'xm • Q v,. 0,y .x 1 - r ti it ftI, ; ~ • I (III I ~ ~ -L`~.~ s :;:1:{ P'E ~ - cc ~i I m' 9 9 ~ ~ ~iil t\ l I~ I ~w I - ~ 1 O1:,F0,u ® ' ij YY I ` 1qQ ~ ; ? '•da _ i it ^ ~ ~ / J / ~ a ~ l t~ ~ i ~ + t ~li PS1111@ Y~ ' a. * ,x ~ I I N ~ n ©1 m ~ ~ ; 412 « Ifa Y 1 ® ~ ~ r + \ ~ m I Ia ~ ®11 © z ~ I I I "'0'wm,r. ~ m I I °-m ®1 ~ P a+l \ m I a I® I m `Yi~ y m lal® ~ ~ ~1® ®I I ® p i Y m I p l = ~ I® ~®n sl m ® T ( p \ Q ®I I® Q Ice mxm:, \m `'v, I o 5 I l a ~ I ® J ~ ~ 4J ®I 1 ® ~ b ~ ~ , ~ 7~11g1~~ ®I l e &J t" \ m R 44 lift NN- r i~ b R F~0 PANE PREPARED 11Y.- PROJECT REFERENCE No, SHEET NO. (3 ~i` E3 1 1 ( £ t 0& & 1 rONM U-2519E 6 0 wooos a00 ~ A7w wAritgusr 3d~~~Aw TRI R/W SHEET NO. U-2519DA13 ~*~L / AArJ=gAV SAW ROADWAY DESIGN HYDRADIJCS \ - - Q ITT7~PC d~1H BEGIN CoNS~ItT~'Z3''1 aI ENGINEER Y ENGINEER Sm 10m (325 10 iO+OO / ~ ' * * \ ~lr ` ~/r = I LT !J , FORT BRAGG MILITARY RESERVA~~ ~b . O Q Q {3 9TT) PRELIMIN PLAN WOODS `yam r dMM m Ivor »sa corvsrnocrmrr f~ -L- TS 44+04273 LBI=\\ c II L -TT7- PT 10+56J69 eF /'43r/, i2bamr lr caNSr.ReY. - -L- TS 44+76935 1V - \ i + -m- ~'/rf3 l p l ~2 i -C012- TS 44+04275300)n LT) t0 I 8MOm L ' * \ F 1 (26251) -TT7- PT 11+63399'! , r 404273 -L- CURVE DATA FOR -L- ( j PRA R~ s \ INLET 24 l1r/, \ 3 * _ F -TT7- PC 1If45768 +11016 -L- IS 0 4 + 69 (1 50+03-492 11 '1 1111 I- ' " " I Tsai I_ DITCH ~r 1 E ra.6 Lr Qs = 0 4 410 30T ILTJ W T N r WOODS, E~E (242J9) Ls = 92.000 L= 864676 W Lr I' n F \ * ORT F LT =61334 T = 434557 = cDAr7r FEE LT Triw-- - - BRAGG SE ~y R L ST ==613O30.667 $e = 3449255-000 H ,v v~ i ~%r v " ~I• ~ ~ PROP 2Jm CL 3-5-~ - - _ - I ' \ ~ 1 ~ SECURITY F ~ W CURVE DATA FOR -L- O SC 4dP95$IE l FR : \ \ ' ` c3' b \ 0, o s l \ {3 4 LATERAL ? Ip i q Q'I'4 1 _ _ _ _ ' Q/ fi \ \ \ ` BAS DITCH fST: f 7 CL-B RIP RAP - - - - - - - - - _ D T m 4 E DATA FOR -CDR- N 349m EST FfLTER fABRa - - 5 ATERAL ° N fDPS . / GUARDRAIL 8~ a,49m AsE DITCH p~$to 45 05.234 PISto 12 F S GRAD 350 141 XR ..:r Nnl -1 7T 0 599' E E Z _ - Less 9295209$ L m 271b03 / LT = 61-W T = 135868 Z n -PROF ST =30974 R = 3530300 \ Se _ 002 G _ _ r9 I -J s a s Es i ' wooos 7 \ ` END SHLD w ° BERM + WOOD 2 sG1+t `s0BE GNTER 28 s Z CURVE DATA FOR -COL2- % H E v * t rn N g , G DING r DING ONLY ONLY wooos €3~y, vv ti4 77'015 9'£ 6 I -L- SC 45+68935FurDREABIE GuIDERAI\ ,s . \ \ far l ~q' ° 21 / ~ + CURVE DATA fQR -COL2- n Sto 47 *06.710 'I'dl • -C- FAYETTEVI (JJER ` , v O P1= r44,f7.4-(RT) APisa 49+21674 =t849'2?e(LT) AA OD, llp c r =1 so 7s r = .307-961 .000 00000 se = 0,025 -i9 , RADIN ONE l , G ING\ ~dbY~ N N Se = 40 0-025 v ! . ` - c [TS T, 77 o,/, CA - - _ - - -ry- - - - • tr CURVE DATA FOR -RP2D- RA/ wooos +DO2p cDR- PS ~5 PIS Sto 10+40021 PI Slo 11+30.322 y l 1 * Bs =.743' 2623' ILTJ 2G" :q LT = ~LN9 T L 136J50 77' Or 5 E E W -CDR - ar . , -1? -CDR- 370.322 00000 ° TT _ -10, WOODS ST = 20 = U) WO SC = 0.0 6 a 3+81938 -RP2D E D i N- \ 2 2G . -TT7- y _ CURVE DATA 17 RP2 + a G~GUatoRal ~ CU to10+2 .4FOR Ito p+ § POT 38+e2.510 L u AINI 1 54.594 - 2r27-6J6917.4-(LT) L~~25 c = Q ~ ~ - ~ 2GI-8 ~ Ei „ • ,li ~ ,i • q 1 ~ - mm ~ ~ ` ' 46466.605 -CDR W \ \ T 28-417 T 8B26 R 150-000 r. k m Ds~s''+3620 - - - - ,,j I Q'1''1'"S~' s \ Se = e = 002 et 0.02 + RgF 0 = 4'J' - - - ' d'CJ'I' FORT BRAGG MILITARY RESERVATION T IF-r DITCH 2l "Oil 1q, S 4 O'1' WTO QI V Z - - / Q 1' ` 5 LATE ND FENCE J H I +17.664 Q I''I' - BASE DITCH 5 PROP WW I- -BW +2=.065 lr 69.796m 0.T mm R/W +76- (2952T6/-L- soA25m RT I 0229.001 56 (183,567 +BEGIN 38.8 FENCE L qo (21528) +35.8 I 99 -t' 000 14 1yx55 EST. D-9 TONS CL-B RIP AAP TAY JOE KEITH I 6 0.T 43 I Q 1 TOMMY JOE KEITH (13919M L VRP2D- SC 10+60 K,10f * (229.311 29.31') F 4 CLB TONS - to4 Q4M. ,q DS 2441 PG 104 N CL- R!P RAP EST. 42 SM FILTER FABRIC --go., ~~e,~•E 7RACT ON EST,42 7FGC7 ONE 3 rOlrs POT 44+03$08 axis .A. FILTER FABR / 01 / 18 'EST.7 SEE SHEET & a FOR l PROFILE wooos -RP180- TS 44+03$08 LB -CDR- PAC 45+92.M = - : CL-B RIP RAP ES7,nb SY 2 FILTER FABRIC -CDR- TS 44+43287 -RP2D- CS 10+00000 (36m RTl SEE SHEETS 21& 22 FOR PROFI PROFILE (35300m RT! SEE SHEET 24 FOR -CDR-&-RPIBD- PROFILE ESr.09TOHS CL-B BR RAP wooos SEE SHEET 21 FOR WALL PROFILE EST. 42 SM FILTER FABRIC SEE SHEET 37 FOR •Tii• PROFILE RIP 8 SEE SHEET 2.0 FOR DITCH DETAL SEE SHEET 2•G FOR DITCH DETAILS I P CURVE DATA FOR -L- CURVE A FOR - nuts MPAUD NY.- PROJECT REFERENCE No. SHEET NO. b-14 Fl ' l$ 0 + AI m 4 /S 10 1 0 / 10 4 + 1 tf BVTaM' AlAC U-2519E 7 P 47+06.710 21 es = 04'14 YE9 Am 14'!0'3 7'(LT) es = 0'45'14 A = 144l1.4'(RT) 0- g4g 228'(LT) ~"s°' TRI K1W SHEET NO. U-7519DA14 0 ga Ls = 92000 L = 864,67 LS = 92000 L = 121,347 L = 307981 4w xammArow M ROADWAY DESIGN HYDEA000S CT = 61334 T = 434557 LT = 61334 T = 60.678 T = 154295 ENGINEER ENGINEER .6 Z ST = 30.667 R = 3.495.000 ST = 30.667 + -TT7- E1` R = 4.000000 R = ?~OOOOQD am lom _ L z = 0025 p I 15DOOm LT f Se - 00.025 Se = OD25 < 0 X5,11.0,11(4921) WI o f C PRELIMIN Y PLAN Qu aa° F~ h a n o -77, j, 4f I I F m xar use coxsntmrma r S4 ss 'TTT ~-E 8DLTm coNELRH. a Q 4 pT /3 \ 1 q 24 r26251 +50D00 -TT7- = I 7D00m LT w MY. r~ I (14769 - w rc 4WD J > N S B 47 4Y sg J N ^~s \ r r ~ -TT7- PT 13+32724 h -TT7- zzz I I 1-m- she f Ft` p Ile 0 . ~ Q 8 1 ~ 4500m RT (1475) t 4DS cq O$ a N / 8DOOM L 0 O h ONC FpND4jON WIjN lV W F I L` Fl00DC4" l (2625') e + 1. / ,o,,,, +7 4. -rot- m- POT 14 45.000 1 _ 43 i r +50000 -777- WOODS E} ' a +33D~i 7 (22971) Li END CONSTRUCTION fr S4 ~ O7. L'6 'f'fl,n • +85DA7 =rT7~ , DRY PovD ENO TIP PROJE U 519E a FE =971) 7"m RT +60i90--L BEGIN TIP 49+80CT X-00028 r) _L_ POC ,000 (22155) L _ -COL2- POC 49+03.443 4 S 4 S j No74200~'E UR R/N~° r' '1' 'f' • 111.011,.. ` - _ _ , _ - POC 49+5151 ~3C SPECIAL 2 70987m LT PAN' ?Jm CL 3-5 ` - ` - \ v-~C (23290) SECURIT'l \ \ \ \ FENCE FORT BRAGG MILITARY RESERvAT10N I I`\' "fl l1 f - - xQ 1 \ \ . ,p. fl, t Of 69b95m LT -COL2- PRC 47+67.379 I - - ( • ".},fl. , - Up \ \ J _ ! ~'1 . 1 . F(228b51 = I I L POC 48+6!977 ~1f1 ~lr'O,fl. ,ll - ` - , , we WOODS, Q' Q, I I END GRADING BEGIN PAVING I . - W , 1 - 1 ~'b pa = I I wooos N I ::fi:.~..... /yO am 2 \ f c/U C - C 1101 I C +8DDO -L- u _ - EIS / / _ t . y r t I \ \ +865A5 i' F - C - h END PROP 2Jm CL 3-S-dY f 0'11.0 r 1' - , ` Effi- -TITFil I.- N ..3 AN}gl. t.r FS ~c O < - wooos r9 FS Xy END CONSTRUCTION ,C} + ; . = r . . t3\.plll 'I'QII, - _ _ By OTHERS `DING ONLY F ^ 1\ ~ ~ ~ .{!.J/. ~ .-1 ~'l? II ~1,1~`' ~ ' ~ 6 ~I~L?,r; ~ ' _ 0' Clr' 'f' , 1 & FUTURE 1 1 l i~, _ 2.4 501E 1 7GM8 ry~ WOODS / - _ - {3` Ha CABLE I END CONS(M7(I h/R Iy ~llf, 'vo \ \ a 2GI-A «1rDERaL fl I 1 . W Fs 20,1~4 p. Z 2J FAYETTEVILLE OUTER LOOP \'o 24 NILL \ ONLY BY OTHERS I DING 01 I RIII \ /Q GRADIN `0 1011 I , - ` , t E 11'0'/' = ' I 14 cla` FS o a o'1'p 1 I m I END CONSTRUCTION -CDR- CS 49+81567 -C DOS . / I 1 1 /1 N4 WOODS f 7 52' 21.9' E.. - o - q1 . 2' *,46.3, . BL_ N Tr 43' 53.8' E -BL 4i m R ° 4GM41 /5,. W?G b * GIIARDRa n N/H3 AFC GI I _ ,z<S~(, , , 0111 \ -CDR- PT +07,810 s F: BY - _ , Cajl . 1110,r 1, I yER END RETaVING wA n0 pQ,f - - _ OT 0,101 _CMz TS 48+3,A,16 - O'n011 lil 1110,1, . , , I ho 1, S 0,1 (12b0Om Rr) 0111'01n 110. 0'1'01 O Weees-- Q cc Jll _ 0 Pgl { f fJlll r~ $ wooos 0i10'1'I mss` ~1' ~ `'1 _ ` £y, . ,11{~'l'{' ~'f'4'I Q,/, ° END SHiU BERN E - wFJWl . \ - - - - - PRE E° 28,1,E 1 GUTTER +51581 4 \ 7 44+ +74531 y l. SC 49+128 I\\O1) i a` 0 l +sz.7m-(.1~: X01l,a' Fr dr, b 7 4.034m WOODS 01/'o v~ ep° 433 `vv 12/7.19/ + ~0'1'fl,ll0n ,1,E mmG fir, 51M -CDR- i c \ E3, PIS Sto 45+05234 PI to 46+72[115 PIS Sto 48+86J59 -4- 1, • lm 1178259 E00CAA460R - 4 24'289'(LT) 9s = 3'16'26.6 CURVE DATA FOR -TT7-~ Q'1' 3.• e -ENO PROP 12m ww 1-S-Bw C f''Ip 075 759 - a /9 PIS Sto 50+08242 P1 Sto 11+54594 PI Slo 12+74955 PI S1o 13+24777 AND cin \ \ 6, (LT) s =1 - 5'(RT) 6s = 3'16'26.6 6'44'05!(LT) 79'54'185'(LT) A= 872 '49J'(RT,II 'I' ''I'C'I' 'l'{ 1110I. 011 • O . ~T = = =80000 LL - 17.632 L = 69730 L = 22.894 - E'1,{'113'' SEE SHEET 19 FOR -L- P LS RFLE 1 T - x T = 8.626 T = 4L884 T = 14 46 ` C., w SEE SHEET 22 FOR CGL2 PROFILE 135 EF QW42 T = 34.403 LT 53.342 SEE SHEET 24 OR PROFILE = 50000 R = 15100 0.1, . 300 ST = 26.675 R /50000 R = R = TOOOOO ST = 26.675 ,3 ~~M \ LX5y1 C9 C1 SEE SHEET 3T FOR •TTT- PROFILE ~$I R = 3 5 E SHEET 2-2 FOR WALL DETAIL 3 Se = 0.02 Se = OA55 Se = 0.02 Se = 002 Se = 002 j)TeYS CL-B RIP RAP SE FI T R FABRIC t 'H 2 T FOR IT DETAILS HARKU PLANS MPAREC IY: m FREE REFERENCE NO. SHEET N0. N~ aaNarurao=t7Aa~ TRI UR-AW2519E 1 SHEET NO. U-75190A 11 vw wAsytiusc JAW ROADWAY OESRiN HYDRAUUCE ENGINEER ENGINEER 6m Q 1m PRELIMIN Y PLAN 1 00 NOf U!E W STRUC CONSf.REV. 1 ' IW KEY, $J%I:~ SOIL - WOODS WID, i O 0 \ O L - _ - - \ /Q Q I =1 \ 11 ~~11~1~.3'~'9 \ \ P" WOODS FORT BRAGG MILITARY RESERVATION QIWOODS - i- - - - - (23 Q ~ - \ ~Q +70.000 -Y2- G 35 WOODS 1/0 Cli (114.83') +70000 -Y - XI ! Q; ~ R PROP R/W rR"\ PROP R/W 180,000m TAPER G - - - - - - - - - C - - - - C LLJ C - tq N 3-m - - ------°---__KO mm 1110 + 4-'" Lu - W N 300 mm AC E s 300 mm NC _ TO FORT BRAGG E PAVEMENT WIDENING AND RESURFACING 4972 64 -Y2- NC 24 BRAGG BLVD WBC 73 BST p I O LLJ -Y2- AGG BLVD. I m F P - 0 Y 45m k ; i ^ 4 NC 24 BRAGG BLVD EB 73 BS7- _y _ W . ~1? ro---------- rvo- ISnOm RT F ~1II F 12m FDPS - - - - - +25010 -Y2- l:. - . Q 3 17, - L{;}w0o0s 111 0 giQip~il,~•' Y2- POT 7+70.000 BEGIN CONSTRUCTION, PAVEMENT RESURFACING AND WIDENING 12 BST 1200 mm wD -Y- -Y - _.Y_--- Y 11 BSI' T7+7 7 - Y - + ( fim ) FORT BRAGG MILITARY RESERVATION O I I'it I 5 F SEE $fEET 29 FOR -Y2- PROFLE FIfE SRLW DATE SPAYN $rbw moo Drom PUMAS MN TAKE $1`841111U MATCH LINE Y2- 10+00.00 SEE SHEET 8 :i I 10+00, 1200 m WD I I _ 1 -v- MIT 1 I :~D L-4 w ~11'~111 !>„11 I!I~1;1~111~ 1 W \ - : I\ 300 mm W 600_m~U/G..._-----N' Q JNf~.7~/ i I I a~ II \ - 11 Z9I 111 q ~ I _ A o fll o 11 \ \Q 1 ~V*C-0 ,~i l~ \~QIII. VIII VIII alll ~'II~ 1 ~ - - I - _ - - - o~ odgnnnt-.- U ~ ' ~ ~ 110 L I I ~ gg i 5, -1' 1 300 mm DI r 1 ^ KNOX STREET N 1 ° _ n " /I I / -sue , G ~IIs \`d ! ~'II ~'I' VIII dlI'd'I''4 'I QQ'{3111.d1I14 'I- 'll.. ' 3 r I ' I ITO, L+%.J~ 3 R. mm sn- la3 1 1 +00 ' Il is 111. 11~, ~p11 I l.II- !~v+ -I / fll fl'I''III'I'QII'' :iic III ' I I I ~ ~ ? p I / n y r 14 ' / N = I h~ DA ~ ~ I !I I I ! c~ ~ - I a B j I roBI 18Am I;: 113Am > I I I j I E i I, I >~~I I} ~ I E j:Il I _ o -I iQ ~ f.. I I E.I Al II I_ I tom o T C c _ N 1 I n I 'r o f I AN =1 I o CD ~ ~ II A ~!I ~ j I I ~ 3 ~I I Q N s = 3 p: a R~ L+ ! II a o a c l m w QI I p of I Ii! I ~1 ii I I - r I I " I rr ~ I I~ I o~ ~ I I I I d l a I E I r =1 ~ I II ~ I { m I I b a'` A 11 18Am I ::r +00.000 _ i A ! O~mm COLIC l`^, i :IT ~I'''' 3Am I I +20.000 II \ m `I!C E - = I I = ( ~IB31! (114B3' k!: \ \ +45.475 Am : ° OBm - 1 1= I I N1 I ps- D25.- o -1 ~ I I 1;; III: = S 1= N ~ I I II r!; I w l ~ 3 ~ I it I i f w`~ fl_1 1= a .o I II C II I I nl I V ~1 \ 3 ii rn I i I I Q\ \ rn I i I I I I\\ \ !:rr II I' I ~ I g N ~ I 13\0 v w I c I bp I y O I 8 r ~ ~ it I I I m w \ o m N I 11 I I\\ \ ° I I ti: ~ I 9, L9 w N ° I I +20.000} 1D fit X i:4 <33 / _ I Q I o ~ C" ~o C m ^ 735A751 1 1! D i! I 450 mm \ \ v / / \ zE s3 = m MATCH LINE Y2- 13+40.00 SEE SHEET 4 z Y o N PIANS MEPARED W: PROJECT REFERENCE NO. SHEET NO. ~t't.$ 9U1M0N]Aa IJ4519E 10 --_-J - _ \ b\ A~h9L¢t9V0 AaVOA TRI R /W SHEET NO. U-2519DA Z3 pa tPramsA~ scv48mas mr N aAr~r?smmP ROADWAY DESIGN HYDRAIIHCS N ENGINEER ENGINEER Sm p 10m N~ PRELIMIN Y PLAN 00 NOi V96 ~mucnw CONSTAN. MAD es s eR sus -Y2- POT 21+42.888 = , +1 Rw REV. JOHN SHAW o-Y - POT /2796323- DB 3480 PG 85 1 ~cT - WOODS * Z N FLAG ALBERT MET2GER POLE DS 6758 PG T51 FRANK S. SHAW E; 10 JOHN G. SHAW ~ I DB 2524 PG q G LT O 170.000m TURN LANE 1 68464r on TAP 1 ~ I I YA P T + 7 N +75DD0 -Y2- S Y - + EL ) n N SW 1 XISI IN IJ B YPOT A • .+10 m ) s +j I Ih I 'I' U grfl,l f~},p ? p l 'I' h•gr . p + o,1 Q'i' r lp l rl °I I, . 3 1 ©P • r I p{~,I hQ r . _ soG mm U,Ga r T r r 74 , -G00 mm U/G T T r AM4 Q CR-- _ =BL ""~~ON ErA CR 375 mm CO REIA JE 8 COLLILR _=m - - Q - - - -------------600- 60000 mm C&G 600 8 - - 71 f F NC 24 BRAG BLVD WS BST ~ 75 ~ ~ - RGRAlx f 72 REM EX E a 73 _ 4 N In . -w + - -TC- - T--r ---T- -T - - - - - - - -it -----T ws T - GRAIL r rt~f0G iPfCr MTL r` MTL • - N k_- T ? i.: i MTL 4,,Q T~, N T. v ric 9Bdr _ JJl11} B!Sf' _ L D 3 /d Z W S ~ r 7/ 78 79 & ~t 0 BST f T- 16 fl CONG F-~ F m 2 - - - - - \ - _ V I _ CRSTINE R/M ~ ~tif 14'i rFE _ I x +LT F\ F CA +7 -Y - GR / E 26DOOm Rr ` ' 235m R7 I I t7L E tTT na'6') 1 + -Y - + F(l fxlSTlNG ITT' Bsr 735D54i -r o00 -Y2- (104-W) 26.D70m RT Y3- + GR (85-W) c ff II I p s +39-9D4 -Y3- = 9B +39.904 -Y3- 3 I4DOpn L H (4593) p woods E 96 10 END C/A (452Y) F. NANCY W. BROADWELL nf NANCY w.BROADWELL END FENCE 1 2 Sp I DB 4481 PG 99 5 V-DITCH i_------, / q ? 'I'43 Jgr~rir C/ EST. 48 TONS CL-8 RIP R EST. 59 SM FILTER FABRIC 0 Lu 11 P ! V- DITCH / WOODS o _DITCH , - , 00 a / 63 Z IF 0 1/1 a WOODS / e N Lu LLJ i / 1, NQZ f IQo_ ' r R55 E and V ~ ~ I~ W CURVE DATA FOR -Y2- CURVE DATA FOR -Y3- u Z wACNOVIA BANK P/ Sto 20+01,202 PI Sto 24+28.054 PI Sto 11+65600 ec p = 8T 43 283' (1T) L DID Q T~5 PC. 460 p = f 08 453' (LT) p = !2 05' 46l (LT) 1 = 10000! L = 253341 L = 199,041 o. m U y k / T =50002 T= 127J43 T, ;lK / l2 R = 5.OODDOO R = !,200.000 R = 1 0 SE = Q06 6 SEE SHEETS 30 S, 31 FOR -Y2- PROFILE cc ~~O F se - 0.025 se - 004 SEE SHEET 32 FOR -Y3- PROFILE SEE SHEET 2 G FOR DITCH DETAILS O B SEE SHEET 2-H FOR NT DETAIL b SEE SHEET 2-L FOR ISLAND DETAILS I KAN$ MEPAlED BY, PROJECT REFERENCE NO, SHEET N0. FL49RUC8 If EL-Ta~-W-S -N` M U-2519E 11 CURVE DATA FOR -Y2- cavsim mvYv 9N +R4 TRI RAW SHEET NO. IJ-25190A 26 PI Sto 24+28.054 °0 BA AVJ1f1 ROADWAY DESIGN HYDRWHCS Q = 12J05'46Jr(LT) ENGINEER ENGINEER L = 253.341 sm 1om T = 127.143 R = /200.00 PRELIMINA Y PLAN Se - 0.4 W DO NM um CONSrHUCt M ~F P CONST.M. =N RW W. O O O N N N a,~ a ~ I 1 Q I N - I Q II W * d ODDS I FRANK S. SHAW 6 JOHN G. SHAW N MARIE SHAFT DEE kANDER M. SHAW 0 DO 2526 PG 10 q DB 2T95 PG 231 4089 PG 272 ~ ~ II I a WOODS 1~ I W R I A f y 'T• +I. D Yn 1 W QIQ ,I, m i•,I,. ii•ili•ip .,i•ii. iii ~i} ~ ~i y } I ~,I, i , . , T iU ~~1 A f tl/M Q ll/M RP. -F-S, i 600 0 I I~ mm U/G ~ V11 I -Y f D. 1 ce CS (RET) 20 ~ F 76 ~ 600 : 6oofert~ cac - _ - REM EX f m CO) 1 NC 24 BRAGG BLVD WBL BST - N c 17.4Y - 2- NTL • q t61a' . h - BY68 E91 • 24 BRaGG BLVD EBL B57 _ Y2- 24+TLO79 (2.013m RTI -7 Z BST - - -r RiR vM ~R l/M ON00 _ -v- 11 Q i~ f mm - C I~?y t;/I~~~ / _ --Y---Yi B5T y---Y---Y--'- _Y - sac / - y_--v-IY- I--------- - q~ llrv,er 600 mm IRON RAIL 1 I f I_ j Ems- Q I 'Y 0. m 1 it LS +40=0 -Y2- +50.000 - I SOIL & GR I Bs a .70.0170m RT XI r E 1 I I I (5+6,4Y) I I + 1N X31 s I I i ? Li 3 END CONSTRUCTION PAVEMENT RE F • = I n LL 0 AN W/ N/N -y2- POC 4+ {31 I W / I SARAH SHAH RAEO(R4 DO 4246 PG 692 I ~Q W//° I I I I t7 o ODDS / I NANCY N.BROADNELL Z < Q / F I I I r DS 4481P0 99 / I E) Z 3 = /a., / I ~ _~4DO mmvw0 I s F Bus ~ ~ /y I IsReus • E3 Q ~o = / : I I ? (Zs = W / WOODS Fi} Lu / BST 4n / €3 \ o0 ay~d~ b/ W _y- E - _y_ - VV1Z IEO fl Y- - a. U I m ~ J C) ~B SEE SHEET 31 FOR -Y2• PROFILE PLANS !HEMMED BI PROJECT REFERENCE NO, SHEET NO. H.VRM & BVTOMOSM U-2S19E 12 COAV19XBW dllT!!h'664~ TRI R 1W SKEET NO. U-2519DA 10 4m WWOmm lx~ imr ROADWAY DESIGN HYDRAMCS ENGINEER ENGINEER 5m Q 10m PRELIMINA Y PLAN DO NOT U86 OONSTRUCIWN CONRJN. SW RE/, RP/BD- TS 36+47380 1 \ % IV I I ~ w 1 1 \ FORT BRAGG / ^I N MILITARY RESERVATION \ .1 E I \ \ a O M \IN 219 x 0 I rl i GLIARDRaL CaTa FUTURE CONSTRUCTION AT-1 BEG FUTURE RETAINING I II OSTA~ONR II I1 'n 34+37.000 -COLT- N 69 52 124 E 17.650m LT) RP1BD- _ _ _ _ I 3 CgjARDRAIL \V - - - - - PROP - - - - - - - 90A1 - - L = SRECIAC - l ^u^ st - B~__ -$AB~EA-----~ c- CN BPAR~RIER -n ---sL c GM Z N 811 55' to END FUTURE RETAINING AT-1 8/ 8'E WALL 3 n ~ 4 34+33.00 -COL1- E1 lr' T X V W 0 (7-6601% RII of rr _ _x. - -x re y NANCY BROADNELL I r~ ' 900 ` corvc DB 2586 PG 497 5 C1AL CUT r r 2 so m"!__ Pv_c_ , n CONC 0 O\ M G SED 0 + r r _ ~V I so • I LT -i W t : s ` \ \ \ x0968 f-RP1 r I I ! i - _ -dSQ- f, s ti~7TXA7 COU' I` P R/W \ r +8).000 -COLT- 5 110 BEGIN 1.2m WW I -COU- P>~~f 35+30000 x36.47) 1 n Z PENCE YY/I-4 RW o b '~ou BEGIN CONSTRUCTIO l \ i'N~- E 10.0 TONS CL-8 RIP AP \11~ BEGIN GRADING ONLY CONC CONC I CONC CONIC LLI 3 E 23.4 5Y FILTER F IC '--50 mM2)~c _j F------ _ i2 I t W Y) I ~+24ze7 -coLl ~ 911 1 67.720 ouc I • 1 NC D PH OCOIRI L I--°--- . -I © r II <iOrmerly JOSEPH 301 _ W - - - _ ~ +27.558 -COL1- OB 3160 O n d 90.509 { W I f7 II ,n, p W O I LJ CON CONC N coNc CONIC C 1 n J P nn J J I DA NG Q ER TREE LIMIT d r NW n n O uu~ CL I I I S Do tee SEE SHEET 23 FOR -RPIBD- PROFILE SEE SHEET 2-G FOR DITCH DETAILS O k SEE SHEET 2-N FOR SHEER POINT DIAGRAM 2 P AN6 PREPARED rr: PROJECT REFERENCE NO. SHEET N0. ALOMM & EU7Y~E40NINC RI 112519E 13 R/W SHEET NO. LW519DA 25 uu m n w ROADWAY DESIGN HYDRAUNCS AALA= ENGINEER ENGINEER 5m 10m PRELIMINA Y PLAN M HaT M w cwstevcrroN ' CON5T.REY. kW RH, I N,40 B3 ~ ~ N I 8 FORT BRAGG MILITARY RESERVATION - ~ ~ IS A1TL EII I x I I I I I I ~ N>< I II, I ~I c I N a ~ I I ~ a l ~ Its I g I II 1 ~ 0 E 9 a Da A F rv a W ul I f k J ~ y I _ II DI I I ~ I I I ~ III _ J I I x a -Y POT ! 5 W I - I _ If- l a I I ri- POT 11+90B-% RL ,r~ ~ II r I I© ~ ll _ y I n, I I Q pB L_ 1800mm CHLN `W 1 o 160- B4 Q I ry x-X-x-x pc---x-X-x-X-%~ `r-%-x-x O L 1 \ - / \ ~ fl© 4 fl I r © f\ Q ® I I~ SaNO BAGS Q ~ 5 8 02 08SE Isa- BS -Y- PAVEE M NT R SURFACING e F W . -Y + sem en eucK JACK RD PAVLMtN] U IN fi0mm esT 160- BST same LIST IU _ -EYI- -1 + X-X-X-x-X X-X-X X-x-N ~U C r - IBOOmm CHLK 1 ISODmm -x- -x -CH CHLK N 375 0 % X-x x-x-X-X-X r - 9 ~ ¢ / ~ ~ 1\ ONC. D SAND BdGS~ xx x I ® ~ ~ ® ® e ~ ® ® x-~ 7~ ~ - f rv LA II • 1800mm LN m •n q'~~ 7"' (RETqj x 5 11 a d on l • 1 I~ u x II II ® I 1 'APIRI) 3 x w v N N E I I 111 II rAlut! z E ~ I to -Y5A- POT 1D+15 gX dII I 000 J - IS BILK I ~ E0 N I IS BLK 11 ~ 1. I I0~ X % 0 I I / E I p I Y --x- E U 1 Ex I I u = X n •o o II---__ I m l II° x o V ® / II X X 11 I \ II I -Y5A- POT 10+42.484 x II II I v I 5 II o II ~ II / I__-- I X . ~m I 7 II a I III o tORT BRAGG MILITARY RESERVATION W x D _ L----_ IS BLN I I I 1 UNDER CONSTRUCTION J 1" / I I I I III r I II I I BEGIN CONSTRUCTION BEGIN PAVEMENT RESURFACING II v PUT -y5- 1U+2OD0O I I II I I i SEE $HEET 33 FOR -Y5- PROFILE Muni PREPARED BY: PROJECT REFERENCE NO. SHEET NO. MUM & EVTON OY NC U-2519E 14 aavj&zrz a TRI R /W SHEET NO. u Z3190A 36 A4 ROADWAY DESIGN HYDRAUUCS B40WEIR ENGINEER Sm p 10.m PRELIMINA Y PLAN w Ntrr Vst Po W gmuC N CONRT.REY. RW KEY. l NAD 83 7 ~ 10 O I FORT BRAGG MILITARY RESERVATION I I I Q `ENDI PAVEMENT RE . RfACING I. BEGt, GRADE . -Y5 i POT 15+91.183 I. I I : I m l I I k M IF I ~ Iy X X x XX X k \k~ ° -Y - 60T 10+OODW = II II W NTR k x -Y - T 15+92282 I W = I ' _ 1 -Y5D- PDT 10+25200 +somo -TTS- I PJ CrAC 23 N r5IX y k, x e n LT I; I Cur ce ~ r4sarJ o E W W --L - - - - - 10+00DW = ND CONSTRUCTION I W H I r 1 - PO lA+q .438 -Y5D- POT 10+1 0 1 F y kl WN , O X-X y x X • X--x-X-X ~i 1 -Y5D- POT 10+00." = e c O le.. CNLR -Y5- POT 15+53-%9 m 93 r O \ a D1 ' ` _ O + F 7) (R6 _y PAVEMENT FACINJG 11 = e J - - a F + i ° e.8. esr aLACR jAcR RD. PAVEMENT RESURFACING 6 N wmm cac ; - - - - ~ 660mm cac 1- e- - - '760mm-Z'as- - - - - - Q r+- ~ _ - - = n X-X-X-x-W-X-x-x-X- -x 375~pm CON&-X-X-x-m-x-X-x ~REIw `W t:.7 ! p 2.44m CHLN ®I I i[7-------y- m\ \ 1 - \ • / z OLV W E~2 1 ° -YS- POT +53,759 Q W z END coNSrRUCr10N -y5 B- POT 10+1 - ' END CONSTRUCTION s~ F h I _ - X•~~ I s -Y5c- POT 10+15D00~~ III o Df 1w e& N POT .38M7 FORT BRAGG MILITARY RESERVATION -Y - 10+ : ht; - _ -L . L- - -X x-x -X x-x-x x x x 2S MTL i~ I I I 249m CHLR ~u I y~ II W ~m I L III" j -Y5C- POT 10+45580 XE 11 0 0 0 0 0 0 0 0 0 d i1 II Q it X • -YSE- POT /0+42802 SEE SHEETS 33 & 34 FOR Y5- PROFILE 3 k SEE SHEET 2-G FOR DITCH DETAILS KAN$ MEPAUD RY: PROJECT EEFERENCE N0. SHEET NO. CURVE DATA FOR -x5- AV RI U-2519E 15 P! St0 0+49125 PI St0 22+43284 R /W SHEET NO. U-2519DA 27 A= 35 44' OOS (LT) A= 2504' 19J' (RT) 'P" AAW~ UUM V MW A° ROADWAY DESIGN HYDEA000S = 15590 L = 218 96 ENGINEER ENGINEER T - 80.588 T = )11178 5m 10m R 3 250DW R = 500DW Se = 0.04 Se = OD3 I I PRELIMINA Y PLAN \ \ y,\ r \ UU NUT USE CON$'mUC11UN CONSLRNY. \ \ \ \ - _ I RW ny. \ \ 1 I \ \ 1 1 v v A A S n Z y ~ FORT BRaGG MILITARY RESERVATION \ \ \ \ h \ \ 1 11 m + O 15.IXIOm LT \ - ry' (4920 \ + -TT5- M9211 1 ~ \t ^ ' / . x C (6567) EST.IB TONS CL-B RIP RAP -jr \ EST.59 SW FILTER FABRIC +4a" _TT5_ \ \ \ f s'r 0` (6562) If ke Z c, \Y , ~F \ 20000m 0775- j ra i vol g 43 ° O i IN, (492F) cp E C., 94 \ / ` / (492T) G004)RT \ \ 23 SPECIAL E E -E p 1 2 r ` ` Q ` CUT DITCH E CUT DITCH \ \ + -Tr - + -TT - \ \ \ \ \ 6 47 FORT BRAGG MILITARY RESERVATION O \ \ , Q J F SEE SHEET 34 FOR -Y5- PROFILE SEE SHEET 2-G FOR DITCH DETAILS nANS MEPMM K: MIOJER REFERENCE NO. SHEET NO. CURVE DATA FOR -r5- / z,2,o ~ R'0 TRI 519E 16 P1 SY0 17+49125 P1 S1Q 22+43284 iwmmiR R /W SHEET NO. 0-7i19DA 28 _ 25'OQ /9J'(RT) 4m wivltuusx J= V~AMF ROADWAY DESIGN NYDRWEKS A= 35'44005~(LT) AL 18.796 7 - 1~(1 T = f In8 ENGINEER ENGINEER \ \ Sm 10m Se = 004 Se = Op PRELIMINA Y PLAN I / \ \ 1 Iw \ / / \ 1 / / DO Nor um comsmuC \ \ \ \ II 1~ ~ \ ` \ \ rJ/ / / / } CONSTAEV. RWREV, / 0° ~ I I \ \ Ipl 1 1 , - ' I ~ I I / \ \ I I ORT BRAGG MLITARY RESERVATION \ I ~\1~ 1' 111 ~ \~\`~\I I I EST.IB TONS CL-B RIP RAP I EST. 27 TONS CL-B RIP RAP EST. 59 SM F1UER FABRC ` EST. 92 SN FILTER FABRIC \ 1 - ; 1 \ \ ` -'r EST. 548 CL-B . ONB RIP RAP U n \ - - - ~ I~j „4 / EST. 59 SM FILTER FABRIC 18OIX1m r5 - LT - f EE(1( +20 -Tr5- - r59A6Y E E - - E - - - E - F I I ' M920 E rn /-,c f _F h - c f a a O P.) F -7 - ` 1 1 so , 43- I c lE -Y p - c, O + § -0. ° F E ESE +50DOOETT5- i E------- E FN E~ 15DOO:m LT / I E Y7 0 C ws2n - f C E__~-E f 5- E E ~ 17DOO)m LT~S EST. IB TONS CL-B R1P RAP 1 1 / , } E- 401A701 TT5- (55.77 ESL 59 SY FILTER FABRIC I I L N a (4921') I I\ 2 m a fSL IB TONS CL-B RIP AAP N EST. 58 SM FILTER FABRIC I \ I \ FORT BRAGG MLITARY RESERVATION 1 I / a - a a I \ p p a!!// a p/I a 1 \ Ik. p 1 /~F~ I 32~ SEE SIEETS 34 6 35 FOR -Y5 PROFLE MAW PREPAND NY: PROJECT REFERENCE N SHEET N ~ 0, 0. CURVE DATA FOR -Y5- it BMWOWM, TRI LL251 9E 17 PI Sto 17 *49J25 P1 Sia 22+43289 \ \ <w wirram . ecmL S&M Jw R /1V SHEET NO. U-2519DA 29 35'44'005'(LT) 0= 25p~q~ !9T (RT) \ • + ROADWAY DESIGN HYDRAULICS L = !55.917 LL ' 218796 ENGINEER ENGINEER T = 80588 R = 500 sm tom Se = 004 Se = 0.03 PRELIMINA Y PLAN DO NOT UM CMSMUC N ~j yf coK9LRly, ~EO~~ RW RN, 1 \ \1~ Y6' PT Bra roz W-102) I PING N+8T.9T2 - YL g+ L 444 1` ~t1\ 1 FORT BRAGG MILITARY r / RESERVATION g 1 r , ~1 1 I „III J r r r Q ~ 1~1 IL1~ Z N N R l 11 1~IIW -Y6- POC 10+52OD0 -TT5- ! 1 SOIL & GaPVE / m --ESE-ESE E---E= (4920 G c 1 I 6-.006- I~t R r I I 201-0 I N r Y5- SIB 4/ 494'E / I ` 1rn N A 3' / / r ^ ~ -Y - T Sto. 4 = p~ F : _ - _ - - - - - - - - - - - 201-D -Y6- POC Sto.10+33.429 G / rE E E---_E ----s~r~97 E O . . - ~E E E I vim ?tl (492F) I BEGIN CONSTRUCTION N -Y6- P0^ 10+15.000 I 11 I ; - IW II~66 , / l ~ `C I JN I Q In s. R -Y6 10 ! I~ PC I a a FORT BRAGG MILITARY RESERVATION I II - - - - - - - - - - - - - - - - say 1 \ ' I I II I \ III I I i SEE SHEET 35 FOR -YS- PROFILE K" MEPMRD m PROJECT REFERENCE N0. SHEET NO.- tpIORMArBU M tM U~519E 10 CoN80L7ZV0 8NOW6aRA TRI R /W SHEET NO. U-2519DA 35 4roa ~ sum V8ZMV AV ROADWAY DESIGN HYDRAUUCS -AML ENGINEER ENGINEER 5m 10,n I PRELIMINA Y PLANS DO NOT vsa FOR aNmcU=GN ONA.REV. I It /w REV. 82 I I w Eli I I 78 7R I I 719 79 I I 74 74 I I 72 I I 70 70 I 68 SEE SHEETS 4 i 5 FOR PLAN I 39+00 +2D +40 +60 +80 40+00 +20 +40 +60 I 41- I I' l 84 84 I! I I I. I' 80 I, I' 78 I I . I, li 74 I . f, 72 I 70 70 I' I 68 I, SEE SHEETS 4,5 d 6 FOR 4- PLAN II +60 +80 41+00 +20 +40 +60 +80 42+00 +20 +40 +60 +60 43+00 +20 +40 +60 +80 44+00 I' CULVERT DATA SUMMARY PLANS ME1AI ffl By: P0.0JECf REFERENCE N0. SHEE1 N0. DESIGN DISCHARGE = I0J9CN5 JT4 CJ & 9U1M90NZM p "6191 19 DESIGN FREOOENCY = 50 YRS~ TRI R /W SHEEr NO. U-2919DA 96 DESIGN HIGH WATER = 51.40 m Amu WAVIME499 Aavn, Mrr M AAIMM AV 17p7 ROADWAY DESIGN HYDRAUUCS 78 100 YR DISCHARGE = Il33CNS ENGINEER ENGINEER 100 YR 104 YRS Sm Q 10,m 170 YR HIGH HIGH WATER = 6154 m m OVERTOPPING FLOOD ELEV - 67.40m YOOO 76 USK FM FREOIIENCY = 5004 YRS PRE LIMIINAA YYSPLANS DISCHARGE N CONST.RE9. 74 0.hy REV. 70 70 64 60 SEE SHEETS 6 6 7 FOR Ir FIAN 44+00 +8+0 45+00 +20 f40 +60 +80 46400 +20 +40 +60 +80 41400 +20 +40 460 +80 48400 78 78 76 74 i 72 70 70 I I 64 56 SEE SHEET 1 FOR 4 FLAN - I I , I ff ff a 46+00 +20 +40 +60 4180 49+00 +20 +40 +60 +80 50+00 +20 +40 460 +80 51+00 +20 +40 PLANT PAE?ARO n, PROJECT REFERENCE N0. SKEET N0. 1c U-7519E 10 QONBULTWO iaVOWBJP~ TRI R/1Y SHEET NO. U-25190A 40 i Al mn wserra4BB XVA BMW OF wrma~Netnpf ROADWAY DESIGN HYDRAULIC S ENGINEER ENGINEER 82 5m q tOm W%ew PRELIMIN Y PLANS 80 DO NOf U8B P~ WNSIROLTON CONST REV RM' REY. -COL1- 74 74 729 72 70 70 --4 ME 64 lip I r rip SEE SHEETS 17 & 5 FOR -COL1- PLAN 35+00 +20 +40 +60 +80 36+00 +20 +40 +60 +80 37+00 +20 +40 40 +80 36+00 - 80 Coll-78 78 74 72 72 70 64 i 60 60 SEE SHEET 5 FOR -COL1- DEAN a 38400 +20 +40 +60 +80 39400 +20 +40 +60 +80 40+00 +20 +40 +60 +80 41+00 FLAN! 1AEPAREO BY, PROJECT REFERENCE NO.. SHEET NO. RI U 1319E 91 Am WZ47 9A&F XP ABMW M R /W SHEET NO. U-2519DA 46 ALUM4AC'l/p! ROADWAY DESIGN HYDRAIAICS 88 ENGINEER ENGINEER Sm Q 1D,m PRELIMINA Y PLANS 86 m mm ma rai rnxmxvcnorr CONSTJIEY. 84 RNI KEY. -COL2- 80 80 78 76 74 72 70 66 SEE SHEET 4 FOR -COLT- PLAN +60 +80 38+00 +20 +40 +60 +80 39+00 +20 +40 +60 +180 40+00 +20 +40 +60 +80 41+00 -COL2- 82 80 78 76 7 74 72 p - - 70 4 -01- -PM V-U 68 68 66 66 64 62 SEE SHEETS 4 & 6 FOR -COLT- PLAN s 41+00 +2p +40 +60 +80 42+00 +20 +40 +60 +80 43+00 +20 +40 +60 +80 44+00 +20 +40 +60 PLAINS PEEPAKED Vi PROJECT REFERENCE NO, SHEET NO. A=U & JONAC U"-2519E 22 COMULIM TRI Rnv SHEET NO. U-1519DA 47 MW IPl'81C UM BZ ems! OW MR AALEM9AVSAW ROADWAY DESIGN HYDRALRICS 78 ENGINEER ENGINEER Sm Q 10,m 76 PRELIMINA Y PLANS DO 140T FOR CONSLREY. 7 !M' REV. -COL2- 72 70 68 M 4-- 66 64 SEE SHEETS 6 d 7 FOR -COLT- PLAN +60 +80 45+00 +20 +40 +60 +80 46+00 +20 +40 +60 +80 47+00 +20 +40 +60 +80 48+00 +20 -COL2- 76 74 go. go 72 70 69 66 64 60 58 56 SEE SHEET 7 FOR -COL2- PLAN ~3 LE+20 +40 +60 +$0 49+00 +20 +40 +60 +80 50+00 +20 +40 +60 +80 50+00 +20 PLANS PUP 0 rv~ PEOJECF REFERENCE ND. SHEET NO. ----_N1 LL-2519E 25 caYSairwv 8NOW8dJP6 TRI LL-2519E R nV SHEET N0. LL3S19DA 56 ®a wa~rea~aa acvn,ema as AAU=g AV tlA7I ROADWAY DESIGN HYDRAIRJCS ENGINEER ENGINEER 86 5m 10m PRELIMINA Y PLANS DO NOT Un IO0. WNSIRUCIfON 84 Cow.RE9. 82 Rm REV. -RP1BD- 78 76 T 72 70 70 68 68 66 SEE SHEETS 12 R 5 FOR -RRIBD- PLAN +80 36+00 +20 +40 +60 +80 37+00 +20 +40 +60 +80 38+00 +20 +40 +60 +80 39+00 +20 -RP1 BD- 86 84 80 78 7 4 72 7 70 66 66 66 SEE SHEET 5 FOR -MBD- PLAN 3 +20 +40 +60 +80 40+00 +20 +40 +60 +80 41+00 +20 +40 4w +80 42+00 +20 +40 +60 +80 i nANS PREPARED m PROJECF REFERENCE NO. 5J 9E SMEEuF NO. 'wBm & & szvc IFa GgN9pygprp 12 TRI R/W SHEET NO. U -25190A 51 Am WzmtuAW 9LRD„ BZUM fM RALWAA SW ROADWAY DESIGN NYDRAINCS ENGINEER ENGINEER 78 Sm Q 10,m Af)t::iw not! PREL[MINA Y PLANS m CONSTRucnos 76 CONST.M. 0.AY KEY. 74 PMBD- & -CDR- 1 72 72 70 ~I 68 66 64 60 58 58 i SEE SHEETS 5 i 6 FOR alP1SD PUN -ME a SEE SHEET 6 FOR -CDR- PUN t40 +60 t80 46+00 t2O +40 t60 +80 43100 t2O +40 +60 t80 44+00+40 +60 +80 45+00 t20 -CDR- 78 78 76 74 72 7 68 68 66 64 64 62 62 60 56 SEE SHEETS 6 & 7 FOR -CDR- PUN 50+00 +80 47+00 +20 +40 +60 +80 48+00 +20 +40 +60 +80 49+00 +20 +40 +60 +80 t2O I now ruruoo n: PROIELT REFERENCE NO. SHEET N0. HOBKVCJ & at scum U-2519E 25 TRI R/W SHEET NO. 2519DA d5 Artno$rvcHecROADWAY DESIGN HYDRAULICS pw ENGINEER ENGINEER P7 S lo®m PRELIMINA Y PLANS 82 m va FM CONSrnocnm -RP2B-lift CGNSLREY. 80 Rnv REV, 78 78 76 76 =El 74 74 72 T2 70 70 68 I 66 66 64 SEE SHEET 4 FOR alP1R PLAN 10+00 +20 +40 +60 +80 11+00 +20 +40 +60 +80 12+00 +20 +40 f60 +80 13+00 +20 +40 ~ -RP2B- 82 82 I 80 80 78 78 I 76 76 74 T4 72 72 70 70 68 66 66 64 62 62 SEE SHEET 4 FOR -RP2LF- PLAN +40 +60 +80 14+00 +20 +40 +60 +80 15+00 +20 I PROJECT REFERENCE NO. SHEET NO. PLANS PREPARRD IM )Towa CONSUL19Vll~ MSG TRI uadT9E 16 4M WSMEAM AM BMM dff R/W SHEET NO. U 1S19DA 46 AILW$NC JIRDI ROADWAY DESIGN HYDRAUUCS ENGINEER ENGINEER im Q 1Om it PRELIMINA Y PLANS 82 M NOT Tye FOR COWMM ON CONSTJIEY. R/1V REV. 7 76 76 t2ml I 74 I 72 70 70 PIPE DATA SUMMARY DRAINAGE AREA (HECTARES)= 1.46 DESIGN FREQUENCY = 50YR5 68 DESIGN DISCHARGE = ow CMS DESIGN MP ELEVATION = 7189 m 100 YR DISCHARGE - 030 CMS lp0 YR MW ELEVATION - 71.91 m 66 66 OVERTOPPING FREQUENCY - 500+YRS OVERTOPPING DISCHARGE = I.4B CMS RT PI ELEVATION - 7623 m E-- 64 64 I SEE SHEET 4 FOR 4.P46- PLAN 10+00 +20 +40 +60 +80 11+00 +20 +40 +60 +80 12+00 +20 +40 +60 +W 13+00 +20 +40 -SPUR)B- -LP2B- 82 82 80 80 80 78 80 76 78 78 76 Z-- 40 22-r 7 i 74 74 72 72 72 70 70 68 70 I 68 68 M 64 66 66 64 64 64 62 60 60 62 SEE SHEET 4 FOR 4P13- PLAN SEE SHEET 4 FOR .SPUR2S- PLAN +40 +60 +80 14+00 +20 +40 10+00 +20 +40 +60 +80 11+00 RAJT PurAUD By- PROJECT REFERENCE NO. SHEET NO. FLOWO & BMWOSM U$619E :T N )iN(Jmi Rw TRI RnN SHEET NO. U-2519DA 67 4W WAVIM Bd BdVA ROM OW AtMagAV.Mmer ROADWAY DESIGN HDRAUUCS PIPE DATA SUMMARY ENGINEER ENGINEER 80 DRAINAGE AREA (HECTARES)= 336 DESIGN FREOUENCY - 50 YRS Sm p 10,m DESIGN DISCHARGE 074 CMS 78 DESIGN HIN ELEVATION - 69.12 m PRELIMINA Y PLANS K10 YR DISCHARGE = OB2 US m NOT Um aoq co srnVCHM 100 YR HW ELEVATION - 69.11 m OVERTOPPING FREMENCY = 200+ YRS CONSTALY. 76 OVERTOPPING DISCHARGE - 1.61 CNS ZZA AIRY P) =IOB m R~ 16 E AT ION 74 74 72 - 72 70 70 68 66 66 64 62 62 60 60 SEE SHEETS S t 6 FOR -MD- PLAN 10+00 +20 +40 +60 +80 11+00 +20 +40 +60 +80 12+'00 +20 +40 +60 -RP1Q- 80 78 78 76 T6 74 74 72 72 70 TO FEE- 68 66 66 64 64 62 62 60 60 SEE SHEET 6 FOR 4tF7D- PLAN +60 +80 13+00 +20 +40 +60 +80 14+00 +20 +40 +60 PIPE DATA $(IYNAi?Y PLANT nePAUD n. PROJECT REFERENCE ND. SiEEf N0. DRAINAGE AREA (HfCTARE5)= l97 ROR>41'C& & MM 117519E ZS DESIGN FRfOUENLY = 50 YRS aavsazrwa TRI R /W SHEET NO. U-2519DA d! DESIGN DISCHARGE - 0.53 CMS ZLM amps wr~ntmu~ ROADWAY DESIGN HTDRAUl1C5 DESIGN Hw ELEVATION = 6938 m ENGINEER ENGINEER 84 !00 YR DISCHARGE - 057 CMS I(p YR HN ELEVATION = 69.87 m Sm Q 1 i0m DVERrOPPING FREDUENCY - 200+YRS OVERTOPPING DISCHARGE = OBI CMS PRELIMINA Y PLANS W NOT Um FM CGN MUCTMN RT PIN FIFVATIQN = 7 m 'MM: CONSTOIEV. 0./W KEY. 80 AP2D- 78 76 r =77: 74 72 -ZL- 70 68 66 64 64 SEE SHEET S FOR 4P7D- PLAN ro+00 +20 +40 +60 +80 #+00 +20 +40 +60 +80 12+00 +20 +40 +60 +80 13+00 +20 +40 4P2D -SPUR2D- 82 80 i 78 80 78 76 78 76 76 74 7.2 74 74 72 7 7 72 EEEtHll 68 68 70 ~iE 5-0-s D 68 66 68 66 64 64 66 66 r; 4 62 60 62 6 60 SEE SHEET 5 FOR 4.P7D- PLAN SEE SHEET 5 FO0. ~PUR7D- PLAN +20 +40 /0+00 +20 +40 +60 +80 NAN! PurAUO rt, PROJECT REFERENCE N0. SHEET N0. FLO & 9UT=OV NC U-25191 29 cawzzrzvv .M wAffmwx mm TRI R/W SHEET NO. U-IS19DA 78 BMN ow xuua$vetnnr RO ~GINE~H E ENNGIINEERR 82 am--= Sm Q 1D+m II PRELIMINA Y PLANS 80 I DO NOP w FM WNBIRUCPON CONSLREI. R/W REV, 78 Y2- 76 i I 72 70 70 68 66 66 66 64 SEE SHEER 8 8 9 FOR -YI- IMAN +60 +80 8+00 +20 +40 +60 +80 9+00 +20 +40 +60 +80 10+00 +20 +40 +60 +80 u+00 +20 78 78 76 74 74 72 70 66 68 66 64 6.0 60 60 g SEE SHEETS 9 & FOR Y1- PLAN +20 +40 +60 +80 12+00 +20 +40 +60 +80 13+00 +20 +40 +60 +80 14+00 +20 +40 +60 +80 P LAM PREPARED Rn PROJECT REFERENCE NO. SHEET NO. XOJ?&M d JyJNC U-2519E 30 aaAaucr~vo TRI R AW SHEET NO. U-2S19DA 79 AM WAVILWASS X amts 'm AdamgAV"wr ROADWAY DESIGN HYDRAUUCS ENGINEER ENGINEER 86 Sm p 10,m PRELIMINA Y PLANS M NOT USE FM W SIRUMOK CONSTJJY. R92 RAY MY. -Y2- 80 80 I 76 76 76 74 74 T --70 ]AMR till= 66 66 SEE $I f2 PLAN +80 15+00 +20 +40 +60 +80 16+00 +20 +40 +60 +80 11+00 +20 +40 460 +80 18400 +20 +40 -Y2- 80 li 78 76 76 74 74 T2 72 0 - - - 66 66 64 64 6.2 SEE SHEETS 5 8 10 FOR Y2- PLAN +40 +60 +80 19+00 +20 +40 +60 +80 20+00 +20 +40 460 +80 21+00 +20 +40 +60 +80 22+00 i i PLANS PREPARED m PROJECT REFERENCE N0. SHEET NO. 1FZOJ36NC9 N W519E 31 NZ Off TRI R/W SHEET No. U 1S19DA EO 4W XZ97V2rA&WVABZ= auUM AVJMF ROADWAY DESIGN HYDRAUUCS ENGINEER ENGINEER 82 sm q 1o~e PRELIMINA Y PLANS ''S~IIRR M NOT V96 MR wNrMUCTMN 80 78 RAY REY. a -Y2- 76 76 14 14 72 72 TO TO 68 66 66 66 64 62 62 SEE SHEET510 6 11 FOR -Y2- PLAN z_- - 22400 +20 +40 +60 +80 23+00 +20 +40 +60 +80 24+00 +20 +40 460 +80 25+00 +20 +40 460 i i ~ i i I I 460 +80 26+00 +20 +40 +60 +80 27+00 +20 PLANS PREPAUD Hi PROJECT REPEIIENCE NO. SHEET NO. l1IOR&N!~ U-1519E 37 cavBMTZW MU TRI R1W SHEET NO. U-1S19DA 81 AAUMAAV JMF ROADWAY DESIGN HYDRAUUCS ENGINEER ENGINEER 5j Q 1 i0m PRELIMINA Y PLANS OD N T USE Rat CONS UMON 82 PIPE DATA SUMMARY CONBTREY DRAINAGE AREA (HECTARES)- 79 ho DESIGN FREQUENCY = 25 YRS lAY Gy DESIGN DISCHARGE = OJ4 CMS DESIGN HW ELEVATION TI.41 m Y3- 100 YR DISCHARGE = 076 CMS !00 YR HW ELEVATION - 71.46M T 78 B OVERTOPPING FREQUENCY = 500+YRS OVERTOPPING DISCHARGE - 33 CMS OVERTOPPING ELEVATION = 72DO to 76 76 74 72 70 PIPE DATA SUMMARY DRAINAGE AREA (HECTARES) - 2.4 M DESIGN FREQUENCY = 25 YRS DESIGN DISCHARGE = OJI CMS DESIGN HIM ELEVATION = 70-5- Y R DISCHARGE = 035 CMS /00 YA HW ELEVATION - 7099 m 64 VERTOPPING FREQUENCY = 500- YRS O 64 OVERTOPPING DISCHARGE - -52 CMS RT PI AT = 71 m SEE SHEETS 70 4 6 FOR Y3- PLAN 10400 +20 440 460 +8o n+00 +20 440 +60 480 12+00 +20 +40 460 480 82 -Y4- 82 80 80 18 78 I 76 76 74 74 7.9 72 70 70 - 66 66 66 PIPE DATA SUMMARY DRAINAGE AREA (HECTARES)- 282 Ip DESIGN FREQUENCY = 25 YRS 64 64 DESIGN DISCHARGE = 0A64CMS = 6899 m DESIGN hW ELEVATION 400 YR OSCHARGE = 0075 CMS IOpYRHW ELEVATION - 69.01m 62 62 OVERrOPPMYO FREWfNCY =500++YR5 OVERTOPPING DISCHARGE - .44 CMS OVERTOPPING E.EVATION = 7 m 60 60 W SEE SHEET 5 FOR -Y4 PLAN 10+00 +20 +40 +60 +80 11400 +20 440 +60 +80 12+00 +20 +40 460 +80 13+00 MANS PREPARED RYt FROIECT REFERENCE N0. SHEET NO. FLOWU & B02g irAwa U -2519E 33 CRIYPOL49V0 mYaweu6 TRI R 1W SHEET NO. U-25190A, 42 jaw BLM BE= W BAdsi AAA lMCI ROADWAY DESIGN HYDRAIIIICS ENGINEER ENGINEER Sm Q t0,m I PRELIMINA Y PLANS DO NVf UBB PUR CIXTSMUCTON 86 COW.REY. It /w MY. ' -Y5- 82 80 78 78 84 Mg EdA 70 76 74 74 70 SEE SHEETS 13 6 14 FOR -YS- FLAN 10+00 +20 +40 +60 +80 11+00 +20 +40 +60 +80 12+00 +20 +40 +60 +80 13+00 -Y5- 86 86 84 84 80 80 78 7 76 76 74 74 7 72 T 70 6-8 SEE SHEET 14 FOR -Y5- MAN 66 a 13+00 +20 +40 +60 +80 14+00 +20 +40 +60 +80 15+00 +20 +40 +60 +80 I, PLANS FAEIAAlD Rr: PROJECT REFERENCE NO. SHEET NO. ~1NG RI U-1n9E u m XMIMSM ALVAREM 4ff R /W SHEET NO. U-2514DA 59 AALMVAJM MW ROADWAY DEA GN YDRRAUUS 84 Sm p tO,m PRELIMINA Y PLANS 82 ~~p,pl 30 NO]' 113[ FW{ CONSfROC310N CON3T,RR?G RM EEV, Y5- 78 74 i 72 46 70 PM 70 68 PIPE DATA SUMMARY DRAINAGE AREA(HECTARES)= 425 66 DESIGN FRECEIENCY 25YRS DESIGN DISCHARGE - 0.41 CMS DE56 N FAt ELEVATION 7431 m 64 0.47 CMS 100 YR DISCHARGE - YR FAV ELEVATN)AI = 7437m dO0 VERTOPPING FREIXIENCY - lOp+YRS OVERTOPPING DISCHARGE = 55D CMS SEE SHEETS 14 & 15 FOR -YS- RAN MME~ RT PI 1pA/TI - ME mm ry~ ~ 80 16+00 +20 +40 +60 +80 ~ +20 +40 +60 +80 18+00 +20 +40 +60 Y5- 82 80 78 76 76 74 SKE T2 Fit 70 70 68 i 66 62 Sr~:SEE SHEETS 15 S 16 FOR -YS- RAN 3 +60 +80 19+00 +20 +40 +60 +80 20+00 +20 +40 +60 +80 21+00 +80 +40 PLANS PREPARD By, PROJECT REFERENCE NO. SHEET NO. =BM N 117519E 35 aaYaoiraw aNOm9rax6 TRI R /W SHEET NO, U-25190A 94 AM A881C9A9S' VD, BURS' NB RIS~88, AOBLBPS7P ROADWAY DESIGN HYDRAULICS ENGWEER ENGINEER 5m Q tOm PRELIMINA Y PLANS M NVP Un FVR C NSTItuC m CONSTJIEY. R/W REY. 78 Y5- 76 ZfL 7 74 I 70 70 66 66 66 I SEE SHEETS 16 S: 17 FOR -Y5- PLAN +40 +60 +80 22+00 +20 +40 +60 +80 23f00 +20 +40 +60 +80 24100 +20 +40 +60 i I i I PUNS PWA ED rr: PROJECT EEFEEENCE ND. SHEET NO. ~m TRI uas14E 96 AM iPae MUM BLVA tmss nr R /W SHEET NO. U-23190A 92 A&LUG$dt mer ROADWAY DESIGN HYDRAUUCS ENGINEER ENGINEER 84 Sm Q 10,m lil PRELIMINA Y PLANS DD NOT V96 P0A CO[iS1ROC110N CONSTAEY. RM IEK 80 -TT6- 78 M. 76 74 72 79 70 70 68 66 66 I 64 64 SEE SHEET A FOR -TT6• PLAN +60 +80 IT+00 +20 +40 +60 +80 18+00 +20 +40 +60 +80 19+00 +20 +40 +60 t80 TT6- 78 76 74 7-9 72 ,VIM 70 70 68 66 66 62 ~ I 60 60 56 56 - SEE SHEET 4 FOR -TT6- PLAN +80 20+00 +20 +40 +60 +80 21+00 +20 +40 +60 +80 22+00 +20 Purrs PREPARED M. PROJECT REFERENCE NO. SHEET NO. HIORMU & EUIMBOffAV LL-2519E 37 Y2 ~MFAW TRI Rnv SHEET NO. U-35190A 93 aALdlax AV HAA ROADWAY DESIGN HYDRA UCS 80 ENGINEER ENGINEER Sm Q 70m 78 PRELIMINA Y PLANS OD NO 1I~ POR CON9muM1 CONSLEN. RM EEK 76 m- 74 74 7 72 70 68 66 oil 64 62 60 I SEE SHEETS 6 JL 7 FOR -TT7- PLAN 10+00 +20 +40 +60 +80 11+00 +20 +40 +60 +80 12+00 +20 +40 +60 +80 77- i 80 80 78 78 76 74 =9 72 70 70 68 i 68 66 66 64 64 62 60 SEE SHEET 7 FOR -TT7- PLAN +60 13+00 +20 +40 +60 +80 14+00 +20 +40 +60 +80 15+00 +20 +40 +60 +80 16+00