Loading...
HomeMy WebLinkAbout20080895 Ver 1_Approval Letter_20080806O?O? W A T ?RQG CD, jii? _%? Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality August 6, 2008 DWQ EXP No. 08-0895 Wake County R. Calvin Holland and Betty M. Holland 5650 Six Forks Road, Suite 201 Raleigh, NC 27609 Subject Property: O'Reilly Auto Parts / Hwy 64 & Raleigh Beach Road Widening UT to Crabtree Creek [030402, 27-33-(10), C, NSW] Approval of 401 Water Quality Certification and Authorization Certification per the Neuse River Buffer Protection Rules (15A NCAC 2B.0233) with Additional Conditions Dear Mr. & Mrs. Holland: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 0 acres of wetlands, 46 linear feet of perennial stream and 5,136 ft2 of Zone 1 and 2,269 ft2 of Zone 2 of the protected riparian buffers for the purpose of constructing the proposed auto parts store, as described within your Pre-construction Notification Application dated July 22, 2008 with additional information received by DWQ on July 23, 2008, July 29, 2008, August 4, 2008 and August 5, 2008. The impacts are covered by: General Water Quality Certification Number 3705 (GC375). General Certification 3705 allows you to use Nationwide Permit NW39 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, and Non-discharge regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 Permit. This approval is for the purpose and design that you described in your PCN application (July 22, 2008) and additional information received by DWQ from July 23, 2008 to August 5, 2008. If you change your project, you must notify us and you may be required to send us a new application. If the property (or a portion of the property) is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h). This approval requires you to follow the conditions listed in the attached Water Quality Certification (GC3705) and .any additional conditions listed below. 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http://h2o.enr.state.ne.us/ncwetlands No One hCarohna Naturally An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper O'Reilly Auto Parts DWQ EXP# 08-0895 Page 2 of 4 August 6, 2008 The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (and Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Impact Type Amount Approved nits Plan Location or Reference Wetland 0 (acres) Jul 22, 2008 PCN page 4 Stream (perennial) 46 linear feet) Jul 22, 2008 PCN page 4 Riparian buffer Zone 1 5,136 (square feet Jul 22, 2008 PCN. a e 8 Riparian buffer Zone 2 2,269 (square feet Jul 22, 2008 PCN page 8 2. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification and authorized by this approval letter. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. Erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. Design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 4. Construction Stormwater Permit NCGO 10000 Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an NPDES General stormwater permit (NCGO10000) administered by DWQ is automatically issued to the project. This General Permit allows stormwater to be discharged during land disturbing construction activities as stipulated by conditions in the permit. If your project is covered by this permit [applicable to construction projects that disturb one (1) or more acres], full compliance with permit conditions including the sedimentation control plan, self-monitoring, record keeping and reporting requirements are required. A copy of this permit and monitoring report forms may be found at http: //h2o. enr. state. nc. us/su/Forms Documents. htm. No Sediment and Erosion Control Measures in Wetlands and Waters Sediment and erosion control measures shall not be placed in wetlands or waters without prior approval from the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or stream beds or banks, adjacent to or upstream and down stream of the above structures. All sediment and erosion control O'Reilly Auto Parts DWQ EXP# 08-0895 Page 3 of 4 August 6, 2008 devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Land Resources or locally delegated program has released the project. 6. Diffuse Flow (DWQ Reviewed Plans) In an effort to comply with the intent of the diffuse flow provision of the Buffer Rule (15A NCAC 02B .0233(5)), you have provided the DWQ with sand filter designs dated July 29, 2008 with updates on August 5, 2008, and received by DWQ on August 4, 2008 and August 5, 2008. The Operation & Maintenance (O&M) agreement(s) for the proposed level spreaders signed by Mr. R. Calvin Holland on July 28, 2008 must transfer with the sale of the land or transfer of responsibility for the stormwater facilities. DWQ must be notified promptly of every transfer. 7. Stormwater Management Plan One (1) copy of the City of Raleigh approved Stormwater Management Plan (stamped as Approved by the City of Raleigh or along with an approval letter) for this project must be submitted to this office before any impacts authorized by this certification may occur. The structural stormwater practices as approved by the City of Raleigh, as well as drainage patterns, must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the Division of Water Quality. Stormwater easements shall be recorded for a distance of at least 10 feet on each side of all stormwater conveyances, and on all lots containing these structures including future access for maintenance. The stormwater easements shall allow for the ability to inspect and maintain the structures, perform corrective actions as described above and shall provide protection of the structures from potential alternations by future property owners. Please note that DWQ retains the authority to supercede local stormwater approvals on a case-by-case basis when it deems necessary with the approval of the Director of the Division of Water Quality. 8. Culvert Installation All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual (http://www.ncdot.org/doh/operations/BMP manual/download/BMP Manual.pd f) such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. 9. If concrete is used during the construction, then a dry work area should be maintained to prevent direct contact prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete should not be discharged to surface waters due to the potential for elevated pH and possible aquatic life/fish kills. 10. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 11. Notification of Construction The applicant and/or authorized agent shall contact the DWQ Express Review Program in writing at the letterhead address within ten (10) days of the commencement of construction. The applicant/permittee and their authorized agents shall conduct all activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the O'Reilly Auto Parts DWQ EXP# 08-0895 Page 4 of 4 August 6, 2008 Clean Water Act), and any other appropriate requirements of State and Federal Law. If the Division determines that such standards or laws are not being met, including failure to sustain a designated or achieved use, or that State or Federal law is being violated, or that further conditions are necessary to assure compliance, then the Division may reevaluate and modify this General Water Quality Certification. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAM Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) shall be referred in writing to the Director for a decision. , The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act and the Neuse riparian buffer protection rule as described within 15A NCAC 2B .0233. If you have any questions, please telephone Lia Myott Gilleski or Joseph Gyamfi at 919-733-1786. Si Coleen .Sullins CHS/cbkllmg Enclosures: Certificate of Completion GC 3705 cc: USACE Raleigh Regulatory Field Office Lauren Witherspoon, DWQ Raleigh Regional Office File Copy Central Files Bob Zarzecki, S&EC, P.A., 11010 Raven Ridge Road, Raleigh, NC 27614 File: 080895OReillyAutoParts(W ake)EXP+401+NBR