HomeMy WebLinkAbout20080925 Ver 1_More Info Letter_20080728WA O T F9QG C r o ? Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality July 28, 2008 DWQ# 08-0925 Ashe County CERTIFIED MAIL: 7007 3020 0000 6279 7549 RETURN RECEIPT REQUESTED Mr. Jorge Martinez Creekside Pointe at Helton, LLC 119 Fairwich Court Tavernier, FL 33070 Re: Section 401 Water Quality Certification application Dear Mr. Martinez, On June 24, 2008, the North Carolina Division of Water Quality (DWQ) received your "after the fact" application for a 401 General Water Quality Certification to impact 147 linear feet of stream to construct the Creekside Pointe Subdivision near Helton, NC in Ashe County. Additional information is required in order that we may determine your project's compliance with 15A NCAC 2H.0500. The DWQ will require this information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, we will place this project on hold as incomplete until we receive this additional information, and if we do not receive the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506. Please provide the following information so that we may continue to review your project. 1. Additional information on the stream restoration plan is needed. This information should include the construction drawings for natural channel design (i.e. detail for all necessary in- channel structures) for stream impacts that are to be restored. 2. Per the requirements of GC 3705, all work must be done "in the dry". Therefore, dewatering methods will be necessary to temporarily dewater the stream channel during pipe installation. Please provide a construction sequence that details the method of dewatering to be utilized at the site and the sequence of construction events to be followed to ensure compliance with this condition. If dewatering is not feasible, please provide justification. 3. Following a site visit by Amy Euliss, Division of Water Quality staff, its unclear as to whether or not pipes will be perched after excess pipe is removed. Please indicate whether or not pipe burial is achievable. If not please indicate if bedrock is present at the pipe outlets, or if NAhCarolina lvatmwlly North Carolina Division of Water Quality 585 Waughtown Street Phone (336) 771-5000 Customer Service Winston-Salem Regional Office Winston-Salem, NC 27107 Fax (336) 771-4630 1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Mr. Jorge Martinez Creekside Pointe at Helton, LLC July 28, 2008 Page 2 preformed scour holes or rip rap aprons will need to be constructed to ensure channel stability. 4. Please note that the permit issued by the Division will require deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place at the time of recording of the property, or of individual lots, whichever is appropriate. A sample deed notification can be downloaded from the 401/Wetlands Unit web site at http://h2o.enr.state.nc.us/ncwetlands. The text of the sample deed notification may be modified as appropriate to suit to this project. Please respond in writing within 30 calendar days of the date of this letter by sending a copy of this information to Amy Euliss at the address on this letterhead, and a copy to Ian McMillan N. C. Division of Water. Quality, Wetlands/401 Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650. If you will not be able to provide the requested information within that timeframe, please provide written confirmation that you intend to provide the requested information, and include a specific timetable delineating when the requested materials will be provided. If we do not hear from you in 30 calendar days, we will assume that you no longer want to pursue this project and we will consider the project as returned. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. If you have any questions, please contact Amy Euliss, Winston-Salem Regional Office, at 336-771-4959 or amy.euliss@ncmail.net. Sincerely, Steve W. Tedder Regional Supervisor DWQ Winston-Salem Regional Office cc: Amanda Jones, USACE - Asheville Regulatory Office Derek Goddard, BREC Inc. 162 Helen Court Boone, NC 28607 DWQ Wetlands/401 Unit 1'i le Dopy