Loading...
HomeMy WebLinkAbout20170336 Ver 1_CAMA Application_20170322Coastal Management ENVIRONMENTAL QUALITY 2 0 1 7 0 3 3 6 ROY COOPER r,own wl MICHAEL S. REGAN SrcIclarl BRAXTON DAVIS niracim March 17, 2017 i J V t o C":M.-..�. EXPRESS MEMORANDUM: TO: Karen Higgins DEQ WATER RE:fS )1J 401 & Buffer Permitting Unit ti ; UFF R Pte:_ DWR/Water Quality Permitting FROM: Debbie Wilson, Southern Region Express Major Permit Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 debra.wilson(aD_ncdenr.gov Fax: 350-2018 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant: Gene Verble Project Location: 346 Marker Fifty -Five, adjacent to the AIWW, in Holden Beach, Brunswick Co. Proposed Project: to construct an access pier, covered platform, boatlift, and floating dock Please indicate below your agency's position or viewpoint on the proposed project and return this form to Debbie Wilson at the address above by April 9 2017. If you have any questions regarding the proposed project, contact Debbie Wilson at (910) 796-7266 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. *additional comments may be attached. SIGNED This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. DATE State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 919 796 7215 DIVISION OF COASTAL FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Gene Verble 2. LOCATION OF PROJECT SITE: 346 Marker Fifty -Five, adjacent to the AIWW, in Holden Beach, in Brunswick County. Photo Index- 2006: 4-6217; O -Q, 12 Latitude: 33'54'51.27"N Longitude: 78'17'20.85"W 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 3/15/17 Was Applicant Present — No 5. PROCESSING PROCEDURE: Application Received — 3/13/17 Office — Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan — Holden Beach Land Classification from LUP — Developed (Upland), Conservation (Open Water) (B) AEC(s) Involved: EW, PT, CW (C) Water Dependent: Yes (D) Intended Use: Residential (E) Wastewater Treatment: Existing — Municipal Sewer Planned — N/A (F) Type of Structures: Existing — Single Family Residence Planned —Access pier, covered platform, boatlift and floating dock (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: 1 t 1 DI 1J I 111 .1 DI ',4. (A) Vegetated Wetlands (coastal wetlands) 569 sq. ft. (shaded) (B) Non -Vegetated Wetlands (open water) 2,490 sq. ft. (incorporated) (C) Other —High ground 11 (D) Total Area Disturbed: 3,059 sq. ft. (0.07 acres) (E) Primary Nursery Area: No (F) Water Classification: SA Open: No 8. PROJECT SUMMARY: The applicant proposes to construct an access pier, covered platform, boatlift and floating dock. Gene Verble Page 2 9. PROJECT DESCRIPTION: The applicant has requested the subject CAMA Major Permit application be processed under the Express Review Permitting Program. The project site is located at 346 Marker Fifty -Five, adjacent to the AIWW, in Holden Beach, in Brunswick County. To locate the property, travel cross Holden Beach bridge and turn right on Ocean Blvd West. Travel west on Ocean Blvd West approximately 1. 15 miles to High Point St. Turn right on High Point St. and make the next right on West Brunswick Ave. Turn left on Marker 55 Dr. and the site will be located on the left. The subject property encompasses approximately 1. 11 acres in size and averages approximately 7' above normal high water (NHW). The applicant maintains a single-family residence and has approximately 70' of shoreline which is stabilized with natural vegetation. Upland vegetation consists of maintained lawn grass and ornamental landscaping. The property has a steep drop-off along the shoreline down to the NHW line. Vegetation along the embankment consist primarily of Salt Meadow Grass (Spartina patens) down to NHW. There is a wide span of Smooth Cordgrass (Spartina alterniora) which extends from NHW waterward for approximately 415'. The Holden Beach Land Use Plan classifies adjacent waters as Conservation, and the adjacent high ground portion of the project area as Developed. The waters of the AIWW are classified as SA by the NC Division of Water Resources. These waters are not designated as Primary Nursery Area (PNA), by the NC Division of Marine Fisheries and they are CLOSED to the harvest of shellfish. PROPOSED PROJECT: The applicant proposes to construct an access pier, covered platform, boatlift and floating dock. As proposed, a new fixed pier would extend approximately 560' in a northerly direction from the top of the bank into the AIWW. The pier would then lead into an "L -head" covered platform, measuring approximately 17' in width by 13' in length, situated on the east side of the pier. An access ramp would extend from the terminus of the pier waterward to a floating dock measuring approximately 16' in width by 12' in length, which would extend into the AIWW in a northerly direction. A boatlift measuring approximately 12' in width by 13' in length would be installed at the terminus of the pier on the westward side. The application states the proposed structures would be constructed to provide docking space for up to three vessels in water depths ranging from approximately -2.5' to -3' @ normal low water (NLW). 10. ANTICIPATED IMPACTS: The proposed pier system construction would incorporate approximately 569 sq. ft. of Estuarine Waters and Pubic Trust Area and would shade approximately 2,490 sf. of Coastal Wetlands, vegetated primarily with Smooth Cordgrass (Spartina alterniora). The proposed pier, covered platform, floating dock and boatlift would not encroach into the adjacent 15' Riparian Corridor Setback Areas. The proposed pier and docking facility provide docking space for up to three vessels in water depths ranging from approximately -2.5' to -3' @ normal low water (NLW) and would extend approximately 150' into the waterbody, which measures approximately 530' across at this location. As proposed, the docking facility would exceed the 1/4 width rule however, it would not exceed the 1/3 rule nor the established pier head line and would meet the 80' federal channel setback from the AIWW. Minor increases in turbidity should be expected during construction. Submitted by: Debra Wilson Date: 3/16/17 Office: Wilmington Richardson Construction General Contractor NC License #51895 Will Richardson 910-842-5596 (Office) 3235 Seacrest Ave. SW 910-367-0335(Cell) Supply, NC 28462 910-842-5597(Fax) To: NCDEQ From: Will Richardson Re: Major Development Permit Attn: Debbie Wilson Date: March 6, 2017 Job Address: 346 Marker Fifty Five Holden Beach NC 28462 Owner: Gene and Nancy Verble Our company has been asked to install a docking facility for Mr. & Mrs. Gene Verble and family located at 346 Marker Fifty Five, Holden Beach NC along the AIWW. This docking facility is typical of the other docking facilities in the area. It will consist of Q@ docking slips, One boat lift and one floating dock. There will be a covered stationary dock for seating/fishing. Gary Gurganus Surveying has completed a survey with drawings indicating riparian corridor and pier head alignment. Gurganus surveying will also locate the placement of the west side of the project before construction starts. The total length of the project is—5851f. The project will extend from the existing bulkhead wall to the south to the pier head alignment of the adjacent property owners to the east and west. We are asking to move out to the alignment of other piers to the east. The adjacent pier to the east is shorter for some reason than the surrounding piers.The parcel has 701f of shore line. The total shaded area for the project is —413 square feet. The structures at the AIWW end of the project will be a 12ftx16ft covered dock with a 3ftxl6ft aluminum gangway connecting a 12ftxl6ft floating dock. Attached to the west side of the pier will be a 10,000# boat lift. Thank you for reviewing this application and please contact us with any questions or concerns. Regards, Will Richardson RECEIVED DCM WILMINGTON, NC IVerble project location V I; P, . 200 ft ea E-1 WFUUTIONfor Major Development Ponalt (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Palmary Applicant/ Landowner Information Business Name Project Name (if applicable) Applicant 1: First Name Gene MI K Last Name Verble Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address 485 Union Street South PO Box City Concord State NC ZIP 28025 Country 1 United States Phone No. 704- - 490 - 5042 ext. FAX No. N/A - - Street Address (if different from above) City State ZIP Email 2. AgentlContractor Information Business Name Richardson Construction Agent/ Contractor 1: First Name Will MI C Last Name Richardson Agent/ Contractor 2: First Name MI Last Name Mailing Address 3235 'Seac A- CIA/ PO Box City unniv State NC ZIP Phone No. 1 Phone No. 2 ext. - ext. Office Cell 910 842 5596 FAX No. 910-842-5597 Contractor # Street Address (if different from above) City State ZIP Email <Form continues on back> RECEIVED DCM WILMINGTON, NC Form DCM MP -1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Brunswick 346 Marker Fifty Five d. Approximate elevation of tract above NHW (normal high water) or Subdivision Name City State Zip Marker Fifty Five Holden Beach NC 28462 Phone No. Lot No. (s) (if many, attach additional page with list) 910-367-0335 ext. 346, 1 1 1 a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Lumber AIWW c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. 9 Natural E]Manmade []Unknown Atlantic Ocean e. proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed 0Yes E]No work falls within. Holden Beach 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 70 48,351,6sf c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or 70X387 NW L (normal water level) (If many lot sizes, please attach additional page with a list) 7ft qNHW or F1NWL e. Vegetation on tract Seeded Lawn, Landscape vegetation and coastal wetlands f. Man-made features and uses now on tract Residential Dwelling g. Identify and describe the existing land uses adacent to the proposed project site. Residential Dwellings and docking facilities h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? (Attach zoning compliance certificate, if applicable) HBR-1 PYes ONo [INA J. Is the proposed activity part of an urban waterfront redevelopment proposal? 0Yes �No k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. E]Yes ®No [INA If yes, by whom? 1. Is the proposed project located in a National Registered Historic District or does it involve a E]Yes [3JNo EINA National Register listed or eligible property? <Foffn continues on next page> RECEIVED DCM WILMINGTON, NC -u,.e vvlji>n c cons ta 1, ma n a, q emf.-nt.nw rt ; Form DCM MP -1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? [Yes ❑No (ii) Are there coastal wetlands on the site? ❑p'es ❑No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? []Yes [3No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Municiple Sewer o. Describe existing drinking water supply source. City Water Supply p. Describe existing storm water management or treatment systems. None. sheetflow b. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑PubliclGovernment Private residence. Family docking facility (RPrivate/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. For access to the AIWW and launch family boat c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Pier construction will start at the existing bulkhead wall. Contractor will build pier using a rotating boom attached to pier. Rotating boom allow construction of the pier without placing equipment into the wetlands. All other work will be performed from barge located on the AIWW. d. List all development activities you propose. Pier, stationary dock, floating dock and boat lift e. Are the proposed activities maintenance of an existing project, new work, or both? New Work f. What is the approximate total disturbed land area resulting from the proposed project? ❑Sq.Ft or []Acres None g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes [RNo [INA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. None i. Will wastewater or stormwater be discharged into a wetland? ❑Yes No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ❑NA J. Is there any mitigation proposed? ❑Yes [3No ❑NA If yes, attach a mitigation proposal. <Fonn continues on back> RECEIVED t')( M WILMINGTO1*0 "Ic 252-808-2808 .. 1-888-41F?C AST v� rs+nr.rae�a�sta9��a�agc��era#.r��# Form DCM MP -1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additionallnformadon In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitter) in order for the application package to be complete. Items (a) - (0 are always applicable to any major development application. Please consult the application instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Dean Hall Phone No. Address 348 Marker Fifty Five Holden Beach NC 28462 910-842.4181 Name Timoth Gibble Phone No. Address 344 Marker Fifty Five Holden Beach NC 28462 910-417-3332 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. Minor permit for house construction: Permit number: 12014 h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this applicattioni is truthful to the best of my knowledge. Date,—? -2-17 Print Name Kl i LL ZA`tJ 2 (' �► -�� Signatrlre [ L )tom Please indicate application attachments pertaining to your proposed project. ❑DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts ❑DCM MP -3 Upland Development [ADCM MP -4 Structures Information Form DDM MP --A STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Forth DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1.- DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: b. []Commercial ❑Public/Goverpment .[XPrivate/Community c. (i) Dock(s) and/or piers) (ii) Number 1 (iii) Length 560ft pier: 585ft Total project (iv) Width Eft (v) Floating MYes ❑No e. (i) Are Platforms included? (Yes []No If yes: Fixed Floating (ii) Number 1 1 (iii) Length 13 12ft (iv) Width 17 16ft (v) Floating ❑Yes IRNo Note: Roofed areas are calculated from drip/ine dimensions g. (i) Number of slips proposed 3 (ii) Number -of slips existing 0 i. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water, dredging for basin and/or channel I2jOpen water, no dredging required ❑Other, please describe: k• Typical boat length: 23 m. (i) Will the facility have tie pilings? ❑Yes Po (ii) ff yes number of tie pilings? ❑This section not applicable (i) Will the facility be open to the general public? .❑Yes ,IXNo d. (i) Are Finger Piers included? ❑Yes [$No If yes: (ii) Number (iii) Length (iv) Width (v) Floating ❑Yes ❑No f. (i) Are Boatlifts included? IXYes ❑No If yes: (ii) Number (iii) Length 13ft (iv) Width 12ft h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ❑ Dockage ('wet slips") only, number of slips: ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). 23ft bay boat I. (i) Will the facility be open to the general public? ❑Yes [XNo RECEIVED DCM WILMINGTON. NIC y 9 Y L }hr .lik. fs 5 ica3k5 a §w�( ,Y$3t,Fes«n1 w Iry vis * -121,2 /06 a.:St_•f3�iP•�T�rr`� ::: -3-/.i te.3S "cKuS*.,. i.R bL."�Y „x a n y "� � .S �p Form 0CM MP -4 (Structures, Page 2 of 4; 2. DOCKING FACILITY/MARINA OPERATIONS This section not appiicabie a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. I. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes ❑No RECEIVED DCM WILMINGTON. KIC .nage vl mI a' mi eta t ±t f C3 Form ViCrA. MP-4(Structures, Page 3 of 4) n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ❑No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. EICW _OSAV SSB ❑WL ❑None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes []NO If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered Pitts) [A This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑PublidGovernment ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. $ROZN. te.g., wood, :sheetpile, .eta lf.a rock -groin, use MP -2, Excavation and Frll.) LXThis.section not applicable a. (i) Number (ii) Length (iii) Width S. BREAKWATER fe.-g., .wood, sheetpile, etc.) 9This section notappJicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ❑This section not applicable a. Is the structure(s): ❑Commercial [Public/Government ❑Private/Community C. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing 7. GENERAL b. Number d. Description of buoy (color, inscription, size, anchor, etc.) RECEIVED DCM WILMINGTON, NC �,r,�?-�@3$••"��f?�`a �; ^t..£35� •t.�Cg�»€�`i' : x.� r��,�x.s�r a ;a `�d�a�,at . syr�:3�a�s9�.�rz� ��v�se-gats 'd21�':"�`6�a=� Form DCMIM. P-4 (Structures, fags 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines 15 Feet.5ft east and 15.5ft west Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 530 feet Marsh to Marsh e. (i) Will navigational aids be required as a result of the project? ❑Yes 9No [INA (ii) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. —27feet to the west/-32feet to the east d. Water depth at waterward end of structure at NLW or NWL 3feet 8. OTHER ❑This section not applicable a. Give complete description: Project to startat the existing bulkhead wall with a pler approx. 560 feet long, The pier will end with an aluminum gangway gangway going to a 12ftxl6ft floating dock. To the east of the pier end will be a 13ftx17ft( overhang included) covered stationary dock for seating. To the west of the pier end will be a 12ftxl3ft boat lift. March 7th, 2017 Date Verble Docking Facility Project Name Will Richardson Applicant Signature RECEIVED DCM WILMINGTON, NC '1-F,8 ,,,PX WAS'r coastaI"In a::?a pram>t.nv 4 G RALEIGIH ST C'DASTAL. WATERWAY =j HOLDEN SITE BEACH, NO o BLVD• HIGH ATLAN-IC POINT ST. OCEAN V!r.'),NlT[Y MAP NOT TO SCALE NC GRID NORTH, NAD 1983 (NSRS 2011) HORIZONTAL C.ROUND DISTANCES COMBINED S' -ALE FACTOR: 1.0001474 N PROPOSED qTATInFJAPY CROSS SECTION nts —EXISTING WALKWAY — F - LOT I SETBACK MARKER FIFTY FIVE WATER MAP CABINET Y, PAGE 337 ER C10'EFALLS 1, n 227.5B' IN RNCEDRAR TREE 08,20143 0 fy LOT 2 0 'jSflNG 0 ER5- z A00SE TOP OF — — — — — — RIPARIAN 22,280 SQ. FT, ERB -T C 20 BANK 15' — GRAVES —SETBA "T —PROPOSED COASTAL RIPARIAN SO �43 MARSH LINE 6' WIDE PIER CORRIDOR LINE -'-"! - �-A ERB s 0620 LOT 3 — — — -- — — — — — -- — — — — — — — — MARKER o sFIFTY FIVE 0 MAP CABINET Y, PAGE 337 LOT 4 C s r rlv op /v� '0, ERB 0'o TYPICAL PIER X -SECTION ,NOT TO SCALE POST TYPICAL FIEF ELEVATION NOT TO '-,',CAL-E Rmoll Is I I RIPARIAN EXISTING 'ORRIDOR LINE ------ OAT LIFT PROPOSED 12' x 13' 0 ml I ol m rpt 1 0 0 m z SUP 3 BOAT LIFT 2 NLW+ SLIP 2 PROPOSED 3,0' NLW 12' x 16' 25' N I PFLOATING DOC PROPOSED � D— — — — — — — — --- — POSED I 12' x 16' — __ — ® ®— — — — — --- - 1 COVERED DOCK EXISTING 13' x 17' BOAT LIFT WITH OVERHANG — — — — — — — — — — Lj- I — — — — — — — — — — .-EXISTING DOCK LINE 8,0NHW DISTANCE 10' NLW S 61`40`46"`25 Cu 0> L2 X 9.16' . 1 6 . -n ;u 0 N q -7-;b-9'19" E 61.92` Go m CLEAN OUT ol 0 n PT 0 PROPANE TANK EB 0 I TP m TELEPHONE PEDESTAL m 0 01 wM = I MARSH Z z LINE m — — — — -- — — — — — — — CLI O EXISTING I I I RIPARIAN EXISTING 'ORRIDOR LINE ------ OAT LIFT PROPOSED 12' x 13' 0 ml I ol m rpt 1 0 0 m z SUP 3 BOAT LIFT 2 NLW+ SLIP 2 PROPOSED 3,0' NLW 12' x 16' 25' N I PFLOATING DOC PROPOSED � D— — — — — — — — --- — POSED I 12' x 16' — __ — ® ®— — — — — --- - 1 COVERED DOCK EXISTING 13' x 17' BOAT LIFT WITH OVERHANG — — — — — — — — — — Lj- I — — — — — — — — — — .-EXISTING DOCK LINE BEARING DISTANCE LI S 61`40`46"`25 . 44 L2 N 66-02'15" E 9.16' . 1 6 . L3 N q -7-;b-9'19" E 61.92` z q I z m 10 11 rn rn > z z m Ir REVIEW OFFICER'S CERTIFICATE 1, REMEW OFFICER OF COUNTY, CERTIFY THAT THE MAP OR PLAT TO WHICH TIAIS CERTIFICKMN is AFFIXED MEETS ALL STATUTORY REQUIREMENTS FOR RECORDING. REMEW OFFICER NOTES *LOT 2 IS IN FLOOD HAZARD ZONE "VE" BASE ELEVATIION 17 FEET BASED ON F.I.R,M. 3720201600J, PANEL DATE 06-02-06. *THE HOUSE ON LOT 2 APPEARED TO BE TWO LIVING LEVELS ON PILINGS NTH NO GROUND LEVEL ENCLOSURES, *THE HOUSE APPEARED TO BE 100% COMPLETE. *HORIZONTAL LOCATIONS ARE REFERENCED TO NAD 983 (NSRS 2011) USING NCGS VRS WITH A TOPCON HIPER LITE PLUS ON 05-11-15. ERB 0 EXISITNG REBAR (FOUND) ECM A EXISTING CONCRETE MONUMENT NRB 0 NEW REBAR (SET) MH 0 MANHOLE Go 0 CLEAN OUT SO 0 PVC STUB OUT PT 0 PROPANE TANK EB 0 ELECTRIC BOX TP 0 TELEPHONE PEDESTAL ICV 0 IRRIGATION CONTROL VALVE wM 0 WATER METER CTV 0 CABLE TELEVISION sv 0 SEWER VENT PROPOSED DOCK FOR GENE VERBLE MADE FROM LOT 2, (346 MARKER FIFTY FIVE DRIVE), MARKER FIFTY FIVE SUBDIVISION, (MAP CABINET Y, PAGE 337), HOLDEN BEACH, NORTH CAROLINA AND EXISTING PHYSICAL EVIDENCE GARY GURGANUS LAND SURVEYING PROFESSIONAL LAND SURVEYOR NORTH CAROLINA 3369 HOLDEN BEACH RD., SW SUPPLY, NORTH CAROLINA 28462 (910)233-7605 60 0 60 120 SCALE: 1 60' @2016, GARY GURGANUS LAND SURVEYING RECEIVEI DCS WILMINGTO"'41, NC SCALE: I" = 60' 1 DATE: 08-26-16 TOWNSHIP: LOCKWOOD FOLLY FIELD BOOK: COUNTY: BRUNSWICK FILE: 16144DOCK STATE: NORTH CAROLINA mmqffnm��