HomeMy WebLinkAbout20170336 Ver 1_CAMA Application_20170322Coastal Management
ENVIRONMENTAL QUALITY
2 0 1 7 0 3 3 6
ROY COOPER
r,own wl
MICHAEL S. REGAN
SrcIclarl
BRAXTON DAVIS
niracim
March 17, 2017 i J V t
o C":M.-..�.
EXPRESS MEMORANDUM:
TO: Karen Higgins
DEQ WATER RE:fS )1J
401 & Buffer Permitting Unit ti ; UFF R Pte:_
DWR/Water Quality Permitting
FROM: Debbie Wilson, Southern Region Express Major Permit Coordinator
NCDEQ — Division of Coastal Management
127 Cardinal Drive Ext., Wilm., NC 28405 debra.wilson(aD_ncdenr.gov
Fax: 350-2018 (Courier 04-16-33)
SUBJECT: CAMA Application Review
Applicant: Gene Verble
Project Location: 346 Marker Fifty -Five, adjacent to the AIWW, in Holden Beach, Brunswick Co.
Proposed Project: to construct an access pier, covered platform, boatlift, and floating dock
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Debbie Wilson at the address above by April 9 2017. If you have any
questions regarding the proposed project, contact Debbie Wilson at (910) 796-7266 when
appropriate, in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
*additional comments may be attached.
SIGNED
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
DATE
State of North Carolina I Environmental Quality I Coastal Management
127 Cardinal Drive Ext., Wilmington, NC 28405
919 796 7215
DIVISION OF COASTAL
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Gene Verble
2. LOCATION OF PROJECT SITE: 346 Marker Fifty -Five, adjacent to the AIWW, in Holden Beach, in
Brunswick County.
Photo Index- 2006: 4-6217; O -Q, 12 Latitude: 33'54'51.27"N Longitude: 78'17'20.85"W
3. INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 3/15/17
Was Applicant Present — No
5. PROCESSING PROCEDURE: Application Received — 3/13/17
Office — Wilmington
6. SITE DESCRIPTION:
(A) Local Land Use Plan — Holden Beach
Land Classification from LUP — Developed (Upland), Conservation (Open Water)
(B) AEC(s) Involved: EW, PT, CW
(C) Water Dependent: Yes
(D) Intended Use: Residential
(E) Wastewater Treatment: Existing — Municipal Sewer
Planned — N/A
(F) Type of Structures: Existing — Single Family Residence
Planned —Access pier, covered platform, boatlift and floating dock
(G) Estimated Annual Rate of Erosion: N/A
Source - N/A
7. HABITAT DESCRIPTION:
1 t 1 DI 1J I 111 .1 DI ',4.
(A) Vegetated Wetlands (coastal wetlands)
569 sq. ft.
(shaded)
(B) Non -Vegetated Wetlands (open water)
2,490 sq. ft.
(incorporated)
(C) Other —High ground
11
(D) Total Area Disturbed: 3,059 sq. ft. (0.07 acres)
(E) Primary Nursery Area: No
(F) Water Classification: SA Open: No
8. PROJECT SUMMARY: The applicant proposes to construct an access pier, covered platform, boatlift
and floating dock.
Gene Verble
Page 2
9. PROJECT DESCRIPTION:
The applicant has requested the subject CAMA Major Permit application be processed under the Express
Review Permitting Program. The project site is located at 346 Marker Fifty -Five, adjacent to the AIWW,
in Holden Beach, in Brunswick County. To locate the property, travel cross Holden Beach bridge and turn
right on Ocean Blvd West. Travel west on Ocean Blvd West approximately 1. 15 miles to High Point St.
Turn right on High Point St. and make the next right on West Brunswick Ave. Turn left on Marker 55 Dr.
and the site will be located on the left.
The subject property encompasses approximately 1. 11 acres in size and averages approximately 7' above
normal high water (NHW). The applicant maintains a single-family residence and has approximately 70'
of shoreline which is stabilized with natural vegetation. Upland vegetation consists of maintained lawn
grass and ornamental landscaping. The property has a steep drop-off along the shoreline down to the NHW
line. Vegetation along the embankment consist primarily of Salt Meadow Grass (Spartina patens) down to
NHW. There is a wide span of Smooth Cordgrass (Spartina alterniora) which extends from NHW
waterward for approximately 415'.
The Holden Beach Land Use Plan classifies adjacent waters as Conservation, and the adjacent high ground
portion of the project area as Developed. The waters of the AIWW are classified as SA by the NC Division
of Water Resources. These waters are not designated as Primary Nursery Area (PNA), by the NC Division
of Marine Fisheries and they are CLOSED to the harvest of shellfish.
PROPOSED PROJECT:
The applicant proposes to construct an access pier, covered platform, boatlift and floating dock. As
proposed, a new fixed pier would extend approximately 560' in a northerly direction from the top of the
bank into the AIWW. The pier would then lead into an "L -head" covered platform, measuring
approximately 17' in width by 13' in length, situated on the east side of the pier. An access ramp would
extend from the terminus of the pier waterward to a floating dock measuring approximately 16' in width
by 12' in length, which would extend into the AIWW in a northerly direction. A boatlift measuring
approximately 12' in width by 13' in length would be installed at the terminus of the pier on the westward
side. The application states the proposed structures would be constructed to provide docking space for up
to three vessels in water depths ranging from approximately -2.5' to -3' @ normal low water (NLW).
10. ANTICIPATED IMPACTS:
The proposed pier system construction would incorporate approximately 569 sq. ft. of Estuarine Waters
and Pubic Trust Area and would shade approximately 2,490 sf. of Coastal Wetlands, vegetated primarily
with Smooth Cordgrass (Spartina alterniora). The proposed pier, covered platform, floating dock and
boatlift would not encroach into the adjacent 15' Riparian Corridor Setback Areas. The proposed pier
and docking facility provide docking space for up to three vessels in water depths ranging from
approximately -2.5' to -3' @ normal low water (NLW) and would extend approximately 150' into the
waterbody, which measures approximately 530' across at this location. As proposed, the docking facility
would exceed the 1/4 width rule however, it would not exceed the 1/3 rule nor the established pier head line
and would meet the 80' federal channel setback from the AIWW. Minor increases in turbidity should be
expected during construction.
Submitted by: Debra Wilson Date: 3/16/17 Office: Wilmington
Richardson Construction
General Contractor NC License #51895
Will Richardson 910-842-5596 (Office)
3235 Seacrest Ave. SW 910-367-0335(Cell)
Supply, NC 28462 910-842-5597(Fax)
To: NCDEQ
From: Will Richardson
Re: Major Development Permit
Attn: Debbie Wilson
Date: March 6, 2017
Job Address: 346 Marker Fifty Five
Holden Beach NC 28462
Owner: Gene and Nancy Verble
Our company has been asked to install a docking facility for Mr. & Mrs. Gene Verble and family located at
346 Marker Fifty Five, Holden Beach NC along the AIWW. This docking facility is typical of the other
docking facilities in the area. It will consist of Q@ docking slips, One boat lift and one floating dock. There
will be a covered stationary dock for seating/fishing.
Gary Gurganus Surveying has completed a survey with drawings indicating riparian corridor and pier head
alignment. Gurganus surveying will also locate the placement of the west side of the project before
construction starts. The total length of the project is—5851f. The project will extend from the existing bulkhead
wall to the south to the pier head alignment of the adjacent property owners to the east and west. We are asking
to move out to the alignment of other piers to the east. The adjacent pier to the east is shorter for some reason
than the surrounding piers.The parcel has 701f of shore line. The total shaded area for the project is —413
square feet.
The structures at the AIWW end of the project will be a 12ftx16ft covered dock with a 3ftxl6ft aluminum
gangway connecting a 12ftxl6ft floating dock. Attached to the west side of the pier will be a 10,000# boat lift.
Thank you for reviewing this application and please contact us with any questions or concerns.
Regards,
Will Richardson
RECEIVED
DCM WILMINGTON, NC
IVerble project location
V
I; P, .
200 ft
ea E-1
WFUUTIONfor
Major Development Ponalt
(last revised 12/27/06)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Palmary Applicant/ Landowner Information
Business Name
Project Name (if applicable)
Applicant 1: First Name
Gene
MI
K
Last Name
Verble
Applicant 2: First Name
MI
Last Name
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address
485 Union Street South
PO Box
City
Concord
State
NC
ZIP
28025
Country
1 United States
Phone No.
704- - 490 - 5042 ext.
FAX No.
N/A - -
Street Address (if different from above)
City
State
ZIP
Email
2. AgentlContractor Information
Business Name
Richardson Construction
Agent/ Contractor 1: First Name
Will
MI
C
Last Name
Richardson
Agent/ Contractor 2: First Name
MI
Last Name
Mailing Address
3235 'Seac A- CIA/
PO Box
City
unniv
State
NC
ZIP
Phone No. 1
Phone No. 2
ext. - ext. Office
Cell 910 842 5596
FAX No.
910-842-5597
Contractor #
Street Address (if different from above)
City
State
ZIP
Email
<Form continues on back> RECEIVED
DCM WILMINGTON, NC
Form DCM MP -1 (Page 2 of 4)
APPLICATION for
Major Development Permit
3. Project Location
County (can be multiple)
Street Address
State Rd. #
Brunswick
346 Marker Fifty Five
d. Approximate elevation of tract above NHW (normal high water) or
Subdivision Name
City
State
Zip
Marker Fifty Five
Holden Beach
NC
28462
Phone No.
Lot No. (s) (if many, attach additional page with list)
910-367-0335 ext.
346, 1 1 1
a. In which NC river basin is the project located?
b. Name of body of water nearest to proposed project
Lumber
AIWW
c. Is the water body identified in (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site.
9 Natural E]Manmade []Unknown
Atlantic Ocean
e. proposed work within city limits or planning jurisdiction?
f. If applicable, list the planning jurisdiction or city limit the proposed
0Yes E]No
work falls within.
Holden Beach
4. Site Description
a. Total length of shoreline on the tract (ft.)
b. Size of entire tract (sq.ft.)
70
48,351,6sf
c. Size of individual lot(s)
d. Approximate elevation of tract above NHW (normal high water) or
70X387
NW L (normal water level)
(If many lot sizes, please attach additional page with a list)
7ft qNHW or F1NWL
e. Vegetation on tract
Seeded Lawn, Landscape vegetation and coastal wetlands
f. Man-made features and uses now on tract
Residential Dwelling
g. Identify and describe the existing land uses adacent to the proposed project site.
Residential Dwellings and docking facilities
h. How does local government zone the tract?
i. Is the proposed project consistent with the applicable zoning?
(Attach zoning compliance certificate, if applicable)
HBR-1
PYes ONo [INA
J. Is the proposed activity part of an urban waterfront redevelopment proposal? 0Yes �No
k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. E]Yes ®No [INA
If yes, by whom?
1. Is the proposed project located in a National Registered Historic District or does it involve a E]Yes [3JNo EINA
National Register listed or eligible property?
<Foffn continues on next page>
RECEIVED
DCM WILMINGTON, NC
-u,.e vvlji>n c cons ta 1, ma n a, q emf.-nt.nw rt ;
Form DCM MP -1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. (i) Are there wetlands on the site? [Yes ❑No
(ii) Are there coastal wetlands on the site? ❑p'es ❑No
(iii) If yes to either (i) or (ii) above, has a delineation been conducted? []Yes [3No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
Municiple Sewer
o. Describe existing drinking water supply source.
City Water Supply
p. Describe existing storm water management or treatment systems.
None. sheetflow
b. Activities and Impacts
a. Will the project be for commercial, public, or private use? ❑Commercial ❑PubliclGovernment
Private residence. Family docking facility (RPrivate/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
For access to the AIWW and launch family boat
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
Pier construction will start at the existing bulkhead wall. Contractor will build pier using a rotating boom attached to pier.
Rotating boom allow construction of the pier without placing equipment into the wetlands. All other work will be performed
from barge located on the AIWW.
d. List all development activities you propose.
Pier, stationary dock, floating dock and boat lift
e. Are the proposed activities maintenance of an existing project, new work, or both?
New Work
f. What is the approximate total disturbed land area resulting from the proposed project? ❑Sq.Ft or []Acres
None
g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes [RNo [INA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
None
i. Will wastewater or stormwater be discharged into a wetland? ❑Yes No ❑NA
If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ❑NA
J. Is there any mitigation proposed? ❑Yes [3No ❑NA
If yes, attach a mitigation proposal.
<Fonn continues on back>
RECEIVED
t')( M WILMINGTO1*0 "Ic
252-808-2808 .. 1-888-41F?C AST v� rs+nr.rae�a�sta9��a�agc��era#.r��#
Form DCM MP -1 (Page 4 of 4)
APPLICATION for
Major Development Permit
6. Additionallnformadon
In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitter) in order for the application
package to be complete. Items (a) - (0 are always applicable to any major development application. Please consult the application
instruction booklet on how to property prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name Dean Hall Phone No.
Address 348 Marker Fifty Five Holden Beach NC 28462 910-842.4181
Name Timoth Gibble Phone No.
Address 344 Marker Fifty Five Holden Beach NC 28462 910-417-3332
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
Minor permit for house construction: Permit number: 12014
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
7. Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this applicattioni is truthful to the best of my knowledge.
Date,—? -2-17 Print Name Kl i LL ZA`tJ 2 (' �► -��
Signatrlre [ L )tom
Please indicate application attachments pertaining to your proposed project.
❑DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts
❑DCM MP -3 Upland Development
[ADCM MP -4 Structures Information
Form DDM MP --A
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Forth DCM MP -1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1.- DOCKING FACILITY/MARINA CHARACTERISTICS
a. (i) Is the docking facility/marina: b.
[]Commercial ❑Public/Goverpment .[XPrivate/Community
c. (i) Dock(s) and/or piers)
(ii) Number 1
(iii) Length 560ft pier: 585ft Total project
(iv) Width Eft
(v) Floating MYes ❑No
e. (i) Are Platforms included? (Yes []No
If yes: Fixed Floating
(ii) Number 1 1
(iii) Length 13 12ft
(iv) Width 17 16ft
(v) Floating ❑Yes IRNo
Note: Roofed areas are calculated from drip/ine dimensions
g. (i) Number of slips proposed
3
(ii) Number -of slips existing
0
i. Check the proposed type of siting:
❑ Land cut and access channel
❑Open water, dredging for basin and/or channel
I2jOpen water, no dredging required
❑Other, please describe:
k• Typical boat length: 23
m. (i) Will the facility have tie pilings?
❑Yes Po
(ii) ff yes number of tie pilings?
❑This section not applicable
(i) Will the facility be open to the general public?
.❑Yes ,IXNo
d. (i) Are Finger Piers included? ❑Yes [$No
If yes:
(ii) Number
(iii) Length
(iv) Width
(v) Floating ❑Yes ❑No
f. (i) Are Boatlifts included? IXYes ❑No
If yes:
(ii) Number
(iii) Length 13ft
(iv) Width 12ft
h. Check all the types of services to be provided.
❑ Full service, including travel lift and/or rail, repair or
maintenance service
❑ Dockage, fuel, and marine supplies
❑ Dockage ('wet slips") only, number of slips:
❑ Dry storage; number of boats:
❑ Boat ramp(s); number of boat ramps:
❑ Other, please describe:
j. Describe the typical boats to be served (e.g., open runabout,
charter boats, sail boats, mixed types).
23ft bay boat
I. (i) Will the facility be open to the general public?
❑Yes [XNo
RECEIVED
DCM WILMINGTON. NIC
y 9 Y L }hr .lik. fs 5 ica3k5 a §w�( ,Y$3t,Fes«n1 w Iry vis * -121,2 /06
a.:St_•f3�iP•�T�rr`� ::: -3-/.i te.3S "cKuS*.,. i.R bL."�Y „x a n y "� � .S �p
Form 0CM MP -4 (Structures, Page 2 of 4;
2. DOCKING FACILITY/MARINA OPERATIONS This section not appiicabie
a. Check each of the following sanitary facilities that will be included in the proposed project.
❑ Office Toilets
❑ Toilets for patrons; Number: Location:
❑ Showers
❑ Boatholding tank pumpout; Give type and location:
b. Describe treatment type and disposal location for all sanitary wastewater.
c. Describe the disposal of solid waste, fish offal and trash.
d. How will overboard discharge of sewage from boats be controlled?
e. (i) Give the location and number of "No Sewage Discharge" signs proposed.
(ii) Give the location and number of "Pumpout Available" signs proposed.
f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
g. Where will residue from vessel maintenance be disposed of?
h. Give the number of channel markers and "No Wake" signs proposed.
I. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality.
j. What will be the marina policy on overnight and live -aboard dockage?
k. Describe design measures that promote boat basin flushing?
I. If this project is an expansion of an existing marina, what types of services are currently provided?
m. Is the marina/docking facility proposed within a primary or secondary nursery area?
❑Yes ❑No
RECEIVED
DCM WILMINGTON. KIC
.nage vl mI a' mi eta t ±t f C3
Form ViCrA. MP-4(Structures, Page 3 of 4)
n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area?
❑Yes ❑No
o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom
(SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected.
EICW _OSAV SSB
❑WL ❑None
p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes []NO
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
3. BOATHOUSE (including covered Pitts) [A This section not applicable
a. (i) Is the boathouse structure(s):
❑Commercial ❑PublidGovernment ❑Private/Community
(ii) Number
(iii) Length
(iv) Width
Note: Roofed areas are calculated from dripline dimensions.
4. $ROZN. te.g., wood, :sheetpile, .eta lf.a rock -groin, use MP -2, Excavation and Frll.) LXThis.section not applicable
a. (i) Number
(ii) Length
(iii) Width
S. BREAKWATER fe.-g., .wood, sheetpile, etc.) 9This section notappJicable
a. Length b. Average distance from NHW, NWL, or wetlands
c. Maximum distance beyond NHW, NWL or wetlands
6. MOORING PILINGS and BUOYS ❑This section not applicable
a. Is the structure(s):
❑Commercial [Public/Government ❑Private/Community
C. Distance to be placed beyond shoreline
Note: This should be measured from marsh edge, if present.
e. Arc of the swing
7. GENERAL
b. Number
d. Description of buoy (color, inscription, size, anchor, etc.)
RECEIVED
DCM WILMINGTON, NC
�,r,�?-�@3$••"��f?�`a �; ^t..£35� •t.�Cg�»€�`i' : x.� r��,�x.s�r a ;a `�d�a�,at . syr�:3�a�s9�.�rz� ��v�se-gats 'd21�':"�`6�a=�
Form DCMIM. P-4 (Structures, fags 4 of 4)
a. Proximity of structure(s) to adjacent riparian property lines
15 Feet.5ft east and 15.5ft west
Note: For buoy or mooring piling, use arc of swing including length
of vessel.
c. Width of water body
530 feet Marsh to Marsh
e. (i) Will navigational aids be required as a result of the project?
❑Yes 9No [INA
(ii) If yes, explain what type and how they will be implemented.
b. Proximity of structure(s) to adjacent docking facilities.
—27feet to the west/-32feet to the east
d. Water depth at waterward end of structure at NLW or NWL
3feet
8. OTHER ❑This section not applicable
a. Give complete description:
Project to startat the existing bulkhead wall with a pler approx. 560 feet long, The pier will end with an aluminum gangway
gangway going to a 12ftxl6ft floating dock. To the east of the pier end will be a 13ftx17ft( overhang included) covered
stationary dock for seating. To the west of the pier end will be a 12ftxl3ft boat lift.
March 7th, 2017
Date
Verble Docking Facility
Project Name
Will Richardson
Applicant Signature
RECEIVED
DCM WILMINGTON, NC
'1-F,8 ,,,PX WAS'r coastaI"In a::?a pram>t.nv 4
G
RALEIGIH ST
C'DASTAL. WATERWAY
=j HOLDEN
SITE BEACH, NO
o BLVD•
HIGH
ATLAN-IC POINT ST.
OCEAN V!r.'),NlT[Y MAP
NOT TO SCALE
NC GRID NORTH, NAD 1983 (NSRS 2011)
HORIZONTAL C.ROUND DISTANCES
COMBINED S' -ALE FACTOR: 1.0001474
N
PROPOSED
qTATInFJAPY
CROSS SECTION
nts
—EXISTING
WALKWAY
— F -
LOT I SETBACK
MARKER
FIFTY FIVE WATER
MAP CABINET Y, PAGE 337 ER
C10'EFALLS 1, n 227.5B'
IN RNCEDRAR TREE 08,20143
0 fy
LOT 2 0 'jSflNG 0 ER5-
z A00SE TOP OF — — — — — —
RIPARIAN
22,280 SQ. FT, ERB -T C
20 BANK 15' —
GRAVES —SETBA "T
—PROPOSED
COASTAL RIPARIAN
SO �43 MARSH LINE 6' WIDE PIER CORRIDOR LINE
-'-"! - �-A
ERB s 0620
LOT 3 — — — -- — — — — — -- — — — — — — — —
MARKER
o
sFIFTY FIVE
0
MAP CABINET Y, PAGE 337
LOT 4
C s
r rlv
op
/v�
'0, ERB
0'o
TYPICAL PIER X -SECTION
,NOT TO SCALE
POST
TYPICAL FIEF ELEVATION
NOT TO '-,',CAL-E
Rmoll
Is
I
I
RIPARIAN EXISTING
'ORRIDOR LINE ------ OAT LIFT
PROPOSED
12' x 13'
0
ml
I
ol
m
rpt 1
0
0
m
z
SUP 3 BOAT LIFT
2 NLW+ SLIP 2
PROPOSED
3,0' NLW 12' x 16'
25' N I PFLOATING DOC
PROPOSED
�
D— — — — — — — — --- — POSED
I 12' x 16'
— __ —
®
®— — — — — --- - 1 COVERED DOCK
EXISTING 13' x 17'
BOAT LIFT WITH OVERHANG
— — — — — — — — — — Lj- I
— — — — — — — — — — .-EXISTING
DOCK
LINE
8,0NHW
DISTANCE
10' NLW
S 61`40`46"`25
Cu
0>
L2
X
9.16' . 1 6 .
-n
;u
0
N q -7-;b-9'19" E
61.92`
Go
m
CLEAN OUT
ol
0
n
PT
0
PROPANE TANK
EB
0
I
TP
m
TELEPHONE PEDESTAL
m
0
01
wM
= I
MARSH
Z
z
LINE
m
— — — —
-- — — — — — — — CLI
O
EXISTING I
I
I
RIPARIAN EXISTING
'ORRIDOR LINE ------ OAT LIFT
PROPOSED
12' x 13'
0
ml
I
ol
m
rpt 1
0
0
m
z
SUP 3 BOAT LIFT
2 NLW+ SLIP 2
PROPOSED
3,0' NLW 12' x 16'
25' N I PFLOATING DOC
PROPOSED
�
D— — — — — — — — --- — POSED
I 12' x 16'
— __ —
®
®— — — — — --- - 1 COVERED DOCK
EXISTING 13' x 17'
BOAT LIFT WITH OVERHANG
— — — — — — — — — — Lj- I
— — — — — — — — — — .-EXISTING
DOCK
LINE
BEARING
DISTANCE
LI
S 61`40`46"`25
. 44
L2
N 66-02'15" E
9.16' . 1 6 .
L3
N q -7-;b-9'19" E
61.92`
z
q
I z
m
10 11
rn
rn
>
z
z
m
Ir
REVIEW OFFICER'S CERTIFICATE
1, REMEW OFFICER OF
COUNTY, CERTIFY THAT THE MAP OR PLAT TO WHICH TIAIS CERTIFICKMN is
AFFIXED MEETS ALL STATUTORY REQUIREMENTS FOR RECORDING.
REMEW OFFICER
NOTES
*LOT 2 IS IN FLOOD HAZARD ZONE "VE" BASE ELEVATIION
17 FEET BASED ON F.I.R,M. 3720201600J,
PANEL DATE 06-02-06.
*THE HOUSE ON LOT 2 APPEARED TO BE TWO LIVING LEVELS
ON PILINGS NTH NO GROUND LEVEL ENCLOSURES,
*THE HOUSE APPEARED TO BE 100% COMPLETE.
*HORIZONTAL LOCATIONS ARE REFERENCED TO NAD 983
(NSRS 2011) USING NCGS VRS WITH A TOPCON HIPER
LITE PLUS ON 05-11-15.
ERB
0
EXISITNG REBAR (FOUND)
ECM
A
EXISTING CONCRETE MONUMENT
NRB
0
NEW REBAR (SET)
MH
0
MANHOLE
Go
0
CLEAN OUT
SO
0
PVC STUB OUT
PT
0
PROPANE TANK
EB
0
ELECTRIC BOX
TP
0
TELEPHONE PEDESTAL
ICV
0
IRRIGATION CONTROL VALVE
wM
0
WATER METER
CTV
0
CABLE TELEVISION
sv
0
SEWER VENT
PROPOSED DOCK FOR
GENE VERBLE
MADE FROM LOT 2, (346 MARKER FIFTY FIVE DRIVE),
MARKER FIFTY FIVE SUBDIVISION, (MAP CABINET Y,
PAGE 337), HOLDEN BEACH, NORTH
CAROLINA AND EXISTING PHYSICAL EVIDENCE
GARY GURGANUS
LAND SURVEYING
PROFESSIONAL LAND SURVEYOR
NORTH CAROLINA
3369 HOLDEN BEACH RD., SW
SUPPLY, NORTH CAROLINA 28462
(910)233-7605
60 0 60 120
SCALE: 1 60'
@2016, GARY GURGANUS LAND SURVEYING
RECEIVEI
DCS WILMINGTO"'41, NC
SCALE: I" = 60' 1 DATE: 08-26-16
TOWNSHIP: LOCKWOOD FOLLY FIELD BOOK:
COUNTY: BRUNSWICK FILE: 16144DOCK
STATE: NORTH CAROLINA
mmqffnm��