Loading...
HomeMy WebLinkAbout20081775 Ver 3_CAMA Application_20170316'ector Coastal Management ENVIRONMENTAL OVAL17V ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director TO: Ms. Karen Higgins Env. Biological Supervisor Division of Water Quality Wetlands Unit FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Coastal Management Division Morehead City Office 400 Commerce Avenue Morehead City NC 28557 DATE: 13 March 2017 SUBJECT: CAMA Application Review APPLICANT: Evergreen Horizons Inc. MAR 16 2017 PROJECT LOCATION: Project site is located off SR 1354 (Cypress Shores Road) east of the City of Washington on the Pamlico River in, Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes maintenance excavation, new basin excavation with two boat slips and a boat ramp within Shady Shores Subdivision. Please indicate below your position or viewpoint on the proposed project and return this form by 3 April 2017. Please contact Kelly Spivey at 252-948-3853, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY Signed This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Date !i'Nothing Compares 5n:*of%whCuama Ermrcrmerta:Q:aary CQWM1\13na9#M+n: 943 Wa01:iq:or. 5 pa:u♦ \1a:: Washuirm. XC :"339 :5.' 946 6481 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Evergreen Horizons, Inc., Shady Shores 2. LOCATION OF PROJECT SITE: Beaufort County off SR 1354 (Cypress Shores Road) east of the City of Washington on the Pamlico River in Beaufort County, North Carolina Photo Index —2006; 100-8156, S 13 3. INVESTIGATION TYPE: CAMA & State Dredge and Fill 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 21 February 2017 Was Applicant Present — No 5. PROCESSING PROCEDURE: Application Received — 27 February 2017 Office - Washington l �, 6. SITE DESCRIPTION: (A) Local Land Use Plan - 1997 Beaufort County Land Use Plan Land Classification From LUP - Conservation (water), Transition (land) (B) AEC(s) Involved: Estuarine Water, Public Trust Area and Coastal Shoreline (C) Water Dependent: Yes (D) Intended Use: private (E) Wastewater Treatment: Existing - none Planned — N/A (F) Type of Structures: Existing — bulkhead, pier, canal, boat slips Planned - maintenance excavation, basin, bulkhead, boat ramp, 2 slips (G) Estimated Annual Rate of Erosion: N/A (H) Source — N/A 7. HABITAT DESCRIPTION: 8. [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands (404) (B) Non -Vegetated Wetlands f3,080ft2 Canal Bottom (maintenance and basin) (C) Other (Uplands) f375ft2 (boatramp) (D) Total Area Disturbed: ±3,455ft2 (0.07 acres) (E) Primary Nursery Area: No (F) Water Classification: SB NSW Open: No PROJECT SUMMARY: The applicant proposes maintenance excavation, new basin excavation with two boat slips and a boatramp within Shady Shores Subdivision. Evergreen Horizons, Inc. Shady Shores Subdivision Beaufort County Project setting The project site, Shady Shores is an existing 27 lot subdivision located on the east side of the terminal end of SR 1354 (Cypress Shores Road) east of the City of Washington on the Pamlico River in Beaufort County, North Carolina. The original subdivision and associated docks were permitted via CAMA Major Permit numbers 76-08 and 82-09. The previously permitted development includes a 27 lot subdivision, a pier with platform located within Pamlico River proper, approximately 200 linear feet of bulkhead, walkway located over wooded wetlands, 10 slip docking facility, gravel subdivision roads, storm water pond and a man-made canal system. The subdivision is approximately 21 acres (919,980 ft) in size and has approximately 2,300 linear feet of shoreline. The subdivision elevation ranges from 3' —10' above Normal Water Level (NWL). Water depths within the man-made canal average approximately 3.5' below NWL. There have been Section 404 wooded wetlands identified within the boundaries of the subdivision. These wetlands have been identified on plats submitted for CAMA Major permit number 76-08 and 82-09. A portion of these wetlands are located on lots 13 and 14 which is on the north side of the canal being excavated. A drainage culvert is also located in the head of the canal which goes under the subdivision road and ties into a wooded wetland system west of SR 1354. Both the eastern (downstream) side and western (upstream) side of the subdivision are developed lots with single-family dwellings with bulkheads and piers. The Pamlico River is classified as SB. NSW by the Environmental Management Commission at the project site. The Pamlico River is Coastal Fishing waters and is not open to shell fishing. Project description The applicant proposes to conduct maintenance excavation on the most upstream end of the man-made canal. The excavation dimensions are 130'L x 20' W x 1.0' D. Approximately 96 cubic yards of material will be excavated to a final project depth of 3.5' below NWL. The applicant also proposes to excavate an upland basin which equally bisects lots No. 15 and 16. The basin will total 40' along the canal with 20' on each lot. The basin will extend 12' landward into the lots and will be excavated 3.5'below NWL. The spoil excavated from both the maintenance excavation and new basin excavation will be placed on lot no. 23 within the subdivision. Eight tie pilings will be installed in the upland basin to create two boat slips, one for lot 15 and one for lot 16. Additionally, the applicant proposes to construct a 15' W x 26' L boat ramp at the terminal end of the Canal. The concrete boat ramp pad will extend landward an additional 24'. Approximately 265 linear feet of bulkhead will be constructed at NWL adjacent to the areas of both new and maintenance excavation. Evergreen Horizons, Inc. Shady Shores Subdivision Beaufort County Page 2 Anticipated impacts Approximately 96 cubic yards of material will be excavated from the existing man-made canal. Theexcavation of the basin will result in 103 cubic yards of material being excavated from below NWL. The total number of proposed slips for this project will be two. The installation of the new bulkhead will result in localized turbidity. Kelly Spivey —13 March 2017 NARRATIVE SHADY SHORES SUBDIVISION BY: EVERGREEN HORIZONS, INC January 18, 2017 This permit application is to install a concrete boat ramp with service slip for the exclusive use of residents in this 35 lot subdivision. The subdivision was platted and constructed in 2011 with no lots being sold to date. A water system and streets were constructed in 2011. Lots are mostly cleared. A major CAMA permit that is now expired was obtained to do work closer to the Pamlico River shore. This proposal is to install the boat launch in the end of a man made canal where it dead ends into a subdivision street. The proposed two boat slips (12 feet wide by 40 feet long) provide a place for boats to allow other boats to load, unload or pass in the narrow canal which is about 20 feet wide. Hood L. Ric i axd oq; Pz. `' , • v ../ .. '�•i +�Li N � of 18NOM urucnnex fell Major nevoiepment Permit f� r North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name EVA 4,e #"i'"4 rdv c Project Name (if applicable) 5-A q d S /to A cs Applicant 1: FAt Name MI Last Name r /—/iiK Agent/ Contractor 2: First Name gtt MI Applicant 2: First Name Ml Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address,� l 6 f ! 5' No rtr14 cnosf 91-41 Ve PO Box /} City ',,re//e State NG ZIP Country Phone No. ZIP 2-1 8 9 R FAX No. �- P 7 !/f 64 70 a <j Y�ext- Contractor# Y 14 Street Address ff different from above) A City State ZIP Email %Kn ink � .� ✓�eK r��E�s� ✓r� . c o�c Email Gl r iL� art deo Z Agent/ Business Name Agent/ Contractor 1: First Name Hoy � MI I- - Last Name A tr X I ^ d sd A)e- Agent/ Contractor 2: First Name MI Last Name /N1( Ai! 14 Mailing Address PO Box City State ZIP 2-1 8 9 R Phone No. 1 Ai-,Z:%)!� Y77—ext-- Phone No. 2 //rte // +c ®T ext. FAX No. A/ Contractor# Street Address (if different from above) City State` ZIP Email Gl r iL� art deo �¢ 41?- ^ b A11, U, <Form continues on back> Form DCM MP -1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address Ss�o�e1 State Rd. # S/L art e A v e-oxr ��s� i�v� d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) 6/ �,Q t - ❑NHW Subdivision Name SA oi City Kl* f it f jo °-f State /WC Zip � 7-99 47 Phone No. Lot No.(s) (if many, attach additional page withlist) 70 - o - V �y� �,4ext. , !fir A , , a. In ivhich NC river basin is the project located? b. Name of body of water nearest to proposed project I'Att- At4 tc0 MA4'%4de C..'lh/*/ ^ An of/IiCv 'iA c. Is the water y identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ❑Natural Manmade ❑Unknown /9 M 1•G0 /'�; t/,e/„ posed work within city limits or planning jurisdiction? e.L[]No f. If applicable, list the planning jurisdiction or city limit the proposed National Register listed or eligible property? work falls within. 4. 1 Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 3 &To s I de or- e- 4' l ( CAe� 6 f� c. Size of individual lot(s) 0.360 -YL a 0.33 �� d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) 6/ �,Q t - ❑NHW (if ma4lot szes, please attach additional page with a list) or kNWL e. Vegetation on tract �r��sse d �,�d we � t�•.� d � s� wee. �.� � �d � to � y c A •-roc f. Man-made features and uses now on tract AJA' JS14-1/9 re n-sY s 7-12 Al g. Identify and describe the existing land uses adiacent to the proposed project site. Azst d e-Alri,,z / h. How does local government zone the tract? e0vo i. Is the proposed project consistent with the applicable zoning? �a/4-VrJ^ r l r y (Attach zoning co pf nce certificate, if applicable) J%A, ve— 7-JW6ti ❑Yes []No TA j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes MINo k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes KNo [INA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes Wo [INA National Register listed or eligible property? <Form continues on next page> K Form DCM MP -1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site?es []No (ii) Are there coastal wetlands on the site? ❑Yeso0 (iii) If yes to either (i) or (ii) above, has a delineation been conducted? )tes []No (Attach documentation if avallahle) n. Describe existing wastewater treatment facilities. A e. is r� �� d a r���e� �= s I,zv� re s stKs, Y o. Describe existing drinking water supply source. r✓ovt,(t wtit2it- s sT-aam- p. Describe axis ng storm water management or treatment systems. L o w dx„ v.r, r eln✓41,6 japk-aiqr. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? []Commercial ❑Public/Govemment rivate/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. L `Su®cfrvtJl►�. L'AKG% Af1"�j� /��f� Sli%�� -J/I- V �i c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and when; it is to be stored. Iti02 �� Ti2�Cj6,d o d. List all development activities you propose. Ex CAS e �o� c bac/d 2 bao4r �_ei� t6e S� JAI fr-#1/ bva-K `.•e,4<d e. Are the proposed activities maintenance of an existing project, new work, or both? Ger)V#1 MA$i(r-a'44.4 AAIIJ NA," f. What is the approximate total disturbed land area resulting from the proposed project? A d 0"r cro v✓ fir V.4^.e 1�BAt 4.104 Wof q.Ft or []Acres g. Will the proposed proect encroac on any public easement, public accesswa or other area ❑Yes ro []NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. 'S'4e a P Flo fa/ 'r�V40q.- �Ji&5S i i. Will wastewater or stormwater be discharged into a wetland? ❑Yes []No RNA If yes, will this discharged water be of the same salinity as the receiving water? []Yes []No WA j. Is there any mitigation proposed? ❑Yes o [INA If yes, attach a mitigation proposal. <Form continues on back> 3 Form DCM MP -1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) - (0 are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. t/ b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguis between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. ✓ d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. L---, e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management Name I6 j' '0.".04,0!0 JK / I' Phone No. Address 31D V.S 13-1,7 x.writ 1 Wi;idson, Z7ff 3 Name Phone No. Address Namef ✓FW G O�ayd Phone No. Q Address 17-3 "57- /'` a v�K- /�Gtt�S v d A� 6 . �r Z �/ g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. G A r4 A A^r-; t f 2 -01 7 4- 4 8 LAKd h. Signed consultant or agent authorization form, if applicable. d✓ L Wetland delineation, if necessary. r( j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Mustpe signed by properfy owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.h( 7. Certification and Permission to Enter on Land 1 understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. 1 further cert' t at the information provided in this applicatio/n/ is truthful to the best of my knowledge. 07' Date a V �� Print Name 9009 �• • %G a1 c,`S �N Signature GY' Pie a indicate application attachments pertaining to your proposed project. 7DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts � CM MP -3 Upland Development CM MP -4 Structures Information Form DCM MP -2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. 1. EXCAVATION ❑This section not applicable a. Amount of ma nal to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. s'- y d 3 1 u /3 4.-* r QA,d w c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL Mone (ii) Describe the purpo a of the excavation in these areas: 14 %- d. High -ground excavation in cubic yards. l yf Y.,3 A awe w Ull., 6S' �o �.z3 Y -Is r Z DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable a. Location of disposal area. b. Dimensions of disposal area. Z, o4- slre Z3 75- "45-0' = 37j 0 fr c. (i) Do you claim title to disposal area? d. (i) Will a di Pial area be available for future maintenance? X11o, es []No [INA ❑Yes WNo ❑NA (ii attach a letter granting permission from the owner. (ii) If yes, where? e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. []CW ❑SAV ❑SB ❑WL Xwone (ii) Describe the purpose of disposal in these areas: f. (i) Does the disposal include any area in the water? ❑Yes No ❑NA (ii) If yes, h w much water area is affected? r Access Channel (NLW or -)c .3 r,4 Canal f Boat Basin Boat Ramp Rock Groin Rock Breakwater Other (excluding shoreline NWL) stabilization Length 1i 130 if 0 .Z, 6 /1f Width A, 1,0 / Z. 5�- /Y/4- /4/4 Avg. Existing Depth SIA NA NAFinal Depth Project 414 315- 3 °� 7° � NA NA 1. EXCAVATION ❑This section not applicable a. Amount of ma nal to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. s'- y d 3 1 u /3 4.-* r QA,d w c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL Mone (ii) Describe the purpo a of the excavation in these areas: 14 %- d. High -ground excavation in cubic yards. l yf Y.,3 A awe w Ull., 6S' �o �.z3 Y -Is r Z DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable a. Location of disposal area. b. Dimensions of disposal area. Z, o4- slre Z3 75- "45-0' = 37j 0 fr c. (i) Do you claim title to disposal area? d. (i) Will a di Pial area be available for future maintenance? X11o, es []No [INA ❑Yes WNo ❑NA (ii attach a letter granting permission from the owner. (ii) If yes, where? e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. []CW ❑SAV ❑SB ❑WL Xwone (ii) Describe the purpose of disposal in these areas: f. (i) Does the disposal include any area in the water? ❑Yes No ❑NA (ii) If yes, h w much water area is affected? r 3. SHORELINE STABILIZATION (if development is a wood groin, use MP -4 — Strucfures) a. Tvae of shoreline stabilization: ulkhead ❑Riprap ❑Breakwater/Silt ❑Other: c. Average distance waterward of NHW or NWL: Z,e 40 I� e. Type of stabilization material: 0194 0t. woks g. Number of square feet of fill to be placed below water level. Bulkhead backfill �� Riprap �//1' Breakwater/Sill Other 14 i. Source of fill material. 4. OTHER FILL ACTIVITIES (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? []Yes ❑No If yes, (ii) Amount of material to be placed in the water _ (iii) Dimensions of fill area (iv) Purpose of fill 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? �l I r - c. (i) Will navi conal aids be required as a result of the project? ❑Yes LNo ❑NA (ii) If yes, explain what type and how they will be implemented. [3 This section not applicable b. Length: Width: d. Maximum distance waterward of NHW or NWL: Z 4 f. (I) Has there been shoreline erosion during preceding 12 months?Ite ❑Yeso [INA(ii) If yes, amount of erosion and source of erosion amount information h. Type of fill material. S �3d section not applicable b. (i) Will fill material be placed in coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW []SAV ❑SB ❑WL ❑None (ii) Describe the purpose of the fill in these areas: b. What type of construction equipment will be used (e.g., dragline, backhoe, or hydraulic dredge)? d. (i) Will wetlandsbbj gU ssed in transporting equipment to project No site? ❑Yes[INA(ii) If yes, explain stt{{{{eps that will be taken to avoid or minimize environmental impacts. X//.)- . t Date X')Applicant Name `� �% 4�vePr ,eAl Hd/4 Project Name a Applicant Si" G? fj' 51 Form DCM MP -4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS ❑This section not applicable a. (i) Is the docking facility/marina: b. (i) Will the facility be open to the general public? []Commercial ❑Public/Govemment Private/Community []Yes XNo c. (i) Dock(s) and/or pier(s) d. (i) Are Finger Piers included? ❑Yes XNo (ii) Number If yes: (iii) Length (ii) Number (iv) Width (iii) Length (v) Floating []Yes No (iv) Width (v) Floating []Yes []No e. (i) Are Platforms included? []Yes IqNo f. (i) Are Boatlifts included? []Yes XNo If yes: If yes: (ii) Number (ii) Number (iii) Length (iii) Length (iv) Width (iv) Width (v) Floating ❑Yes []No Note: Roofed areas are calculated from dripiine dimensions. g. (i) Number of slips proposed 2 (ii) Number of slips existing 0 h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies Dockage ("wet slips") only, number of slips: Dry storage; number of boats: Boat ramp(s); number of boat ramps: i ❑ Other, please describe: i. Check the proposed type of siting: j. Describe the typical boats to be served (e.g., open runabout, ❑ Land cut and access channel charter boats, sail boats, mixed types). ❑Open water; dredging for basin and/or channel Po wetr� /S3,9- rs ❑Open water, no dredging required ❑Other, please describe: ter Aov-q- EA,frwi k• Typical boat length: - 1. (i) Will the fao& i be open to the general public? ❑Yes No m. Q Will the facility have tie pilings? es []No (') If yes number of tie pilings? 6 i Z DOCKING FACILITY/MARINA OPERATIONS [This section not applicable ,\ a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number. Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h• Give the number of channel markers and "No Wake" signs proposed. L Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the marina/docking facility proposed within a primary or secondary nursery area? Oyes ❑No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ❑No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (S13), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SI3 OWL ❑None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ONO If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) a. (i) Is the boathouse structure(s): ❑Commercial ❑Public/Govemment ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. section not applicable 14. GROIN (e.g., wood, sheetpfle, etc. !f a rock groin, use MP -2, Excavation and Fill.) VThis section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) his section not applicable a- Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS a. Is the structure(s): ❑Commercial ❑Public/Government ❑Private/Community c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing section not applicable b. Number d. Description of buoy (color, inscription, size, anchor, etc.) I 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines -Z4AD Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 2d e. (i) Will navi a ' nal aids be required as a result of the project? []Yes No DNA (ii) If yes, pain what type and how they will be implemented. X/4 8. OTHER a. Give complete description: Date 117-011-7 Projeame ct /j6 J� 30 14 AQl Applicant Name F lr � Q � �/�e'✓�1 'a,0 �d,j �oa s.. Applica 71g l/J, L�✓Sly f¢a✓1�- b. Proximity of structure(s) to adjacent docking facilities. z oa0 ie� 't 40449 C v o4/ d. Water depth at waterward end of structure at NLW or NWL ,prLawo section not applicable 11) i! 1210 1206 %�6' 12 2081199 122 �� 1194 U1237 38 119 WASHINGTON PARK 7 �• 1 1311 1370 POP. 439 / 1301 ® B� 13573 1375 �0 1327 7j 1382 n O� O 1311 1372 1313 - 1389 2 Mill 131 1326 13B I� X61 4 ♦01386 1306 ,310 ' i .02 ip 1313 1309 Im 118 -'v 1203 1360 'r 14 1379 12 I �i • 1367 1316 1316 ® '70 1317 = 1318 191 1320 1364 1319 1321 1322 BEAUFORT COUNTY https://beaufort.connectgis.comIDownloadFile.ashx?i= ags_map2a9d97807dce4Oe9a5a848b3616c37c5x.htm&t=print 1/1 $ Beaufort Printed January 19, 2017 G H yTi v_. See Below for Disclaimer Proper_,,i Lard O;:rers F GPIN � t..t:tY�i--�+ C3J F _ ,.r _-�_.�. •1_ pig.; Vz. 3 , Ir-ericr Tr@C- Lires w f' Cer-erlires C c, L, r tv Lire v F t Cct;; Ire 5r L olid) S-Ke M. f w �? Aa Y a ..Y C .. V � r r i' 1.:. 1� 82 Feet Beaufort County online map access is provided as a public service, as is, as available and without warranties, expressed or implied. Content published on this ebsite is for informational purposes only and is not intended to constitute a legal record nor should it be substituted for the advice or services of industry professionals. The County of Beaufort and the Website Provider disclaim all responsibility and legal liability for the content published on this website. The use grees that Beaufort County and its Assigns shall be held harmless from all actions, claims, damages or judgments arising out of the use of County data. https://beaufort-connectgis-com/DownioadFile.ashx?i= pgs_mapl93aid9d8ad24f45a35c97058ed727e5xhtm&t=print 1/1 Name of Property owner Requesting Permit even 6,A6er4 Mailing Address. lf�KreRsv��re; NC 2Bo7y o -" S -o L r Phone Number': © AKA trtrt e ✓ �� & v, hi � C.� Email Address d ly that i have authorized h/�v Z , to act on n►y behalf, for the purpose of applying for and obtaining all CAMA Permits development: ry for the following proposed sV ,vifl� at my Pq)srty located at n.os,S `i.o as in —&. �O -County' do in fad grant permission to I furthermons cer* that I am authorized to gram and #wjr agents to enter Division of Coastal Management staff, the Local aft ,nond n rWated ro thts on &0 �ed lands in connection Pe Property O0r ktomaftn• -- orType �° TNIe This certification is valid through .._� I r `� I1 1 f\ 4i vO-.S 4 T3 45 �r . PROPOSED 1S X 50' A' BOAT RAMP:, \1.3 I do I I •p)� 38 I I N N \ \4�• HORIIANS,INC. p .. �_.. — D,B.1915.P.738 i\SO• \eLF I I LOT t 5 ' 0.36 ACRE ??O�: vVe 1 I I \ v� ¢ \ r I I I \ N ��eG�\FiQ\ LOT 16Q\ \ 0.33 ACRE /\ m \/ /171 � 71.48• \ K ti •4�)3�.' I ARC: 41.14' N 81.09 10'yy �� 9 I \ \ RADIUS: 25.00' I — _ CHORD: 36.63 CD4 CHpT '• .00 y CHORD BEARING: N 34'00'4414TA 1N�' S8. Q�' DELTA ANGLE: 94 17 O8" - — — — — — — _ ARC: 13.73' �' 2 RADIUS: 275.00' I — CHORD: 13.73' EVECHORD BEARING: N BO.36'52'W _ — HORIZONS INC. DELTA ANGLE: 0751'39' ` \ 738 Q �SR 13U I 1 LEGEND: \ \ I T �AsipRc,�, I I ®IIto ROD \ 1 1 Q FOINI' OSEPROD EXCAVATON \\ \ A 20 0 20 40 80 PROPOSED RI$VEp R anys CONCRETE (BOAT RAMP) \ � 8I GRAPHIC SCALE - FEET \ �J I 3/4" STAINLESS STEEL ROD +2.0 AND WASHER 2"X8' CAP WATER STAINLESS STEEL 4— NUT AND WASHER 2' MAX 2" X 8" �� CAP _+4.0' 3 X 10 MARINE GRADE WHAILER VINYL SHEET PILING —3 X 10 MARINE GRADE WHAILER WATER MARK I I PRO►'03ED - - Ct 84&A- 4&A- TO BE ZERO BACKFILL. THESE U. U �/ ? EXCAVATION - THE EVENT THE BANK IS NOT I S 81'09 70 E109.95 _� S 81'09'70"E X -ss / a 1 82' 19.90 S 81'09'03-E S 11`43.08-4 O I W PROPOSED 44.40\. �, W20.67' �. / BULKHEAD PROPOSED EXCq 20 oATION 8"0 WOOD PILINGS(Typ') � ` 1 1 _ PROPOSED DOCKING AREA I , I � � \ � •sy sk I I \ s I I N N \ \4�• HORIIANS,INC. p .. �_.. — D,B.1915.P.738 i\SO• \eLF I I LOT t 5 ' 0.36 ACRE ??O�: vVe 1 I I \ v� ¢ \ r I I I \ N ��eG�\FiQ\ LOT 16Q\ \ 0.33 ACRE /\ m \/ /171 � 71.48• \ K ti •4�)3�.' I ARC: 41.14' N 81.09 10'yy �� 9 I \ \ RADIUS: 25.00' I — _ CHORD: 36.63 CD4 CHpT '• .00 y CHORD BEARING: N 34'00'4414TA 1N�' S8. Q�' DELTA ANGLE: 94 17 O8" - — — — — — — _ ARC: 13.73' �' 2 RADIUS: 275.00' I — CHORD: 13.73' EVECHORD BEARING: N BO.36'52'W _ — HORIZONS INC. DELTA ANGLE: 0751'39' ` \ 738 Q �SR 13U I 1 LEGEND: \ \ I T �AsipRc,�, I I ®IIto ROD \ 1 1 Q FOINI' OSEPROD EXCAVATON \\ \ A 20 0 20 40 80 PROPOSED RI$VEp R anys CONCRETE (BOAT RAMP) \ � 8I GRAPHIC SCALE - FEET \ �J I 3/4" STAINLESS STEEL ROD +2.0 AND WASHER 2"X8' CAP WATER STAINLESS STEEL 4— NUT AND WASHER 2' MAX 2" X 8" �� CAP _+4.0' 3 X 10 MARINE GRADE WHAILER VINYL SHEET PILING —3 X 10 MARINE GRADE WHAILER WATER MARK I I THIS PROJECT IS INTENDED TO BE ZERO BACKFILL. THESE 7' — ►I SECTIONS ARE SUBMITTED IN cj THE EVENT THE BANK IS NOT STABLE IN SOME PLACES. PROPOSED BULKHEAD CROSS SECTION NO SCALE NOTE: INFORMATION ON THIS MAP FROM PREVIOUS SURVEYS BY OTHERS. i/"• ti' n D REFERENCE: 1 CYPRESS SHORES ON THE PAMLICO SUBDIVLSION (NAME CHANGED TO SHADY SHORES SUBDIVISION) DJ3.191S, P. 738 PLAT CABINET H, SLIDES 73.1 THROUGH 73-S l, r CAMA PERMIT SHEET 1 OF 2 REVISED 2/2/17: BOAT RAMP, BULKHEAD & CULVERT AREA MAP PROPERTY OF: ND SCA EVERGREEN HORIZONS, INC. (SHADY SHORES SUBDIVISION) LONG ACRE TOWNSHIP BEAUFORT COUNTY NORTH CAROLINA SCALE: 1" = 20' DATE: JANUARY 5, 2017 BY: HOOD RICHARDSON, P.A. ENGINEERS -GEOLOGISTS -PLANNERS 110 WEST 2NO STREET WASHINGTON, N.C. 27889 PHONE: (252) 975-3472 I I I I I 1 1 Ito 1 ! IOQ1C I 113 /ie / x0 4 PR�06SED15X50 sG' W I D81`9cO+l 3/4" STAINLESS STEEL ROD AND WASHER 2'X8" CAP WATER STAINLESS STEEL �- NUT AND WASHER 2MAX �r 2"X8' GAP M.0' 3 X 10 MARINE GRADE WHAILER io VINYL SHEET PILING —3 X 10 MARINE GRADE WHALER W aq NORMAL MARK " I I THIS PROJECT IS INTENDED TO BE ZERO BACKFILL. THESE 7' SECTIONS ARE SUBMITTED IN u+ THE EVENT THE BANK IS NOT STABLE IN SOME PLACES. PROPOSED BULKHEAD CROSS SECTION NO SCALE NOTE: INFORMATION ON THIS MAP FROM t'KUVLKIY Uh: NO SC"" PREVIOUS SURVEYS BY OTHERS. \� (SHADY SHORES SUBDIVISION) LONG ACRE TOWNSHIP BEAUFORT COUNTY PRO EXCAVTION 5 SCALE: 1" = 20' DATE: JANUARY 5, 2017 qaap I 81'09 10 E 109.95 V EVERGREEN \2p 110 WEST 2ND STREET DJB.1915, P. 738 WASHINGTON, N. C.27009 PHONE: (252) 975-3472 HORMNS, TNI. 19.90 S 81.0 I / 1 PROPOSED OPOSED BULKHEAD 11'43 O fiT 8•W 44.40 PROPpgED CAMA PERMIT I I z B0WOOC a 2p oATION 0a CINE[ g4NK'._ S / 3s3,. PILINGS fryp.) ` ` I I I_ - PROPOSED DOCKING �� \ s ITS, 3728 I I l l I \ l ?' ! I L •. �"•I� 3/4" STAINLESS STEEL ROD AND WASHER 2'X8" CAP WATER STAINLESS STEEL �- NUT AND WASHER 2MAX �r 2"X8' GAP M.0' 3 X 10 MARINE GRADE WHAILER io VINYL SHEET PILING —3 X 10 MARINE GRADE WHALER W aq NORMAL MARK " I I THIS PROJECT IS INTENDED TO BE ZERO BACKFILL. THESE 7' SECTIONS ARE SUBMITTED IN u+ THE EVENT THE BANK IS NOT STABLE IN SOME PLACES. PROPOSED BULKHEAD CROSS SECTION NO SCALE NOTE: INFORMATION ON THIS MAP FROM t'KUVLKIY Uh: NO SC"" PREVIOUS SURVEYS BY OTHERS. \� (SHADY SHORES SUBDIVISION) LONG ACRE TOWNSHIP BEAUFORT COUNTY REFERENCE: SCALE: 1" = 20' DATE: JANUARY 5, 2017 CYPRESS SHORES ON THE PAMLICO SUBDIVISIONFC BY: HOOD RICHARDSON, P.A. V EVERGREEN \2p 110 WEST 2ND STREET DJB.1915, P. 738 WASHINGTON, N. C.27009 PHONE: (252) 975-3472 HORMNS, TNI. \�F� LOT 15 D.B. 1915, P. 738 CAMA PERMIT I I 0.36 ACRE -TI'--•.— - _..-•. REVISED 2/2/17: BOAT RAMP, BULKHEAD B CULVERT I I l l I \ l N LOT 16 ! I L •. �"•I� ... 0.33 ACRE /\ I 1 •• I I ARC:41.14' N 81.09'10 I \ CHOIRS: 36.63' CHORD CHORD BEARING: N 34'00'4419 DELTA ANGLE: 94'17'08" - - BCRD ••?> 9j. �CTq f4R 0" y _ _ / RADIUS: CHORD: 275.00' 13.73' CHORD BEARING: gi?RmEN; DELTA ANGLE: N 80'36'57W 0751'39" \ D.B.1915,i738 / 1 LEGEND: \ ! 1 0 IRON ROD 1 - / 0 POINT r 1 PROPOSED EXCAVATION \ \ \ \ PROPOSED CONCRETE (BOAT RAMP) 20 0 20 40 60 \ I \ GRAPHIC SCALE - FEET \ 3/4" STAINLESS STEEL ROD AND WASHER 2'X8" CAP WATER STAINLESS STEEL �- NUT AND WASHER 2MAX �r 2"X8' GAP M.0' 3 X 10 MARINE GRADE WHAILER io VINYL SHEET PILING —3 X 10 MARINE GRADE WHALER W aq NORMAL MARK " I I THIS PROJECT IS INTENDED TO BE ZERO BACKFILL. THESE 7' SECTIONS ARE SUBMITTED IN u+ THE EVENT THE BANK IS NOT STABLE IN SOME PLACES. PROPOSED BULKHEAD CROSS SECTION NO SCALE NOTE: INFORMATION ON THIS MAP FROM t'KUVLKIY Uh: NO SC"" PREVIOUS SURVEYS BY OTHERS. \� (SHADY SHORES SUBDIVISION) LONG ACRE TOWNSHIP BEAUFORT COUNTY REFERENCE: SCALE: 1" = 20' DATE: JANUARY 5, 2017 CYPRESS SHORES ON THE PAMLICO SUBDIVISIONFC BY: HOOD RICHARDSON, P.A. V (NAME CHANGED TO SHADY SHORES SUBDIVISION) 110 WEST 2ND STREET DJB.1915, P. 738 WASHINGTON, N. C.27009 PHONE: (252) 975-3472 PLAT CABINET H, SLIDES 73.1 THROUGH 73.5 CAMA PERMIT CF.! -: •-.- SHEET 1 OF 2 REVISED 2/2/17: BOAT RAMP, BULKHEAD B CULVERT AREA MAP t'KUVLKIY Uh: NO SC"" EVERGREEN HORIZONS, INC. \� (SHADY SHORES SUBDIVISION) LONG ACRE TOWNSHIP BEAUFORT COUNTY NORTH CAROLINA SCALE: 1" = 20' DATE: JANUARY 5, 2017 C32J� BY: HOOD RICHARDSON, P.A. V ENGINEERS-GEOLO°ISTS-PLANNERS 110 WEST 2ND STREET WASHINGTON, N. C.27009 PHONE: (252) 975-3472 il�G�li61 PAVEMENT 4.0' ELEV. f PROPOSED VINYL BULKHEAD - - r r -i -r T r- =-T T T- f l -r -r T-� 7 T T-117 -r 7---- -1-1-7 - T T- I -I Z T T- r- � T r -1 -<.0' ELEV. EXISTING CANAL BANK 1 1 1 XISTING CANAL BANK — --- - -- — — — — --- --- _ — � — — — _ PROPOSED i l I l l l F --- 1 1 1 EXCAVATION l0 1 1 1 1 1 1 1 I I I I I I I I I I I I I I I I I t l l l l l l I OPoSED M \`% r CONCRETE 11 1 1 1 1 NORMLAWATER MARKT 1 1 1 1 1 1 1 I M OPF 1 1 1 1 1 1 1 1 1 \ \ \ \ \ \ \ \ \ PROPOSED EXCAVATION -3.5' ELEV. 25 3 SITE W15 4 24 01fvC; CAMA PERMIT SHEET 2 OF 2 REVISED 2/27/17: BULKHEAD ET LICK g�v 23// AREA MAP / U NO SCAL I EVERGREEN HORIZONS, INC. o\O�q�Oa �4� 21 22 DREDGE SPOIL DISPOSAL AREA NO SCALE 16 M- 17 "tA CROSS SEC11ON ATOA' HORIZONTAL AND VERDCAL SCALE.- I' = 5' EX 20 CROSS SECTION BTOB' HORIZONTAL AND VERTICAL SCALE, I' - 5' CAMA PERMIT SHEET 2 OF 2 REVISED 2/27/17: BULKHEAD SR f3U AREA MAP PROPERTY OF: NO SCAL I EVERGREEN HORIZONS, INC. (SHADY SHORES SUBDIVISION) 3z rQ i1 L'A T LONG ACRE TOWNSHIP BEAUFORT COUNTY NORTH CAROLINA ( RIVER ROAD SCALE: 1" = 5' DATE: JANUARY 5, 2017 32 BY: HOOD RICHARDSON, P.A. 316 ENGIN1 00 WEST L2ND TSTREETNNERS WASHINGTON, N.C. 27889 PHONE: (252) 975-3472 CAN 16-01-167-A