Loading...
HomeMy WebLinkAbout20150994 Ver 3_T-01 Phase II Additonal Info Submittal_20170220February 20, 2017 NCDEQ — Division of Water Resources Water Quality Regional Operations Section 2090 U.S. Hwy. 70 Swannanoa, NC. 28778 Attention: Andrew Moore, P.G. U.S. Army Corps of Engineers Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, NC 28801 Attention: David Brown, P.G. Reference: Response to Request for Additional Information PSNC Line T-01 Replacement Project Phase II DWR Project #20150994 V3 USACE ID No. SAW 2016-00773 Polk, Rutherford and Cleveland Counties, North Carolina S&ME Project No. 7435-16-013 Dear Messrs. Moore and Brown: This letter is in response to a February 2, 2017 request for additional information received from Andrew Moore with the NC Department of Environmental Quality (NCDEQ) - Division of Water Resources (DWR) regarding the aforementioned project. NCDEQ-DWR determined that our application was incomplete and could not be further processed until items listed in this letter were addressed. The following paragraphs presents NCDEQ-DWR comments in bold italics followed by our responses in standard text: DWR: The January 9, 2017 submittal indicates that all streams within the proposed greenfield segment of the project cannot be crossed at near -perpendicular angles (i.e. 75-105 degrees) as required in Condition 10 of Water Quality Certification 3884. The Division understands the difficulty in re -orienting crossings within, or adjacent to, the existing gas line easement. However, it is not clear why the crossings cannot meet the noted tolerance within the greenfield segment and/or why the greenfield segment was not designed to cross streams at near -perpendicular angles. Please specify which stream crossings within the greenfield segment cannot meet this threshold and provide additional detail as to why there are no practical alternatives to the proposed crossing orientations. (15A NCAC 02H .0506(f) and (g)]. Response to Request for Additional Information S&ME Project No. 7435-16-013 PSNC Line T-01 Replacement Project Phase II February 20, 2017 PSNC: The stream crossings associated with greenfield segments of the project are identified in Table 1 (Appendix I). The table also includes justification for the alignment associated with each crossing. DWR: Proposed crossing SD03 appears to cross the same stream three times resulting in what appears to be avoidable impacts. Please re -configure the orientation of the pipeline to one crossing of the stream or clearly explain why three crossings of the same stream are unavoidable. (15A NCAC 02H.0506(t) and (g)]. PSNC explored a variety of routes across the subject parcel. Stream SD03 flows diagonally across the entire southwestern portion of the parcel, then onto an adjoining tract, and back onto the subject parcel in the northwestern portion. In order to accommodate the landowner and preserve the marketable value of the property, the proposed route closely abuts the property boundary, and in so doing, will cross the stream at two separate locations. Because SD03 is extremely meandering, selection of an optical crossing point proved difficult. Shifting the crossings as they are proposed would either affect more stream, adjacent wetlands, or involve encroachment onto a separate landowner. To minimize the impact of these crossings, PSNC reduced the width of the combined temporary and permanent easements from 80 feet to 65 feet, reducing the stream impacts by 33 feet. DWR: The January 9, 2017 submittal indicates that the proposed project will not meet Condition 16 of Water Quality Certification 3884, which requires that the construction corridor be limited to 40 feet. The submittal proposes to limit the construction corridor to 80 feet at stream and wetland crossings, with the exception of four crossings that will require additional temporary workspace in excess of 80 feet. The construction corridor for Phase I of the Line T-01 pipeline replacement project was limited to 50 feet at stream and wetland crossings. It is not clear why an additional 30 feet of construction corridor is necessary for Phase II when Phase I was successfully completed with a SO - foot construction corridor at stream and wetland crossings. Please provide additional detail regarding the need for the additional 30 feet of construction corridor and what type of activities will occur within the construction corridor adjacent to streams and wetlands. [15A NCAC 02H .OS06(fl and (g)]. While the width of the construction corridor was limited to 50 feet at stream and wetland crossings during Phase I of the project, this reduction in workspace created significant safety and constructability issues for the contractor. The 8 -inch diameter gasline, which must remain in service during construction of the new pipeline, is generally located at least 15 feet from the edge of the existing easement, and is buried at varying depths. To minimize potential safety concerns, PSNC has determined that the portion of the existing easement containing the "live" line should be excluded from use by the heavy equipment required to install the new 24 -inch line. As such, no more than 65 feet of the proposed 80 -foot construction corridor is available to safely operate the heavy equipment and install the new pipe. However, because safety issues concerning an existing pipe are not applicable in greenfield portions of the project, PSNC decided to reduce the proposed width of the combined temporary and permanent easements at all greenfield stream and wetland crossings to 65 feet. As indicated in Tables 2 and 3 (Appendix II), this approach reduces the proposed project wide temporary stream impacts from 11,113 linear feet (If) to 10,561 If. Similarly, overall temporary wetland impacts have been reduced from 2.373 acre to 2.286 acre, and permanent conversion impacts from 0.434 acre to 0.397 acre. The revised impact tables are presented in the table below for your convenience, and revised drawings that depict the reduced easement at greenfield stream and wetland crossings are included in Appendix III. VA Response to Request for Additional Information S&ME Project No. 7435-16-013 PSNC Line T-01 Replacement Project Phase II February 20, 2017 Summary of Revised Project -wide Stream and Wetland Impacts Stream Impacts (if) Pipeline Construction Activities/Crossings Culvert Placement for Access Road Temporary Permanent Permanent 10.561 0 •.Impacts Temporary Impacts Permanent Open Water Impacts (Fill placement) 30 Permanent Wetland Impacts (Fill Placement and Conversion) 2.286 0 0.397 Through this reduction in workspace, the proposed project -wide temporary stream impacts have been reduced by 552 If, and temporary wetland impacts reduced by 0.087 acre. DWR: There appear to be pre-existing culverts in the vicinity of stream crossings SA08, SA10, WA021SA19, SA27, SA28, WA14/SA38, WA45/SA69, SA80, SA81A, SA104, and SA117. What is the pipeline construction approach in these areas with regard to the pre-existing culvert? For example, will the pipeline be placed under the culvert, will the culvert be permanently removed, temporarily removed and returned to its original location, etc? [15A NCAC 02H .0502(x)(4)]. The construction approaches in regard to the pre-existing culverts are identified in Table 4 (Appendix IV). DWR: There are two proposed pipe centerlines and/or HDD bores depicted on Figures 67 (SAI 7), 71 (SA22), 120 (SA81A), 121 (SC03A), 122 (SA87), 132 (SAI00), 170 (WG03), 171 (WG04), 193 (WC01), 194 (WA65), and 196 (WA07). Can you clarify why two new pipe centerlines and/or HDD bores are depicted at these locations? [ISA NCAC 02H .0502(b)]. There are several locations where the existing 8 -inch pipe is being simultaneously relocated within the same easement as the proposed 24 -inch pipe, as depicted on the aforementioned drawings. At these locations, installation of the 8 -inch pipe will occur within the same footprint as that permitted for the 24 - inch line, and will not result in additional stream or wetland impacts beyond those identified in this application. Thank you for your consideration of this additional information submittal. If you have questions or we can provide anything else, please feel free to contact us at 704.523.4726. Sincerely, S&ME (71 �' �__ Joey Lawler, PWS Project Manager Senior Reviewed by Chris Stahl, PE Response to Request for Additional Information SWE Project No. 7435-16-013 PSNC Line T-01 Replacement Project Phase II February 20, 2017 Attachments ♦ Appendix I — Table 1 - Greenfield Stream Crossing Justification ♦ Appendix II — Table 2 - Revised Stream Impacts; Table 3 — Revised Wetland Impacts ♦ Appendix III — Revised Impact Drawings for Greenfield Crossings ♦ Appendix IV — Table 4 - Existing Culvert Crossings 4 Appendix I Table 1- Greenfield Stream Crossing Justification Table 1 Greenfield Stream Crossing Justification PSNC Line T-001 Replacement Phase II The proposed route is aligned to abut the existing property line at this location. Shifting alignment north would not result in a more perpendicular crossing and would impact additional wetlands SC04 UT to Little White Oak Creek (WC09). Shifting the alignment south would not result in a more perpendicular crossing, and would push the easement closer to an existing dwelling. Width of combined temporary and permanent easements reduced from 80 feet to 65 feet; impacts reduced by 17 feet. Crossing is near perpendicular. Width of combined temporary and permanent easements also SC08 Machine Creek reduced from 80 feet to 65 feet; impacts reduced by 15 feet. Shifting the alignment north or south would not likely result in a less -perpendicular crossing. A wetland area (WC10) is also located just south of the proposed alignment. The width of combined SC06 UT to Machine Creek temporary and permanent easements was reduced from 80 feet to 65 feet; impacts reduced by 17 feet. Stream is meandering both upstream and downstream of the crossing location. Shifting alignment south would impact additional wetland area. Shifting alignment north would also not result in SC11 UT to Wheat Creek perpendicular crossing and may result in greater permanent impacts to WC12. Width of combined temporary and permanent easements also reduced from 80 feet to 65 feet; impacts reduced by 16 feet. Stream is meandering both upstream and downstream of the crossing location. Shifting alignment north would impact additional wetland area. Shifting permanent easement south would not result in SC12 UT to Wheat Creek perpendicular crossing and shifting alignment south would impact a wetland area (WC13). Width of combined temporary and permanent easements also reduced from 80 feet to 65 feet; impacts reduced by 17 feet. Crossing is near perpendicular, but a small portion of a meander to the north may be impacted by temporary workspace. Shifting the alignment north would result in increased stream impacts. The SC14 UT to Wheat Creek alignment cannot be shifted further south without impacting a parallel stream channel (SC15) and adjacent wetland area (WC14). Width of combined temporary and permanent easements also reduced from 80 feet to 65 feet; impacts reduced by 56 feet. Greenfield Stream Crossing Justification PSNC Line T-001 Replacement Phase II Crossing is near perpendicular, but a small portion of a meander to the north may be impacted by temporary workspace. Shifting the alignment north or south would result in increased stream SD10 UT to Green River impacts, and increased impacts to wetlands (WD10). Width of combined temporary and permanent easements also reduced from 80 feet to 65 feet; impacts reduced by 84 feet. Crossing is near perpendicular. Reduction in width of combined temporary and permanent easements SE02 UT to Green River also reduced from 80 feet to 65 feet results in meander no longer being affected. Impacts reduced by 33 feet. Crossing is near perpendicular. Width of combined temporary and permanent easements reduced SE01 UT to Green River from 80 feet to 65 feet; impacts reduced by 16 feet. Crossing is meandering at this location. Shifting alignment north would impact additional stream length. Shifting alignment south would not result in perpendicular crossing and shifting alignment SD05/06 UT to Green River south would impact additional stream length and a second stream (SD07). Width of combined temporary and permanent easements reduced from 80 feet to 65 feet; impacts reduced by 78 feet. Shifting the alignment north or south would not result in a more -perpendicular crossing, and wetlands areas (WD04-WD06) are located to the south. The width of the combined temporary and SD03 UT to Green River permanent easements at this area was reduced from 80 feet to 65 feet, reducing the stream impacts by 33 feet. Proposed pipeline route abuts property line in order to accommodate landowner and preserve property value. Shifting alignment north would result in a less -perpendicular crossing, and shifting SF01 UT to Green River alignment south to the adjacent property would also impact a wetland area (WG01). Width of combined temporary and permanent easements also reduced from 80 feet to 65 feet; impacts reduced by 25 feet. Proposed pipeline route abuts property line in order to accommodate landowner and preserve property value. Shifting alignment east would not result in a less -perpendicular crossing and would impact a wetland area (WG02). Shifting the alignment west to the adjacent property would severely SG02 UT to Green River encumber this much smaller tract by taking up nearly 20 percent of the parcel. The width of combined temporary and permanent easements reduced from 80 feet to 65 feet; impacts reduced by 27 feet. SA52 I Second Broad River lCrossing is near perpendicular and pipe will be installed by HDD. Greenfield Stream Crossing Justification PSNC Line T-001 Replacement Phase II Crossing is near perpendicular. Width of combined temporary and permanent easements also SA81A UT to First Broad River reduced from 80 feet to 65 feet; impacts reduced by 16 feet. Proposed route abuts an existing farm road to accommodate landowner. Width of combined SC03A UT to First Broad River temporary and permanent easements also reduced from 80 feet to 65 feet; impacts reduced by 21 feet. Pipe will be installed by HDD. Shifting alignment to the south would impact church. Shifting SA87 First Broad River alignment north would impact Hexast lis naniflora population. Shifting the alignment north or south would not accommodate required Blacksburg Road and railroad SA100 UT to Logan Branch HDD crossing tolerance. Width of combined temporary and permanent easements was reduced from 80 feet to 65 feet; impacts reduced by 10 feet. Crossing is near perpendicular. Width of combined temporary and permanent easements also SA119 Long Branch reduced from 80 feet to 65 feet; impacts reduced by 15 feet. Proposed route is aligned to abut existing powerline easement and property boundary. Shifting alignment east would result in greater wetland impacts (WA77) and shifting the alignment west would SA121 UT to Long Branch encroach into the existing powerline easement. Width of combined temporary and permanent easements also reduced from 80 feet to 65 feet; impacts reduced by 40 feet. Crossing is near perpendicular. Width of combined temporary and permanent easements also SH01 UT to Long Branch reduced from 80 feet to 65 feet; impacts reduced by 16 feet. Appendix II Table 2 - Revised Stream Impacts; Table 3 — Revised Wetland Impacts Table 2 Revised Stream Impacts Temporary disturbance / SA01A 41 6+21 Perennial 123 0 35.306697 82.174082 trenched pipeline crossing Temporary disturbance / SA02 42 17+87 Intermittent 81 0 35.306843 82.170548 trenched pipeline crossing SAO1B Temporary disturbance / 43 50+75 Perennial 280 0 35.306937 82.159683 (Canal Creek) trenched pipeline crossing Temporary disturbance / SA03 44 52+23 Intermittent 31 0 35.306838 82.15906 trenched pipeline crossing Temporary disturbance / SA04 45 76+96 Perennial 117 0 35.305827 82.150913 trenched pipeline crossing Temporary disturbance / SA05 46 85+55 Perennial 96 0 35.305246 82.148113 trenched pipeline crossing SA06 Temporary disturbance / 47 108+62 Perennial 81 0 35.302916 82.141007 (Little White Oak Creek) trenched pipeline crossing Temporary disturbance / SA07 48 122+37 Perennial 108 0 35.301083 82.136963 trenched pipeline crossing SA08 49 139+52 Intermittent Temporary disturbance 22 0 35.297879 82.133349 Temporary disturbance / SA10 50 171+00 Perennial 90 0 35.295278 82.123396 trenched pipeline crossing Temporary disturbance / SA12 51 183+61 Intermittent 104 0 35.293811 82.119543 trenched pipeline crossing Temporary disturbance / SA13 52 192+74 Intermittent 79 0 35.292756 82.116762 trenched pipeline crossing Temporary disturbance / SC04 53 REV 218+51 Intermittent 76 0 35.29247 82.109424 trenched pipeline crossing SC08 Temporary disturbance / 54 REV 239+92 Perennial 71 0 35.295875 82.103761 (Machine Creek) trenched pipeline crossing Temporary disturbance / SC06 55 REV 263+91 Perennial 76 0 35.298273 82.096277 trenched pipeline crossing Temporary disturbance / SC11 56 REV 299+92 Perennial 129 0 35.299361 82.084415 trenched pipeline crossing Temporary disturbance / SC12 57 REV 321+35 Perennial 134 0 35.297937 82.077517 trenched pipeline crossing Temporary disturbance / SC14 58 REV 347+14 Perennial 92 0 35.297412 82.069013 trenched pipeline crossing Temporary disturbance / SD10 59 REV 377+09 Perennial 66 0 35.295185 82.05938 trenched pipeline crossing Temporary disturbance / SE02 60 REV 388+77 Perennial 68 0 35.29276 82.056881 trenched pipeline crossing Temporary disturbance / SE01 61 REV 418+28 Perennial 65 0 35.289179 82.048956 trenched pipeline crossing Temporary disturbance / SD06 62 438+08 Intermittent 8 0 35.286332 82.04331 trenched pipeline crossing Temporary disturbance / SD05 63 REV 439+10 Perennial 261 0 35.286369 82.042891 trenched pipeline crossing Temporary disturbance / SD03 64 REV 455+84 Perennial 216 0 35.2843 82.037974 trenched pipeline crossing Temporary disturbance / SG02 65 REV 468+66 Perennial 179 0 35.281942 82.036305 trenched pipeline crossing Temporary disturbance / SF01 66 REV 483+62 Perennial 78 0 35.278682 82.036512 trenched pipeline crossing SA17 Avoided (HDD) /temporary 67 567+19 Perennial 30 0 35.271172 82.013792 (Green River) bridge crossing Temporary disturbance / SA18 68 582+16 Intermittent 126 0 35.271178 82.00899 trenched pipeline crossing Temporary disturbance / SA19 69 602+29 Perennial 64 0 35.273471 82.002844 trenched pipeline crossing Temporary disturbance / SA21 70 629+17 Perennial 109 0 35.27626 81.995098 trenched pipeline crossing SA22 71 657+77 Perennial Avoided (HDD) 0 0 35.276416 81.985607 (Broad River) Temporary disturbance / SA24 72 677+53 Perennial 52 0 35.277391 81.979091 trenched pipeline crossing SA25 Temporary disturbance / 73 705+45 Perennial 126 0 35.27858 81.969871 (Grays Creek) trenched pipeline crossing Temporary disturbance / SA27 74 733+26 Perennial 74 0 35.278835 81.96058 trenched pipeline crossing Temporary disturbance / SA28 75 743+07 Perennial 201 0 35.279224 81.957018 trenched pipeline crossing SA29 76 753+83 Intermittent Temporary disturbance 42 0 35.279566 81.953775 SA31 Temporary disturbance / 77 797+44 Perennial 127 0 35.280234 81.939396 (Jarretts Creek) trenched pipeline crossing SA34 Temporary disturbance / 78 868+73 Perennial 85 0 35.282215 81.915637 (Richardson Creek) trenched pipeline crossing SA35 79 868+90 Intermittent Temporary disturbance 47 0 35.282317 81.915601 Revised Stream Impacts Temporary disturbance / TSA36 !12 80 869+71 Perennial 1r!O 35.282249 81.91535 trenched pipeline crossing SA37 81 937+18 Perennial Temporary disturbance 79 0 35.283474 81.893565 Temporary disturbance / SA38 82 938+18 Perennial 54 0 35.283501 81.893245 trenched pipeline crossing SA39 83 938+43 Perennial Temporary disturbance 46 0 35.283497 81.893147 Temporary disturbance / SA40 84 955+28 Perennial 134 0 35.28352 81.886951 trenched pipeline crossing Temporary disturbance / SA41 85 957+47 Perennial 82 0 35.283712 81.886778 trenched pipeline crossing Temporary disturbance / SA42 86 981+73 Perennial 100 0 35.284257 81.878681 trenched pipeline crossing SA43 Temporary disturbance / 87 991+91 Perennial 115 0 35.284586 81.875297 (Flo ds Creek) trenched pipeline crossing SA44 Temporary disturbance / 88 1021+07 Perennial 184 0 35.285305 81.865602 (Bracketts Creek) trenched pipeline crossing Temporary disturbance / SA46 89 1033+73 Perennial 72 0 35.285567 81.86142 trenched pipeline crossing Temporary disturbance / SA45 90 1034+75 Perennial 181 0 35.28563 81.861089 trenched pipeline crossing Temporary disturbance / SA47 91 1053+91 Perennial 112 0 35.286336 81.85473 trenched pipeline crossing Temporary disturbance / SA49 92 1147+85 Perennial 115 0 35.288766 81.825736 trenched pipeline crossing Temporary disturbance / SA51 93 1210+19 Perennial 111 0 35.289166 81.80646 trenched pipeline crossing SA52 94 1234+93 Perennial Avoided (HDD) 0 0 35.2871 81.798634 (Second Broad River) SA53 95 1236+35 Perennial Avoided (HDD) 0 0 35.286914 81.798218 Temporary disturbance / SA55 96 1250+85 Perennial 141 0 35.285568 81.793601 trenched pipeline crossing Temporary disturbance / SA56 97 1318+52 Perennial 202 0 35.281233 81.77201 trenched pipeline crossing SA57 Temporary disturbance / 98 1326+56 Perennial 56 0 35.280929 81.769311 (Hills Creek) trenched pipeline crossing Temporary disturbance / SA58 99 1340+04 Perennial 95 0 35.279825 81.765087 trenched pipeline crossing Temporary disturbance / SA59 100 1354+06 Perennial 85 0 35.278133 81.760891 trenched pipeline crossing SA61 Temporary disturbance / 101 1426+81 Perennial 123 0 35.273406 81.737454 (Grog Creek) trenched pipeline crossing Temporary disturbance / SA62 102 1450+63 Perennial 100 0 35.27165 81.729826 trenched pipeline crossing SA63 Temporary disturbance / 103 1452+32 Perennial 156 0 35.271406 81.729447 (Grog Creek) trenched pipeline crossing Temporary disturbance / SA64 104 1468+23 Perennial 88 0 35.270268 81.72416 trenched pipeline crossing Temporary disturbance / SA65 105 1469+19 Perennial 83 0 35.270198 81.723845 trenched pipeline crossing Temporary disturbance / SA66 106 1481+94 Perennial 130 0 35.269192 81.719876 trenched pipeline crossing Temporary disturbance / SA67 107 1512+23 Perennial 190 0 35.266903 81.710025 trenched pipeline crossing Permeant loss due to access road culvert installation (no SA68 108 1524+92 Perennial 0 30 35.266254 81.705876 impact outside of road area due to bore Temporary disturbance / SA69 109 1536+71 Perennial 67 0 35.26569 81.702019 trenched pipeline crossing Temporary disturbance / SA71 110 1557+23 Perennial 143 0 35.264049 81.695434 trenched pipeline crossing SA72 Temporary disturbance / 111 1562+25 Perennial 140 0 35.263142 81.694104 (Sand Run) trenched pipeline crossing Temporary disturbance / SA73 112 1579+69 Perennial 160 0 35.261752 81.688547 trenched pipeline crossing Temporary disturbance / SA75 113 1638+36 Perennial 102 0 35.256536 81.670179 trenched pipeline crossing Temporary disturbance / SA76A 114 1696+71 Perennial 136 0 35.253391 81.651022 trenched pipeline crossing Temporary disturbance / SA76B 115 1710+28 Perennial 126 0 35.252323 81.646712 trenched pipeline crossing SB03 Temporary disturbance / 116 1761+29 Perennial 142 0 35.249433 81.630196 (Beaverdam Creek) trenched pipeline crossing Temporary disturbance / SB04 117 1786+23 Perennial 145 0 35.246253 81.622904 trenched pipeline crossing SA79 Temporary disturbance / 118 1807+29 Perennial 367 0 35.244544 81.616218 (Hawkins Branch) trenched pipeline crossing Revised Stream Impacts Stream Name Impact Station Flow Regim�er Temporary Permanent Latitude Longitude Map No. 1����kmpact (LF) Impact Temporary disturbance / SA80 119 1815+42 Intermittent 143 0 35.244129 81.613402 trenched pipeline crossing Temporary disturbance / SA81A 120 REV 1863+53 Perennial 53 0 35.237675 81.600698 trenched pipeline crossing Temporary disturbance / SC03A 121 REV 1864+53 Perennial 100 0 35.237741 81.600378 trenched pipeline crossing SA87 122 1910+78 Perennial Avoided (HDD) 0 0 35.238783 81.587365 (First Broad River) Temporary disturbance / SA88 123 1949+24 Perennial 86 0 35.23592 81.575028 trenched pipeline crossing Temporary disturbance / SA90 124 1964+91 Perennial 85 0 35.234828 81.569943 trenched pipeline crossing Temporary disturbance / SA91 125 1988+50 Perennial 118 0 35.233036 81.56234 trenched pipeline crossing SA92 126 2009+70 Perennial Temporary disturbance 51 0 35.231357 81.555601 Temporary disturbance / SA93 127 2009+94 Intermittent 85 0 35.231276 81.555544 trenched pipeline crossing Temporary disturbance / SA94 128 2013+95 Perennial 99 0 35.231003 81.554266 trenched pipeline crossing SA95 129 2014+51 Perennial Temporary disturbance 132 0 35.231038 81.554018 Temporary disturbance / SA96 130 2047+64 Perennial 94 0 35.228806 81.54334 trenched pipeline crossing Temporary disturbance / SA98 131 2059+45 Perennial 64 0 35.228102 81.539472 trenched pipeline crossing Temporary disturbance / SA100 132 REV 2106+05 Perennial 95 0 35.223359 81.526374 trenched pipeline crossing Temporary disturbance / SA102 133 2145+60 Perennial 153 0 35.222531 81.514721 trenched pipeline crossing Temporary disturbance / SA104 134 2217+15 Perennial 62 0 35.217242 81.494077 trenched pipeline crossing Temporary disturbance / SA106 135 2233+19 Perennial 79 0 35.216405 81.488815 trenched pipeline crossing SA107 136 2254+25 Perennial Avoided (HDD) 0 0 35.215005 81.482005 (Buffalo Creek) SA108 137 2290+15 Perennial Avoided (HDD) 0 0 35.212083 81.470543 (Beason Creek) SA110 138 2298+52 Perennial Temporary disturbance 63 0 35.211296 81.467906 Temporary disturbance / SA111 139 2358+05 Perennial 62 0 35.206854 81.448697 trenched pipeline crossing Temporary disturbance / SA112 140 2369+42 Perennial 90 0 35.206087 81.445054 trenched pipeline crossing Temporary disturbance / SA113 141 2374+86 Perennial 79 0 35.205583 81.443321 trenched pipeline crossing SA114 Temporary disturbance / 142 2390+22 Perennial 81 0 35.20453 81.438342 (Long Branch) trenched pipeline crossing Temporary disturbance / SA117 143 2415+38 Perennial 56 0 35.202919 81.430163 trenched pipeline crossing Temporary disturbance / SA120 144 2422+52 Intermittent 94 0 35.202383 81.427878 trenched pipeline crossing SA119 Temporary disturbance / 145 REV 2430+34 Perennial 66 0 35.201598 81.425632 (Long Branch) trenched pipeline crossing Temporary disturbance / SH01 146 REV 2453+14 Perennial 66 0 35.196621 81.422792 trenched pipeline crossing Temporary disturbance / SA121 147 REV 2468+65 Perennial 108 0 35.192533 81.422778 trenched pipeline crossing Totals: 10,561 30 = amended by reducing combined width of temporary and permanent easement from 80 feet to 65 feet Table 3 Revised Wetland Impacts Temporary ground disturbance / OWA02 148 139+26 Open Water 0.020 0.000 35.297842 82.13346 trenched pipeline crossing Temporary ground disturbance / WC07 149 218+24 Headwater Forest 0.052 0.000 35.292382 82.109464 trenched pipeline crossing Temporary ground disturbance / trenched pipeline crossing / WC11 150 REV 243+64 Headwater Forest permanent conversion of forested 0.032 0.145 35.296428 82.10264 vegetation to emergent in new utility corridor. Temporary ground disturbance / WC12 151 REV 300+15 Seep clearing of forested vegetation in 0.001 0.000 35.299444 82.084356 temporary workspace Temporary ground disturbance / trenched pipeline crossing / WD10 152 REV 376+96 Headwater Forest permanent conversion of forested 0.002 0.042 35.295046 82.059486 vegetation to emergent in new utility corridor. Temporary ground disturbance/ permanent conversion of forested WE02 153 388+70 Headwater Forest 0.002 0.004 35.292766 82.056948 vegetation to emergent in new utility corridor. Temporary ground disturbance/ trenched pipeline crossing / WE01 154 418+19 Headwater Forest permanent conversion of forested 0.000 0.004 35.289134 82.049025 vegetation to emergent in new utility corridor. Temporary ground disturbance/ trenched pipeline crossing / WD07 155 455+64 Headwater Forest permanent conversion of forested 0.000 0.004 35.284229 82.038016 vegetation to emergent in new utility corridor. Temporary ground disturbance/ trenched pipeline crossing / WD06 156 457+20 Headwater Forest permanent conversion of forested 0.000 0.004 35.284018 82.037555 vegetation to emergent in new utility corridor. Temporary ground disturbance / WA02 157 602+68 Bottomland Hardwood 0.004 0.000 35.273335 82.0029 trenched pipeline crossing Temporary ground disturbance / WA03 158 629+02 Bottomland Hardwood 0.018 0.000 35.276294 81.995158 trenched pipeline crossing Temporary ground disturbance / trenched pipeline crossing / WA04 159 677+63 Seep 0.018 0.000 35.277522 81.979083 clearing of forested vegetation in temporary workspace Temporary ground disturbance / WA05 160 704+66 Floodplain Pool 0.026 0.000 35.278598 81.970121 trenched pipeline crossing Temporary ground disturbance / trenched pipeline crossing / WA08 161 777+53 Headwater Forest 0.158 0.000 35.280285 81.945966 clearing of forested vegetation in temporarV workspace WAll 162 869+92 Headwater Forest Temporary ground disturbance 0.0340.000 35.282356 81.915261 Temporary ground disturbance / trenched pipeline crossing / WA14 163 937+97 Headwater Forest 0.064 0.000 35.283372 81.893141 clearing of forested vegetation in temporarV workspace Temporary ground disturbance / trenched pipeline crossing / WA15 164 956+76 Seep 0.049 0.000 35.283621 81.887011 clearing of forested vegetation in temporary workspace Temporary ground disturbance / WA16 165 957+32 Headwater Forest 0.054 0.000 35.283653 81.886814 trenched pipeline crossing Temporary ground disturbance / trenched pipeline crossing / WA18 166 1034+05 Headwater Forest 0.012 0.000 35.285451 81.861306 clearing of forested vegetation in temporarV workspace Temporary ground disturbance / WA19 167 1035+OS Seep 0.015 0.000 35.285568 81.860935 trenched pipeline crossing Temporary ground disturbance / OWA06 168 1061+17 Open Water 0.005 0.000 35.286604 81.852325 trenched pipeline crossing Temporary ground disturbance / WA20 169 1061+73 Bottomland Hardwood 0.065 0.000 35.286594 81.852099 trenched pipeline crossing Temporary ground disturbance / WG03 170 1096+84 Seep 0.002 0.000 35.288854 81.841397 trenched pipeline crossing Revised Wetland Impacts TemporaryWetland Impact Station WAM Class .. ..Impact ID . . J(Acre) 0 m (Acre) Temporary ground disturbance / trenched pipeline crossing / WG04 171 1103+01 Seep permanent conversion of forested 0.013 0.013 35.288571 81.839551 vegetation to emergent in new utility corridor. Temporary ground disturbance / trenched pipeline crossing / WA21 172 1147+28 Headwater Forest 0.116 0.000 35.288783 81.825858 clearing of forested vegetation in temporary workspace Temporary ground disturbance / trenched pipeline crossing / WA23 173 1201+10 Headwater Forest 0.038 0.000 35.289978 81.809348 clearing of forested vegetation in temporarV workspace Temporary ground disturbance / WA26 174 1210+37 Headwater Forest 0.005 0.000 35.289087 81.806458 trenched pipeline crossing Conversion of forested vegetation WA27 175 1233+75 Riverine Swamp Forest to emergent within new permanent 0.000 0.062 35.287299 81.798996 easement. Temporary ground disturbance / trenched pipeline crossing / WA28 176 1240+52 Non -Tidal Freshwater Marsh 0.152 0.000 35.286513 81.79689 clearing of forested vegetation in temporary workspace Temporary ground disturbance / WA29 177 1251+08 Seep clearing of forested vegetation in 0.001 0.000 35.285379 81.793585 temporary workspace WA30 178 1318+04 Headwater Forest Temporary ground disturbance 0.010 0.000 35.281345 81.772189 Temporary ground disturbance / WA31 179 1318+63 Seep 0.034 0.000 35.281178 81.77202 trenched pipeline crossing Temporary ground disturbance / WA36 180 1426+94 Headwater Forest 0.001 0.000 35.273387 81.737457 trenched pipeline crossing Temporary ground disturbance / trenched pipeline crossing / WA37 181 1448+91 Bottomland Hardwood 0.123 0.000 35.271711 81.730414 clearing of forested vegetation in temlporarV workspace Temporary ground disturbance / trenched pipeline crossing / WA38 182 1454+00 Seep 0.141 0.000 35.271339 81.728791 clearing of forested vegetation in temporary workspace Temporary ground disturbance / WA39 183 1481+62 Headwater Forest 0.003 0.000 35.269149 81.720018 trenched pipeline crossing Permanent wetland fill for creation WA43 184 1525+03 Headwater Forest of a new 30' wide access road 0.000 0.006 35.266322 81.705797 corridor. Temporary ground disturbance / WA45 185 1536+95 Headwater Forest 0.008 0.000 35.265532 81.701916 trenched pipeline crossing Temporary ground disturbance / WA47 186 1580+82 Headwater Forest 0.076 0.000 35.261592 81.688173 trenched pipeline crossing Temporary ground disturbance / trenched pipeline crossing / WA48 187 1638+01 Headwater Forest 0.012 0.000 35.256499 81.67027 clearing of forested vegetation in temloorarV workspace Temporary ground disturbance / W1303 188 1719+81 Headwater Forest clearing of forested vegetation in 0.010 0.000 35.251516 81.643726 temporary workspace Temporary ground disturbance / WA52 189 1805+35 Seep 0.023 0.000 35.244458 81.616843 trenched pipeline crossing Temporary ground disturbance / WA60 190 1964+50 Headwater Forest 0.015 0.000 35.234825 81.570146 trenched pipeline crossing Temporary ground disturbance / WA61 191 1988+79 Seep 0.002 0.000 35.232907 81.562318 trenched pipeline crossing Temporary ground disturbance / trenched pipeline crossing / WA63 192 2014+99 Headwater Forest 0.030 0.000 35.230888 81.553919 clearing of forested vegetation in temporarV workspace Temporary ground disturbance/ trenched pipeline crossing / WCO1 193 2095+66 Headwater Forest permanent conversion of forested 0.010 0.006 35.223751 81.529805 vegetation to emergent in new utility corridor. Temporary ground disturbance / WA65 194 2114+71 Headwater Forest clearing of forested vegetation in 0.017 0.000 35.224627 81.524698 temporary workspace = amended by reducing combined width of temporary and permanent easement from 80 feet to 65 feet Revised Wetland Impacts TemporaryWetland Impact ID Map No. Station WAM Class .. ..Impact J(Acre) (Acre) -in Temporary ground disturbance / WA66 195 2131+96 Headwater Forest 0.001 0.000 35.223485 81.519037 trenched pipeline crossing WA67 196 REV 2161+46 Headwater Forest Avoided with reroute 0.000 0.000 35.220693 81.510143 Temporary ground disturbance / trenched pipeline crossing / WA68 197 2248+44 Bottomland Hardwood 0.071 0.000 35.215461 81.483868 clearing of forested vegetation in temporary workspace Temporary ground disturbance / WA69 198 2260+39 Riverine Swamp Forest clearing of forested vegetation in 0.110 0.000 35.214736 81.479964 temporary workspace Temporary ground disturbance / WA70 199 2265+94 Riverine Swamp Forest 0.014 0.000 35.214046 81.478645 trenched pipeline crossing Temporary ground disturbance / trenched pipeline crossing / WA71 200 2274+91 Riverine Swamp Forest 0.142 0.000 35.213346 81.475425 clearing of forested vegetation in temporary workspace Temporary ground disturbance / trenched pipeline crossing / WA72 201 2297+90 Headwater Forest 0.441 0.000 35.211509 81.468045 clearing of forested vegetation in temporary workspace Temporary ground disturbance/ trenched pipeline crossing / WA77 202 REV 2470+01 Bottomland Hardwood permanent conversion of forested 0.034 0.084 35.192183 81.422573 vegetation to emergent in new utility corridor. Temporary ground disturbance/ trenched pipeline crossing / WA79 203 2472+54 Bottomland Hardwood permanent conversion of forested 0.000 0.007 35.191502 81.422282 vegetation to emergent in new utility corridor. Temporary ground disturbance/ trenched pipeline crossing / WA78 204 2473+22 Headwater Forest permanent conversion of forested 0.000 0.016 35.191358 81.422119 vegetation to emergent in new utility corridor. Totals:l 2.286 1 0.397 = amended by reducing combined width of temporary and permanent easement from 80 feet to 65 feet Appendix III Revised Impact Drawings for Greenfield Crossings s 0\ ♦ ♦ 0 60." g 120 ♦' (IN FEET) WC09; WC09 ♦♦' REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB -METER ACCURACY, BUT HAVE NOT BEEN SURVEYED BY REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS AND PIPE LOCATIONS WERE PROVIDED BY TRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED. THEY ARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE, SCALE 1 "=60' PROJECT NO: 7435-16-013 DATE: 2-15-2017 DRAWN BY: S&ME DDH LEGEND LIMITS OF DISTURBANCE TEMPORARY WORKSPACE NEW PERMANENT EASEMENT (PROPOSED) > — — STREAM CENTERLINE STREAM BANKS ® JURISDICTIONAL WETLANDS STREAM IMPACTS: TEMPORARY STREAM IMPACT AREA Stream Crossing ID SC04 Local Waterway UT to Little White Oak Creek Longitude 35.292470°N Latitude 82.109424°W Flow Regime Intermittent Cowardin Classification R4 HGM Code Riverine LF in ROW 76 LF Permanent Impact 0 LF Temporary Impact 76 Impact Description Temporary disturbance / trenched pipeline crossing None Additional Notes JURISDICTIONAL IMPACTS: SC04 Stream Crossing LINE T-01 REPLACEMENT PROJECT PHASE II PSNC ENERGY POLK, RUTHERFORD & CLEVELAND CO., NORTH CAROLINA FIGURE NO. 53 REV \ J 0 ��' 60 120 (IN FEET) - LEGEND LIMITS OF DISTURBANCE TEMPORARY WORKSPACE NEW PERMANENT EASEMENT (PROPOSED) > — — STREAM CENTERLINE STREAM BANKS STREAM IMPACTS: TEMPORARY STREAM IMPACT AREA Stream Crossing ID SC08 Local Waterway Machine Creek I I ' 35.295875°N Latitude 82.103761°W Flow Regime \ J 0 ��' 60 120 (IN FEET) - LEGEND LIMITS OF DISTURBANCE TEMPORARY WORKSPACE NEW PERMANENT EASEMENT (PROPOSED) > — — STREAM CENTERLINE STREAM BANKS STREAM IMPACTS: TEMPORARY STREAM IMPACT AREA Stream Crossing ID SC08 Local Waterway Machine Creek Longitude 35.295875°N Latitude 82.103761°W Flow Regime Perennial Cowardin Classification R3 HGM Code Riverine LF in ROW 71 LF Permanent Impact 0 LF Temporary Impact 71 Impact Description Temporary disturbance / trenched pipeline crossing REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB -METER I I Additional Notes ACCURACY, BUT HAVE NOT BEEN SURVEYED BY REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS AND PIPE LOCATIONS WERE PROVIDED BY TRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED. THEY ARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE. None SCALE: DATE: JURISDICTIONAL IMPACTS. FIGURE NO 1 " = 60' 2-15-2017 SC08 (Machine Creek) Stream Crossing PROJECT NO: DRAWN BY: S&ME LINE T-01 REPLACEMENT PROJECT PHASE II 54 7435-16-013 DDH PSNC ENERGY REV Ilh- POLK, RUTHERFORD & CLEVELAND CO., NORTH CAROLINA LEGEND p -LIMITS OF DISTURBANCE V TEMPORARY WORKSPACE m L'•g NEW PERMANENT EASEMENT (PROPOSED) E >-- STREAM CENTERLINE Tio STREAM BANKS JURISDICTIONAL WETLANDS z / STREAM IMPACTS: 5 I TEMPORARY STREAM IMPACT AREA v 4 / 3 O� 3 yI 3 Stream Crossing ID SC06 x Local Waterway UT to Machine Creek I' Longitude 35.298273°N a o Latitude 82.096277°W a Q _ . � Flow Regime Perennialo a o \ Cowardin Classification R3 3 • � HGM Code Riverine o N _ f ? / W,G10 I I LF in ROW 76 o o I LF Permanent Impact 0 V I, II' lPo LF Temporary Impact 76 'I Temporary disturbance / trenched pipeline crossing Impact Description 0 60 120 ti None b (IN FEET) S� e REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB-METER Additional Notes ACCURACY, BUT HAVE NOT BEEN SURVEYED BY REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS AND PIPE LOCATIONS WERE PROVIDED BY TRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED. THEY ARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE, SCALE: DATE: JURISDICTIONAL IMPACTS. FIGURE NO. 1 " = 60 ' 2-15-2017 SC06 Stream Crossing S&ME 55 DRAWN BY: PROJECT NO: LINE T-01 REPLACEMENT PROJECT PHASE II 7435-16-013 DDH PSNC ENERGY REV POLK, RUTHERFORD & CLEVELAND CO., NORTH CAROLINA I 1 I LEGEND LIMITS OF DISTURBANCE p I I TEMPORARY WORKSPACE m NEW PERMANENT EASEMENT (PROPOSED) > - - STREAM CENTERLINE Ti o II ) i II P STREAM BANKS JURISDICTIONAL WETLANDS STREAM IMPACTS: TEMPORARY STREAM IMPACT AREA v a a 5 3 '. `WC1'2 l 3 3 I + Stream Crossing ID SC11 Local Waterway UT to Wheat Creek � f + Longitude 35.299361°N a Latitude 82.084415°W o a Q l Flow Regime Perennial s O WC,12 I Cowardin Classification R3 i Code Riverine N + ^ LF in ROW 129 ti � ti LF Permanent Impact 0 V I LF Temporary Impact 129 Temporary disturbance / trenched I y � � I pipeline crossing Impact Description 0 60 120 None �� (IN FEET) o REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB-METER Additional Notes ACCURACY, BUT HAVE NOT BEEN SURVEYED BYA REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS AND PIPE LOCATIONS WERE PROVIDED BY TRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED. THEY ARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE, SCALE: DATE: JURISDICTIONAL IMPACTS. FIGURE NO. 1 " = 60' 2-15-2017 SC11 Stream Crossing S&ME 56 DRAWN BY: PROJECT NO: LINE T-01 REPLACEMENT PROJECT PHASE II 7435-16-013 DDH PSNC ENERGY REV POLK, RUTHERFORD & CLEVELAND CO., NORTH CAROLINA r d r I I s �• i I °o I ' I ----------------I------------------ LEGEND -LIMITS OF DISTURBANCE TEMPORARY WORKSPACE NEW PERMANENT EASEMENT (PROPOSED) > - - STREAM CENTERLINE STREAM BANKS ® JURISDICTIONAL WETLANDS STREAM IMPACTS: TEMPORARY STREAM IMPACT AREA Stream Crossing ID I SC12 +� r Local Waterway UT to Wheat Creek I _ a Longitude 35.297937°N Latitude 82.077517°W - - - - - - - - - - - Flow Regime Perennial Cowardin Classification R3 HGM Code Riverine LF in ROW 134 y W,C13` LF Permanent Impact 0 I y i I I LF Temporary Impact 134 bW. ,C 1,3�x ti Temporary disturbance / trenched I 1 Impact Description pipeline crossing 0 I 60 !� 120 1 e None (IN FEET) i o, REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB -METER ti Additional Notes ACCURACY, BUT HAVE NOT BEEN SURVEYED BYA REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS• AND PIPE LOCATIONS WERE PROVIDED BYTRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED. THEYARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE. - SCALE: DATE: JURISDICTIONAL IMPACTS. FIGURE NO. 1 " = 60' 2-15-2017 SC12 Stream Crossing 7 PROJECT NO: DRAWN BY: S&ME LINE T-01 REPLACEMENT PROJECT PHASE II 5 J 7435-16-013 DDH PSNC ENERGY REV POLK, RUTHERFORD & CLEVELAND CO., NORTH CAROLINA 0 0 v 3 3 a rU�r �Y I . ,i v J Vi � r r { o J 60 120 — — — SC45, WC1�4 WC (IN FEET) r �( REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB -METER ACCURACY, BUT HAVE NOT BEEN SURVEYED BY REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS AND PIPE LOCATIONS WERE PROVIDED BY TRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED. THEY ARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE, SCALE 1 "=60' PROJECT NO: 7435-16-013 LEGEND LIMITS OF DISTURBANCE TEMPORARY WORKSPACE NEW PERMANENT EASEMENT (PROPOSED) > — — STREAM CENTERLINE STREAM BANKS ® JURISDICTIONAL WETLANDS STREAM IMPACTS: TEMPORARY STREAM IMPACT AREA Stream Crossing ID SC14 Local Waterway UT to Wheat Creek Longitude 35.297412°N Latitude 82.069013°W Flow Regime Perennial Cowardin Classification R3 HGM Code Riverine LF in ROW 92 LF Permanent Impact o LF Temporary Impact 92 Impact Description Temporary disturbance / trenched pipeline crossing None Additional Notes DATE: JURISDICTIONAL IMPACTS: 2-15-2017 SC14 Stream Crossing DRAWN BY: S&ME LINE T-01 REPLACEMENT PROJECT PHASE II DDH PSNC ENERGY POLK, RUTHERFORD & CLEVELAND CO., NORTH CAROLINA FIGURE NO. 58 REV 3 3 a LEGEND -LIMITS OF DISTURBANCE Z TEMPORARY WORKSPACE r x NEW PERMANENT EASEMENT (PROPOSED) > — — STREAM CENTERLINE STREAM BANKS ® JURISDICTIONAL WETLANDS STREAM IMPACTS: TEMPORARY STREAM IMPACT AREA f _'rWD1,0 'P WD10' l Stream Crossing ID SD10 Local Waterway UT to Green River Longitude 35.295185°N �WD1;0 ••` '/ •` `.� �+ Latitude 82.059380°W Flow Regime Perennial Cowardin Classification R3 • 1 �1 �`•� I HGM Code Riverine f coo)' •J� �`•l LF in ROW 66 ` WD10 oti LF Permanent Impact 0 LF Temporary Impact 66 Temporary disturbance / trenched pipeline crossing l Impact Description 0 ' 60 120 f (IN FEET) •.•• None REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB -METER Additional Notes ACCURACY, BUT HAVE NOT BEEN SURVEYED BYA REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS AND PIPE LOCATIONS WERE PROVIDED BY TRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED. THEY ARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE, SCALE: DATE: JURISDICTIONAL IMPACTS. FIGURE NO. 1 " = 60 2-15-2017 SD10 Stream Crossing 9 PROJECT NO: DRAWN BY: S&ME LINE T-01 REPLACEMENT PROJECT PHASE II 5 J 7435-16-013 DDH PSNC ENERGY REV 16- POLK, RUTHERFORD & CLEVELAND CO., NORTH CAROLINA 0 v 3 3 n o 3 0 N N O LEGEND N ♦� '. �I _ - - -LIMITS OF DISTURBANCE p ♦ `� _ - - TEMPORARY WORKSPACE �` s6�� •, _ NEW PERMANENT EASEMENT (PROPOSED) Ti ♦# �Y > - - STREAM CENTERLINE 0 STREAM BANKS ` ♦• ® JURISDICTIONAL WETLANDS •� ♦, fi STREAM IMPACTS: •�/ TEMPORARY STREAM IMPACT AREA a D ♦ a ♦ `' dr 3 r _ � ♦ f A ♦ ♦ 3 ♦`� WE02 �` - Stream Crossing ID SE02 X s • , Local Waterway UT to Green River Longitude 35.292760°N Latitude 82.056881'W a `• ; Flow Regime Perennial s i o E024,•`.� Cowardin Classification R3 ' ` �` \ i « — •- - ` - HGM Code Riverine \` ,•� LF in ROW 68 0 1N,E02 \,f •�, LF Permanent Impact 0 `♦ LF Temporary Impact 68 -- — 0Z8 — — — }' '. 4 .� `♦ Temporary disturbance / trenched `• f✓ ♦ pipeline crossing ` - • Impact Description 0 ...- 60 � 120 - .. 4± a �. , f. ♦ �♦ - •�. None — _0414 FEET) REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB-METER • Additional Notes ACCURACY, BUT HAVE NOT BEEN SURVEYED BYA REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS AND PIPE LOCATIONS WERE PROVIDED BY TRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED. THEY ARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE. ` 0 SCALE: DATE: JURISDICTIONAL IMPACTS. FIGURE NO. 1 " = 60 ' 2-15-2017 SE02 Stream Crossing PROJECT NO: DRAWN BY: S&ME LINE T-01 REPLACEMENT PROJECT PHASE II 60 7435-16-013 DDH PSNC ENERGY REV POLK, RUTHERFORD & CLEVELAND CO., NORTH CAROLINA ♦ ♦ ♦, % 0 60 120' `♦ (IN FEET) el REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB -METER ♦♦ ACCURACY, BUT HAVE NOT BEEN SURVEYED BYA REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS = AND PIPE LOCATIONS WERE PROVIDED BY TRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED. THEYARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE, SCALE: DATE: 1 " = 60' 2-15-2017 PROJECT NO: DRAWN BY: S&ME 7435-16-013 DDH LEGEND LIMITS OF DISTURBANCE TEMPORARY WORKSPACE NEW PERMANENT EASEMENT (PROPOSED) > — — STREAM CENTERLINE STREAM BANKS ® JURISDICTIONAL WETLANDS STREAM IMPACTS: TEMPORARY STREAM IMPACT AREA Stream Crossing ID SE01 Local Waterway UT to Green River Longitude 35.289179°N Latitude 82.048956°W Flow Regime Perennial Cowardin Classification R3 J� Riverine LF in ROW 65 LF Permanent Impact 0 LF Temporary Impact 65 i Temporary disturbance / trenched pipeline crossing r r: r A � A I r / sr� I i I • �� �'♦ � � I r' ♦r ♦ ♦ ♦, % 0 60 120' `♦ (IN FEET) el REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB -METER ♦♦ ACCURACY, BUT HAVE NOT BEEN SURVEYED BYA REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS = AND PIPE LOCATIONS WERE PROVIDED BY TRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED. THEYARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE, SCALE: DATE: 1 " = 60' 2-15-2017 PROJECT NO: DRAWN BY: S&ME 7435-16-013 DDH LEGEND LIMITS OF DISTURBANCE TEMPORARY WORKSPACE NEW PERMANENT EASEMENT (PROPOSED) > — — STREAM CENTERLINE STREAM BANKS ® JURISDICTIONAL WETLANDS STREAM IMPACTS: TEMPORARY STREAM IMPACT AREA Stream Crossing ID SE01 Local Waterway UT to Green River Longitude 35.289179°N Latitude 82.048956°W Flow Regime Perennial Cowardin Classification R3 HGM Code Riverine LF in ROW 65 LF Permanent Impact 0 LF Temporary Impact 65 Impact Description Temporary disturbance / trenched pipeline crossing None Additional Notes JURISDICTIONAL IMPACTS: SE01 Stream Crossing LINE T-01 REPLACEMENT PROJECT PHASE II PSNC ENERGY POLK, RUTHERFORD & CLEVELAND CO., NORTH CAROLINA FIGURE NO. 61 REV e`♦ ee e e e e e 65 e OS , i i i i 01 60 120 i (IN FEET) REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB -METER ACCURACY, BUT HAVE NOT BEEN SURVEYED BY REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS AND PIPE LOCATIONS WERE PROVIDED BY TRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED. THEY ARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE, LEGEND LIMITS OF DISTURBANCE TEMPORARY WORKSPACE NEW PERMANENT EASEMENT (PROPOSED) > — — STREAM CENTERLINE STREAM BANKS STREAM IMPACTS: TEMPORARY STREAM IMPACT AREA Stream Crossing ID SD05 Local Waterway UT to Green River Longitude 35.286369°N Latitude 82.042891°W Flow Regime Perennial Cowardin Classification R3 HGM Code Riverine LF in ROW 261 LF Permanent Impact 0 LF Temporary Impact 261 Impact Description Temporary disturbance / trenched pipeline crossing Additional Notes None SCALE: DATE: JURISDICTIONAL IMPACTS: 1 " = 60' 2-15-2017 SD05 Stream Crossing PROJECT NO: DRAWN BY: S&ME LINE T-01 REPLACEMENT PROJECT PHASE II 7435-16-013 DDH PSNC ENERGY Ilh— POLK, RUTHERFORD & CLEVELAND CO., NORTH CAROLINA FIGURE NO. 63 REV 3 3 a r, � — I f ,`•`. Apo '` IW 0 60 120 (IN FEET) k SD03 Local Waterway �4 II Longitude a Latitude 82.037974°W Flow Regime Perennial Cowardin Classification R3 HGM Code Riverine LF in ROW 216 LF Permanent Impact 0 LF Temporary Impact I Impact Description Temporary disturbance / trenched pipeline crossing I f� dd i l REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB -METER ACCURACY, BUT HAVE NOT BEEN SURVEYED BY REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS AND PIPE LOCATIONS WERE PROVIDED BY TRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATION DISPLAYED ARE APPROXIMATED. THEY ARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE. SCALE 1 "=60' PROJECT NO: 7435-16-013 LEGEND _ -LIMITS OF DISTURBANCE TEMPORARY WORKSPACE NEW PERMANENT EASEMENT (PROPOSED) > — — STREAM CENTERLINE STREAM BANKS ® JURISDICTIONAL WETLANDS STREAM IMPACTS: TEMPORARY STREAM IMPACT AREA Stream Crossing ID SD03 Local Waterway UT to Green River Longitude 35.284300°N Latitude 82.037974°W Flow Regime Perennial Cowardin Classification R3 HGM Code Riverine LF in ROW 216 LF Permanent Impact 0 LF Temporary Impact 216 Impact Description Temporary disturbance / trenched pipeline crossing Additional Notes None DATE: JURISDICTIONAL IMPACTS: 2-15-2017 SD03 Stream Crossing DRAWN BY: S&ME LINE T-01 REPLACEMENT PROJECT PHASE II DDH PSNC ENERGY POLK, RUTHERFORD & CLEVELAND CO., NORTH CAROLINA FIGURE NO. 64 REV w 0 v D 3 a i 1X �1 Y ♦ i ' I i 0 60� 120 ; i (IN FEET) REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB -METER ACCURACY, BUT HAVE NOT BEEN SURVEYED BYA REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS AND PIPE LOCATIONS WERE PROVIDED BY TRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED. THEYARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE, LEGEND LIMITS OF DISTURBANCE TEMPORARY WORKSPACE NEW PERMANENT EASEMENT (PROPOSED) > — — STREAM CENTERLINE STREAM BANKS ® JURISDICTIONAL WETLANDS STREAM IMPACTS: TEMPORARY STREAM IMPACT AREA Stream Crossing ID SG02 Local Waterway UT to Green River Longitude 35.281942°N �ti ♦ Flow Regime Perennial Cowardin Classification R3 HGM Code Riverine LF in ROW 179 LF Permanent Impact 0 LF Temporary Impact 179 Impact Description i i 1X �1 Y ♦ i ' I i 0 60� 120 ; i (IN FEET) REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB -METER ACCURACY, BUT HAVE NOT BEEN SURVEYED BYA REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS AND PIPE LOCATIONS WERE PROVIDED BY TRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED. THEYARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE, LEGEND LIMITS OF DISTURBANCE TEMPORARY WORKSPACE NEW PERMANENT EASEMENT (PROPOSED) > — — STREAM CENTERLINE STREAM BANKS ® JURISDICTIONAL WETLANDS STREAM IMPACTS: TEMPORARY STREAM IMPACT AREA Stream Crossing ID SG02 Local Waterway UT to Green River Longitude 35.281942°N Latitude 82.036305°W Flow Regime Perennial Cowardin Classification R3 HGM Code Riverine LF in ROW 179 LF Permanent Impact 0 LF Temporary Impact 179 Impact Description Temporary disturbance / trenched pipeline crossing Additional Notes None SCALE: DATE: JURISDICTIONAL IMPACTS: 1 " = 60' 2-15-2017 SG02 Stream Crossing PROJECT NO: DRAWN BY: S&ME LINE T-01 REPLACEMENT PROJECT PHASE II 7435-16-013 DDH PSNC ENERGY Ilk- POLK, RUTHERFORD & CLEVELAND CO., NORTH CAROLINA FIGURE NO. 65 REV 3 a REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB -METER ACCURACY, BUT HAVE NOT BEEN SURVEYED BY REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS AND PIPE LOCATIONS WERE PROVIDED BY TRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED. THEY ARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE, LEGEND LIMITS OF DISTURBANCE TEMPORARY WORKSPACE NEW PERMANENT EASEMENT (PROPOSED) > — — STREAM CENTERLINE STREAM BANKS ® JURISDICTIONAL WETLANDS STREAM IMPACTS: TEMPORARY STREAM IMPACT AREA Stream Crossing ID SF01 Local Waterway UT to Green River Longitude ♦ ♦ Latitude ♦ 1 r{ Perennial I `WG011 f , 0 60 120 A V-A (IN FEET)." REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB -METER ACCURACY, BUT HAVE NOT BEEN SURVEYED BY REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS AND PIPE LOCATIONS WERE PROVIDED BY TRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED. THEY ARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE, LEGEND LIMITS OF DISTURBANCE TEMPORARY WORKSPACE NEW PERMANENT EASEMENT (PROPOSED) > — — STREAM CENTERLINE STREAM BANKS ® JURISDICTIONAL WETLANDS STREAM IMPACTS: TEMPORARY STREAM IMPACT AREA Stream Crossing ID SF01 Local Waterway UT to Green River Longitude ♦ ♦ Latitude ♦ 1 r{ Perennial `WG011 f , 0 60 120 A V-A (IN FEET)." REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB -METER ACCURACY, BUT HAVE NOT BEEN SURVEYED BY REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS AND PIPE LOCATIONS WERE PROVIDED BY TRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED. THEY ARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE, LEGEND LIMITS OF DISTURBANCE TEMPORARY WORKSPACE NEW PERMANENT EASEMENT (PROPOSED) > — — STREAM CENTERLINE STREAM BANKS ® JURISDICTIONAL WETLANDS STREAM IMPACTS: TEMPORARY STREAM IMPACT AREA Stream Crossing ID SF01 Local Waterway UT to Green River Longitude 35.278682°N Latitude 82.036512°W Flow Regime Perennial Cowardin Classification I R3 I HGM Code Riverine ' LF in ROW 78 LF Permanent Impact I 0 1 LF Temporary Impact 78 Temporary disturbance / trenched Impact Description pipeline crossing Additional Notes None SCALE: DATE: JURISDICTIONAL IMPACTS: 1 " = 60' 2-15-2017 SF01 Stream Crossing PROJECT NO: DRAWN BY: S&ME LINE T-01 REPLACEMENT PROJECT PHASE II 7435-16-013 DDH PSNC ENERGY Ilh- POLK, RUTHERFORD & CLEVELAND CO., NORTH CAROLINA FIGURE NO. 66 REV w 0 v 3 3 a 3 a LEGEND LIMITS OF DISTURBANCE b I TEMPORARY WORKSPACE NEW PERMANENT EASEMENT (PROPOSED) I (P ,.''� >-- STREAM CENTERLINE Ii pl x'30.. • top�, STREAM BANKS CULVERTS STREAM IMPACTS: TEMPORARY STREAM IMPACT AREA `�9 •,�'' •ea a\Sty y , , o{ ^\ 4 Stream Crossing ID SA81A i 65' k ` pi // / '� Local Waterway UT to First Broad River ' Longitude 35.237675°N �4 , y a y ti l yt •' Latitude 81.600698°W Flow Regime Perennial Cowardin Classification R3 HGM Code Riverine +� I LF in ROW 53 LF Permanent Impact 0 I ' LF Temporary Impact 53 � 1 y �� Temporary disturbance / trenched I I Impact Description pipeline crossing 0 60 i 120 Though clearing and upland disturbance IN FEET ) I will occurthroughout the temporary REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB-METER Additional Notes workspace, disturbance below the ACCURACY, BUT HAVE NOT BEEN SURVEYED BYA REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS OH WM will be limited to an 80" corridor, AND PIPE LOCATIONS WERE PROVIDED BY TRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS as shown. DISPLAYED ARE APPROXIMATED. THEY ARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE, SCALE: DATE: JURISDICTIONAL IMPACTS. FIGURE NO. 1 " = 60 2-15-2017 SA81A Stream Crossing S&ME 20 PROJECT NO: DRAWN BY: LINE T-01 REPLACEMENT PROJECT PHASE II 7435-16-013 DDH PSNC ENERGY REV POLK, RUTHERFORD & CLEVELAND CO., NORTH CAROLINA 3 a 000 `oe�ovJ � scar ce TA 65' I I I• tl I Q I lcoq P rN 0 1, 60 120�1'Q IT'D (IN FEET) Ifj REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB -METER ACCURACY, BUT HAVE NOT BEEN SURVEYED BYA REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS AND PIPE LOCATIONS WERE PROVIDED BY TRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED. THEYARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE, SCALE 1 "=60' PROJECT NO: 7435-16-013 LEGEND N LIMITS OF DISTURBANCE TEMPORARY WORKSPACE NEW PERMANENT EASEMENT (PROPOSED) > — — STREAM CENTERLINE STREAM BANKS CULVERTS STREAM IMPACTS: TEMPORARY STREAM IMPACT AREA Stream Crossing ID SC03A Local Waterway UT to First Broad River Longitude P y'4 Latitude I Flow Regime Perennial 000 `oe�ovJ � scar ce TA 65' I I I• tl I Q I lcoq P rN 0 1, 60 120�1'Q IT'D (IN FEET) Ifj REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB -METER ACCURACY, BUT HAVE NOT BEEN SURVEYED BYA REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS AND PIPE LOCATIONS WERE PROVIDED BY TRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED. THEYARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE, SCALE 1 "=60' PROJECT NO: 7435-16-013 LEGEND N LIMITS OF DISTURBANCE TEMPORARY WORKSPACE NEW PERMANENT EASEMENT (PROPOSED) > — — STREAM CENTERLINE STREAM BANKS CULVERTS STREAM IMPACTS: TEMPORARY STREAM IMPACT AREA Stream Crossing ID SC03A Local Waterway UT to First Broad River Longitude 35.237741°N Latitude 81.600378°W Flow Regime Perennial Cowardin Classification I R3 I HGM Code Riverine ' LF in ROW 100 LF Permanent Impact I 0 1 LF Temporary Impact 100 Temporary disturbance / trenched Impact Description pipeline crossing Though clearing and upland disturbance will occur throughout the temporary workspace, disturbance below the Additional Notes OHWM will be limited to an 80' corridor, as shown. DATE: JURISDICTIONAL IMPACTS: 2-15-2017 SC03A Stream Crossing DRAWN BY: S&ME LINE T-01 REPLACEMENT PROJECT PHASE II DDH PSNC ENERGY POLK, RUTHERFORD & CLEVELAND CO., NORTH CAROLINA FIGURE NO. 121 REV 3 3 a LEGEND LIMITS OF DISTURBANCE p TEMPORARY WORKSPACE NEW PERMANENT EASEMENT (PROPOSED) w Ti 0 > - - STREAM CENTERLINE o STREAM BANKS STREAM IMPACTS: TEMPORARY STREAM IMPACT AREA � / ♦ r D a Q /53 N ♦ m ♦ : Stream Crossing ID SA100 ♦ x ,! Local Waterway UT to Buffalo Creek .�- Longitude 35.223359°N a / ♦ - L` ' • Latitude 81.526374°W a Q ♦ Flow Regime 9 Perennial s w / Cowardin Classification 3 R3 f HGM Code Riverine I /• LF in ROW 95 N f y LF Permanent Impact V 0 I LF Temporary Impact 95 low-. 'y o Temporary disturbance /trenched pipeline crossing Impact Description 0 60 120 None (IN FEET)/ REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB -METER Additional Notes ACCURACY, BUT HAVE NOT BEEN SURVEYED BYA REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS AND PIPE LOCATIONS WERE PROVIDED BY TRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED. THEY ARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE, SCALE: DATE: JURISDICTIONAL IMPACTS. FIGURE NO. 1 " = 60 ' 2-15-2017 SA100 Stream Crossing S&ME 132 PROJECT NO: DRAWN BY: LINE T-01 REPLACEMENT PROJECT PHASE II 7435-16-013 DDH PSNC ENERGY REV Ilh- POLK, RUTHERFORD & CLEVELAND CO., NORTH CAROLINA , , , , , i '`-� Z -- p(���/-------- P^�g�� � 'lam `' ' , , 0 `� 60 120 f (IN'FEET) LEGEND N LIMITS OF DISTURBANCE TEMPORARY WORKSPACE PERMANENT EASEMENT (EXISTING) NEW PERMANENT EASEMENT (PROPOSED) > - - STREAM CENTERLINE STREAM BANKS STREAM IMPACTS: TEMPORARY STREAM IMPACT AREA Stream Crossing ID SA119 Local Waterway Long Branch Longitude 35.201598°N Latitude 81.425632°W Flow Regime Perennial Cowardin Classification R3 HGM Code Riverine LF in ROW 66 LF Permanent Impact 0 LF Temporary Impact 66 Temporary disturbance / trenched Impact Description pipeline crossing None REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB -METER _ - Additional Notes ACCURACY, BUT HAVE NOT BEEN SURVEYED BYA REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS - AND PIPE LOCATIONS WERE PROVIDED BY TRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS _ DISPLAYED ARE APPROXIMATED. THEY ARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE, SCALE: DATE: JURISDICTIONAL IMPACTS. FIGURE NO. 1 " = 60' 2-15-2017 SA119 (Long Branch) Stream Crossing C PROJECT NO: DRAWN BY: S&ME LINE T-01 REPLACEMENT PROJECT PHASE II 145 J 7435-16-013 DDH PSNC ENERGY REV 16- POLK, RUTHERFORD & CLEVELAND CO., NORTH CAROLINA 3 a 1 1 -- LEGEND LIMITS OF DISTURBANCE p 1 1 TEMPORARY WORKSPACE � ! , NEW PERMANENT EASEMENT (PROPOSED) / { Ti > — — STREAM CENTERLINE g 1 1 STREAM BANKS S " JURISDICTIONAL WETLANDS � z 'f STREAM IMPACTS: y•_ f 1 1 �' `� ✓ ; '' l n TEMPORARY STREAM IMPACT AREA a 1 1 �� • 1 1 1 1 3 1 1 1 1 d 3 Stream Crossing ID SH01 WG05---- WG05 Local Waterway UT to Long Branch Longitude 35.196621°N a o Latitude 81.422792°W a Flow Regime Perennial s 1 1 Cowardin Classification o R3 3 2 HGM Code Riverine _ 1 LF in ROW 66 -- LF Permanent Impact 0 _ LF Temporary Impact 66 Temporary disturbance / trenched 1 - pipeline crossing 1 Impact Description 0 - 60 120 1 ' i 1 � 1 I (IN FEET) None REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB-METER - Additional Notes ACCURACY, BUT HAVE NOT BEEN SURVEYED BYA REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS AND PIPE LOCATIONS WERE PROVIDED BYTRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED. THEY ARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE, SCALE: DATE: JURISDICTIONAL IMPACTS. FIGURE NO. 1 " = 60 ' 2-15-2017 SH01 Stream Crossing S&ME 146 PROJECT NO: DRAWN BY: LINE T-01 REPLACEMENT PROJECT PHASE II 7435-16-013 DDH PSNC ENERGY REV POLK, RUTHERFORD & CLEVELAND CO., NORTH CAROLINA 0 v 3 3 a LEGEND -LIMITS OF DISTURBANCE TEMPORARY WORKSPACE NEW PERMANENT EASEMENT (PROPOSED) > — — STREAM CENTERLINE • 1� STREAM BANKS a ® JURISDICTIONAL WETLANDS STREAM IMPACTS: paF ` 1 1 TEMPORARY STREAM IMPACT AREA r , , , I 14 � II N •� , 1 I r Aa v5 , .r ` ♦♦ Stream Crossing ID SA121 Local Waterway UT to Long Branch ♦ '. I` ♦,♦ Longitude 35.192533°N Latitude 81.422778°W I' �♦ `♦ y I , WA.77 Flow Regime Perennial Cowardin Classification R3 �' „ � � ♦ � HGM Code Riverine LF in ROW 108 LF Permanent Impact 0 `♦ �' `♦ d' LF Temporary Impact 108 — _ r l Temporary disturbance / trenched I `♦ pipeline crossing ♦ f Impact Description 0 60 12011 None ♦ ♦♦ (IN FEET) = REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB -METER ` '� Additional Notes ACCURACY, BUT HAVE NOT BEEN SURVEYED BYA REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS AND PIPE LOCATIONS WERE PROVIDED BYTRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS ♦ a DISPLAYED ARE APPROXIMATED. THEYARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE. ` ' SCALE: DATE: JURISDICTIONAL IMPACTS: FIGURE NO. 1 " = 60 ' 2-15-2017 SA121 Stream Crossing S&ME 147 PROJECT NO: DRAWN BY: LINE T-01 REPLACEMENT PROJECT PHASE II 7435-16-013 DDH PSNC ENERGY REV Ilh- POLK, RUTHERFORD & CLEVELAND CO., NORTH CAROLINA 0 v 3 3 a I• 0 60 120 (IN FEET) REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB -METER ACCURACY, BUT HAVE NOT BEEN SURVEYED BYA REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS AND PIPE LOCATIONS WERE PROVIDED BYTRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED. THEYARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE, SCALE 1 "=60' PROJECT NO: 7435-16-013 LEGEND N PROPOSED PIPE CENTERLINE p ___:LIMITS OF DISTURBANCE s >-- STREAM CENTERLINE 0 STREAM BANKS ®JURISDICTIONAL WETLANDS PARCELS TEMPORARY WORKSPACE D NEW PERMANENT EASEMENT (PROPOSED) WETLAND IMPACT AREAS: 3 PERMANENT WETLAND IMPACT TEMPORARY WETLAND IMPACT , Wetland Crossing ID WC11 Local Waterway LIT to Machine Creek x Longitude 82.102640°W a Latitude 35.296428°N o WAM Classification Headwater Forest Cowardin Classfication PEM/ PFO 3 HGM Code Riverine N Acres Permanent Impact 0 0.145 Acres Temporary Impact N 0.032 H V Impact Description Temporary ground disturbance / trenched pipeline crossing / permanent conversion of forested vegetation to emergent in new utility corridor. Additional Notes Cleared temporary workspaces will be permitted to revegetate naturally back to original condition. DATE: JURISDICTIONAL IMPACTS: 2-15-2017 WC11 Wetland Crossing DRAWN BY: S&ME LINE T-01 REPLACEMENT PROJECT PHASE II DDH PSNC ENERGY POLK, RUTHERFORD & CLEVELAND CO., NORTH CAROLINA GURE NO. 150 REV I 1 I LEGEND N PROPOSED PIPE CENTERLINE ! I � o R I I :LIMITS OF DISTURBANCE STREAM CENTERLINE II I STREAM BANKS ®JURISDICTIONAL WETLANDS PARCELS 7 I TEMPORARY WORKSPACE I ti I I NEW PERMANENT EASEMENT (PROPOSED) WETLAND IMPACT AREAS: AI I i II =TEMPORARY WETLAND IMPACT I '• ' I I Wetland Crossing ID WC12 Local Waterway UT to Wheat Creek Longitude 82.084356°W Latitude 35.299444°N WAM Classification Seep I Cowardin Classfication PEM/ PFO o ;' ,' HGM Code Slope I W C�12 , Acres Permanent Impact 0.000 Acres Temporary Impact 0.001 I 1 f I Temporary ground disturbance /clearing � Uj •, � � � • . _ � of forested vegeation in temporary - Impact Description workspace 0 I 60 r 4'120 I Cleared temporary workspaces will be 0 1111110 �`, permitted to revegetate naturally back to %(IN FEET) ,f original condition. REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB-METER Additional Notes ACCURACY, BUT HAVE NOT BEEN SURVEYED BYA REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS AND PIPE LOCATIONS WERE PROVIDED BY TRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED. THEY ARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE, SCALE: DATE: JURISDICTIONAL IMPACTS: FIGURE NO. 1 " = 60' 2-15-2017 WC12 Wetland Crossing S&ME LINE T-01 REPLACEMENT PROJECT PHASE II 151 PROJECT NO: DRAWN BY: 7435-16-013 DDH PSNC ENERGY REV POLK, RUTHERFORD & CLEVELAND CO., NORTH CAROLINA w 0 3 '+ LEGEND PROPOSED PIPE CENTERLINE o -LIMITS OF DISTURBANCE >-- STREAM CENTERLINE ' STREAM BANKS �'•� ,�'`.• ®JURISDICTIONAL WETLANDS •�'`.� PARCELS TEMPORARY WORKSPACE NEW PERMANENT EASEMENT (PROPOSED) WETLAND IMPACT AREAS: • ' = PERMANENT WETLAND IMPACT .• .� WD1,0 •.�� TEMPORARY WETLAND IMPACT �� ; ___��' WD10' Wetland Crossing ID WD10 i `• j,�.� {, .� •••� �• �'•• Local Waterway UT to Green River ,r ,'`.� �' �• Longitude 82.059486'W Latitude 35.295046'N •••. WAM Classification Headwater Forest �• O�� +� ooh � Cowardin Classfication PFO HGM Code Riverine •�.� WD10 � Acres Permanent Impact 0.042 � Acres Temporary Impact 0.002 f �• �� otic ••�•� h Temporary ground disturbance / _ trenched pipeline crossing / permanent 'fF �, ••• „•. Impact Description conversion of forested vegetation to in f emergent new utility corridor. 0 ' 60 120 f Cleared temporary workspaces will be WD1'`0 �� r� — _otsr _ permitted to revegetate naturally back to (IN FEET) original condition. REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB -METER Additional Notes ACCURACY, BUT HAVE NOT BEEN SURVEYED BYA REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS - - AND PIPE LOCATIONS WERE PROVIDED BYTRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS - DISPLAYED ARE APPROXIMATED. THEYARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE. SCALE: DATE: JURISDICTIONAL IMPACTS: FIGURE NO. 1 " = 60' 2-15-2017 WD10 Wetland Crossing tS&ME -01 T-01 REPLACEMENT PROJECT PHASE II 152 PROJECT NO: DRAWN BY: 7435-16-013 DDH PSNC ENERGY REV 16— POLK, RUTHERFORD & CLEVELAND CO., NORTH CAROLINA 3 REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB -METER ACCURACY, BUT HAVE NOT BEEN SURVEYED BY REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS AND PIPE LOCATIONS WERE PROVIDED BY TRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED. THEY ARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE, SCALE 1 "= 100' PROJECT NO: 7435-16-013 DATE: 2-15-2017 DRAWN BY: S&ME DDH LEGEND N PROPOSED PIPE CENTERLINE FORMER LIMIT OF DISTURBANCE 'LIMITS OF DISTURBANCE >—— STREAM CENTERLINE STREAM BANKS ®JURISDICTIONAL WETLANDS PARCELS TEMPORARY WORKSPACE PERMANENT EASEMENT (EXISTING) NEW PERMANENT EASEMENT (PROPOSED) Wetland Crossing ID WA67 Local Waterway LIT to Buffalo Creek Longitude 81.510143'W Latitude 35.220693'N WAM Classification Headwater Forest e� ae , 1 —-_810SQ1132 •-, ♦ I ♦ `, . '' d I A67 yY X - `---- ------------------ 011001, '200 0 ' , l (IN FEET) ;g REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB -METER ACCURACY, BUT HAVE NOT BEEN SURVEYED BY REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS AND PIPE LOCATIONS WERE PROVIDED BY TRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED. THEY ARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE, SCALE 1 "= 100' PROJECT NO: 7435-16-013 DATE: 2-15-2017 DRAWN BY: S&ME DDH LEGEND N PROPOSED PIPE CENTERLINE FORMER LIMIT OF DISTURBANCE 'LIMITS OF DISTURBANCE >—— STREAM CENTERLINE STREAM BANKS ®JURISDICTIONAL WETLANDS PARCELS TEMPORARY WORKSPACE PERMANENT EASEMENT (EXISTING) NEW PERMANENT EASEMENT (PROPOSED) Wetland Crossing ID WA67 Local Waterway LIT to Buffalo Creek Longitude 81.510143'W Latitude 35.220693'N WAM Classification Headwater Forest I Cowardin Classfication I PEM/PFO 1 HGM Code I Riverine 1 JAcres Permanent Impact 0.000 ' Acres Temporary Impact 0.000 Avoided with reroute- no longer impacted Impact Description This area has been rerouted into uplands and this wetland will no longer be impacted. Additional Notes JURISDICTIONAL IMPACTS: WA67 Wetland Crossing LINE T-01 REPLACEMENT PROJECT PHASE II PSNC ENERGY POLK, RUTHERFORD & CLEVELAND CO., NORTH CAROLINA GURE NO. 196 REV 11 �► LEGEND • N PROPOSED PIPE CENTERLINE w -LIMITS OF DISTURBANCE STREAM CENTERLINE �• ♦• I STREAM BANKS • ®JURISDICTIONAL WETLANDS 4' �♦ �♦ WA.77 PARCELS ♦•• ti ,♦•'� TEMPORARY WORKSPACE D I NEW PERMANENT EASEMENT (PROPOSED) ♦' I WETLAND IMPACT AREAS: 53 ' PERMANENT WETLAND IMPACT TEMPORARY WETLAND IMPACT I I Wetland Crossing ID WA77 ID `♦ ItJ Local Waterway UT to Long Branch ��� ♦•/�I Longitude 81.422573°W Latitude 35.192183°N ♦ ♦♦ ,�• WAM Classification Bottomland Hardwood ♦ �'�,' ,♦ Cowardin Classfication PFO o 1 1 • 4 ♦t 3 d I ♦ . HGM Code Riverine N Acres Permanent Impact o 0.084 I♦ •♦ Acres Temporary Impact 0.034 ♦ •♦ ,♦• ti ♦ � 't ♦ •♦ `♦ `♦ •♦ Temporary ground disturbance / ♦ trenched pipeline crossing / permanent }� ♦♦ .♦ `♦• Impact Description conversion of forested vegetation to emergent in new utility corridor. 0 'x.60 120 I `. •. Cleared temporary workspaces will be ` `• `♦ I ♦ •♦ • + permitted to revegetate naturally back to (IN FEET) • ,' `♦ original condition. REFERENCE: JURISDICTIONAL FEATURE LOCATION WAS DETERMINED USING GPS UNITS CAPABLE OF SUB -METER `• + Additional Notes ACCURACY, BUT HAVE NOT BEEN SURVEYED BYA REGISTERED LAND SURVEYOR. PROPOSED WORKSPACES, ACCESS ROADS AND PIPE LOCATIONS WERE PROVIDED BYTRC. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS `• II DISPLAYED ARE APPROXIMATED. THEYARE NOT BASED ON CIVIL SURVEY INFORMATION, UNLESS STATED OTHERWISE. •,;} SCALE: DATE: JURISDICTIONAL IMPACTS: FIGURE NO. 1 " = 60' 2-15-2017 WA77 Wetland Crossing M_ S&ME -01 T-01 REPLACEMENT PROJECT PHASE II 202 PROJECT NO: DRAWN BY: I 7435-16-013 DDH PSNC ENERGY REV Ih- POLK, RUTHERFORD & CLEVELAND CO., NORTH CAROLINA Appendix IV Table 4 - Existing Culvert Crossings Table 4: Existing Culvert Crossings PSNC Line T-001 Replacement Phase II SA08 UT to Little White Oak Creek Cut and replace or dig under existing culvert to install new pipe SA10 UT to Little White Oak Creek Remove and replace existing culvert to install new pipe WA02/SA19 UT to Green River Remove and replace existing culvert to install new pipe SA27 UT to Grays Creek Remove and replace existing culvert to install new pipe SA28 UT to Grays Creek Remove and replace existing culvert to install new pipe WA14/SA69 UT to Sandy Run Remove and replace existing culvert to install new pipe SA80 UT to Hawkins Branch Cut and replace or dig under existing culvert to install new pipe SA81 UT to First Broad River Cut and replace or dig under existing culvert to install new pipe SA104 UT to Buffalo Creek Cut and replace or dig under existing culvert to install new pipe SA117 UT to Long Branch Cut and replace or dig under existing culvert to install new pipe