Loading...
HomeMy WebLinkAbout20150994 Ver 3_WRC Comments_20170207� North Carolina Wildlife Resources Commission 9 Gordon Myers, Executive Director February 7, 2017 Mr. David Brown U.S. Army Corps of Engineers, Regulatory Branch 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-5006 SUBJECT: PSNC Line T-01 Replacement Project Phase II Polk, Rutherford, and Cleveland Counties Dear Mr. Brown: Biologists with the North Carolina Wildlife Resources Commission (NCWRC) reviewed an application for impacts associated with the T-01 Phase II Pipeline Replacement Project, which include 11,113 ft of temporary and 30 ft of permanent stream impact, as well as 2.4 acres of temporary and 0.4 acre of permanent wetland impact in Polk, Rutherford, and Cleveland Counties. Our comments on this application are offered for your consideration under provisions of the Clean Water Act of 1977 (33 U.S.C. 466 et. seq.) and Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661-667d). PSNC intends to replace 48 miles of gas pipeline in or adjacent to existing easements. Seventy- seven percent of the line would be within an existing right-of-way (ROW). Twenty-three percent of the line would be new ROW, most of this in order to avoid the town of Boiling Springs and the Tryon Equestrian Center. The line crosses multiple streams in Polk, Rutherford, and Cleveland Counties in the Broad River basin. Wild trout would not be impacted by project activities, and a trout moratorium is not needed. The line crosses a number of streams with significant aquatic resources and notable adjacent features, including the following: 1. Green River in Polk County. The Green River hosts the Seagreen Darter [Etheostoma thalassinum, NC Significantly Rare (SR)] and Carolina Foothills Crayfish (Cambarus johni, NC SR). 2. Broad River in Rutherford County, which hosts Seagreen Darter (NC SR) and Carolina Foothills Crayfish (NC SR). 3. Floyds Creek in Rutherford County, which hosts Carolina Foothills Crayfish (NC SR). 4. Sandy Run/Cliffside Natural Area, a designated natural area by the NC Natural Heritage Program. This natural area roughly follows the boundary of a population of Dwarf -flowered Heartleaf (Hexastylis naniflora, US and NC Threatened). Mailing Address: Habitat Conservation • 1721 Mail Service Center • Raleigh, NC 27699-1721 Telephone: (919) 707-0220 • Fax: (919) 707-0028 PSNC T-01 Replacement Phase II Page 2 February 7, 2017 Polk, Rutherford, Cleveland Counties 5. Beaverdam Creek in Cleveland County, which also hosts Carolina Foothills Crayfish (NC SR). The pipeline will be installed via trench cut in most wetlands and streams. The Green River, Broad River, Second Broad River, First Broad River, Buffalo Creek, and Beason Creek will all be crossed with horizontal directional drilling, avoiding direct channel disturbance. Wetlands will be crossed with equipment mats, wetland vegetation cut at ground level, and where practicable, wetland topsoil will be set aside during trenching for replacement afterwards and the wetland and 10 -ft buffer outside of the wetland replanted with a native wetland seed mix. Streams will be trenched in the dry, with flows pumped around the work area. The top 6-12 inches of stream substrate will be stockpiled and kept saturated during pipe installation, to be replaced once the pipe is installed. Banks will be restored to pre -construction contours, and coir matting and a cover crop and riparian mix applied to the banks. The native riparian mix will also be planted 50 ft landward from the bank. The final ROW will be 50 ft wide. However, the proposed construction corridor is 95 to 110 ft in upland areas and 80 ft in stream and wetland areas in order to allow adequate space for the pipe replacement. A 50 -ft workspace was required for Phase I of the PSNC T-01 pipeline replacement project, and it is unclear why an 80 -ft width of stream/wetland impact is needed to install a 24 -inch pipe. In addition, the stream impact table names 11,113 ft of temporary impact, and each specific impact ranges from 8 to 367 ft, with many greater than 80 feet in width. We understand that some crossings will not be perpendicular and will require additional width of stream. It appears, however, that the temporary impact length accounts for the entire length of the stream that is in the construction corridor, and a majority of the `impact length' may only be riparian clearing and soil disturbance, not actual channel disturbance. Therefore, the length of actual channel disturbance is unclear. In our April 20, 2016 comments, we recommended that fescue -based seed mixtures be avoided, as fescue is invasive and provides little benefit to wildlife; the permanent upland seeding specifications provided for this project are Tall Fescue -based. We strongly recommend that PSNC use native grasses and herbaceous plants in their permanent seeding specifications. The US Fish and Wildlife Service (USFWS) urged PSNC to incorporate pollinator species into their plantings and provided specific planting recommendations. More utility line projects are incorporating native pollinators into their plantings; for example, the Atlantic Coast Pipeline has proposed regionally tailored native seed mixes that incorporate pollinator species (see https://www.dom.com/about-us/news-center/natural- _gas-projects-and-initiatives/atlantic-coast- pipeline/ferc-filings-and-information). NCWRC can work with the USFWS and PSNC to customize a seed mix for the project. We offer the following recommendations to minimize impacts to terrestrial and aquatic wildlife: 1. Avoid equipment maintenance in the immediate vicinity of streams, make stream crossings as narrow as possible, minimize stream bank disturbance, avoid spraying of herbicides, and cut woody vegetation so that stumps can resprout. 2. Sediment and erosion controls measures should be installed prior to any land clearing or PSNC T-01 Replacement Phase II Page 3 February 7, 2017 Polk, Rutherford, Cleveland Counties construction. These measures should be routinely inspected and properly maintained. Excessive silt and sediment loads can have numerous detrimental effects on aquatic resources including destruction of spawning habitat, suffocation of eggs, and clogging of gills of aquatic species. 3. Matting used for stabilization should be free of nylon or plastic mesh, as this mesh netting frequently entangles wildlife and is slow to degrade resulting in a hazard that may last for years. 4. Any ROW vegetation maintenance work should generally be avoided between April 1 and October 1 to minimize impacts to ground nesting birds. 5. Where feasible, work within the existing easement to minimize impacts to terrestrial wildlife habitat. Avoid the removal of large trees at the edges of easement corridors. Use woody debris and logs from any corridor clearing to establish brush piles and downed logs adjacent to the cleared right-of-way to improve habitat for wildlife. 6. Re -seed all disturbed areas with seed mixtures that are beneficial to wildlife; avoid fescue based mixtures because fescue is invasive and provides little benefit to wildlife. Native mixes of grasses and herbaceous plants that emphasize pollinator species are recommended. Allowing the corridor area to re -vegetate into a brush/scrub habitat would maximize benefits to wildlife. For areas adjacent to residential areas, a native shrub/grass option may be beneficial. Thank you for the opportunity to review and comment on this project. Please contact me at (828) 558-6011 if you have any questions. Sincerely, Andrea Leslie Mountain Region Coordinator, Habitat Conservation Program Ec: Olivia Munzer, NCWRC Bryan Tompkins, US Fish and Wildlife Service Andrew Moore, NC Division of Water Resources Joey Lawler, S&ME