Loading...
HomeMy WebLinkAbout20080709 Ver 1_Other Agency Comments_20080722Permit Class ?. NEW STATE OF NORTH CAROLINA Permit Number 111-08 Department of Environment and Natural Resources and (" Coastal Resources Commission 1-`-=' 2 `Z. Zoo$ for ?SfOWNN ERBRpNC X Major Development in an Area of Environmental ContO?"an!o pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Avon Development, LLC, 5097 Bay Cr., Suffolk, VA 23435 Authorizing development in Dare County at adj. to a man-made canal off Mill Creek, at 40161-A N. End Rd., in Avon , as requested in the permittee's application dated 2/19/08, including the attached workplan drawing (1) dated revised 5/15/08 This permit, issued on July 18. 2008 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Docking Facility 1) Unless specifically altered:herein, this permit authorizes only the docking facility and uses located in or over the- water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non-water dependent uses of structures shall be conducted on, in or over public trust waters without permit modification. 2) Any portion of the permitted access pier and docking facilities built over coastal wetlands must not exceed six feet in width and must be elevated a minimum of three feet over the wetland substrate as measured from the bottom of the decking. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. .? James H. G gson, Director Division of Coastal Management This permit and its conditions are hereby accepted. December 31, 2011 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee Avon Development, LLC. ADDITIONAL CONDITIONS Permit # 113-08 Page 2 of 3 3) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 4) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 5) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee will not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 6) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 7) This permit authorizes a maximum of four additional formalized boat slips. Boat Ramp 8) The boat ramp shall either be poured .at an upland location and pushed into place once hardened, or poured entirely within a watertight containment structure. Live concrete shall not be allowed to contact waters of the State or waters that will enter waters of the State. 9) The dimensions of the gravel drive shall not exceed the limits shown on the attached workplan drawing. Stormwater Management 10) The Division of Water Quality approval of this project under stormwater management rules of the Environmental Management Commission is covered by way of Stormwater Permit No. SW7080417, which was issued on 6/7/08. Any violation of the permit approved by the DWQ will be considered a violation of this CAMA permit. General 11) No open water areas or vegetated wetlands shall be excavated or filled, outside the area indicated in the attached workplan drawing. 12) This permit shall not be not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. Avon Development, LLC. ADDITIONAL CONDITIONS Permit # 111-08 Page 3 of 3 NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any such activity for this determination. The permittee is further advised that many non-water dependent activities are not authorized within 30 feet of the normal high water level. NOTE: The N.C. Division of Water Quality has authorized the proposed project under General Water Quality Certification No. 3642 (DWQ Project No. 08-0709), which was issued on 6/6/08. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW-200801465) which was issued on 6/12/08. z 'I { m ' n t Z O t NC 12 ?c O € c > ' -I f p y ? r t ?0 ! l)k -u r z o ?-` to C , 0 \ Ion ! _o d°d 11=8 0 mmr`?a t ? z? b .. 00 Z 3 1 o C31 p. O ;K O t ! I < `S FOOD m Z t ! ! / m cn m O ! ! O O D O ! ! ma 0000 O r i' i t ! ! / 0?m'X rr9DZ m? t O ? X.AS g=?? mM, o 007 O ? ? u) -i:t7 C !! ! // r-u z7 = 0 -? m D l ! opZ.Xpm NN?Cn m` N N t !ti SSG) Z u ?%xx56 r D t !?/ nC)OLnm fnDmrn o? OC 12 a, 0 ? ;KTOo? oo o Cn z (n V Z !??! N Ow0 ?-0 (.n Dr c) N 105 w < /_•+ M Z o / / D t co 0 ' m r -u co I "O t ? Om ow ? j tj ?' m? w o r ARo z ! ow O z -q m (.0 o 0 pFRryf/ - - t m n -I - -4__ t ivy ?C J 1 W ?' cn 7 O ! 0 D t AGE ??, z TP y 0 7_ ' Cl) L r C BEELINE ? Wes'' , ?sq ANNA 8 CKyq?KygM .I' \ o k?yFv SYDNEY iWA``4cEL JA& F?L - • . ANAL 8 0 D O O -q W-4 mmm D ?m n n D M M 0 0 m > CO *? > m 0 ;u T D 0 G) m O? ium a-W Zi m m s i 8ON? _ -, < X 290 Z m DD?VI?g 1? r-,D=r-D m x8mmZm Do fj) 29 D ROTC) D = g°a,.?u- X?x"zx m HiTmx°D S I? Oo a G?OO? R > -TI W <O0WG) > O ? D ? ?O z m? C Cn m n Gj -a° /o w /r rr r r ? 1 ?C a fts-r is f a p -?? 22' mr ' a, PROPOSED 2111' Z o,DOCK (386 z ???.A Pip a m + 4" 02 m? ?tSTING I OOCK n ??E)c! GB LEgp r l