HomeMy WebLinkAbout20140090 Ver 3_Sediment Loss Site #3_20170125Wanucha, Dave
From:
Sent:
To:
Cc:
Subject:
Attachments:
Braquet, Stephanie
Wednesday, January 25, 2017 11:25 AM
Wanucha, Dave
Euliss, Amy
Beltway Site #3
beltway site 3jpg; beltway site 3 wingwalljpg
Attached are two pictures of the berm failure and sediment accumulation.
The site received over 2-inches of rain in already wet conditions. Approximately 5(5 gallon) buckets of sediment was loss. We
recommended the contractor go ahead and remove the sediment since it was located in a small space and easily removable. All
accumulated sediment will be removed. Going forward, it was suggested that the contractor utilize compaction equipment to
help with compaction of the soil.
If you have any further questions or need more information, please contact me.
Thanks
Stephanie Braquet
Division 9 Environmental Specialist
North Carolina Department of Transportation
336 747 7800 office
scbraquet(a�ncdot.qov
375 Silas Creek Parkway
Winston Salem, NC 27127-7167
a������ �������,��:s���������� �� ����� ������ ��`��,� ����:����,�,� �,� ,�������� �� ��`��
�V����� �°��������� ��.����� ��������,� ��W�r ����:� a���.� �� ���,����,���� �� �������� �s�����,�.
I!Irr�7ail �;urre,�l�ui�dc,i��:e, C�u ai�d ��ruir7 U•ii� �ci�dcr i� �ul����;�E� �C�u U•ic, I"J,�, I ul�li�; I'�Ee,�;ur;� I...aw ai�d rr�7ay I�c rll��:lu�crl �C�u �C�h•ih�rl I�artle,�,