HomeMy WebLinkAbout20170227 Ver 1_NWP 3 Verfication Email_20170220Carpenter,Kristi
From: Steenhuis, Joanne
Sent: Monday, February 20, 2017 9:38 AM
To: Carpenter,Kristi
Subject: FW: NWP 3 verification bridge 126 Columbus
Attachments: bridge 126 Columbus NWP 3-signed.pdf; impact summary sheet.pdf; MFT Form bridge 126-
signed.pdf; plans.pdf; signed PJD form.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
Hey Kristilynn,
Does this go in the no TIP # under bridges? I'm still trying to learn.
-----Original Message-----
From: Hair, Sarah E CIV CESAW CESAD (US) [mailto:Sarah.E.Hair@usace.army.mil]
Sent: Friday, February 17, 2017 11:36 AM
To: Rerko, James J <jjrerko@ncdot.gov>
Cc: Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov>
Subject: FW: NWP 3 verification bridge 126 Columbus
2nd attempt
-----Original Message-----
From: Hair, Sarah E CIV CESAW CESAD (US)
Sent: Friday, February 17, 2017 11:01 AM
To: 'Rerko, James J' <jjrerko@ncdot.gov>
Cc: 'Steenhuis, Joanne' <joanne.steenhuis@ncdenr.gov>
Subject: NWP 3 verification bridge 126 Columbus
Jim,
Attached please find the verification letter with special conditions, signed PJD, signed MRT Form, and plans for the
following project:
Corps Action ID: SAW-2017-00317
Project name: bridge 126
County: Columbus
Below is a link to our webpage for the NWP 3 with General and Regional Conditions:
http://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Permits/Nationwide-Permits/
This email serves as official notice; No paper copy will be mailed.
Thank you,
Liz Hair
Project Manager
USACE-Wilmington District
Wilmington Regulatory Field Office
69 Darlington Avenue
Wilmington, NC 28403
910-251-4049
Sarah.e.hair@usace.army.mil