Loading...
HomeMy WebLinkAbout20170227 Ver 1_NWP 3 Verfication Email_20170220Carpenter,Kristi From: Steenhuis, Joanne Sent: Monday, February 20, 2017 9:38 AM To: Carpenter,Kristi Subject: FW: NWP 3 verification bridge 126 Columbus Attachments: bridge 126 Columbus NWP 3-signed.pdf; impact summary sheet.pdf; MFT Form bridge 126- signed.pdf; plans.pdf; signed PJD form.pdf Follow Up Flag: Follow up Flag Status: Flagged Hey Kristilynn, Does this go in the no TIP # under bridges? I'm still trying to learn. -----Original Message----- From: Hair, Sarah E CIV CESAW CESAD (US) [mailto:Sarah.E.Hair@usace.army.mil] Sent: Friday, February 17, 2017 11:36 AM To: Rerko, James J <jjrerko@ncdot.gov> Cc: Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov> Subject: FW: NWP 3 verification bridge 126 Columbus 2nd attempt -----Original Message----- From: Hair, Sarah E CIV CESAW CESAD (US) Sent: Friday, February 17, 2017 11:01 AM To: 'Rerko, James J' <jjrerko@ncdot.gov> Cc: 'Steenhuis, Joanne' <joanne.steenhuis@ncdenr.gov> Subject: NWP 3 verification bridge 126 Columbus Jim, Attached please find the verification letter with special conditions, signed PJD, signed MRT Form, and plans for the following project: Corps Action ID: SAW-2017-00317 Project name: bridge 126 County: Columbus Below is a link to our webpage for the NWP 3 with General and Regional Conditions: http://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Permits/Nationwide-Permits/ This email serves as official notice; No paper copy will be mailed. Thank you, Liz Hair Project Manager USACE-Wilmington District Wilmington Regulatory Field Office 69 Darlington Avenue Wilmington, NC 28403 910-251-4049 Sarah.e.hair@usace.army.mil