HomeMy WebLinkAbout20080433 Ver 1_More Info Received_20080718WITHERS & RAVENEL ENGINEERS 1 PLANNERS I SURVEYORS 111 MacKenan Drive CARY, NORTH CAROLINA, 27511 (919) 469-3340 FAX (919) 467-6008 TO: NC-Division of Water Quality 2321 Crabtree Boulevard Raleigh, NC 27604 WE ARE SENDING YOU ? Shop Drawings ? Copy of Letter ® Attached via ? Prints ? Change order DATE 7118/08 JOB NO. 2061284.01 ATTENTION Cyndi Karolyn and Ian McMillan PHONE # RE: Bradford Courier U Plans ? Diskette _ the following items: ? Samples ? Specifications COPIES DATE NO. DESCRIPTION 5 Responses for Additional Information 5 DWQ Supplemental worksheets and Design details 5 Photos of the drainageway below BMP3 outfall JU THESE ARE TRANSMITTED as checked below: ? For approval ? Approved as submitted ? For your use ? Approved as noted ® As requested ? Returned for corrections ? For review and comment ? 5 t E:Vn - .N E i 1,A ND 6NFa i ER(?L,4u'r y S AN{7 ,C7pR,ti"N!TER L? 2RNGh: E] Resubmit copies for approval ? Submit copies for distribution ? Return corrected prints ? FOR BIDS DUE 20 ? PRINTS RETURNED AFTER LOAN TO US REMARKS: Received By: COPY TO: file SIGNED: Todd Preuninger if enclosures are not as noted, kindly notify us at once. WITHERS cN' RAVENEL ENGINEERS I PLANNERS I SURVEYORS July 18, 2008 NC-Division of Water Quality Attn: Ms. Cyndi Karoly and Mr. Ian McMillan, 2321 Crabtree Blvd. D Raleigh, North Carolina 27604 JUL Re: Request for Additional information - Bradford ps?w??sYORM,r?a1ERBRANLH W&R Project #: 2o61284 VIV DWQ Project #: o8-0433 Dear Ms. Karoly and Mr. McMillan, We received your request for additional information regarding the proposed impacts associated with the Bradford project. I have included a brief response to each of your requests below. Your letter asks for the following information: 1) As mentioned in the previous Request for More Information, the proposed BMPs must be designed to meet state requirements regardless of whether the stormwater review is being conducted by the Town or Cary or the DWQ. Please insure that the proposed BMPs include provisions for pretreatment, flowpath lengths, 3:1 side slopes and other required design elements listed in the DWQ BMP Manual. BMP #2 in particular must be reconfigured such that the inflows are combined into a single forebay that comprises approximately 20 percent of the surface area. Also, please redesign BMP #3 to meet state standards for wet detention ponds. As per your request, the BMP's have been re-designed to meet the required design elements listed in DWQ's BMP Manual. Copies of the revised stormwater plans and DWQ worksheets are included with the attachments. 2) Please label the level spreaders on the site plans and the Supplement Forms such that they can be easily identified and cross-referenced. The level spreaders and supplement forms have been labeled so that they can be identified and cross-referenced. 3) The filter strip for Level Spreader 1 is too steep on the upslope side. Please relocate this level spreader downslope where the filter strip is appropriate for diffuse flow. Level spreaders has been re-located to a more suitable location. iii MacKenan Drive i Cary, NC 27511 1 tel: 919.469.3340 1 fax: 919.467.6oo8 i www.withersravenel.com 7040 Wrightsville Avenue i Suite 1o1 i Wilmington, NC 28403 1 tel: 910.256.9277 1 fax: 910.256.2584 Brunswick Surveying 1 1027 Sabbath Home Rd, SW I Supply, NC 28462 1 tel: 910.842.9392 1 fax: 910.842.8019 • Page 2 July 18, 2008 4) Please show how diffuse flow requirements are being met at the outlet of BMP #3. If you choose to provide a level spreader, then you must submit a completed Level Spreader Supplement Form (with all required items) for each proposed level spreader. Due to the fact that the closest buffered stream is approximatelYg5o feet from the outlet of BMP3, we do not believe that a level spreader should be required. The discharge from this outlet will actually be less than the pre-development flows Additionally, before the stormwater enters the riparian buffers, it will flow through a relatively flat vegetated filter, and wetlands, further reducing velocity and providing nutrient/sediment removal. Photos and a topographic map of this drainageway are included with the attachments. Please feel free to call if you have questions or require additional information. We trust that this information will allow you to complete your review of this project. Sincerely, WITHERS & RAVENEL, INC. Todd Preuninger Senior Biologist Attachments: 1) DWQ Supplemental worksheets and design details 2) Photos of the drainageway below BMP3 outfall. ?OaOF W ATF?OMCM G f NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be completely filled out, printed and submitted. DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)! Project name Bradford Contact name Hunter Freeman Phone number 9191469-3340 Date June 19, 2008 Drainage area number 1 777 r : HBO to For Level Spreaders Receiving Flow From a BMP Type of BMP Wet Pond Drawdown flow from the BMP 0.37 cis For Level Spreaders Receiving Flow from the Drainage Area Drainage area Impervious surface area Percent impervious Rational C coefficient Peak flow from the 1 in/hr storm Time of concentration Rainfall intensity, 1 0-yr storm Peak flow from the 10-yr storm fe fe cfs min inthr cfs Do not complete this section of the worksheet. Do not complete this section of the worksheet. Do not complete this section of the worksheet. Do not complete this section of the worksheet. Do not complete this section of the worksheet. Do not complete this section of the worksheet. Do not complete this section of the worksheet. Do not complete this section of the worksheet. Do not complete this section of the worksheet. Where Does the Level Spreader Discharge ? To a grassed bioretention cell? To a mulched bioretention cell? To a wetland? To a filter strip or riparian buffer? Other (specify) Filter Strip or Riparian Buffer Characterization (if applicable) Width of grass Width of dense ground cover Width of wooded vegetation Total width Elevation at downslope base of level lip Elevation at top of bank of the receiving water Slope (from level lip to to top of bank) Are any draws present? Level Spreader Design Forebay surface area Feet of level lip needed per cfs Answer 'Y" to one of the following: Length based on the 1 inthr storm? Length based on the 10-yr storm? Length based on the BMP discharge rate? Design flow Is a bypass device provided? n (Y or N) n (Y or N) n (Y or N) y (Y or N) Complete filter strip characterization below. 71.00 ft 0.00 ft 40.00 ft 111.00 ft 328.00 fmsl 324.00 fmsl 3.60 % OK n (Y or N) OK 0.00 sq ft No forebay is needed. 32 fttcfs n (Y or N) n (Y or N) y (Y or N) 0.40 cfs y (Y or N) OK Form SW401-Level Spreader, Fifter Strip, Restored Riparian Buffer-Rev.4 Parts I. and II. Design Summary, page 1 of 2 Length of the level lip Are level spreaders in series? Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Dimensions of the channel (see diagram below): M B W y Peak velocity in the channel during the 10-yr storm Channel lining material 15.00 it Level spreader length OK. n (Y or N) (Y or N) (Y or N) ft it It cis ------------ M B ? M Form SW401-Level Spreader, Fifter Strip, Restored Riparian Buffer-Rev.4 Parts I. and II. Design Summary, page 2 of 2 111r, REQ IRED ITEM CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan InMals Sheet No. CZ-o 1. Plans (1" - 50' or larger) of the entire site showing: C&•p _? - Design at ultimate build-out, _ - Off-site drainage (if applicable), T1 APACT MAPS - Delineated drainage basins (include Rational C coefficient per basin), At - C t - Forebay (if applicable), - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROM, and - Boundaries of drainage easement. C -0- 3 2. Plan details (1" = 30' or larger) for the level spreader showing: Forebay (if applicable), - High flow bypass system, - One foot topo lines between the level lip and top of stream bank, - Proposed drainage easement, and - Design at ultimate build-out. Clo•D 3. Section view of the level spreader (1" = 20' or larger) showing: .9 Z_ - Underdrain system (if applicable), - Level lip, - Upslope channel, and - Downslope filter fabric. &*AeJ 4. A date-stamped photograph of the filter strip that clearly shows the type of vegetation that is present. Cla D 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire drainage area is stabilized. 6. The supporting calculations. 7. A copy of the signed and notarized operation and maintenance (0&M) agreement. TO 13b7 SI E? 8. A copy of the deed restrictions (if required). ONL 67 HoA /S FS-r-% ?sytA Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.4 Part III, page 1 of 1 _AWA 5 O?aF W a NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be completely filled out, printed and submitted. DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)I N' t . - Project name Bradford Contact name Hunter Freeman Phone number 919469-3340 Date June 19, 2008 Drainage area number 2 For Level Spreaders Receiving Flow From a BMP Type of BMP Wet Pond Drawdown flow from the BMP 0.42 cfs For Level Spreaders Receiving Flow from the Drainage Area Drainage area Impervious surface area Percent impervious Rational C coefficient Peak flow from the 1 in/hr storm Time of concentration Rainfall intensity, 10-yr storm Peak flow from the 10-yr storm Where Does the Level Spreader Discharge ? To a grassed bioretention cell? To a mulched bioretention cell? To a wetland? To a filter strip or riparian buffer? Other (specify) Filter Strip or Riparian Buffer Characterization (if applicable) Width of grass Width of dense ground cover Width of wooded vegetation Total width Elevation at downslope base of level lip Elevation at top of bank of the receiving water Slope (from level lip to to top of bank) Are any draws present? Level Spreader Design Forebay surface area Feet of level lip needed per cis Answer "Y" to one of the following: Length based on the 1 in/hr storm? Length based on the 10-yr storm? Length based on the BMP discharge rate? Design flow Is a bypass device provided? f? fe cfs min in/hr cfs Do not complete this section of the worksheet. Do not complete this section of the worksheet. Do not complete this section of the worksheet. Do not complete this section of the worksheet. Do not complete this section of the worksheet. Do not complete this section of the worksheet. Do not complete this section of the worksheet. Do not complete this section of the worksheet. Do not complete this section of the worksheet. n (Y or N) n (Y or N) n (Y or N) y (Y or N) Complete filter strip characterization below. 20.00 it 24.00 it 33.00 ft 77.00 ft 329.00 fmsl 327.00 fmsl 2.60 % OK n (Y or N) OK 50.00 sq ft No forebay is needed. 35 ft/cfs n (Y or N) n (Y or N) y (Y or N) 0.42 cis y (Y or N) OK Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.4 Parts I. and II. Design Summary, page 1 of 2 Length of the level lip Are level spreaders in series? Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Dimensions of the channel (see diagram below): M B W y Peak velocity in the channel during the 10-yr storm Channel lining material 15.00 ft n (Y or N) n (Y or N) y (Y or N) 4.00 ft 3.00 ft 15.00 ft 1.50 ft 35.00 cfs Riprap Level spreader length OK. ------------- .t M M B Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.4 Parts I. and II. Design Summary, page 2 of 2 UJ. RE4U ED ITEM, CHECKL,IST , Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. In' 'als A Pagel Plan Sheet No. CZ-0 1. Plans (1" - 50' or larger) of the entire site showing: CG D -C(n,3 - Design at ultimate build-out, - Off-site drainage (if applicable), MP?1" mA - Delineated drainage basins (include Rational C coefficient per basin), F b if li bl - ore ay ( app ca e), A) - al - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), and - Boundaries of drainage easement. Oil Y-L 3 2. Plan details (1" = 30' or larger) for the level spreader showing: - Forebay (if applicable), - High flow bypass system, - One foot topo lines between the level lip and top of stream bank, - Proposed drainage easement, and - Design at ultimate build-out. r!o 3 3. Section view of the level spreader (1" = 20' or larger) showing: AS - Underdrain system (if applicable), - Level lip, - Upslope channel, and - Downslope filter fabric. 4. A date-stamped photograph of the filter strip that clearly shows the type of vegetation that is present. 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire drainage area is stabilized. CID, 3 6. The supporting calculations. 7. A copy of the signed and notarized operation and maintenance (0&M) agreement. 7D $ E S/LIV Erg 8. A copy of the deed restrictions (if required). 15S7A6 LJSR6-,D ONGE f/0A /S Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.4 Part III, page 1 of 1 J1:y 7- . ^? s n I a LLJ cl? < Q w (f) O ,--I w y) w 00 w ? w N w O J J J J W J J J J } } 0 Q Q LL LL co LL I- H Q O D Z O O O O } ? O O a a a n. m m m m Q w w w w z Z w w w w w O o z z z z N N O O O O N U v of o' 0' cl? cl? C? Q d LL w w w w w L L > > LL LL ? LL m m D M O Z cc co m co u d Q Q Q Q m m a w Q LL H U) U Q a W J C0 Q Lu w Q ? w w D U-) H Un w Vi LL H U LL Q w O a ? U Q cy Q J a ~ ? w O a W F- L) d U p-w-cn ,n ??>Qwo 't 0Q- in LL U O U O Z Q Q O v w ?Q>?coCE rP co Q C ?V Q o LU -H UO Ld u) d U .} Z) O N = iwi = O LU U m > wwC Q G cl? ~ O O a > w 0 0 W Lw F- X_ z o O o a Q Z L a w U Q7 (n Z z C) w D ? U zO ? U Q O 0 - < 0 Q W Y cl? O O a O g > Q a J Q EL r > 0 0 I Y ? it u¢ i? °$rg N ?I °y, fl I i 't pad V En ID O N ^ Q LLP 01 4. N NN Q tD } ,. I N Q O 000 / ap0 WNN p0 z C'4 ar :) C) LLJ IX OioW IMU NQ 0: m rn CL 0 Ix r? :) O I I- U •.?.? U O W) I-- W C14 b a Z N ON a w a =) ?. o o d N ? \ \ m? " J w d W / a // t ZJ? ? (8?? - w -T izh , 7F;111( .? 7-7 ??? ? 1, ? ??/? `-• ??Nf ??, , ??y ?} 71? ? , ,P-c'?- .?+,rti.':? _ _ - ?fR 1? J ?d ? , tit 11 W? ,b? I{? L• 4 i_? v Afli t -.??, . r r ° (r ? I ?o Q ? I I?? Q I Z W X W W .. m N 8 1N ? N wa N Boa L, QL? U I' W d Z w J w W 0 ?Yi y i1 r f u{ 'I ?`? ,III 1{?? ° ? I6 i 0 p J - W o LLJ O J Q N Wei U H N ILU ° C) o II > ,c y _ ? Q U C r N ? W = Y U o =` N ° - ? / 1L ? _ W W I V v W 1t ? r '? ?t h 1 e K, { t l rn., ttt? RD" o Q? F. 1: U W Z- Z 0-7 r ~ V) VP?J . JN1SI 3AJUQ SIAV I E ' 0? a tX i I i1[ `I f?I I 1 1 ? 1 1 a 3 m X w Q L clL O m Q u t 71001.0 1W - M GOW'O MUSS *MP 'Ro9UMU -6+9.906190 - 1191493 JWdM4\906190\9ft11 13*dM\O"\M\-k +wd-lDY9Z 190\OYZI-YOWD??H EXISTING BOX CULVERT & I l RIPRAP DISSIPATOR II I I; IMPACT A4 II 399 SF-ZONE 2 I I''I `JLL IMrl1V 1 MAr h-L rVr% LLVLL SPREADER LOCATION) GRAPHIC SCALE x 10 0 25 50 100 E? O 1 inch = 50 ft. BRADFORD IMPACT MAP A-1 WITHERS & RAVENEL ENGINEERS 1 PLANNERS I SURVEYORS CARP WAKE COUNTY NORTH CAROLINA 1? 1? __ -1 1111 an Mi, 6" DIP FROM FLOW BYPASS STRUCTURE (SEE IMPACT MAP A-1 FOR FLOW BYPASS STRUCTURE LOCATION) SEE IMPACT MAP A-3 FOREBAY/LEVEL NOTE: FOREBAY TO BE INSTALLED AFTER COMPLETION OF GRADING AND RETAINING WALLS, AND AFTER CONVERSION OF BMP FROM EROSION CONTROL DEVICE TO WET POND. Ex SPREADER DETAIL GRAPHIC SCALE 50 0 25 50 100 1 inch = 50 ft. BRADFORD IMPACT MAP A-2 WITHERS &- RAVENEL ENGINEERS 1 PLANNERS I SURVEYORS NORTH NOTE: 6" DIP SHALL BE CAPPED UNTIL AFTER ENTRY FEATURE IS CONVERTED FROM EROSION CONTROL DEVICE TO WET POND /'0-RING' GASKE TED CLASS 111 RCP 42" DIAMETER FLOW FROM BMP 12 ---------- 'O-RING' GASKETED CLASS 111 RCP 24 DIAMETER FLOW FROM ENTRY FEATURE WEIR WALL SEE NOTE 'O-RING' GASKETED) CLASS Ill RCP 6" DIP TO 42" DIAMETER LEVEL SPREADER /2 FLOW FROM BMP IJt2 (SEE N07F) SPUTTER BOX (JB 431) PLAN VIEW (FLOW BYPASS STRUCTURE) NTS PIPE FROM BYPASS STRUCTURE 3 SPUTTER BOX (JB 431) SECTION (FLOW BYPASS STRUCTURE) NTS 'O-RING' GASKETED CLASS 111 RCP 42" DIAMETER TO STREAM 24" CURB & GUTTER (3,000 PSI MIN COMPRESSIVE STRENGTH) 0.00% SLOPE ON TOP OF GUTTER (FLAT SLOPE) SEE PLAN FOR LEVEL SPREADER LENGTH LEVEL SPREADER LIP ELEVATION= 4"-6" HIGHER EXISTING SLOPE ON DOWNSTREAM SIDE DIFFUSED FLOW THROUGH BUFFER 3'-0" INSTALL CLASS B RIP RAP FROM OUTLET TO BOTTOM OF FOREBAY 18" MIN DEPTH, 3' WIDE WITH GEOTEXTILE LINER 54" I.D. JUNCTION BOX 'O-RING' GASKETED CLASS III RCP 24" DIAMETER FLOW FROM ENTRY FEATURE r 6" DIP TO LEVEL SPREADER (SEE NOTE) WEIR WALL (8" WIDTH) 12 'O-RING' GASKETED CLASS III RCP 42" DIAMETER TO STREAM .. n • . - n NOTE: FOREBAY TO BE INSTALLED AFTER COMPLETION OF GRADING & RETAINING WALLS AND AFTER CONVERSION OF BMP FROM EROSION CONTROL DEVICE TO WET POND. L-#57 WASHED STONE - COMPACTED COMPACDE 4" THICK (MIN) PERMAMENT GEOTEXTILE UNDERLINER NOTE: FOREBAY NOT REQUIRED DUE TO LOW FLOW FROM DRAWDOWN ORIFICE TYPICAL FOREBAYILEVEL SPREADER DETAIL NTS BRADFORD IMPACT MAP A-3 WITHERS &- RAVENEL ENGINEERS 1 PLANNERS I SURVEYORS IMPACT B l 723 SF-ZONE 0 NOTE: FOREBAY TO BE INSTALLED AFTER SEE IMPACT MAP B-2 FOREBAY/LEVEL COMPLETION OF GRADING AND RETAINING SPREADER DETAIL WALLS, AND AFTER CONVERSION OF BMP FROM EROSION CONTROL DEVICE TO WET POND. GRAPHIC SCALE x 50 o 25 50 100 O 1 inch = 50 ft. Z BRADFORD IMPACT MAP B-1 WITHERS &- RAVENEL ENGINEERS I PLANNERS 1 SURVEYORS NORTH CAROLINA (> \ ?tip?e( ?94,FIJ \ SANITARY SEWER ss \` EASEMENT \`\ \ s \ \ `,\ ss \?_\\ LINEAR\ TEMPORARY IMPACT C 1=-;- WETLAND 77 SF-WETLAND EPHEMERAL STREAM SS\ (NON-JURISDICTIONAL) SS US ARMY CORPS OF ENGINEERS \SS JURISDICTIONAL DETERMINATION SAW-2006-32870-292 \ 0 R sS \ \ SS. WETLAND US ARMY CORPS OF ENGINEERS JURISDICTIONAL DETERMINATION SAW-2006-32870-292 AREA: 0.025 ACRES (1087 SF) GRAPHIC SCALE 50 0 25 50 100 1 inch = 50 ft. BRADFORD NORTH CAROLINA IMPACT MAP C-1 H O Z WITHERS & RAVENEL ENGINEERS 1 PLANNERS I SURVEYORS I L Or r' r1 L I ITTr' L 1T 1'+T Pfr AL• 0? W A7- RQ Michael F. Easley, Governor y William G. Ross Jr., Secretary ?- North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality June 16, 2008 DWQ Project # 08-0433 Wake County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Mr. Jeff Furman Crosland, LLC 4000 Westchase Boulevard, Suite 390 Raleigh, NC 27607 Subject Property: Bradford Ut to Turkey Creek [030402, 27-33-2, C, NSW] REQUEST FOR MORE INFORMATION Dear Sir or Madam: On May 9, 2008, the Division of Water Quality (DWQ) received your revised application dated May 9, 2008, to fill or otherwise impact 0.001 acres of 404/wetland and 1,914 square feet of Zone 1 Neuse River basin protected riparian buffers, and 4,141 square feet of Zone 2 Neuse River basin protected riparian buffers to construct the proposed residential development. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the additional information requested below, we will place this project on hold as incomplete until we receive this additional information. If we do not receive the requested information, your project will be formally returned as incomplete. Please provide the following information so that we may continue to review your project. Additional Information Requested: As mentioned in the previous Request for More Information, the proposed BMPs must be designed to meet state requirements regardless of whether the stormwater review is being conducted by the Town or Cary or the DWQ. Please insure that the proposed BMPs include provisions for pretreatment, flowpath lengths, 3:1 side slopes and other required design elements listed in the DWQ BMP Manual. BMP #2 in particular must be reconfigured such that the inflows are combined into a single forebay that comprises approximately 20 percent of the surface area. Also, please redesign BMP #3 to meet state standards for wet detention ponds. 2. Please label the level spreaders on the site plans and the Supplement Forms such that they can be easily identified and cross-referenced. 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-6893 / Internet: httph2venr ?tatc nc u? ncw?tlands NorthCarolina 'Yatrrrallry An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper e Crosland, LLC Page 2 of 2 June 16, 2008 3. The filter strip for Level Spreader 1 is too steep on the upslope side. Please relocate this level spreader downslope where the filter strip is appropriate for diffuse flow. 4. Please show how diffuse flow requirements are being met at the outlet of BMP #3. If you choose to provide a level spreader, then you must submit a completed Level Spreader Supplement Form (with all required items) for each proposed level spreader. Please submit this information within 30 calendar days of the date of this letter. If we do not receive this requested information within 30 calendar days of the date of this letter, your project will be withdrawn and you will need to reapply with a new application and a new fee. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733-1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sincerely, Cyndi Karoly, Supervisor 401 Oversight/Express Review Permitting Unit CBK/ijm cc: Lauren Witherspoon, DWQ Raleigh Regional Office USACE Raleigh Regulatory Field Office File Copy Central Files Todd Preuninger, Withers & Ravenel, 111 MacKenan Drive, Cary, NC 27511 Filename: 080433Bradford(Wake)0n_Ho1d2