HomeMy WebLinkAbout20170197 Ver 1_B-5330 Final buffer permit drawings_20170216�
�
�
See Sheet 9A For Index of Sheets
See Sheet 9B For Conventlonol Symbols
����� �� ������ �������d��
������'�.� ��� ������.,�'���
FRA11tl�LI1� C� U1�TY
LOCATION: BRIDGE 1110.107 OVER DEVIL CRADLE CREEK
0111 SR 1413 (S UTTON RD. )
TYPE OF WORK: GRADING, DRAINAGE, PAVI11lG, A11tD STRUCTURE
BEGIN TlP PROJECT B-5330
—l— Pl1T CTd //�Fl1M
—L—
SR /4/3 (SUTTON RDJ
TO US HWY 40/
BEGIN BRIDGE
—L— POT STA15+04A0
CLEARING ON THIS PROJECT SHALL BE TO LIMITS ESTABLISHED USING METHOD III.
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
�
\ END BRIDGE
�,-� ��;,��— POT ST
.� �
i" *`.' .'_�. .
/ : .�_.� _ _ ..
�
�P�O ,�op
�L � �P
O0
�P
�i`�v�h'?�OJECT B-53
� s .yr�'�( f�.`L�'f�.�
� � ��l
��
�� �
BUFFER DRAWING
SHEET OF
r� SR �4�2 rPETE SMiTy Ro
i �,
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Prepared an tae o�,�e5 of� �nnauLres E�vcINEEx
50 25 0 50 100 LENGTH ROADWAY TIP PROJECT B-5330 = 0.144 mi. �� E�' V f� � T � ,,'�' "�� ���p
ADT = 260 , � � �� E<�� ECOLOGICAL �� �
V= 60 MPH LENGTH STRUCTURES TIP PROJECT B-5330 = O.OU mi. �,s3e�";;• ' �•����_� ENCINEERING ��� �°���
a
PLANS TOTAL LENGTH TIP PROJECT B-5330 = 0.161 mi. zot2 sra.vo,axo srEcrFrcnrroxs :ID �
CLASS = RURAL Y.t.
LOCAL RIGHT OF WAY DATE: ANDY YOUNG. PE SlGNATURE: � �
50 25 0 50 100 � �
SUBREGIONAL TIER SEPTEMBER 23, 2016 rao�Ecr exciNSEa ROADWAY DESIGN ENGINEER �� �
PROFILE (HORIZONTAL) RlGHT OF WAY MICHAEL BURNS, EI ��.��. ��.��
COMPLETE: PROJECT DES7GN ENGINEER �yg p�����
10 5 0 10 20
LETTING DATE: LISA GILCHRIST, EI
NCDOT CONTACT �,E
PROFILE (VERTICAL) JUNE 9.2017 sicxnruxs:
N
0
B5330-3
Pi sta n+�.e�
0 = //' 29' 02.7' lRT1
D = 3' 49' //.0"
L = 300.65'
T = 150.83'
R = 1.500A0'
Runoff = l00'
SB = 4%
DETAIL 1
TOE PROTECTION
, No� �o ��a�e�
O�
uanl �'�p,�`F"0. sLovE
�RouNo d F
GEaTE%iilE
d=2 Ft.
Type of Liner= Cloxs I Rip-Rop
FROM STA. 14+00 TO STA. 14+50 -L- RT
���,:.� . , . .
���
DETAIL 2
BANK STABILIZATION
�Hoi�o s�aie�
3.0'min.
s.o
NWS
I.5:1 OR FLAiTER 4
GEOiEXTILE
Type of Liner= CLA55 II RIPRAP
STA 15+62 -L- �EAST BANK)
� �UE�
LT & RT �
P E PUE PUE
Q-- PUE PUE
_// �5
---- ------ 2'FDPS
BEGIN TlP PROJECT 8-5330
—L— POC STAIlt50.U0
----------�'rur� ---
SITE 1,2,3,4
�
O
°��- � �- CLA55 II RIP RAI
(STR PAY ITEM)
BANK STABILIZATION
SEE DETAIL 2 �
EST 25 TON
E5T 55 SY
CLASS II RIP RA
(STR PAY ITEM)
sire i � N
TOE PROTECTION —� / ' Y X X
SEE DETAIL 1 �:' E
CLASS I RIP RAP ��� ,y ti
EST 50 TON -��� / / �
EST 80 SY GEOTEXTILE l-' �W� �� 4
REMOVE �- � /�
SITE 3 / ., /�
/ :
/
�S/� �
O / 5�/
�'�
�
��
\
\
\
O
/
PROIECT REFERENCE NO. SHEET NO.
BUFFER DRAWING B-5330 4
ROADWAY DESIGN HYDRAULICS
SH E ET O F ENGINEER ENGINEER
/;
�'�,:
CLA55 B RIP RAP
EST 1 TON Y�-y-�.
� EST 5 SY GEOTEXTILE �'}" +y .y� y"-y- �
N��� ������ ��
�a�� �� �'y �y'L � ���
�� �� �� � ���
�� � ���1
PUE — \��, �' � PU
� �s wre�eows R E � PUE � � �
� --------- � a�
� LT 2
i o —�---� R o°
W A r FOP,S� ��
�
-- R ----- — ----zF�� � a ��
�
_ __ �
/ 'E 15" W/ELBOWS /NC.= � �'
/� N 2 , O
(lYP.J � �v � C= �
� / p ?YP.I
y,'� /y .��,—�i e._ CL455 B 21P RAP
�. �� �y � '1��� . EST 1 TON �..
� � �. �'�'�'Y .y�� EST 5 SY GEOtEXTILE
�
� � ��
/�.a�M — �—� �... — .
SITE 4
TBM 2 ELEVATION = 266.51
N 891467 E 2221057
L STATION 15+83.00 257' RIGHT
NAIL SET IN 8' SWEET GUM TREE
BRUSH
1� �
�
�90 ` �v� ,�,i: i ���-,' �ENO�NOGI�CNL
�� DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
��� 50' 0' 100'
S
�O
lJ
sca�E
25' 0' 50'
WSET SCALE
Q ALLOWABLE IMPACTS ZONE 1
N
� ALLOWABLE IMPACT$ ZONE 2
E
TBM I ELEVATION = 280.25
N 891343 E 2221628
L STATION 10+00.00
5 53"21'17.52" E Dlst 1121'
NAIL SET IN 28" OAK TREE
B5330-2
NOTE: THE CONTRACTOR MUST
COMPLETELY REMOVE ALL EXISTING
AND OLDER BRIDGE COMPONENTS.
THE REMOVAL OF THE BULKHEAD
MUST BE DONE USING APPROVED
NCDOT BMP METHODS. THE PLACEMENT
OF THE IMPERVIOUS DIKE IS
CONSIDERED INCIDENTAL TO REMOVAL
OF THE EXISTING BULKHEAD AND
INSTALLATION OF THE BANK
STABILIZATION.
FOR —L— PROFILE,SEE SHEET 5
FOR STRUGTURE PUW5.5££ SHEETS 5—ITHRU 5-18
BUFFER IMPACTS SUMMARY
IMPACT BUFFER
TYPE ALLOWABLE MITIGABLE REPLACEMENT
STRUCTURE SIZE / ROAD PARALLEL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2
SITE NO. TYPE STATION (FROM/TO) CROSSING BRIDGE IMPACT (ftZ) (ftZ) (ftZ) (ftZ) (ft2) (ft2) (ftZ) (ftZ)
1 1 90'; 33" BOX BEAM 14+80 TO 15+40 -L- LT X 1444.7 723.8
2 1 90 ; 33" BOX BEAM 15+63 TO 16+28 -L- LT X 1363.8 648.1
3 1 90 ; 33" BOX BEAM 14+47 TO 15+28 -L- RT X 1878.6 804.9
4 1 90'; 33" BOX BEAM 15+57 TO 16+16 -L- RT X 1248.3 623.7
TOTAL: 5935.4 2800.5 0.0 0.0 0.0 0.0