Loading...
HomeMy WebLinkAbout20170083 Ver 1_Approval Letter_20170208j.9. Water Resources Environmental Quality February 8, 2017 Joseph and Dixie Mazur 171 Summer Lane Mill Spring, NC 28756 ROY COOPER GO ... u I MICHAEL S. REGAN 5'etoel"y S. JAY ZIMMERMAN Dbector D W R # 17-0083 Polk County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS 171 Summer Lane Shoreline Stabilization Dear Mr. and Mrs. Mazur: You have our approval for the impacts listed below for the purpose described in your application dated January 17, 2017, and received by the Division of Water Resources (Division) on January 20, 2017. These impacts are covered by the attached Water Quality General Certification Number 3898 and the additional conditions listed below. This certification is associated with the use of General Permit Number 30 issued by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, Water Supply Watershed, and Trout Buffer regulations. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. [15A NCAC 02H .0506(6) and/or (c)] ^.Nothing Gornpaim:-..a.. Stat, of Ncatll Caml'ma I Eavn...rwl Quality I Water Res,ur,ee 2090 U.S. Hi,i,,, 70, S.au,,oa, Nonh Ca.una 38778 838-396-4500 Mazur -171 Summer Lane DWR# 17-0083 401 Approval Page 2 of 3 Type of Impact Amount Approved Permanent Open Waters Above Pool Below Pool 0.0069 acres 0.0069 acres This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification/Authorization. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification (s) and is responsible for complying with all conditions. [15A NCAC 02H .0507(d)(2)] 3. All banks shall be laid back to at least a 2:1 (length : height) slope and riprap applied at the water/land interface. Riprap shall be placed as a linear protective measure upon the regraded slopes. Stone used in stabilization shall be of a size and density sufficient to prevent movement by wave or current action or stream flow and shall consist of clean rock or masonry material free of debris or toxic pollutants. The riprap shall be installed over a toed in filter fabric to prevent soil erosion behind the stabilized area. This authorization shall in no way be construed as allowing the installation of a bulkhead or seawall. [15A NCAC 02H .0507(c)) This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] This Certification can be contested as provided in Articles 3 and 4 of General Statute 1508 by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between B:OOam and S:OOpm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Mazur -171 Summer Lane D W RH 17-0083 401 Approval Page 3 of 3 If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DENR: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review by the Division under section 401 of the Clean Water Act as described in 15A NCAC 02H .0500. Please contact Andrew Moore at 828-296-4684 or Andrew.W.Moore@ncdenr.gov if you have any questions or concerns. Sincerely, Zan Price, P.E., Assistant Regional Supervisor Water Quality Regional Operations Asheville Regional Office Enclosures: GC 3898 - Certificate of Completion cc: David Brown — USACE Asheville Regulatory Field Office (via email) Andrea Leslie —NCWRC (via email) Stan Aiken — DEMLR (via email) Cathy Ruth — Polk County Planning (via email) DWR ARO 401 files DWR 401 and Buffer Permitting Unit (via email) G:\WR\WQ\Polk\4015\Nan-DOT\Mazur 171 Summer WneWRVL.Mazur171SummerL ne.2-8-17.docx Water Quality Certification No. 3898 'star Quality Certification Number 3898 Is issued in conformity, with the requirements of Section 11Public Laws 92-500 and 96-217 of the United States and subject to the North Carolina vision of Water Quality Regulations in 15A NCAC 02H 0600and 15A NCAC 02B .0200 for the :charge of fill material to waters and wetland areas as described in the Wilmington District's agional (General) Permit Number 198200030 and Regional Permit Number 198200079 and for Riparian Area Protection Rules (Buffer Rules) in 16A NCAC 02B .0200. The State of North Carolina certifies that the specified category of activity will not violate applicable portions of $actions 301, 902, 903 306 and 307 of the Public Laws92-500and 96-217 If conducted in accordance withthe conditions hereinafter set forth. Activities meeting any one (1) of the following thresholdsor circumstances require written approval for a 401 Water Quality Certification from the Division of Water Quality (the "Division'tt a) Activities that result in fill, dredging or excavation' of waters or wetlands below the normal high water level: or - b) Any impact associated with a Notice of Violation or an enforcement action for violation(s) of.DWQ Wetland Rules (15A NCAC 02H.0500), Isolated Weiland Rules (15A NCAC 02H .1300), DWQ Surface Water or Wetland Standards, or Riparian Buffer Rules ('15A NCAC 028..0200); or e). Any impacts to streams and/or buffers in the Neuse,.. Tar -Pamlico, or Catawba River Basins oral the Randleman, Jordan or Goose Creek Watersheds (or any other basin or watershed with Riparian Area ProtaoBon Rules [Buffer Rules) in effect at time of application) unless the activities are listed as "EXEMPT" from these rules or a Buffer Authorization Certificate is issued through N.C.Division of Coastal :Management (DCM) delegation for"ALLOWABLE" activities. In accordance with North Oarokre General Statute 143-2153.13(e), wnften apodyal for s 401 —` --- Water Quality General. Certification must includethe appropriate fee If a project also requires. a CAMA Permit, then one payment to both agencies shall be submitted and will be the higher of the two fees. Activities included In. this General Certification that do not meat one of the thresholds. listed abovedo not require written approval from the Division as long as they comply with the Conditions of Certification listed below. If any of these Conditions cannot be met, then written approval from the Division Is required. Conditions of Certification: 1. No Impacts Beyond those Authorized in the Written Approval or Beyond the Threshold of Use of this Certification No waste, spoil, solids, orflll of kind shall occur in wetlands, waters, or riparian areas beyond the footprint of theimpacts depleted in the pre -Construction Notification, as authorized In the written approval from the Division or beyond the thresholds established for Use of this Certification without written authorization Including incidental impacts.: All construction activities, including the design, Installation, operation, andmaintenance of sediment and erosion control Best Management Practices shall be performed so that no violations of state water quality standards, statutes or rules occur, .Approved plans and Water Quality Certification No. 3898 Water Quality Certification No. 3898 specifications for this project are incorporated by reference and are enforceable parts of this permit. 2, Standard Erosion and Sediment Control Practices Erosion and sediment Control practices must be In full compliance with all specifications. governing the proper design, installation and operation and: maintenance ofsuch Beat Management Practices and if applicable comply with the specific conditions and requirements of the NPOES Construction Stormwater Permit issued to thesite: a, Design, Installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal or exceed the requirements specified In the most recent version of the North Carolina Sediment and Erosion Control Manual, The devices shall be maintained on all construction sites, borrow sites, and waste pile(spoil) projects, -including contractor -owned or leased borrow pits associated With the project. b.. Por borrow pit sites the erosion and sediment control measures must be designed, installed, operated and maintained In accordance with the most recent version of the North Carolina Surface Mining Manual e. Reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act and the Mining Act of 1971,. d, Sufficient materials required for stabilizationand/or repair of erosion control measures and stormwater routing. and treatment shall he on site star times. e. If the project occurs in waters or watersheds classified as: Primary Nursery Areas (PNAs), SA WS -1. WS -11, High Quality (HOW), or Outstanding Resource (ORW) waters,then the sedimentation and erosion control designs must comply with the requirements set forth in 15A NCAC 04B .0124; Design Standards in Sensitive Watersheds. 3, No Sediment and Erosion Control Measures in Wetlands or Waters unavoidable, then design and placement of is conducted in manner that may result in qts -i adjacent to or upstream and downstream of it control devices shall be removed and the hat( date that the Division of Land Resources (01-1 the specific areawithin the project. 4. Construction Stormwater Permit NCGO10000 or more and Aa 1 wetlands and waters is )nholmeasuresshall not be ends, stream beds, or banks, i All sediment and erosion within two (2)months of the ted program has. released. for construction projects that disturb water to be dischamed durinc land record keeping Water Quality Certification No. 3898 2. Water Quality Certification No. 3898 The North Carolina Department of Transportation (NCOOT)shall be required to be in full compliance with the conditions related to construction activities within the most recent version of their individual NPDES (NOS000250) stormwater permit, 5. Construction Moratoriums and Coordination if activities. must occur during periods of high biological activity (Le. sea turtle nesting, fish spawning, or bird nesting), then biological monitoring may be required atthe request of other state or federal agencies and coordinated with these activities. - All moratoriums on construction activities established. by the NO Wildlife. Resources Commission (WRC) US Fish and Wildlife Service (USFWS), NC Division of Marine Fisheries (DMI', or National Marine Fisheries Service (NMFS) to lessen impacts on trout, anadromous fish, (arval/post-larval fishes and crustaceans, or other aquatic species of concern shall be implemented Exceptions to this condition require written approval by the resource agency responsible for the given moratorium.. Work Within the. twenty-five (25) designated trout counties or Identified state or federal endangered or threatened species habitat shall be coordinated with the appropriate WRC, USFWS NMFS,„and/or DMIF personnel, B. Work In the Dry All work inor adjacent to stream waters shall be conducted sothat the flowingstream: does not come in contact with the disturbed area Approved bestmanagement practices from the most current version of the NO sediment and Erosion Control Manual; or the NO DOT Construction and Maintenance Activities Manual such as sandbags, rock berms, cofferdams, and other diversion structures shall be used to minimize excavation in: flowing water. Exceptions to this conditionrequire application submittal to and written approval by the Division. 7. Riparian Area. Protection(Huffer) Rules or other basin or watershed withbuffer rules) shall be ,tructed in accordance with 15A NCAO 028 ,0233, :. .0243 0250, .0267 and .0005, and shall be located, designed, constructed,. and maintained to have minimaldisturbance to protect water quality to the maximum extent practicable through the use of best management practices.. All buffer rule requirements, including. diffuse flow requirements, must be met. 8. If concrete is: used during the construction, then all necessary measures shall be taken to prevent direct contactbetween uncured or curing concrete and waters of the state. Wafer that Inadvertently contacts uncured concrete shall not be discharged to waters of the state due to the potential for elevated pH and possible aquatic life( fish kills. 9. Rip -rep shallbe installed waterward of bulkheads. installed in freshwater lakes to ensure protection of aquatic habitat. Construction over wetlands shall be elevated at least three (3) feet above any wetlands; and floating structures shall not rest periodically on the bottom. 10. Piersand boat houses shall be constructed to provide for storage and removal of sewage rather than allowing raw waste or other sewage to be disposed directly Into surface waters, it. Deed notifications or similar mechanisms shell be placed on all retained Jurisdictional wetlands, waters,: and protective buffers within the project boundaries In order to assure Water Duality Certification No. 3898 Water Quality Certification No. 3898 compliance for future wetland, water, and buffer impact These mechanismsshall be put in placeat the time of recording of the property or of Individual lots Whichever is appropriate, A sample deed notification can be downloaded from the 401/Wetlands Unit web site at htto:f1portal.ncdenrora/weblwalswplws/401/certsand]5ermits/apply/foTms. The text of the sample deed notification may be modified asappropriate tosuit to a --Pacific Project Documentationof deed notifications shall be provided to the Division upon request. 12. If an environmental document is required under the National or State Environmental Policy Act (NEPA or SEPA) then this General Certification Is not valid until a Finding of No Significant Impact (FONSI) or Record of Decision (ROD) Is issued by the State Clearinghouse. 13, In the twenty (20) coastal counties, the appropriate. DWQ Regional Office must be contacted to determine if Coastal Stormwater Regulations will be required. 14. This General Certification does not relieve the applicant of the responsibility to obtain all other required Federal, State, or Local approvals, 15. The appllcanUpermiltee and their authorized agents shall conduct all activities In a manner consistent with. State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal Law. If the Divisiondetermines that such standards or laws are not being met Including failure to sustain adesignated or achieved use, or that State or Federal law is being violated, or that further conditions are necessary to assure compliance, then the Division may reevaluate and modify this General Water Quality Certification, 16, When written authorization isrequired for use of this certification, upon completion of all permitted impacts included within the approval and any subsequent modifications, the applicant shall be required to return the certificate of completion attached to the approval. One copy of the certificate shall be sent to the DWQ Central Office in Raleigh at 1650 Mail Service Center; Raleigh NC, 27699-1660. 17 Additional site-specific conditions, Including monitoring and/or modeling requirements, may 18. This certification grants permission to the director an authorized representative of the. Director, or DENR staff, upon the presentation. of proper credentials to enter the property during normal business hours.. This General Certification shallexpire on the same day asthe expiration date of the corresponding Nationwide and/or Regional Generat Permit, The conditions in effect on the date of issuance of Certification for a specific project shall remain in effect for the Ida of the project, regardless of the expiration date of this Certification, Non-compliance with or violation of the conditions herein set forth by a specific project may result in revocation of this General Certificationfor the project and may also result in criminal and/or civii penalties. The Director of the North Carolina Division of Water Quality may require submission of formal application for individual Certification for any project In this category of activity if itis determined that the project is likely to have a significant adverseeffect upon water quality, :including state or federally listed endangered or threatened aquatic species, or degrade the waters so that existing uses of the wetland or downstream waters are precluded, Water Quality Certification No, 3898 4 Water Quality Certification No. 3898 Public hearings maybe held for specific applications or group of applications prior to a Certification decision if deemed in the public's best interest by the Director of the North Caroline Division of Water Quality, Effective date: March 19, 2012 DIVISION OF WATER QUALITY By Charles Wakild, P. E. Director History Note: Water Quality Certification Number 3808 issued March 19, 2012 replaces WQC Number 3693 issued November 1, 2007, WQC Number 3039 issued March 19, 2007; WQC Number 3492 issued December 31, 2004, and WQC Number 3373 issued March 18, 2002 This:. General Certification is rescinded when the Corps of Engineers reauthorizes any of the corresponding Nationwide and/or Regional General Permits or when deemed appropriate by the Director of the Division of Water Quality. Water Quality Certification No. 3898 5 Water Resources P,vimnmmaWl Quality WR Project No.: Applicant: Project Name: Date of Issuance of 401 Water County: Certificate of Completion ROY COOPER Gonrmo, MICHAEL S. REGAN Secretary S. JAY ZIMMERMAN Oirartm Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 and Buffer Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be reamed to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date Agent's Certification 1, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date If this project was designed by a Certified Professional I, , as a duly registered Professional _ (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due cue and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No. ..�Nothing Compares...;,_ slave or Naa Carolina I PvviNanental Qnalty I wastR 8B araas 209011S. Highway 70, Swnnnaina, North Camliiu 28778 828-2964500